SLBE 318729 Comprehensive Facility Rehabilitation
Solicitation number
140P2024R0048
Issued by

About this file

This document is a Small Business Participation Proposal that is required to be submitted as part of an offer for the federal contract opportunity SLBE 318729 Comprehensive Facility Rehabilitation on Manitou Islands.

The proposal requires the offeror, whether a large or small business, to indicate the percentage of work they plan to subcontract to small businesses, including specific categories of small businesses such as small disadvantaged, woman-owned, HUBZone, veteran-owned, and service-disabled veteran-owned. The offeror must also list the principal supplies and services to be provided by the small business subcontractors and describe the extent of their commitment to using small businesses. Other than small business offerors are also required to submit a separate Small Business Subcontracting Plan meeting the FAR 52.219-9 requirements. The proposal is to be submitted as part of the offer for the Department of the Interior, National Park Service's solicitation 140P2024R0048 for the Comprehensive Facility Rehabilitation project on the Manitou Islands.

View the file

Other files

File Type Posted
Amend_07_Attachment_0007.pdf PDF
Sol_140P2024R0048_Amd_0007.pdf PDF
2011_South_Manitou_Island_Geotechnical_Report_0006.pdf PDF
Sheet_CT3_5_-_Abutment_and_Mooring_Details_0006.pdf PDF
Section_33_11_13_-_Water_Supply_Well_0006.pdf PDF
Section_31_62_16_-_Steel_Piling_Marine_0006.pdf PDF
Section_01_33_23B_-_Submittal_List_0006.pdf PDF
1984_Engineering_Survey___Design_Study_-_Manitou_Islands_0006.pdf PDF
2024_08_29_SLBE_318729_Amendment_006_Q_A_0006.pdf PDF
Section_01_11_00_-_Summary_Of_Work_0006.pdf PDF
1985_Sleeping_Bear_Prelim_Design_Rpt_N_Manitou_Dock_0006.pdf PDF
Sol_140P2024R0048_Amd_0006.pdf PDF
Sol_140P2024R0048_Amd_0005.pdf PDF
Amend_05_Attachment_0005.pdf PDF
Amend_04_Attachment_0004.pdf PDF
Sol_140P2024R0048_Amd_0004.pdf PDF
Sol_140P2024R0048_Amd_0003.pdf PDF
Amend_03_140P2024R0048_Attachment_0003.pdf PDF
Sol_140P2024R0048_Amd_0002.pdf PDF
B11_Industry_Day_Sign_In_0002.pdf PDF
B11_Pre-Bid_Sign_In_0002.pdf PDF
B09_Amend_1_Attachment_11_SLBE_318729_-_Contract_Price_Schedule_-_BLANK_0001.xlsx XLSX spreadsheet
B09_Amend_1_Attachment_3_SLBE_318729_-_FINAL_DWG_CDs_Part_1_(reduced)_0001.pdf PDF
Sol_140P2024R0048_Amd_0001.pdf PDF
B09_Amend_1_Attachment_1_SLBE_318729_-_Project_Manual_Part_1_of_2(reduced)__0001.pdf PDF
B08_140P2024R0048_SLBE_318729_Solicitation_Package.pdf PDF
B08_Attachment_11_SLBE_318729_-_Contract_Price_Schedule_-_BLANK_-_FINAL_CDs.xlsx XLSX spreadsheet
B08_Attachment_2_SLBE_318729_-_Project_Manual_Part_2_(reduced).pdf PDF
Sol_140P2024R0048.pdf PDF
B08_Attachment_6_Past_Performance_Questionnaire.docx DOCX document
B08_Attachment_5_Project_Experience_Questionnaire.docx DOCX document
B08_Attachment_3_SLBE_318729_-_FINAL_DWG_CDs_Part_1_(reduced).pdf PDF
B08_Attachment_7_General_References.docx DOCX document
B08_Attachment_4_SLBE_318729_-_FINAL_DWG_CDs_Part_2_(reduced).pdf PDF
B08_Attachment_1_SLBE_318729_-_Project_Manual_Part_1_of_2(reduced)_.pdf PDF
B08_Attachment_9_Subcontracting_Plan_Form.docx DOCX document
B08_Attachment_10_Wage_Determinations.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SMALL BUSINESS PARTICIPATION DOCUMENT

All Offerors (both large and small businesses) are required to complete a Small Business Participation Proposal. Offerors should propose the level of participation of small businesses (as a small business prime and/or small business subcontractors) in the performance of the acquisition relative to the objectives/goals set forth in the evaluation of this area.

1. Check the applicable size and categories for the PRIME offeror only -- Check all applicable boxes:

{ } Large Prime { } Small Business Prime; also categorized as a { } Small Disadvantaged Business (SDB) { } Woman-Owned Small Business (WOSB) { } Historically Underutilized Zone (HUB Zone) Small Business { } Veteran Owned Small Business (VOSB) { } Service Disabled Veteran Owned Small Business (SDVOSB)

2. Submit the total percentage of work to be performed by both large and small businesses (include the percentage of work to be performed both by Prime and Subcontractors):

Example: If Prime proposes a price of $1,000,000 (including all options), and small business(es) will provide $250,000 in services/supplies as a prime or subcontractor, the % planned for small businesses is 25%; and 75% for large business equaling 100%.

Total Percentage planned for Large Business (es) % = $ Total Percentage planned for Small Business (es) % = $ NOTE: 100% when combined, large and Small Business totals must equal 100%

3. Please indicate the total percentage of participation to be performed by small business. The percentage of work performed by Small Businesses that qualify for small business:

Small Business(es)%
Small Disadvantaged Business% HUB Zone Small Business% Woman Owned Small Business%
Service Disabled Veteran Owned SB% Veteran Owned Small Business%

NOTE: When combined, large and Small Business totals must equal 100%

4. List principle supplies/services to be performed by Small Businesses:

Example: If a Small Business qualifies also as a WOSB and a SDVOSB, and you can add them to each category below in which they qualify. Name of Company Identify Type of Service/Supply Small Business (SB):

5. Describe the extent of commitment to use small businesses (for example, what types of commitments if any are in place for this specific acquisition either – small business prime, written contract, verbal, enforceable, non-enforceable, joint venturing, mentor protégé, etc.)

Additional Important Note for Other Than U.S. Small Businesses ONLY.

Small Business Subcontracting Plan is Required (FAR 52.219-9). Separate from Small Business Participation Plan, other than U.S. Small Business offerors must also submit a subcontracting plan meeting the requirements of FAR 52.219-9 and shall address all 15 elements per FAR 19.704. Other than U.S. Small Businesses must submit acceptable subcontracting plans to be eligible for award. Subcontracting Plan shall reflect and be consistent with the commitments offered in the Small Business Participation Plan. Subcontracting Plans are not required for Small Businesses.

File details come from the government source that posted it. Updated .