Sol_140P2024R0048_Amd_0006.pdf

PDF 93 KB Posted

Attached to
SLBE 318729 Comprehensive Facility Rehabilitation
Solicitation number
140P2024R0048
Issued by

About this file

This document is an amendment (Amendment 06) to a solicitation for the SLBE 318729 Comprehensive Facility Rehabilitation project on the Manitou Islands, issued by the National Park Service. The amendment provides construction document clarifications, including the use of park utilities and facilities for contractors, the Trude Cottage addition and demolition plan, past performance requirements, government-furnished permits, small business contracting goals, and environmental and quality control manager requirements. It also provides references to geotechnical studies, updates to the wildlife biologist and tree trimming requirements, and clarifications to the piling, water supply well, and abutment details. The proposal due date is not extended. The solicitation number is 140P2024R0048.

View the file

Other files

File Type Posted
Amend_07_Attachment_0007.pdf PDF
Sol_140P2024R0048_Amd_0007.pdf PDF
2011_South_Manitou_Island_Geotechnical_Report_0006.pdf PDF
Sheet_CT3_5_-_Abutment_and_Mooring_Details_0006.pdf PDF
Section_33_11_13_-_Water_Supply_Well_0006.pdf PDF
Section_31_62_16_-_Steel_Piling_Marine_0006.pdf PDF
Section_01_33_23B_-_Submittal_List_0006.pdf PDF
1984_Engineering_Survey___Design_Study_-_Manitou_Islands_0006.pdf PDF
2024_08_29_SLBE_318729_Amendment_006_Q_A_0006.pdf PDF
Section_01_11_00_-_Summary_Of_Work_0006.pdf PDF
1985_Sleeping_Bear_Prelim_Design_Rpt_N_Manitou_Dock_0006.pdf PDF
Sol_140P2024R0048_Amd_0005.pdf PDF
Amend_05_Attachment_0005.pdf PDF
Amend_04_Attachment_0004.pdf PDF
Sol_140P2024R0048_Amd_0004.pdf PDF
Sol_140P2024R0048_Amd_0003.pdf PDF
Amend_03_140P2024R0048_Attachment_0003.pdf PDF
Sol_140P2024R0048_Amd_0002.pdf PDF
B11_Industry_Day_Sign_In_0002.pdf PDF
B11_Pre-Bid_Sign_In_0002.pdf PDF
B09_Amend_1_Attachment_11_SLBE_318729_-_Contract_Price_Schedule_-_BLANK_0001.xlsx XLSX spreadsheet
B09_Amend_1_Attachment_3_SLBE_318729_-_FINAL_DWG_CDs_Part_1_(reduced)_0001.pdf PDF
Sol_140P2024R0048_Amd_0001.pdf PDF
B09_Amend_1_Attachment_1_SLBE_318729_-_Project_Manual_Part_1_of_2(reduced)__0001.pdf PDF
B08_140P2024R0048_SLBE_318729_Solicitation_Package.pdf PDF
B08_Attachment_8_Small_Business_Participation_Document.docx DOCX document
B08_Attachment_11_SLBE_318729_-_Contract_Price_Schedule_-_BLANK_-_FINAL_CDs.xlsx XLSX spreadsheet
B08_Attachment_2_SLBE_318729_-_Project_Manual_Part_2_(reduced).pdf PDF
Sol_140P2024R0048.pdf PDF
B08_Attachment_6_Past_Performance_Questionnaire.docx DOCX document
B08_Attachment_5_Project_Experience_Questionnaire.docx DOCX document
B08_Attachment_3_SLBE_318729_-_FINAL_DWG_CDs_Part_1_(reduced).pdf PDF
B08_Attachment_7_General_References.docx DOCX document
B08_Attachment_4_SLBE_318729_-_FINAL_DWG_CDs_Part_2_(reduced).pdf PDF
B08_Attachment_1_SLBE_318729_-_Project_Manual_Part_1_of_2(reduced)_.pdf PDF
B08_Attachment_9_Subcontracting_Plan_Form.docx DOCX document
B08_Attachment_10_Wage_Determinations.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P2024R0048 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

07/08/20240006

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/08/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this Amendment 06 is to provide construction document clarifications listed below. This amendment also provides an answer to questions 36-63, additional questions are expected to be answered in subsequent amendments. This amendment also provides Geotechnical

References and additional information on the following attachments: Summary of Work, Submittal List, Steel Piling Marine, Water Supply Well and Abutment and Mooring Details.

Please see Amend 06 Attachments. Proposal due date is not extended.

Construction Document Clarifications:

General Clarifications

Use of park utilities and facilities for contractors.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Edwin Berry

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P2024R0048/0006

Trude Cottage addition.

Trude Cottage demo plan (reference Section 02 41

01).

Factor 6 ¿ Past Performance.

Government furnished permits.

Non-Large business contracting goals.

Small business revenue limits and certification requirements.

Requirements for an Environmental Manager presence on-site.

Requirements for a Quality Control Manager presence on-site.

Roles of the Wildlife Biologist (reference

Section 01 11 00).

Estimations of existing vertical and battered piling withing the existing North Manitou Island

Sheet Pile Dock structure were provided.

References ¿ Geotechnical

1984 Engineering Survey & Design Study - Manitou

Islands

1985 Sleeping Bear Prelim Design Rpt N Manitou

Dock

2011 South Manitou Island Geotechnical Report

Section 01 11 00

1.9 ¿ Wildlife Biologist is not needed if the trees are cut within allowable window, October 1 through April 15.

1.10 B.6.b - Removal or trimming of trees and

other woody vegetation dates have been updated.

1.10 15 ¿ Specification and associated project submittal list has been updated to note the restoration plan is to be provided by the

Contractor for review and approval.

Section 31 62 16

Added Section 1.2 D.3 ¿ Engineering Survey &

Design Study for Manitou Islands for the historical soil boring information.

1.5.E.1 ¿ Revised ¿preconstruction¿ to be

¿pre-installation¿. Revised meeting location to be at the jobsite or conducted virtually.

2.3 F ¿ Jetting is acceptable for the demo and

removal of existing piling.

3.3 - Clarification provided to depth of required borings, locations, SPT intervals, bedrock, and third-party involvement.

3.4 D.1.b ¿ Revisions made from excavating

driveline to probing driveline and performing

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P2024R0048/0006 excavation if required.

3.4 H.1.b ¿ Piling cut-offs are to become the

property of the Contractor (instead of the

Contracting Officer).

3.5A - Clarification provided for obstructions reasonably anticipated to be encountered.

Section 33 11 13

1.2 A.1 - ¿Driven¿ replaced with ¿Drilled¿.

2.1 B ¿ Section removed.

2.3 A.1 ¿ Section been updated to specify

submersible pumps.

3.1 G ¿ Section removed.

3.1 H ¿ Reference to ¿provision supplement¿

removed.

3.1 M.4 ¿ Section removed.

3.2 A ¿ Reference specification updated from

221113 Facility Water Distribution Piping to

221118 Water Distribution System.

Sheet C0.0

Response provided to documentation required of existing conditions.

Sheet CT3.5

Clarification to Details 1/CT3.5 and 4/CT3.5 have been updated to more accurately depict the insitu sand placement extents around the concrete abutments.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .