This document appears to be Attachment 4 - SLBE 318729 FINAL DWG CDs Part 2 (reduced) related to the federal contract opportunity for SLBE 318729 Comprehensive Facility Rehabilitation on Manitou Islands. The contract is solicited by the Department of the Interior National Park Service National Office. The attachment likely contains technical drawings or construction documents associated with the facility rehabilitation project. No further details on the specific products, services, or requirements for the contract opportunity are provided in this attachment. The key details would need to be summarized from the main solicitation documents.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET INDEX
SLEEPING BEAR DUNES NATIONAL LAKESHORE
FACILITY REHABILITATION
ON MANITOU ISLANDS
3 5
SLEEPING BEAR DUNES NATIONAL LAKESHORE
FACILITY REHABILITATION
ON MANITOU ISLANDS
0 50 100 200 Feet
GENERAL NOTES
1. REFER TO SHEET E0.0 FOR SYMBOLS AND
ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.
SHEET KEYNOTES
1. EXISTING UNDERGROUND MAIN ELECTRICAL
SERVICE FEEDER LOOPS TO REMOVED AND
REPLACED (TOTAL OF 2 FEEDS). DISCONNECT
FEEDS FROM EXISTING VILLAGE DISTRIBUTION
PANEL IN GENERATOR ROOM OF MAINTENANCE
SHED AND AT EXISTING TAP BOXES. EXISTING TAP
BOXES TO BE REMOVED AND REPLACED. EXISTING
SUB FEED TAPS TO REMAIN. REFER TO SHEET ED1.2
FOR ADDITIONAL INFORMATION. REFER TO SHEETS
E1.0 & E1.3 FOR NEW WORK SCOPE.#
2. REMOVE EXISTING TAP CONDUCTORS BETWEEN TAP
BOX AND EXISTING WELL PUMP HOUSE.
3. EXISTING WELL PUMP HOUSE TO BE DEMOLISHED.
PROTECT EXISTING FEED TO RESIDENTIAL HOUSE
FOR EXTENSION TO NEW CHLORINATION &
PRESSURE BUILDING PANEL. REFER TO SHEET E1.0
FOR ASSOCIATED ELECTRICAL RE-WORK REQUIRED.
4. EXISTING TRUDE COTTAGE. ALL EXISTING
ELECTRICAL SYSTEMS ARE TO BE CAREFULLY
REMOVED, MINIMIZING DAMAGE TO EXISTING
INTERIOR WALLS AND CEILINGS TO THE
EXTENT POSSIBLE. REFER TO SHEET EJ1.0 FOR
NEW WORK SCOPE.
2. PROJECT SHALL CONFORM TO THE REQUIREMENTS
OF THE NATIONAL ELECTRICAL CODE 2023 VERSION.
EXISTING TAP BOX TO BE REMOVED AND REPLACED.
REFER TO SHEET E1.0 FOR ADDITIONAL INFORMATION.
5.
EXISTING PV EQUIPMENT TO BE REMOVED AND
REPLACED. REMOVE EXISTING PV SOLAR ARRAYS
AND UNDERGROUND FEED BACK TO PV EQUIPMENT
IN EQUIPMENT ROOM OF MAINTENANCE SHED.
6.
4. REFER TO SHEET CU1.0 FOR BUILDING/FACILITY
NAMES AND LOCATIONS ON NORTH MANITOU ISLAND.
6. ALL DEMOLITION PLANS AND DEMOLITION NOTES
ARE INTENDED AS A GENERAL GUIDE TO THE
DEMOLITION REQUIRED FOR THIS PROJECT
BUT MAY NOT BE ALL INCLUSIVE. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO
VERIFY EXISTING CONDITIONS AND REMOVE OR
RE-WORK ALL EXISTING ELECTRICAL ITEMS,
EQUIPMENT, DEVICES, ETC... THAT INTERFERE WITH
NEW SCOPE SHOWN WITHIN PROJECT DOCUMENTS.
ELECTRICAL SITE DEMO PLAN -
NMI
5. THE PURPOSE OF THIS SHEET IS TO IDENTIFY
EXISTING CONDITIONS AND EXTENT OF EXISTING
MICRO-GRID EQUIPMENT TO BE REPLACED OR
REMOVED ON NORTH MANITOU.
3. CONTRACTOR TO FIELD VERITY EXACT LOCATION OF
EXISTING FEEDERS IN ADVANCE OF STARTING
EXCAVATION.
05/10/2024
SLEEPING BEAR DUNES NATIONAL LAKESHORE
FACILITY REHABILITATION
ON MANITOU ISLANDS
5 6
7 8
11 12
SHEET KEYNOTES
1. EXISTING VILLAGE DISTRIBUTION PANEL TO BE
REPLACED.
2. MAINTENANCE SHED POWER METER TO REMAIN.
3. REMOVE INCOMING SOLAR ARRAY DISCONNECT
SWITCH.
4. REMOVE EXISTING POWER INVERTER.
5. REMOVE EXISTING 125A, 240V GENERATOR A
CIRCUIT BREAKER TO REMAIN.
6. REMOVE EXISTING 125A, 240V GENERATOR B
CIRCUIT BREAKER.
7. REMOVE EXISTING 120V BATTERY BANK #2
DISCONNECT.
8. REMOVE EXISTING 120V BATTERY BANK #1
DISCONNECT.
9. REMOVE EXISTING GENERATOR. EC TO VERIFY
WITH NPS CONTRACTING OFFICER WHETHER
GENERATORS ARE TO BE SALVAGED,
MAINTAINED IN GOOD OPERATION CONDITION
AND TURNED OVER TO NPS FOR SALVAGE OR IF
EC IS TO REMOVE THEM FROM SITE/ISLAND.
10. REMOVE EXISTING BATTERY BANK #1.
11. REMOVE EXISTING BATTERY BANK #1
DISCONNECT.
12. REMOVE EXISTING BATTERY BANK #2
DISCONNECT.
13. REMOVE EXISTING BATTERY BANK #2.
GENERAL NOTES
1. REFER TO SHEET E0.0 FOR SYMBOLS AND
ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.
2. PROJECT SHALL CONFORM TO THE REQUIREMENTS
OF THE NATIONAL ELECTRICAL CODE 2023 VERSION.
3. THE PURPOSE OF THIS SHEET IS TO IDENTIFY
EXISTING CONDITIONS AND EXTENT OF EXISTING
MICRO-GRID EQUIPMENT TO BE REPLACED OR
REMOVED ON NORTH MANITOU.
4. ALL DEMOLITION PLANS AND DEMOLITION NOTES
ARE INTENDED AS A GENERAL GUIDE TO THE
DEMOLITION REQUIRED FOR THIS PROJECT
BUT MAY NOT BE ALL INCLUSIVE. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO
VERIFY EXISTING CONDITIONS AND REMOVE OR
RE-WORK ALL EXISTING ELECTRICAL ITEMS,
EQUIPMENT, DEVICES, ETC... THAT INTERFERE WITH
NEW SCOPE SHOWN WITHIN PROJECT DOCUMENTS.
ELECTRICAL DEMO PLAN - NMI
5. REFER TO DIVISION 1, 017419 SPECIFICATIONS FOR
DISPOSAL REQUIREMENTS OF HAZARDOUS
MATERIALS.
ON MANITOU ISLANDS
M
2 2
EXISTING VILLAGE
FEEDER '1'
3#4/0, 1#3GND
EXISTING VILLAGE
FEEDER '2'
3#4/0, 1#3GND
VILLAGE DISTRIBUTION PANEL
NORTH LODGE
(USLSS LIFEBOAT STATION QTRS)
MAIN LODGE
(USLSS DWELLING QTRS)
SOUTH LODGE
(USLSS CREW READY QTRS)
MAINTENANCE
BUILDING
DOCK
CARE-TAKER HOUSE
(HANS HALSETH HOUSE)
BEACH CART
USCG GENERATOR BUILDING
(LAUNDRY)
WELL PUMP HOUSE
SHEET KEYNOTES
1. VILLAGE DISTRIBUTION PANEL TO BE REMOVED AND
REPLACED. EXISTING PANEL FEEDS TO BE
RE-FED FROM NEW DISTRIBUTION PANEL UNLESS
NOTED OTHERWISE. REFER TO SHEETS ED1.0, ED1.1
& E1.3 FOR ADDITIONAL INFORMATION.
GENERAL NOTES
1. REFER TO SHEET E0.0 FOR SYMBOLS AND
ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.
200A - 120/240V 3W+G
0/
0/
0/
MAINTENANCE SHED
0/
SAWMILL
2. PROJECT SHALL CONFORM TO THE REQUIREMENTS
OF THE NATIONAL ELECTRICAL CODE 2023 VERSION.
4. REMOVE EXISTING TAP CONDUCTORS BETWEEN TAP
BOX AND EXISTING WELL PUMP HOUSE. REFER TO
SHEET ED1.0 FOR ADDITIONAL INFORMATION.
3. EXISTING TAP BOX TO BE REMOVED AND REPLACED
(TYP).
2. EXISTING UNDERGROUND MAIN ELECTRICAL
SERVICE FEEDER LOOP TO BE REMOVED AND
REPLACED. EXISTING SUB FEED TAPS TO REMAIN.
REFER TO SHEETS ED1.0 & E1.3 FOR ADDITIONAL
INFORMATION.
5. ALL DEMOLITION PLANS AND DEMOLITION NOTES
ARE INTENDED AS A GENERAL GUIDE TO THE
DEMOLITION REQUIRED FOR THIS PROJECT
BUT MAY NOT BE ALL INCLUSIVE. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO
VERIFY EXISTING CONDITIONS AND REMOVE OR
RE-WORK ALL EXISTING ELECTRICAL ITEMS,
EQUIPMENT, DEVICES, ETC... THAT INTERFERE WITH
NEW SCOPE SHOWN WITHIN PROJECT DOCUMENTS.
4. THE PURPOSE OF THIS SHEET IS TO IDENTIFY
EXISTING CONDITIONS AND EXTENT OF EXISTING
ELECTRICAL DISTRIBUTION TO BE REPLACED OR
REMOVED ON NORTH MANITOU.
ELECTRICAL DEMO ONE-LINE
DIAGRAM - AC - NMI
3. CONTRACTOR TO FIELD VERITY EXACT LOCATION OF
EXISTING FEEDERS IN ADVANCE OF STARTING
EXCAVATION.
SLEEPING BEAR DUNES NATIONAL LAKESHORE
FACILITY REHABILITATION
ON MANITOU ISLANDS
0 50 100 200 Feet
E1.4
E1.4 SHEET KEYNOTES #
GENERAL NOTES
1. REFER TO SHEET E0.0 FOR SYMBOLS AND
ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.
1. PROVIDE NEW UNDERGROUND FEEDERS FROM MAIN
DISTRIBUTION PANEL IN GENERATOR ROOM IN
MAINTENANCE SHED TO NEW TAP BOX. REFER TO
SHEET E1.3 FOR ADDITIONAL INFORMATION.
2. PROJECT SHALL CONFORM TO THE REQUIREMENTS
OF THE NATIONAL ELECTRICAL CODE 2023 VERSION.
3. PROVIDE NEW CONDUCTORS FROM NEW TAP BOX TO
SERVE NEW CHLORINATION & PRESSURE BUILDING.
REFER TO SHEET E1.3 FOR ADDITIONAL INFORMATION.
NEW CHLORINATION & PRESSURE BUILDING. REFER
TO SHEET EK1.0 FOR ADDITIONAL INFORMATION.
5.
PROVIDE NEW UNDERGROUND FEEDER FROM NEW
TAP BOX TO EXISTING TRUDE COTTAGE. REFER TO
SHEET E1.3 FOR ADDITIONAL INFORMATION.
TRUDE COTTAGE. REFER TO SHEET EJ1.0 FOR NEW
ELECTRICAL SYSTEM DESIGN.
7.
PROVIDE NEW 11"X9"X6-3/4" QUAZITE BOX FOR TAP OF
EXISTING RESIDENTIAL FEED AT EXISTING WELL PUMP
HOUSE LOCATION. PROVIDE NEW UNDERGROUND
CONDUCTORS TO NEW CHLORINATION & PRESSURE
BUILDING PANEL. REFER TO SHEETS E1.3 & EK1.0 FOR
ADDITIONAL INFORMATION.
8.
PROVIDE NEW UNDERGROUND CABLING FROM PV
ARRAYS BACK TO PV INVERTERS LOCATED IN
EQUIPMENT ROOM IN MAINTENANCE SHED. REFER
TO E1.4 FOR ADDITIONAL INFORMATION.
6.
4.
2. PROVIDE NEW 11"X18"X12" TAP BOX & RECONNECT
EXISTING TAP FEEDER TO NEW MAIN LOOP FEEDER.
REFER TO SHEET E1.3 FOR ADDITIONAL
INFORMATION.
3. REFER TO SHEET CU1.0 FOR BUILDING/FACILITY
NAMES AND LOCATIONS ON NORTH MANITOU ISLAND.
ELECTRICAL SITE PLAN - NMI
FIELD VERIFY TAP CONNECTION BOX SIZE
REQUIREMENTS AT ALL LOCATIONS (TYP).
9.
ON MANITOU ISLANDS
#6 GND - STRANDED USED TO GROUND
RACKING SYSTEM
#10 PV WIRE. APPROX 100' (FIELD CONFIRM LENGTH)
STRING #1 (6) MODULES IN SERIES. 2.3 KW (DC)
STC TOTAL
G
STRING #3 (6) MODULES IN SERIES. 2.3 KW (DC) STC
TOTAL
G
GND
INV-1
5.8 KW, 208 VAC, TRANSFORMERLESS
INTERNAL GFCI, AFCI, RAPID SHUTDOWN AC AND DC
DISCONNECT
L1
N
OUTSIDE INSIDE
TO AC DISTRIBUTION SYSTEM.
REFER TO SHEET E1.3.
L2
L1
GENERATOR
CONTACTOR AND
CIRCUIT BREAKERS
L3
L1 L2 L3 N G
L2
L1
L3
N
N
B-INV-1
BATTERY INVERTER
6.0 KW, 120 VAC,
TRANSFORMERLESS
L1
N G
L1
L2
L3
N G
G
BATTERY
DISCONNECT
G L3
L2
N G
TO GND
REPEATS FOR B-INV 2 & 3
REPEATS FOR INV 2,3,4,5 & 6
AC-1
AC COMBINER PANEL 200A, 3PH, 4W
SCCR: 10KA
CALCULATED FAULT CURRENT: 0.97 KA
B-INV-2
96 KWH BATTERY STRING
GND
GND
L2
L1
L3
N
G
L2
L1
L3
N
L2
L1
L3
N
EXISTING
GEN - 40KW, 208V 3P 4W
EXISTING
GEN - 40KW, 208V 3P 4W
L2
L1
L3
N
30A/2P
LOAD SHEDDING
CONTACTOR AND CIRCUIT
BREAKERS
BATTERY CONTACTORS AND
CIRCUIT BREAKERS
L2
200A/3P
A
A
A
A
A
0A
/3 P
150A/3P
150A/3P
B-INV-3
DUAL GENERATOR AUTOMATIC
TRANSFER SWITCH
150A, 208V, 3PH
B-INV-5
MC-1
MULTI CONTROLLER BOX
200A - 208V, 3PH, 4W
SCCR: 10KA
CALCULATED FAULT CURRENT: 0.98 KA
INVERTER CIRCUIT BREAKER
200A/3P
GENERAL NOTES
1. REFER TO SHEET E0.0 FOR SYMBOLS AND
ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.
2. PROJECT SHALL CONFORM TO THE REQUIREMENTS
OF THE NATIONAL ELECTRICAL CODE 2023 VERSION.
SHEET KEYNOTES
1. EXISTING GENERATOR RELOCATED FROM SOUTH
ISLAND. CONTRACTOR RESPONSIBLE FOR
RELOCATION OF BOTH GENERATORS IN THIS
CONTRACT.
INV-2
INV-3
INV-4
INV-5
3#3/0, 1#3/0 N, 1#6 G, 2"C
3#1/0, 1#1/0 N, 1#6G, 2"C
3#4, 1#4 N, 1#10 G, 1-1/4"C
3.
#1/0
1#6 G
B-INV-4
A
L1
B-INV-6
INV-6
30A/2P
30A/2P
30A/2P
30A/2P
30A/2P
2#10, 1#10 N, 1#10 G, 3/4"C
DATA MANAGER
TO B-INV-1
TO AC DISTRIBUTION METER
TO EXISTING DATA RACK IN
MAINTENANCE OFFICE
0A
/3 P
3#1/0, 1#1/0 N, 1#6G, 2"C
ELECTRICAL ONE-LINE DIAGRAM -
MICROGRID - NMI
3#4, 1#4 N, 1#10 G, 1-1/4"C
RS-485
G
G
3#1/0, 1#1/0 N, 1#6G, 2"C
G
TO GND
TO GND
EQUIPMENT SUMMARY:
· 5.8 KW PV INVERTERS: 6 INVERTERS, ARRANGED
FOR THREE PHASES.
· 6.0 KW BATTERY INVERTERS: 6INVERTERS, 2 PER
PHASE.
· 96 KWH BATTERY STRINGS: 6 REQUIRED, TOTAL
CAPACITY OF 576 KWH.
· 445 W PV MODULES: 90 MODULES. MOUNTING:
GROUND.
· MULTI-CONTROLLER BOX: INTEGRATES PV,
BATTERY, AND GENERATOR INPUTS AND
OUTPUTS TO LOAD.
· DUAL GENERATOR AUTOMATIC TRANSFER
SWITCH: ALTERNATES USAGE BETWEEN 2
GENERATORS BASED ON RUN TIME. INCLUDES
COMMUNICATIONS MODULE FOR REMOTE
MONITORING VIA EXISTING ISLAND
COMMUNICATIONS SYSTEM.
· 40 KW GENERATORS: EXISTING (RELOCATED),
208V, THREE PHASE, DIESEL FROM EXISTING
CENTRAL STORAGE TANK.
· 200A AC COMBINER PANEL: 208V, THREE PHASE.
· DATA MANAGER: CAT5E ENABLED DEVICE ABLE
TO INTERFACE WITH INVERTERS TO PUBLISH PV
PRODUCTION DATA TO WEB PORTAL.
2. 2-WIRE GENERATOR START SIGNAL FROM MASTER
BATTERY INVERTER.
TO INV-2 THRU 6
CAT-5E
DATA MANAGER
TO B-INV-2
THRU 6RS-485
#1/0
MICRO-GRID CONTROL
1. SOLAR PV ENERGY SHALL SUPPLY THE DISTRIBUTION
SYSTEM AND BATTERY ENERGY STORAGE.
2. WHEN PV PRODUCTION IS INSUFFICIENT FOR THE
DISTRIBUTION SYSTEM, STORED BATTERY ENERGY
SHALL BE USED IN ADDITION TO PV PRODUCTION.
3. BATTERY STORAGE LEVELS BELOW 30% SHALL START
THE GENERATOR. GENERATOR AND PV ENERGY SHALL
THEN SUPPLY THE DISTRIBUTION SYSTEM AND
BATTERY ENERGY STORAGE SYSTEM.
4. BATTERY STORAGE LEVELS ABOVE 80% SHALL SHUT
OFF THE GENERATOR. SYSTEM SHALL RETURN TO
RELYING ON SOLAR PV ENERGY AND/OR STORED
BATTERY ENERGY AS ABOVE.
GENERATOR AUTOMATIC TRANSFER SWITCH (ATS)
CONTROL
1. BATTERY INVERTER TO SEND AUTO-START SIGNAL TO
GENERATOR ATS UPON BATTERY STATE OF CHARGE
REACHING PROGRAMMED LEVELS.
2. ATS TO HAVE ALTERNATE SELECTOR SWITCH
ACTIVATED:
2.1. GENERATOR 1 AND GENERATOR 2 WILL ALTERNATE
IN THEIR STARTING PREFERENCE. UPON SIGNAL
FORM INVERTER TO START, IF GENERATOR 1 IS
SELECTED TO START, ON NEXT START SIGNAL,
GENERATOR 2 WILL BE SIGNALED TO START. AND
VICE VERSA.
2.2. IF PREFERRED GENERATOR FAILS TO START,
STANDBY GENERATOR IS SIGNALED TO START.
3. GENERATOR 1 PREFERRED SOURCE SWITCH
ACTIVATED
3.1. UPON SIGNAL FORM INVERTER TO START,
GENERATOR 1 IS SELECTED TO START. IN THE
EVENT GENERATOR 1 FAILS TO START, GENERATOR
2 SHALL BE SIGNALED TO START.
4. GENERATOR 2 PREFERRED SOURCE SWITCH
ACTIVATED
4.1. UPON SIGNAL FORM INVERTER TO START,
GENERATOR 2 IS SELECTED TO START. IN THE
EVENT GENERATOR 2 FAILS TO START, GENERATOR
1 SHALL BE SIGNALED TO START.
5. BATTERY INVERTER NO LONGER REQUESTS THE
GENERATOR SYSTEM:
5.1. UPON SIGNAL FROM BATTERY INVERTER TO SHUT
DOWN GENERATORS, THE ATS WILL BEGIN
RETRANSFER TO NORMAL SEQUENCE.
5.2. ATS INITIATES COOLDOWN CYCLE OF GENERATOR.
6. BATTERY INVERTER CARRIES OUT LOAD FREE
DISCONNECTION OF GENERATOR.
CONTROL SEQUENCE
3. PROVIDE 120V, 1P, 20A CIRCUIT TO DATA MANAGER
USING 2#12 AND 1#12 GND IN 3/4"C FROM EXISTING
LOAD CENTER IN MAINTENANCE SHED.
ON MANITOU ISLANDS
SOLAR PV SYSTEM - MODULE DETAILS SOLAR PV SYSTEM - SYSTEM SUMMARY
Module Make LONGI SOLAR Estimated Annual System Production (Helioscope) 51,310 kWh/yr
Module LR4-72HBD-445M Tilt Angle / Azimuth of Arrays 25/180 Deg.
Rated Maximum Power (STC) 455 W System kW (dc) 40.1 kW (dc)
System kW (ac) 34.6 kW (ac)
SOLAR PV INVERTER - DC SYSTEM DETAILS DC / AC ratio 1.16
Inverter Make SMA
Inverter Model SUNNY BOY SOLAR PV SYSTEM - OVERALL SUMMARY Maximum System Voltage 480 V Quantity of Modules - PV Module Array Typical 90 Maximum Input Current / Maximum Short-Circuit Current 15A/60A Quantity of Inverters 6 Quantity of Inverters 6
SOLAR PV INVERTER - AC SYSTEM DETAILS (EACH INVERTER)
Rated Power at Nominal Voltage 5760 W Maximum Apparent Power 5760 VA Nominal AC Voltage / AC Voltage Range 240 V Maximum Output Current 24 A
Quantity of Modules - PV Module Array Typical 90
MICROGRID SYSTEM
PERFORMANCE SUMMARY - NMI
ELECTRICAL SHOCK HAZARD
LABEL LOCATION: TERMINALS IN INVERTERS, DISCONNECTS, AC
COMBINER BOXES, AND AC COMBINER PANELBOARDS.
WARNING!
MULTIPLE POWER SOURCES
WARNING!
LABEL LOCATION: ENERGY MONITORING EQUIPMENT AND INVERTERS.
WARNING!
PHOTOVOLTAIC PANEL
LABEL LOCATION: AC DISCONNECTS
WARNING!
LABEL LOCATION: DC TERMINALS IN INVERTERS AND DC COMBINER
BOXES
WARNING!
LABEL LOCATION: MULTICLUSTER BOX, MAIN DISTRIBUTION PANEL, AND POINT OF
INTERCONNECTION.
SOLAR
PHOTOVOLTAIC
MODULES
LABEL LOCATION: EVERY 8' ALONG DC CONDUITS, BEFORE AND AFTER EACH WALL OR
ROOF PENETRATION, EACH DC COMBINER BOX, AND ALL DC JUNCTION BOXES.
DO NOT TOUCH TERMINALS.
TERMINALS ON BOTH LINE
AND LOAD SIDES MAY BE
ENERGIZED IN OPEN
POSITION.
ELECTRICAL SHOCK HAZARD
ELECTRICAL SHOCK HAZARD
IF GROUND FAULT
INDICATED, ALL GROUNDED
CONDUCTORS MAY BE
UNGROUNDED AND
ENERGIZED.
THE DC CONDUCTORS OF
THIS PHOTOVOLTAIC
SYSTEM ARE
UNGROUNDED AND MAY
BE ENERGIZED.
GENERATOR POWER,
BATTERY POWER AND
SOLAR PHOTOVOLTAIC
POWER SOURCES
SUPPLYING THIS SYSTEM.
LABEL LOCATION: MULTICLUSTER BOX, MAIN DISTRIBUTION
PANEL, AND POINT OF INTERCONNECTION.
LABEL LOCATION: MULTICLUSTER BOX, MAIN DISTRIBUTION PANEL, AND AS REQUIRED BY AUTHORITY HAVING JURISDICTION.
PHOTOVOLTAIC SYSTEM HAS RAPID
SHUTDOWN DEVICE
WARNING
PHOTOVOLTAIC POWER SOURCE
SOLAR PV SYSTEM EQUIPPED
WITH RAPID SHUTDOWN
DO NOT ADD LOADS, THIS IS
A PHOTOVOLTAIC
COMBINER PANEL ONLY.
TURN RAPID
SHUTDOWN SWITCH
TO THE "OFF"
POSITION TO SHUT
DOWN PV SYSTEM
AND REDUCE SHOCK
HAZARD IN THE
ARRAY.
ON MANITOU ISLANDS
M
M M M
M
14 14
VILLAGE FEEDER '1'
3#350, 1#500N, 1#1G - 3"C
VILLAGE FEEDER '2'
3#350, 1#500N, 1#1G - 3"C
VILLAGE DISTRIBUTION PANEL
SCCR: 10KA
CALCULATED FAULT CURRENT: 0.96 KA
DOCK
BEACH CART
TRUDE COTTAGE
100A 120/208V, 4W+G
SHEET KEYNOTES
1. FEEDER OVERSIZED FOR VOLTAGE DROP UP TO
1200FT.
GENERAL NOTES
1. REFER TO SHEET E0.0 FOR SYMBOLS AND
ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.
NEW NEW
CHLORINATION &
PRESSURE BUILDING
60A 120/240V, 3W+G
200A - 208V, 3PH, 4W+G
PRIVATE
RESIDENCE
2#4/0, 1#4/0 N, 1#3G - 2"C
0/
0/
SAWMILL
3. LIGHT LINEWEIGHT IS EXISTING TO REMAIN AND
DARK LINEWEIGHT IS NEW WORK UNLESS NOTED
OTHERWISE.
3#10 & 1#10G - 3/4"C
2. EXTEND EXISTING CONDUCTORS TO NEW NEW
CHLORINATION & PRESSURE BUILDING PANEL.
CONFIRM EXISTING WIRE SIZES AND MATCH IF
DIFFERENT. REFER TO SHEETS E1.0 & EK1.0 FOR
ADDITIONAL INFORMATION.
2. PROJECT SHALL CONFORM TO THE REQUIREMENTS
OF THE NATIONAL ELECTRICAL CODE 2023 VERSION.
3#4/0, 1#350N, 1#1G - 3"C
3. PROVIDE NEW UNDERGROUND FEEDER FROM NEW
TAP BOX TO SERVE NEW NEW CHLORINATION &
PRESSURE BUILDING PANEL. REFER TO SHEET E1.0
FOR ADDITIONAL INFORMATION.
4. PROVIDE NEW 20/1 BREAKER AND 20A, 120V POWER
CONNECTION FOR DIESEL TANK PUMP FROM
EXISTING MAINTENANCE SHED LOAD CENTER. FEED
TO BE RUN UNDERGROUND. REFER TO SHEET CF1.0
FOR EXACT LOCATION & SHEET E1.4 FOR
CIRCUITING INFORMATION.
1#12, 1#12N, 1#12G - 3/4"C
5. RECONNECT EXISTING TAP FEEDER TO NEW MAIN
LOOP FEEDER. REFER TO SHEET E1.0 FOR
ADDITIONAL INFORMATION. TAP TO COMPLY WITH
TAP RULES IN NEC 240.21(B)(5).
TYP
6. PROVIDE NEW UNDERGROUND FEEDER FROM
NEW TAP BOX TO EXISTING TRUDE COTTAGE.
REFER TO SHEET E1.0 FOR ADDITIONAL
INFORMATION.
7. RECONNECT EXISTING FEED TO NEW DISTRIBUTION
PANEL.
TO MICROGRID SYSTEM.
REFER TO SHEET E1.1.
8. CONNECT EXISTING TO REMAIN FEEDS TO NEW
DISTRIBUTION FEEDER USING PHASE 1, PHASE 2,
NEUTRAL AND GROUND.
9. CONNECT EXISTING TO REMAIN FEEDS TO NEW
DISTRIBUTION FEEDER USING PHASE 2, PHASE 3,
NEUTRAL AND GROUND.
10. CONNECT EXISTING TO REMAIN FEEDS TO NEW
DISTRIBUTION FEEDER USING PHASE 1, PHASE 3,
NEUTRAL AND GROUND.
3#1/0, 1#1/0 N, 1#6 G, 2"C
USCG GENERATOR BUILDING
(LAUNDRY)
MAINTENANCE SHED
11. PROVIDE NEW 20/1 BREAKER AND 20A, 120V POWER
CONNECTION FOR GASOLINE TANK PUMP FROM
EXISTING MAINTENANCE SHED LOAD CENTER. FEED
TO BE RUN UNDERGROUND. REFER TO SHEET CF1.0
FOR EXACT LOCATION & SHEET E1.4 FOR
CIRCUITING INFORMATION. ALL CONDUITS,
CONDUCTORS, HOUSINGS, EQUIPMENT, ETC SHALL
BE CLASS I, DIV I RATED.
ELECTRICAL ONE-LINE DIAGRAM -
AC - NMI
GB
/2
SP
AR
E
0/
SP
AR
E
MAINTENANCE BUILDING
12. GROUNDING ELECTRODE FOR ENTIRE SYSTEM.
SIZED PER NEC TABLE 250.66.
1#12, 1#12N, 1#12G - 3/4"C
NORTH LODGE
(USLSS LIFEBOAT STATION QTRS)
MAIN LODGE
(USLSS DWELLING QTRS)
SOUTH LODGE
(USLSS CREW READY QTRS)
CARE-TAKER HOUSE
(HANS HALSETH HOUSE)
/1
SP
AR
E
/1
SP
AR
E
MAIN
#6G
13. TYPICAL, EXISTING TAP TO BUILDING LOAD CENTERS
NOTED AS 3#4, 1#8G.
14. BREAKER FRAME TO ACCEPT OVERSIZED FEEDERS.
0A
T
0A F
0A
T
0A F
200AT
400AF
SLEEPING BEAR DUNES NATIONAL LAKESHORE
FACILITY REHABILITATION
ON MANITOU ISLANDS
3 42 10
SHEET KEYNOTES
1. WALL MOUNTED, TYPICAL.
# GENERAL NOTES
1. REFER TO SHEET E0.0 FOR SYMBOLS AND
ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.
2. PV MODULES, TYPICAL. NEW ARRAY IS TO BE
INSTALLED IN THE SAME LOCATION AND FOOTPRINT
AS THE EXISTING ARRAY TO MINIMIZE SITE IMPACT.
IF NEW ARRAY FOOTPRINT WILL BE LARGER, THIS
MUST BE BROUGHT TO THE CONTRACTING
OFFICER'S ATTENTION FOR APPROVAL
3. CONTRACTOR TO PROVIDE NEW GROUND MOUNT
BALLASTED RACKING SYSTEM.
4. REFER TO SHEET E1.1 FOR CONDUIT AND WIRE
SIZES. REFER TO SHEET E1.0 FOR CONDUIT AND
WIRE ROUTING.
5. PROVIDE NEW 20/1 BREAKER AND 20A, 120V POWER
CONNECTION FOR DIESEL TANK PUMP FROM
EXISTING MAINTENANCE BUILDING LOAD CENTER.
REFER TO SHEET CF1.0 FOR EXACT LOCATIONS &
SHEET E1.3 FOR ADDITIONAL INFORMATION.
6 EXISTING GENERATOR RELOCATED FROM SOUTH
ISLAND. GENSET ACCESSORIES TO BE POWERED
FROM NEARBY EXISTING RECEPTACLES WITHIN
ROOM.
2. PROJECT SHALL CONFORM TO THE REQUIREMENTS
OF THE NATIONAL ELECTRICAL CODE 2023 VERSION.
7. PROVIDE NEW 20/1 BREAKER AND 20A, 120V POWER
CONNECTION FOR GASOLINE TANK PUMP FROM
EXISTING MAINTENANCE SHED LOAD CENTER. FEED
TO BE RUN UNDERGROUND. REFER TO SHEET CF1.0
FOR EXACT LOCATION & SHEET E1.3 FOR
ADDITIONAL INFORMATION. ALL CONDUITS,
CONDUCTORS, HOUSINGS, EQUIPMENT, ETC SHALL
BE CLASS I, DIV I RATED.
ENLARGED EQUIPMENT PLAN - NMI
3. REFER TO 263110 PV SPECIFICATION FOR PV SYSTEM
REQUIREMENTS.
8. EMERGENCY POWER OFF DEVICE SHALL
DISCONNECT POWER TO GASOLINE PUMP.
9. FLOOR MOUNTED DISTRIBUTION PANEL.
4. MAINTAIN 6" CLEARANCE AROUND PV INVERTERS
AND 12" CLEARANCE AROUND BATTERY INVERTERS.
CONFIRM RECOMMENDED EQUIPMENT CLEARANCES
WITH MANUFACTURER.
10. CONTRACTOR TO COORDINATE WITH GROUND
MOUNT MANUFACTURER TO PRODUCE A WIND-LIFT
STUDY. STUDY SHALL DETERMINE THE QUANTITY
AND LOCATION OF BALLAST BLOCKS TO BE
PROVIDED AND INSTALLED BY CONTRACTOR.
ON MANITOU ISLANDS
Feet 0 60 120
SMI UTILITIES OVERVIEW
ON MANITOU ISLANDS
Feet 0 40 80
SMI SANITARY SEWER PLAN
ON MANITOU ISLANDS
Feet
SMI SANITARY SEWER PLAN
ON MANITOU ISLANDS
SMI WATER DISTRIBUTION PLAN
Feet
ON MANITOU ISLANDS
SMI WATER DISTRIBUTION PLAN
ON MANITOU ISLANDS
SMI CHLORINATION AND PRESSURE BUILDING
PLAN
0 2 4
LIMIT OF
WILDERNESS
REMOVE AND REPLACE
EXISTING DIESEL LINES
FROM DIESEL TANK TO
GENERATOR / PUMP
HOUSE BUILDING
ABANDON
FUEL LINES
DSL
DSL
DSL
DSL
DSL
DS
L
DSL
DSL
DSL
DSL
DSL
GENERATOR /
PUMP HOUSE
MAINTENANCE
SHOP
EXISTING DIESEL
TANK TO REMAIN
EXISTING GAS
TANK REMOVE
AND DISPOSE
REMOVE AND DISPOSE
OF EXISTING GAS FILL
PUMP
CONCRETE
BOLLARD TO
REMAIN (TYP.)
CLEAR AND REMOVE ALL
MATERIALS INSIDE FENCED
AREA IN PREPARATION
FOR NEW CONCRETE PAD
GASOLINE AND
DIESEL FUEL DISPENSER
TO REMAIN
EXISTING CONCRETE
PAD TO REMAIN
TANK TO REMAIN
EXISTING CHAIN LINK
FENCE TO REMAIN
REMOVE & REPLACE 6'
OF CHAIN LINK FENCE TO
REPLACE DIESEL LINES
REMOVE & REPLACE 4'
OF CHAIN LINK FENCE TO
REPLACE DIESEL LINES
TREELINE
EX ELECTRICAL
LINE TO REMAIN
EX WATERLINE
TO REMAIN
ELECTRICAL
LINE TO REMAIN
ELECTRICAL LINES TO BE
REPLACED (SEE ELECTRICAL
DRAWINGS FOR ADDITIONAL
INFORMATION)
EX ELECTRICAL
LINE TO REMAIN
LIMIT OF
WILDERNESS
DSL
DSL
DSL
DSL
DSL
DS
L
DSL
DSL
DSL
DSL
DSL
PROPOSED DIESEL LINES
(TWO - 1.5" DOUBLE WALL
FLEXIBLE PIPES)
GENERATOR /
PUMP HOUSE
MAINTENANCE
SHOPNEW UL-2085
DOUBLE-WALLED
1,000-GALLON GASOLINE
TANK WITH ALL
REQUIRED
APPURTANCES
NEW 6" THICK
REINFORCED
CONCRETE
CF3.0
CF3.0
EXPANSION
JOINT (TYP.)
CONTROL
JOINT (TYP.)
CF3.0
CF3.0
GRAVEL STRIP
ADJACENT TO
CHAIN LINK
FENCE
CF3.0
SLEEPING BEAR DUNES NATIONAL LAKESHORE
FACILITY REHABILITATION
ON MANITOU ISLANDS
ST
ATE OF MICHIGAN
LICENSED PROFESSIONAL ENG
INE
ER
TIMOTHY J.
HOGAN
License No.
6201065299
5/10/2024
DEMOLITION PLAN PROPOSED PLAN
0 10 20 40 Feet
1. ALL FUEL SYSTEM WORK SHALL BE CONDUCTED IN ACCORDANCE WITH
APPLICABLE FEDERAL, STATE, AND LOCAL CODES, STANDARDS, AND
REGULATIONS.
2. GASOLINE TANKS MUST BE IN COMPLIANCE WITH UL-2085 STANDARD
Notes
ON MANITOU ISLANDS
SMI DOCK DEMO PLAN
0 250 500
ON MANITOU ISLANDS
SMI DOCK PLAN
0 10 20
ON MANITOU ISLANDS
SMI DOCK PLAN
ON MANITOU ISLANDS
SMI DOCK FRAMING PLAN
ON MANITOU ISLANDS
SMI DOCK FRAMING PLAN
ON MANITOU ISLANDS
SMI DOCK MOORING PLAN
0 30 60
SMI DOCK PROFILE
SMI DOCK PROFILE
ON MANITOU ISLANDS
Feet 0 60 120
SMI SWPPP PLAN
0 20 40
SLEEPING BEAR DUNES NATIONAL LAKESHORE
FACILITY REHABILITATION
SMI CHICAGO RD SITE PLAN
ON MANITOU ISLANDS
SMI CHICAGO RD GRADING PLAN
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
0 150 300
SLEEPING BEAR DUNES NATIONAL LAKESHORE
FACILITY REHABILITATION
SMI CHICAGO RD
SMI CHICAGO RD TYPICAL SECTION
ON MANITOU ISLANDS
TYPICAL VAULT TOILET
FOUNDATION DETAILS
ON MANITOU ISLANDS
TYPICAL VAULT TOILET
FOUNDATION DETAILS
ON MANITOU ISLANDS
SMI CHICAGO RD CHLORINATION AND
PRESSURE BUILDING
0 2 4
SMI CHLORINATION AND PRESSURE
BUILDING STRUCTURAL PLAN
SLEEPING BEAR DUNES NATIONAL LAKESHORE
FACILITY REHABILITATION
ON MANITOU ISLANDS
ST
AT E OF MICHIGAN
L ICENSED PROF ES S IONAL ENG
I N
EE
R
PHILIP J.
JOHNSON
License No.
6201038200
BUILDING STRUCT ELEV AND DTLS
SLEEPING BEAR DUNES NATIONAL LAKESHORE
FACILITY REHABILITATION
ON MANITOU ISLANDS
COMPONENT & CLADDING PRESSURES
ZONE 10 SF 20 SF 50 SF 100 SF
2n,2r,3e
COMPONENTS & CLADDING WIND PRESSURE (PSF)
3r
1,2e
ST
AT E OF MICHIGAN
L ICENSED PROF ES S IONAL ENG
I N
EE
R
PHILIP J.
JOHNSON
BUILDING FRAMING DETAILS
SLEEPING BEAR DUNES NATIONAL LAKESHORE
FACILITY REHABILITATION
ON MANITOU ISLANDS
ST
AT E OF MICHIGAN
L ICENSED PROF ES S IONAL ENG
I N
EE
R
PHILIP J.
JOHNSON
SMI CHICAGO RD STRUCTURAL
FOUNDATION PLAN & DETAILS
SLEEPING BEAR DUNES NATIONAL LAKESHORE
FACILITY REHABILITATION
ON MANITOU ISLANDS
ZONE ≤ 19.4 9 (ft )>19.4≤ 77.4 >77.4
COMPONENTS & CLADDING WIND PRESSURE (PSF)
COMPONENT & CLADDING WIND PRESSURES:
4,5
DESIGN WIND PRESSURE FOR ROOF END WALL (PSF)
4,5
ZONE 10 SF 20 SF 50 SF 100 SF
ST
AT E OF MICHIGAN
L ICENSED PROF ES S IONAL ENG
I N
EE
R
PHILIP J.
JOHNSON
ROOF PLANS AND DETAILS
SLEEPING BEAR DUNES NATIONAL LAKESHORE
FACILITY REHABILITATION
ON MANITOU ISLANDS
ST
AT E OF MICHIGAN
L ICENSED PROF ES S IONAL ENG
I N
EE
R
PHILIP J.
JOHNSON
SECTIONS AND DETAILS
SLEEPING BEAR DUNES NATIONAL LAKESHORE
FACILITY REHABILITATION
ON MANITOU ISLANDS
ST
AT E OF MICHIGAN
L ICENSED PROF ES S IONAL ENG
I N
EE
R
PHILIP J.
JOHNSON
ON MANITOU ISLANDS
SMI CHLORINATION AND PRESSURE /
BATTERY BUILDING
SMI PAVILION - DETAILS
L5
L5
GFCI
SLEEPING BEAR DUNES NATIONAL LAKESHORE
FACILITY REHABILITATION
ON MANITOU ISLANDS
ELECTRICAL CHICAGO RD PLANS -
SMI
GENERAL NOTES
1. REFER TO SHEET E0.0 FOR SYMBOLS AND
ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.
SHEET KEYNOTES #
1. PROVIDE 20A, 240V 1-PHASE POWER CONNECTION
FOR WELL PUMP CONTROLLER.
#10 PV WIRE W/#10 THWN GROUND.
APPROX 100' (FIELD CONFIRM LENGTH)
OUTSIDE INSIDE
#6 GND - STRANDED USED ON RACKING.
BARE OR GREEN (250.120 (C))STRING #1 (1) MODULE PER OPTIMIZER. (4)
OPTIMIZERS IN SERIES. 3.8 KW (DC) STC TOTAL
G
APPROX 10' FROM INVERTERS TO
COMBINER PANEL
INV-1
3.8 KW, 240 VAC, TRANSFORMERLESS
INTERNAL GFCI, AFCI, RAPID SHUTDOWN
AC AND DC DISCONNECT
L1 L2 N G
BATTERY DISCONNECT
TO GROUND ROD
20A
20A
GG
L1 L2
N
G
20A WELL PUMP
20A
LIGHTS
20A
DRINKING FOUNTAINS
20A
RECEPTACLES
30KWH BATTERY STRING
2. MOUNT FIXTURE JUST BELOW ROOF TRUSS BOTTOM
VIA SUPPLIED CHAIN.
3. PV MODULE (TYP).
2. PROJECT SHALL CONFORM TO THE REQUIREMENTS
OF THE NATIONAL ELECTRICAL CODE 2023 VERSION.
3#10, 1#10G - 3/4"C
#10 PV WIRE W/#10 THWN GROUND.
4. PROVIDE GROUND ROD TIED TO PV SYSTEM.
445W PV
MODULE (TYP)
TO WATER SERVICE
#8G
20A
PAVILION RECEPTACLES
5. NEUTRAL TO GROUND BOND.
6. ALL CONDUIT, EQUIPMENT, DEVICES, ETC. WITHIN
BUILDING SHALL BE RATED FOR CORROSIVE
ENVIRONMENT. NEMA 4X PANELBOARD.
AC-1
AC COMBINER PANEL 20A, 1PH, 3W
SCCR: 10KA
CALCULATED FAULT CURRENT: 0.02 KA
BENTH JOHNSON/KELDERHOUSE QTRS
TOBIN, JOHN & LOTTIE HOUSE QTRS
HUTZLER, GEORGE I & SELMA QTRS
ON MANITOU ISLANDS
HUTZLER, GEORGE C & MARY ANN
FARMHOUSE
HUTZLER, GEORGE C & MARY ANN BARN
HUTZLER, GEORGE C & MARY ANN BARN
HUTZLER, GEORGE C & MARY ANN SHED #1
HUTZLER, GEORGE C & MARY ANN SHED #2
HUTZLER, GEORGE C & MARY ANN SHED #2
ON MANITOU ISLANDS
KEELER, ORY & BETTY HOUSE QTRS
(SHIRK HOUSE)
SMI MAINTENANCE SHOP
SMI MAINTENANCE SHOP
ON MANITOU ISLANDS
USLSS DWELLING QTRS (SMI LIFE SAVING
STATION)
ON MANITOU ISLANDS
USLSS DWELLING QTRS (SMI LIFE SAVING
STATION)
KRAMER QTRS
KRAMER QTRS
ON MANITOU ISLANDS
ROBINETTE, RAY AND VIOLET HOUSE /
BURDICK
USLSS WOOD SHED
USLSS BOAT HOUSE #2
POST OFFICE TOM THOMPSON
ON MANITOU ISLANDS
HUTZLER, GEORGE C & MARY ANN CHICKEN
COOP
E. TOBIN COTTAGE
E. TOBIN COTTAGE
SMI ADDITIONAL BUILDING SCOPE
ON MANITOU ISLANDS
0 15 30 60 Feet
GENERAL NOTES
1. REFER TO SHEET E0.0 FOR SYMBOLS AND
ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.
SHEET KEYNOTES
1. EXISTING FEEDER WIRES FROM MAIN DISTRIBUTION
PANEL TO VILLAGE DISTRIBUTION PANEL TO BE
REMOVED AND REPLACED. CONDUIT IS EXISTING TO
REMAIN AND RE-USED. REFER TO SHEETS ED2.3,
E2.0 & E2.3 FOR ADDITIONAL INFORMATION.
2. PROJECT SHALL CONFORM TO THE REQUIREMENTS
OF THE NATIONAL ELECTRICAL CODE 2023 VERSION.
2. EXISTING VILLAGE DISTRIBUTION PANEL TO BE
REMOVED AND REPLACED. EXISTING FEEDS TO BE
RE-FED FROM NEW DISTRIBUTION PANEL. REFER TO
SHEETS ED2.3 & E2.0 FOR ADDITIONAL
INFORMATION.
3. EXISTING METERS TO BE DISCONNECTED AND
REMOVED.
4. EXISTING PULLBOX TO BE RE-USED FOR SPLICES TO
EXISTING VILLAGE POWER FEEDS.
5. EXISTING FEED FROM GENERATORS IN GENERATOR
BUILDING TO PV INVERTER IN MAINTENANCE
BUILDING TO BE REMOVED AND REPLACED. REFER
TO SHEETS ED2.3 & E2.0 FOR ADDITIONAL
INFORMATION.
3. CONTRACTOR TO FIELD VERITY EXACT LOCATION OF
EXISTING FEEDERS IN ADVANCE OF STARTING
EXCAVATION.
6. EXISTING FEED FROM PV INVERTER TO MAIN
DISTRIBUTION PANEL TO BE REMOVED AND
REPLACED. REFER TO SHEETS ED2.3 & E2.0 FOR
ADDITIONAL INFORMATION.
4. REFER TO SHEET CU2.0 FOR BUILDING/FACILITY
NAMES AND LOCATIONS ON SOUTH MANITOU ISLAND.
ELECTRICAL SITE DEMO PLAN -
SMI
5. THE PURPOSE OF THIS SHEET IS TO IDENTIFY
EXISTING CONDITIONS AND EXTENT OF EXISTING
MICRO-GRID EQUIPMENT TO BE REPLACED OR
REMOVED ON SOUTH MANITOU.
6. ALL DEMOLITION PLANS AND DEMOLITION NOTES
ARE INTENDED AS A GENERAL GUIDE TO THE
DEMOLITION REQUIRED FOR THIS PROJECT
BUT MAY NOT BE ALL INCLUSIVE. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO
VERIFY EXISTING CONDITIONS AND REMOVE OR
RE-WORK ALL EXISTING ELECTRICAL ITEMS,
EQUIPMENT, DEVICES, ETC... THAT INTERFERE WITH
NEW SCOPE SHOWN WITHIN PROJECT DOCUMENTS.
ON MANITOU ISLANDS
2 3
5 6
SHEET KEYNOTES
1. REMOVE EXISTING BATTERY BANK #1 & #2.
2. REMOVE EXISTING 250 AMP DISCONNECTS THAT
SERVE BATTERY BANK #1 & #2.
3. REMOVE EXISTING SOLAR PV ARRAY
DISCONNECTS #1 & #2.
4. REMOVE EXISTING 25KVA POWER INVERTER.
5. 125 AMP INVERTER LOAD DISCONNECT TO BE
REMOVED AND REPLACED.
6. REMOVE EXISTING 250 AMP DISCONNECTS THAT
SERVE BATTERY BANK #3 & #4.
7. REMOVE EXISTING BATTERY BANK #3 & #4.
8. REMOVE EXISTING 25KW ROOF MOUNTED PV
ARRAY.
GENERAL NOTES
1. THE PURPOSE OF THIS SHEET IS TO IDENTIFY
EXISTING CONDITIONS AND EXTENT OF EXISTING
MICRO-GRID EQUIPMENT TO BE REPLACED OR
REMOVED ON SOUTH MANITOU.
2. ALL DEMOLITION PLANS AND DEMOLITION NOTES
ARE INTENDED AS A GENERAL GUIDE TO THE
DEMOLITION REQUIRED FOR THIS PROJECT
BUT MAY NOT BE ALL INCLUSIVE. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO
VERIFY EXISTING CONDITIONS AND REMOVE OR
RE-WORK ALL EXISTING ELECTRICAL ITEMS,
EQUIPMENT, DEVICES, ETC... THAT INTERFERE WITH
NEW SCOPE SHOWN WITHIN PROJECT DOCUMENTS.
3. REFER TO DIVISION 1, 017419 SPECIFICATIONS FOR
DISPOSAL REQUIREMENTS OF HAZARDOUS
MATERIALS.
ELECTRICAL DEMO PLAN - SMI
ON MANITOU ISLANDS
2 34
SHEET KEYNOTES
1. EXISTING 40 KW GENERATORS A AND B TO BE
RELOCATED. REFER TO SHEETS ED2.3, E1.1 &
E1.4 FOR ADDITIONAL INFORMATION.
2. REMOVE EXISTING TRANSFER SWITCH.
3. REMOVE EXISTING MAIN DISTRIBUTION PANEL.
4. GENERATOR A AND B 125 AMP DISCONNECT
SWITCHES TO BE REMOVED.
5. EXISTING GENERATOR BLDG BRANCH PANEL
AND METER TO REMAIN.
3. THE PURPOSE OF THIS SHEET IS TO IDENTIFY
EXISTING CONDITIONS AND EXTENT OF EXISTING
MICRO-GRID EQUIPMENT TO BE REPLACED OR
REMOVED ON SOUTH MANITOU.
GENERAL NOTES
1. REFER TO SHEET E0.0 FOR SYMBOLS AND
ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.
2. PROJECT SHALL CONFORM TO THE REQUIREMENTS
OF THE NATIONAL ELECTRICAL CODE 2023 VERSION.
4. ALL DEMOLITION PLANS AND DEMOLITION NOTES
ARE INTENDED AS A GENERAL GUIDE TO THE
DEMOLITION REQUIRED FOR THIS PROJECT
BUT MAY NOT BE ALL INCLUSIVE. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO
VERIFY EXISTING CONDITIONS AND REMOVE OR
RE-WORK ALL EXISTING ELECTRICAL ITEMS,
EQUIPMENT, DEVICES, ETC... THAT INTERFERE WITH
NEW SCOPE SHOWN WITHIN PROJECT DOCUMENTS.
ELECTRICAL DEMO PLAN - SMI
ON MANITOU ISLANDS
4 4
6 7
MM M M
MAIN DISTRIBUTION PANEL
SHEET KEYNOTES
1. GENERATOR IS EXISTING TO BE RE-USED FOR
NORTH ISLAND. REFER TO SHEETS E1.1 AND E1.4
FOR ADDITIONAL INFORMATION. CONTRACTOR
RESPONSIBLE FOR RELOCATION OF BOTH
GENERATORS IN THIS CONTRACT.
GENERAL NOTES
1. REFER TO SHEET E0.0 FOR SYMBOLS AND
ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.
500A 120/208V, 3P, 4W+G
0/
GENERATOR
BUILDING
2. PROJECT SHALL CONFORM TO THE REQUIREMENTS
OF THE NATIONAL ELECTRICAL CODE 2023 VERSION.
0/
5/
5/
0/
LIGHT HOUSE
MAINTENANCE
SHOP
VANT HOUSE
GENERATOR A
40KW, 208V 3P 4W
GENERATOR B
40KW, 208V 3P 4W
VILLAGE DISTRIBUTION PANEL
500A 120/208V, 3P, 4W+G
0/
BOAT HOUSE NO. 1
0/
5/
0/
COAST GUARD
STATION
(USLSS DWELLING
QTRS)
VISITOR CENTER
(POST OFFICE)
BOAT HOUSE NO. 2
5/
JOHNSON (BENTH
HOUSE QTRS)
BURDICK COTTAGE
(ROBINETTE, RAY
AND VIOLET
HOUSE)
PV INVERTER
PV BATTERIES PV SOLAR
GENERATOR
TRANSFER SWITCH
5/
5. PV INVERTER TO BE REMOVED AND REPLACED.
REFER TO SHEET E2.1 FOR ADDITIONAL
INFORMATION.
9. MAIN DISTRIBUTION PANEL TO BE REMOVED AND
REPLACED. EXISTING PANEL FEEDS TO BE RE-FED
FROM NEW DISTRIBUTION PANEL. REFER TO
SHEETS E2.0, E2.3 & E2.4 FOR ADDITIONAL
INFORMATION.
11. VILLAGE DISTRIBUTION PANEL TO BE REMOVED AND
REPLACED. EXISTING FEEDS FROM PANEL TO BE
RE-FED FROM NEW DISTRIBUTION PANEL. REFER TO
SHEETS E2.0 & E2.3 FOR ADDITIONAL INFORMATION.
2. FEEDER FROM GENERATOR TO TRANSFER PANEL
TO BE REMOVED AND REPLACED. REFER TO SHEETS
E2.0 & E2.1 FOR ADDITIONAL INFORMATION.
3. GENERATOR TRANSFER PANEL TO BE REMOVED
AND REPLACED. REFER TO SHEET E2.1 FOR
ADDITIONAL INFORMATION.
4. FEEDER FROM TRANSFER PANEL TO PV INVERTER
TO BE REMOVED AND REPLACED. REFER TO SHEET
E2.1FOR ADDITIONAL INFORMATION.
6. PV BATTERIES AND FEED TO BE REMOVED AND
REPLACED. REFER TO SHEET E2.1 FOR ADDITIONAL
INFORMATION.
7. PV SOLAR AND FEED TO BE REMOVED AND
REPLACED. REFER TO SHEET E2.1 FOR ADDITIONAL
INFORMATION.
8. FEEDER FROM PV INVERTER TO MAIN DISTRIBUTION
PANEL TO BE REMOVED AND REPLACED. REFER TO
SHEET E2.3 FOR ADDITIONAL INFORMATION.
10. FEEDER WIRES FROM MAIN DISTRIBUTION PANEL TO
VILLAGE DISTRIBUTION PANEL TO BE REMOVED AND
REPLACED. CONDUIT IS EXISTING TO REMAIN AND
RE-USED. REFER TO SHEETS E2.0 & E2.3 FOR
ADDITIONAL INFORMATION.
3. CONTRACTOR TO FIELD VERITY EXACT LOCATION OF
EXISTING FEEDERS IN ADVANCE OF STARTING
EXCAVATION.
SMITH
(BENTH JOHNSON/KELDER
HOUSE QTRS)
5/
KRAMER
QUARTERS
5/
12. PULLBOX EXISTING TO BE RE-USED FOR EXISTING
FEED CONNECTIONS TO NEW DISTRIBUTION
PANELBOARD. REFER TO SHEET E2.3 FOR
ADDITIONAL INFORMATION.
ELECTRICAL DEMO ONE-LINE
DIAGRAM - AC - SMI
4. THE PURPOSE OF THIS SHEET IS TO IDENTIFY
EXISTING CONDITIONS AND EXTENT OF EXISTING
MICRO-GRID EQUIPMENT TO BE REPLACED OR
REMOVED ON SOUTH MANITOU.
5. ALL DEMOLITION PLANS AND DEMOLITION NOTES
ARE INTENDED AS A GENERAL GUIDE TO THE
DEMOLITION REQUIRED FOR THIS PROJECT
BUT MAY NOT BE ALL INCLUSIVE. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO
VERIFY EXISTING CONDITIONS AND REMOVE OR
RE-WORK ALL EXISTING ELECTRICAL ITEMS,
EQUIPMENT, DEVICES, ETC... THAT INTERFERE WITH
NEW SCOPE SHOWN WITHIN PROJECT DOCUMENTS.
ON MANITOU ISLANDS
0 30 60 120 Feet
SHEET KEYNOTES
1. PROVIDE NEW UNDERGROUND WIRE IN EXISTING
CONDUIT FROM NEW MAIN DISTRIBUTION PANEL IN
GENERATOR BUILDING TO NEW VILLAGE DISTRIBUTION
PANEL. REFER TO SHEET E2.3 FOR ADDITIONAL
INFORMATION.
GENERAL NOTES
1. REFER TO SHEET E0.0 FOR SYMBOLS AND
ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.
2. PROVIDE NEW EXTERIOR VILLAGE DISTRIBUTION
PANEL AT EXISTING LOCATION. REFER TO SHEET
E2.3 FOR ADDITIONAL INFORMATION. DISTRIBUTION
PANEL SHALL BE RATED FOR CORROSIVE
ENVIRONMENT, NEMA 4X.
2. PROJECT SHALL CONFORM TO THE REQUIREMENTS
OF THE NATIONAL ELECTRICAL CODE 2023 VERSION.
3. PROVIDE NEW FEED FROM GENERATORS IN
GENERATOR BUILDING TO GENERATOR
CONTROLLER IN MAINTENANCE BUILDING. REFER
TO SHEET E2.1 FOR ADDITIONAL
INFORMATION.
4. PROVIDE NEW FEED FROM MULTI-CONTROLLER BOX
IN MAINTENANCE BUILDING TO MAIN DISTRIBUTION
PANEL IN GENERATOR BUILDING . REFER TO SHEETS
E2.1 & E2.3 FOR ADDITIONAL INFORMATION.
ELECTRICAL SITE PLAN - SMI
3. REFER TO SHEET CU2.0 FOR BUILDING/FACILITY
NAMES AND LOCATIONS ON SOUTH MANITOU ISLAND.
5. PROVIDE NEW 20/1 BREAKER AND 20A, 120V POWER
CONNECTION FOR GASOLINE TANK PUMP FROM
EXISTING GENERATOR BUILDING LOAD CENTER.
FEED TO BE RUN UNDERGROUND. REFER TO SHEET
CF2.0 FOR EXACT LOCATION & SHEET E2.3 FOR
ADDITIONAL INFORMATION. ALL CONDUITS,
CONDUCTORS, HOUSINGS, EQUIPMENT, ETC SHALL
BE CLASS I, DIV I RATED.
ON MANITOU ISLANDS
TO AC DISTRIBUTION
SYSTEM. REFER TO
SHEET E2.3.
L2
L1
GENERATOR
CONTACTOR AND
CIRCUIT BREAKERS
L3
L1 L2 L3 N G
INV-2
L2
L1
L3
N
N
B-INV-1
BATTERY INVERTER
6.0 KW, 120 VAC,
TRANSFORMERLESS
L1
N G
L1
L2
L3
N G
G
BATTERY
DISCONNECT
G L3
L2
L1
N G
TO GND
REPEATS FOR B-INV 2 THRU 9
REPEATS FOR INV 2, 3, 4, & 5
INV-6 SHALL HAVE ONE STRING OF 5 AND TWO STRINGS OF 4, 1.8 KW (DC).
INV-7,8, & 9 SHALL HAVE THREE STRINGS OF 4 EACH.
AC-1
AC COMBINER PANEL 250A, 3PH, 4W
SCCR: 10KA
CALCULATED FAULT CURRENT: 1.37 KA
B-INV-2
96 KWH BATTERY STRING
GND
L2
L1
L3
N
G L2
L1
L3
N
GEN - 60KW, 208V 3P 4W
LOAD SHEDDING
CONTACTOR AND CIRCUIT
BREAKERS
BATTERY CONTACTORS AND
CIRCUIT BREAKERS
250A/3P
A
A
A
A
A
A
0A
/3 P
250A/3P
B-INV-3
INV-3
INV-4
INV-5
INV-6
B-INV-8
B-INV-9
MC-1
MULTI CONTROLLER BOX
250A - 208V, 3PH, 4W
SCCR: 10KA
CALCULATED FAULT CURRENT: 1.38 KA
INVERTER CIRCUIT BREAKER
250A/3P
A
A
A
L3
L2
B-INV-4
B-INV-7
G N
B-INV-5
B-INV-6
GENERAL NOTES
1. REFER TO SHEET E0.0 FOR SYMBOLS AND
ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.
2. PROJECT SHALL CONFORM TO THE REQUIREMENTS
OF THE NATIONAL ELECTRICAL CODE 2023 VERSION.
3#8, 1#8 N, 1#10 G, 3/4"C
3-250KCMIL, 1-250KCMIL N, 1#4 G, 2-1/2"C
3-250kcmil, 1-250kcmil N, 1#4 G, 2-1/2"C
3#4, 1#4 N, 1#10 G, 1-1/4"C
3#4, 1#4 N, 1#10 G, 1-1/4"C
3#4, 1#4 N, 1#10 G, 1-1/4"C
3.
3-250KCMIL, 1-250KCMIL N, 1#4 G,
2-1/2"C (UNDERGROUND)
GENERATOR BUILDING
(REFER TO DETAIL 3/E2.4)
MAINTENANCE BUILDING
(REFER TO DETAIL 1/E2.4)
#1/0
1#6 G
TO GND
#1/0
#6 GND - STRANDED USED TO GROUND
RACKING SYSTEM
#10 PV WIRE. APPROX 100' (FIELD CONFIRM LENGTH)
STRING #1 (1) MODULE PER OPTIMIZER. (5)
OPTIMIZERS IN SERIES. 2.3 KW (DC) STC TOTAL
G
STRING #3 (1) MODULE PER OPTIMIZER. (5) OPTIMIZERS
IN SERIES. 2.3 KW (DC) STC TOTAL
G
GND
INV-1
5.8 KW, 208 VAC, TRANSFORMERLESS
INTERNAL GFCI, AFCI, RAPID SHUTDOWN AC AND DC
DISCONNECT
L1
N
OUTSIDE INSIDE
GND
L2
DATA MANAGER
TO B-INV-1
TO AC DISTRIBUTION METER
TO EXISTING DATA RACK IN
MAINTENANCE OFFICE
RS-485
TO INV-2 THRU 6
CAT-5E
30A/2P
30A/2P
30A/2P
30A/2P
30A/2P
30A/2P
INV-7
30A/2P
INV-8
30A/2P
INV-9
30A/2P
0A
/3 P
EQUIPMENT SUMMARY:
· 5.8 KW PV INVERTERS: 9 INVERTERS, ARRANGED
FOR THREE PHASES.
· 6.0 KW BATTERY INVERTERS: 9 INVERTERS, 2 PER
PHASE.
· 96 KWH BATTERY STRINGS: 9 REQUIRED, TOTAL
CAPACITY OF 864 KWH.
· 445 W PV MODULES: 124 MODULES. MOUNTING:
ROOF.
· MULTI-CONTROLLER BOX: INTEGRATES PV,
BATTERY, AND GENERATOR INPUTS AND
OUTPUTS TO LOAD.
· DUAL GENERATOR AUTOMATIC TRANSFER
SWITCH: ALTERNATES USAGE BETWEEN 2
GENERATORS BASED ON RUN TIME. INCLUDES
COMMUNICATIONS MODULE FOR REMOTE
MONITORING VIA EXISTING ISLAND
COMMUNICATIONS SYSTEM.
· NEW 60 KW GENERATORS: 208V, THREE PHASE,
DIESEL FROM EXISTING CENTRAL STORAGE
TANK
· 250A AC COMBINER PANEL: 208V, THREE PHASE.
· DATA MANAGER: CAT5E ENABLED DEVICE ABLE
TO INTERFACE WITH INVERTERS TO PUBLISH PV
PRODUCTION DATA TO WEB PORTAL.
L2
L1
L3
N
DUAL GENERATOR AUTOMATIC
TRANSFER SWITCH
250A, 208V, 3PH
G
TO GND
L1
DATA MANAGER
TO B-INV-2
THRU 6RS-485
G
L2
L1
L3
N
GEN - 60KW, 208V 3P 4W
250A/3P
G
SHEET KEYNOTES
1. 2-WIRE GENERATOR START SIGNAL FROM MASTER
BATTERY INVERTER.
TO GND
ELECTRICAL ONE-LINE DIAGRAM -
MICROGRID - SMI
2. PROVIDE 120V, 1P, 20A CIRCUIT TO DATA MANAGER
USING 2#12 AND 1#12 GND IN 3/4"C FROM EXISTING
LOAD CENTER IN MAINTENANCE SHOP.
MICRO-GRID CONTROL
1. SOLAR PV ENERGY SHALL SUPPLY THE DISTRIBUTION
SYSTEM AND BATTERY ENERGY STORAGE.
2. WHEN PV PRODUCTION IS INSUFFICIENT FOR THE
DISTRIBUTION SYSTEM, STORED BATTERY ENERGY
SHALL BE USED IN ADDITION TO PV PRODUCTION.
3. BATTERY STORAGE LEVELS BELOW 30% SHALL START
THE GENERATOR. GENERATOR AND PV ENERGY SHALL
THEN SUPPLY THE DISTRIBUTION SYSTEM AND
BATTERY ENERGY STORAGE SYSTEM.
4. BATTERY STORAGE LEVELS ABOVE 80% SHALL SHUT
OFF THE GENERATOR. SYSTEM SHALL RETURN TO
RELYING ON SOLAR PV ENERGY AND/OR STORED
BATTERY ENERGY AS ABOVE.
GENERATOR AUTOMATIC TRANSFER SWITCH (ATS)
CONTROL
1. BATTERY INVERTER TO SEND AUTO-START SIGNAL TO
GENERATOR ATS UPON BATTERY STATE OF CHARGE
REACHING PROGRAMMED LEVELS.
2. ATS TO HAVE ALTERNATE SELECTOR SWITCH
ACTIVATED:
2.1. GENERATOR 1 AND GENERATOR 2 WILL ALTERNATE
IN THEIR STARTING PREFERENCE. UPON SIGNAL
FORM INVERTER TO START, IF GENERATOR 1 IS
SELECTED TO START, ON NEXT START SIGNAL,
GENERATOR 2 WILL BE SIGNALED TO START. AND
VICE VERSA.
2.2. IF PREFERRED GENERATOR FAILS TO START,
STANDBY GENERATOR IS SIGNALED TO START.
3. GENERATOR 1 PREFERRED SOURCE SWITCH
ACTIVATED
3.1. UPON SIGNAL FORM INVERTER TO START,
GENERATOR 1 IS SELECTED TO START. IN THE
EVENT GENERATOR 1 FAILS TO START, GENERATOR
2 SHALL BE SIGNALED TO START.
4. GENERATOR 2 PREFERRED SOURCE SWITCH
ACTIVATED
4.1. UPON SIGNAL FORM INVERTER TO START,
GENERATOR 2 IS SELECTED TO START. IN THE
EVENT GENERATOR 2 FAILS TO START, GENERATOR
1 SHALL BE SIGNALED TO START.
5. BATTERY INVERTER NO LONGER REQUESTS THE
GENERATOR SYSTEM:
5.1. UPON SIGNAL FROM BATTERY INVERTER TO SHUT
DOWN GENERATORS, THE ATS WILL BEGIN
RETRANSFER TO NORMAL SEQUENCE.
5.2. ATS INITIATES COOLDOWN CYCLE OF GENERATOR.
6. BATTERY INVERTER CARRIES OUT LOAD FREE
DISCONNECTION OF GENERATOR.
CONTROL SEQUENCE
ON MANITOU ISLANDS
SOLAR PV SYSTEM - MODULE DETAILS SOLAR PV SYSTEM - SYSTEM SUMMARY
Module Make LONGI SOLAR Estimated Annual System Production (Helioscope) 62,940 kWh/yr
Module LR4-72HBD-445M Tilt Angle / Azimuth of Array 18.4/217.5 Deg.
Rated Maximum Power (STC) 455 W System kW (dc) 56.4 kW (dc)
System kW (ac) 52.2 kW (ac)
SOLAR PV INVERTER & STRING COMBINER - DC SYSTEM DETAILS DC / AC ratio 1.08 Inverter Make SMA Inverter Model SUNNY BOY SOLAR PV SYSTEM - OVERALL SUMMARY Maximum System Voltage 480 V Quantity of Modules - PV Module Array Typical 124 Maximum Input Current / Maximum Short-Circuit Current 15A/60A Quantity of Inverters 9 Quantity of Inverters 9
SOLAR PV INVERTER - AC SYSTEM DETAILS (EACH INVERTER)
Rated Power at Nominal Voltage 5760 W Maximum Apparent Power 5760 VA Nominal AC Voltage / AC Voltage Range 240 V Maximum Output Current 24 A
Quantity of Modules - PV Module Array Typical 124
ELECTRICAL SHOCK HAZARD
LABEL LOCATION: TERMINALS IN INVERTERS, DISCONNECTS, AC
COMBINER BOXES, AND AC COMBINER PANELBOARDS.
WARNING!
MULTIPLE POWER SOURCES
WARNING!
LABEL LOCATION: ENERGY MONITORING EQUIPMENT AND INVERTERS.
WARNING!
PHOTOVOLTAIC PANEL
LABEL LOCATION: AC DISCONNECTS
WARNING!
LABEL LOCATION: DC TERMINALS IN INVERTERS AND DC COMBINER
BOXES
WARNING!
LABEL LOCATION: MULTICLUSTER BOX, MAIN DISTRIBUTION PANEL, AND POINT OF
INTERCONNECTION.
SOLAR
PHOTOVOLTAIC
MODULES
LABEL LOCATION: EVERY 8' ALONG DC CONDUITS, BEFORE AND AFTER EACH WALL OR
ROOF PENETRATION, EACH DC COMBINER BOX, AND ALL DC JUNCTION BOXES.
DO NOT TOUCH TERMINALS.
TERMINALS ON BOTH LINE
AND LOAD SIDES MAY BE
ENERGIZED IN OPEN
POSITION.
ELECTRICAL SHOCK HAZARD
ELECTRICAL SHOCK HAZARD
IF GROUND FAULT
INDICATED, ALL GROUNDED
CONDUCTORS MAY BE
UNGROUNDED AND
ENERGIZED.
THE DC CONDUCTORS OF
THIS PHOTOVOLTAIC
SYSTEM ARE
UNGROUNDED AND MAY
BE ENERGIZED.
GENERATOR POWER,
BATTERY POWER AND
SOLAR PHOTOVOLTAIC
POWER SOURCES
SUPPLYING THIS SYSTEM.
LABEL LOCATION: MULTICLUSTER BOX, MAIN DISTRIBUTION
PANEL, AND POINT OF INTERCONNECTION.
LABEL LOCATION: MULTICLUSTER BOX, MAIN DISTRIBUTION PANEL, AND AS REQUIRED BY AUTHORITY HAVING JURISDICTION.
PHOTOVOLTAIC SYSTEM HAS RAPID
SHUTDOWN DEVICE
WARNING
PHOTOVOLTAIC POWER SOURCE
SOLAR PV SYSTEM EQUIPPED
WITH RAPID SHUTDOWN
DO NOT ADD LOADS, THIS IS
A PHOTOVOLTAIC
COMBINER PANEL ONLY.
MICROGRID SYSTEM
PERFORMANCE SUMMARY - SMI
TURN RAPID
SHUTDOWN SWITCH
TO THE "OFF"
POSITION TO SHUT
DOWN PV SYSTEM
AND REDUCE SHOCK
HAZARD IN THE
ARRAY.
ON MANITOU ISLANDS
M M M M M
M M M M M M M M
M
MAIN DISTRIBUTION PANEL
SCCR: 10KA
CALCULATED FAULT CURRENT: 0.92 KA
250A 120/208V, 3P, 4W+G
0/
0/
5/
5/
0/
LIGHT HOUSEMAINTENANCE
SHOP
VANT HOUSE
SHEET KEYNOTES
1. PROVIDE SPLICE FOR EXISTING FEED TO NEW
DISTRIBUTION PANEL. CONFIRM EXISTING WIRE
SIZES AND MATCH IF DIFFERENT.
GENERAL NOTES
1. REFER TO SHEET E0.0 FOR SYMBOLS AND
ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.
2. PROJECT SHALL CONFORM TO THE REQUIREMENTS
OF THE NATIONAL ELECTRICAL CODE 2023 VERSION.
TO MICROGRID SYSTEM.
REFER TO SHEET E2.1.
3. LIGHT LINEWEIGHT IS EXISTING TO REMAIN AND
DARK LINEWEIGHT IS NEW WORK UNLESS NOTED
OTHERWISE.
3-250KCMIL, 1-250KCMIL N, 1#4 G, 2-1/2"C
(UNDERGROUND)
NEW 3-250KCMIL, 1-250KCMIL N, 1#4 G IN
EXISTING UNDERGROUND 6"C
VILLAGE DISTRIBUTION PANEL
(NEMA 4X, STAINLESS STEEL OUTDOOR ENCLOSURE)
SCCR: 10KA
CALCULATED FAULT CURRENT: 0.75 KA
250A 120/208V, 3P, 4W+G
0/
BOAT HOUSE NO. 1
0/
5/
0/
BOAT HOUSE NO. 2
5/
5/
5/
5/
TYP
2. RECONNECT EXISTING FEEDS TO NEW
DISTRIBUTION PANELBOARD.
EXISTING PULLBOX
2#3/0, 1#3/0 N, 2-1/2"C
2-300KCMIL, 1-300KCMIL N, 3"C
2#3/0, 1#3/0 N, 2-1/2"C 3#3/0, 1#3/0 N, 2-1/2"C
2#3/0, 1#3/0 N, 2"C
2-300KCMIL, 1-300KCMIL N, 3"C
2#4/0, 1#4/0 N, 2-1/2"C
3#4/0, 1#4/0 N, 2-1/2"C
COAST GUARD
STATION
(USLSS DWELLING
QTRS)
VISITOR CENTER
(POST OFFICE)
JOHNSON (BENTH
HOUSE QTRS)
BURDICK COTTAGE
(ROBINETTE, RAY
AND VIOLET
HOUSE)
SMITH
(BENTH JOHNSON/KELDER
HOUSE QTRS)
KRAMER
QUARTERS
GB
3. GROUNDING ELECTRODE FOR ENTIRE SYSTEM.
SIZED PER NEC TABLE 250.66.
/3
SP
AR
E
0/
SP
AR
E
ELECTRICAL ONE-LINE DIAGRAM -
AC - SMI
5/
SP
AR
E
5/
SP
AR
E
5/
SP
AR
E
MAIN
5/
SP
AR
E
5/
SP
AR
E
GENERATOR
BUILDING
1#12, 1#12N, 1#12G - 3/4"C
4. PROVIDE NEW 20/1 BREAKER AND 20A, 120V POWER
CONNECTION FOR GASOLINE TANK PUMP FROM
EXISTING GENERATOR BUILDING LOAD CENTER.
FEED TO BE RUN UNDERGROUND. REFER TO SHEET
CF2.0 FOR EXACT LOCATION & SHEET E2.3 FOR
ADDITIONAL INFORMATION. ALL CONDUITS,
CONDUCTORS, HOUSINGS, EQUIPMENT, ETC SHALL
BE CLASS I, DIV I RATED.
5/
SP
AR
E
SLAND MNTS
60KW GENERATOR 60KW GENERATOR
SLEEPING BEAR DUNES NATIONAL LAKESHORE
FACILITY REHABILITATION
ON MANITOU ISLANDS
SHEET KEYNOTES
1. PV MODULE, TYPICAL. REFER TO SHEET E2.2 FOR
ADDITIONAL INFORMATION AND QUANTITIES.
2. ROOF MOUNTED PV MODULES. ATTACH TO
EXISTING RAIL SYSTEM.
3. WALL MOUNTED, TYPICAL.
GENERAL NOTES
1. REFER TO SHEET E0.0 FOR SYMBOLS AND
ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.
2. PROJECT SHALL CONFORM TO THE REQUIREMENTS
OF THE NATIONAL ELECTRICAL CODE 2023 VERSION.
4. ROOF MOUNTED PV MODULES. ATTACH TO NEW RAIL
SYSTEM. CONTRACTOR TO PROVIDE AND INSTALL
NEW FLUSH RAIL AND MOUNTING SYSTEM
COMPATIBLE WITH EXISTING SHINGLE ROOF.
5. ROOF RIDGE.
ENLARGED EQUIPMENT PLAN -
SMI
3. REFER TO 263110 PV SPECIFICATION FOR PV SYSTEM
REQUIREMENTS. COORDINATE WITH STRUCTURAL.
4. MAINTAIN 6" CLEARANCE AROUND PV INVERTERS
AND 12" CLEARANCE AROUND BATTERY INVERTERS.
CONFIRM RECOMMENDED EQUIPMENT CLEARANCES
WITH MANUFACTURER.
TYPICAL ARCHITECTURAL DETAILS
TYPICAL CIVIL SEPTIC DETAILS
TYPICAL CIVIL WATER DETAILS
TYPICAL SWPPP DETAILS
ON MANITOU ISLANDS
ST
ATE OF MICHIGAN
LICENSED PROFESSIONAL ENG
INE
ER
TIMOTHY J.
HOGAN
License No.
6201065299
5/10/2024
NOTES:
1. PROVIDE EXPANSION JOINTS WHENEVER CONCRETE SLABS MEET OR ARE
ADJACENT TO WALLS OR FIXED STRUCTURES. (TYP)
2. MAX 30' SPACING BETWEEN EXPANSION JOINTS. (TYP)
3. MAXIMUM 10' SPACING BETWEEN EXPANSION & CONTROL JOINTS. (TYP)
4. ONE COMPONENT SILICONE SEALANT TO MEET ASTM C-920, TYPE S, GRADE
P, CLASS 25. COLOR SHALL BE GRAY.
2" MAX. JOINT
X X X X X X
6" BROOM FINISH CONCRETE
PAVING W/6x6 W2.9 X W2.9
WELDED WIRE MESH
CENTERED IN SLAB
4" AGGREGATE BASE COURSE
COMPACTED SUBGRADE
6" REINFORMCED CONCRETE
NOT TO SCALE
CF3.0
CONCRETE JOINT
NOT TO SCALE
CF3.0
TROWELED CONTROL JOINT
1/4" WIDE AND 1" DEEP
CONCRETE PAVING (TYP)
CONTROL JOINT (TYP)
TOOLED EDGE
1/4"RADIUS ON
EXPOSED SURFACES
TOOLED EDGE
1/4"RADIUS ON
EXPOSED
SURFACES
PRE-MOLDED EXPANSION
JOINT
NOTE:
1. 12 GA. TRACER WIRE TO BE BURIED WITH NON-METALLIC DIESEL LINE.
2. SEE SPECIFICATION SECTION 33 40 20 FOR WARNING TAPE AND TRACER WIRE
INFORMATION.
CF3.0
DIESEL PIPE TRENCH
NOT TO SCALE
FINISHED GRADE
DIESEL FUEL
LINE (TYP.)
6" MIN.
12 GA. TRACER
WIRE (TYP.)6" MIN.
6" MIN.
3' MAX.
SLOPE PER O.S.H.A.
STANDARDS
HAND PLACED AND TAMPED
GRANULAR BACKFILL PER
SPECIFICATIONS
DETECTABLE MARKING
TAPE (TYP.)
8" TO 10"
FINISHED SURFACE VARIES
GRANULAR BEDDING
PER SPECIFICATIONS
4'
1'
6" OVERLAP
FILTER FABRIC
GRAVEL STRIP ADJACENT TO EXISTING FENCE
NOT TO SCALE
CF3.0
X X X X X X
6"
AGGREGATE
BASE COURSE
6" BROOM FINISH
CONCRETE
COMPACTED
GRAVEL
EXISTING FENCE
TO REMAIN
EXISTING FENCE FOOTER
TO REMAIN (DEPTH AND
DIAMETER UNKNOWN)
ONE COMPONENT SILICONE
CONCRETE SEALANT
ONE COMPONENT SILICONE
CONCRETE SEALANT
TYPICAL DOCK DETAILS
TYPICAL PRECAST DETAILS
ABUTMENT & MOORING DETAILS
SAFETY LADDER DETAILS
TYPICAL STRUCTURAL DETAILS
FACILITY REHABILITATION
ON MANITOU ISLANDS
ST
AT E OF MICHIGAN
L ICENSED PROF ES S IONAL ENG
I N
EE
R
PHILIP J.
JOHNSON
| Sheets and Views |
| COVER |
| G0.0 SHEET INDEX |
| G0.1 PROJECT VICINITY MAP |
| G0.2 STAGING PLAN |
| G0.3 STAGING PLAN |
| G0.4 NMI STAGING PLAN |
| G0.5 SMI STAGING PLAN |
| G0.6 SMI CHICAGO RD STAGING PLAN |
| G0.7 NMI CLIN DEFINITION |
| G0.8 NMI EXTERIOR IMPROVEMENT CLINS DEFINITION |
| G0.9 SMI CLIN DEFINITION |
| G0.10 SMI EXTERIOR IMPROVEMENT CLINS DEFINITION |
| C0.0 CIVIL NOTES |
| CU0.0 CIVIL UTILITY NOTES |
| CS0.0 CIVIL SEPTIC NOTES |
| CW0.0 CIVIL WATER NOTES |
| CT0.0 CIVIL TRANSPORTATION NOTES |
| CT0.1 CIVIL TRANSPORTATION NOTES |
| S0.0 STRUCTURAL NOTES |
| S0.1 STRUCTURAL NOTES |
| CU1.0 NMI UTILITIES OVERVIEW |
| CS1.0 NMI SANITARY SEWER PLAN |
| CS1.1 NMI SANITARY SEWER PLAN |
| CS1.2 NMI SANITARY SEWER PLAN |
| CW1.0 NMI WATER DISTRIBUTION PLAN |
| CW1.1 NMI WATER DISTRIBUTION PLAN |
| CW1.2 NMI WATER DISTRIBUTION PLAN |
| CK1.0 NMI CHLORINATION AND PRESSURE BUILDING PLAN |
| SK1.0 NMI CHLORINATION AND PRESSURE BUILDING STRUCTURAL PLAN |
| SK1.1 NMI CHLORINATION AND PRESSURE BUILDING STRUCTURAL DETAILS |
| CT1.0 NMI DOCK DEMO PLAN |
| CT1.1 NMI DOCK PLAN |
| CT1.2 NMI DOCK PLAN |
| CT1.3 NMI DOCK FRAMING PLAN |
| CT1.4 NMI DOCK FRAMING PLAN |
| CT1.5 NMI DOCK MOORING PLAN |
| CT1.6 NMI DOCK PROFILE |
| CT1.7 NMI DOCK PROFILE |
| CG1.0 NMI DOCK PATH PLAN |
| CN1.0 NMI DOCK OVERVIEW PLAN - BASE BID |
| CN1.1 NMI DREDGE PLAN - BASE BID |
| CN1.2 NMI DREDGE CROSS-SECTIONS - BASE BID |
| CN1.3 NMI DREDGE CROSS-SECTIONS - BASE BID |
| CN1.4 NMI DREDGE DISPOSAL PLAN - BASE BID |
| CN1.5 NMI DREDGE DISPOSAL CROSS-SECTIONS - BASE BID |
| CN1.6 NMI SWPPP PLAN - BASE BID |
| SJ1.0 TRUDE COTTAGE STRUCTURAL FOUNDATION & ROOF PLANS |
| SJ1.1 TRUDE COTTAGE STRUCTURAL SECTIONS & DETAILS |
| CU2.0 SMI UTILITIES OVERVIEW |
| CS2.0 SMI SANITARY SEWER PLAN |
| CS2.1 SMI SANITARY SEWER PLAN |
| CW2.0 SMI WATER DISTRIBUTION PLAN |
| CW2.1 SMI WATER DISTRIBUTION PLAN |
| CK2.0 SMI CHLORINATION AND PRESSURE BUILDING PLAN |
| CT2.0 SMI DOCK DEMO PLAN |
| CT2.1 SMI DOCK PLAN |
| CT2.2 SMI DOCK PLAN |
| CT2.3 SMI DOCK FRAMING PLAN |
| CT2.4 SMI DOCK FRAMING PLAN |
| CT2.5 SMI DOCK MOORING PLAN |
| CT2.6 SMI DOCK PROFILE |
| CT2.7 SMI DOCK PROFILE |
| CN2.0 SMI SWPPP PLAN |
| CL2.0 SMI CHICAGO RD SITE PLAN |
| CL2.1 SMI CHICAGO RD GRADING PLAN |
| CL2.2 SMI CHICAGO RD |
| CL2.3 SMI CHICAGO RD TYPICAL SECTION |
| CL2.4 TYPICAL VAULT TOILET FOUNDATION DETAILS |
| CL2.5 TYPICAL VAULT TOILET FOUNDATION DETAILS |
| CL2.6 SMI CHICAGO RD CHLORINATION AND PRESSURE BUILDING |
| SL2.0 SMI CHLORINATION AND PRESSURE BUILDING STRUCTURAL PLAN |
| SL2.1 SMI CHLORINATION AND PRESSURE BUILDING STRUCT ELEV AND DTLS |
| SL2.2 SMI CHLORINATION AND PRESSURE BUILDING FRAMING DETAILS |
| SL2.3 SMI CHICAGO RD STRUCTURAL FOUNDATION PLAN & DETAILS |
| SL2.4 SMI CHICAGO RD STRUCTURAL ROOF PLANS AND DETAILS |
| SL2.5 SMI CHICAGO RD STRUCTURAL SECTIONS AND DETAILS |
| CS3.0 TYPICAL CIVIL SEPTIC DETAILS |
| CW3.0 TYPICAL CIVIL WATER DETAILS |
| CW3.1 TYPICAL CIVIL WATER DETAILS |
| CW3.2 TYPICAL CIVIL WATER DETAILS |
| CN3.0 TYPICAL SWPPP DETAILS |
| CT3.0 TYPICAL DOCK DETAILS |
| CT3.1 TYPICAL DOCK DETAILS |
| CT3.2 TYPICAL DOCK DETAILS |
| CT3.3 TYPICAL DOCK DETAILS |
| CT3.4 TYPICAL PRECAST DETAILS |
| CT3.5 ABUTMENT & MOORING DETAILS |
| CT3.6 SAFETY LADDER DETAILS |
| S3.0 TYPICAL STRUCTURAL DETAILS |