B08_Attachment_4_SLBE_318729_-_FINAL_DWG_CDs_Part_2_(reduced).pdf

PDF 31 MB Posted

Attached to
SLBE 318729 Comprehensive Facility Rehabilitation
Solicitation number
140P2024R0048
Issued by

About this file

This document appears to be Attachment 4 - SLBE 318729 FINAL DWG CDs Part 2 (reduced) related to the federal contract opportunity for SLBE 318729 Comprehensive Facility Rehabilitation on Manitou Islands. The contract is solicited by the Department of the Interior National Park Service National Office. The attachment likely contains technical drawings or construction documents associated with the facility rehabilitation project. No further details on the specific products, services, or requirements for the contract opportunity are provided in this attachment. The key details would need to be summarized from the main solicitation documents.

View the file

Other files

File Type Posted
Amend_07_Attachment_0007.pdf PDF
Sol_140P2024R0048_Amd_0007.pdf PDF
2011_South_Manitou_Island_Geotechnical_Report_0006.pdf PDF
Sheet_CT3_5_-_Abutment_and_Mooring_Details_0006.pdf PDF
Section_33_11_13_-_Water_Supply_Well_0006.pdf PDF
Section_31_62_16_-_Steel_Piling_Marine_0006.pdf PDF
Section_01_33_23B_-_Submittal_List_0006.pdf PDF
1984_Engineering_Survey___Design_Study_-_Manitou_Islands_0006.pdf PDF
2024_08_29_SLBE_318729_Amendment_006_Q_A_0006.pdf PDF
Section_01_11_00_-_Summary_Of_Work_0006.pdf PDF
1985_Sleeping_Bear_Prelim_Design_Rpt_N_Manitou_Dock_0006.pdf PDF
Sol_140P2024R0048_Amd_0006.pdf PDF
Sol_140P2024R0048_Amd_0005.pdf PDF
Amend_05_Attachment_0005.pdf PDF
Amend_04_Attachment_0004.pdf PDF
Sol_140P2024R0048_Amd_0004.pdf PDF
Sol_140P2024R0048_Amd_0003.pdf PDF
Amend_03_140P2024R0048_Attachment_0003.pdf PDF
Sol_140P2024R0048_Amd_0002.pdf PDF
B11_Industry_Day_Sign_In_0002.pdf PDF
B11_Pre-Bid_Sign_In_0002.pdf PDF
B09_Amend_1_Attachment_11_SLBE_318729_-_Contract_Price_Schedule_-_BLANK_0001.xlsx XLSX spreadsheet
B09_Amend_1_Attachment_3_SLBE_318729_-_FINAL_DWG_CDs_Part_1_(reduced)_0001.pdf PDF
Sol_140P2024R0048_Amd_0001.pdf PDF
B09_Amend_1_Attachment_1_SLBE_318729_-_Project_Manual_Part_1_of_2(reduced)__0001.pdf PDF
B08_140P2024R0048_SLBE_318729_Solicitation_Package.pdf PDF
B08_Attachment_8_Small_Business_Participation_Document.docx DOCX document
B08_Attachment_11_SLBE_318729_-_Contract_Price_Schedule_-_BLANK_-_FINAL_CDs.xlsx XLSX spreadsheet
B08_Attachment_2_SLBE_318729_-_Project_Manual_Part_2_(reduced).pdf PDF
Sol_140P2024R0048.pdf PDF
B08_Attachment_6_Past_Performance_Questionnaire.docx DOCX document
B08_Attachment_5_Project_Experience_Questionnaire.docx DOCX document
B08_Attachment_3_SLBE_318729_-_FINAL_DWG_CDs_Part_1_(reduced).pdf PDF
B08_Attachment_7_General_References.docx DOCX document
B08_Attachment_1_SLBE_318729_-_Project_Manual_Part_1_of_2(reduced)_.pdf PDF
B08_Attachment_9_Subcontracting_Plan_Form.docx DOCX document
B08_Attachment_10_Wage_Determinations.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET INDEX

SLEEPING BEAR DUNES NATIONAL LAKESHORE

FACILITY REHABILITATION

ON MANITOU ISLANDS

3 5

SLEEPING BEAR DUNES NATIONAL LAKESHORE

FACILITY REHABILITATION

ON MANITOU ISLANDS

0 50 100 200 Feet

GENERAL NOTES

1. REFER TO SHEET E0.0 FOR SYMBOLS AND

ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.

SHEET KEYNOTES

1. EXISTING UNDERGROUND MAIN ELECTRICAL

SERVICE FEEDER LOOPS TO REMOVED AND

REPLACED (TOTAL OF 2 FEEDS). DISCONNECT

FEEDS FROM EXISTING VILLAGE DISTRIBUTION

PANEL IN GENERATOR ROOM OF MAINTENANCE

SHED AND AT EXISTING TAP BOXES. EXISTING TAP

BOXES TO BE REMOVED AND REPLACED. EXISTING

SUB FEED TAPS TO REMAIN. REFER TO SHEET ED1.2

FOR ADDITIONAL INFORMATION. REFER TO SHEETS

E1.0 & E1.3 FOR NEW WORK SCOPE.#

2. REMOVE EXISTING TAP CONDUCTORS BETWEEN TAP

BOX AND EXISTING WELL PUMP HOUSE.

3. EXISTING WELL PUMP HOUSE TO BE DEMOLISHED.

PROTECT EXISTING FEED TO RESIDENTIAL HOUSE

FOR EXTENSION TO NEW CHLORINATION &

PRESSURE BUILDING PANEL. REFER TO SHEET E1.0

FOR ASSOCIATED ELECTRICAL RE-WORK REQUIRED.

4. EXISTING TRUDE COTTAGE. ALL EXISTING

ELECTRICAL SYSTEMS ARE TO BE CAREFULLY

REMOVED, MINIMIZING DAMAGE TO EXISTING

INTERIOR WALLS AND CEILINGS TO THE

EXTENT POSSIBLE. REFER TO SHEET EJ1.0 FOR

NEW WORK SCOPE.

2. PROJECT SHALL CONFORM TO THE REQUIREMENTS

OF THE NATIONAL ELECTRICAL CODE 2023 VERSION.

EXISTING TAP BOX TO BE REMOVED AND REPLACED.

REFER TO SHEET E1.0 FOR ADDITIONAL INFORMATION.

5.

EXISTING PV EQUIPMENT TO BE REMOVED AND

REPLACED. REMOVE EXISTING PV SOLAR ARRAYS

AND UNDERGROUND FEED BACK TO PV EQUIPMENT

IN EQUIPMENT ROOM OF MAINTENANCE SHED.

6.

4. REFER TO SHEET CU1.0 FOR BUILDING/FACILITY

NAMES AND LOCATIONS ON NORTH MANITOU ISLAND.

6. ALL DEMOLITION PLANS AND DEMOLITION NOTES

ARE INTENDED AS A GENERAL GUIDE TO THE

DEMOLITION REQUIRED FOR THIS PROJECT

BUT MAY NOT BE ALL INCLUSIVE. IT SHALL BE THE

RESPONSIBILITY OF THE CONTRACTOR TO

VERIFY EXISTING CONDITIONS AND REMOVE OR

RE-WORK ALL EXISTING ELECTRICAL ITEMS,

EQUIPMENT, DEVICES, ETC... THAT INTERFERE WITH

NEW SCOPE SHOWN WITHIN PROJECT DOCUMENTS.

ELECTRICAL SITE DEMO PLAN -

NMI

5. THE PURPOSE OF THIS SHEET IS TO IDENTIFY

EXISTING CONDITIONS AND EXTENT OF EXISTING

MICRO-GRID EQUIPMENT TO BE REPLACED OR

REMOVED ON NORTH MANITOU.

3. CONTRACTOR TO FIELD VERITY EXACT LOCATION OF

EXISTING FEEDERS IN ADVANCE OF STARTING

EXCAVATION.

05/10/2024

SLEEPING BEAR DUNES NATIONAL LAKESHORE

FACILITY REHABILITATION

ON MANITOU ISLANDS

5 6

7 8

11 12

SHEET KEYNOTES

1. EXISTING VILLAGE DISTRIBUTION PANEL TO BE

REPLACED.

2. MAINTENANCE SHED POWER METER TO REMAIN.

3. REMOVE INCOMING SOLAR ARRAY DISCONNECT

SWITCH.

4. REMOVE EXISTING POWER INVERTER.

5. REMOVE EXISTING 125A, 240V GENERATOR A

CIRCUIT BREAKER TO REMAIN.

6. REMOVE EXISTING 125A, 240V GENERATOR B

CIRCUIT BREAKER.

7. REMOVE EXISTING 120V BATTERY BANK #2

DISCONNECT.

8. REMOVE EXISTING 120V BATTERY BANK #1

DISCONNECT.

9. REMOVE EXISTING GENERATOR. EC TO VERIFY

WITH NPS CONTRACTING OFFICER WHETHER

GENERATORS ARE TO BE SALVAGED,

MAINTAINED IN GOOD OPERATION CONDITION

AND TURNED OVER TO NPS FOR SALVAGE OR IF

EC IS TO REMOVE THEM FROM SITE/ISLAND.

10. REMOVE EXISTING BATTERY BANK #1.

11. REMOVE EXISTING BATTERY BANK #1

DISCONNECT.

12. REMOVE EXISTING BATTERY BANK #2

DISCONNECT.

13. REMOVE EXISTING BATTERY BANK #2.

GENERAL NOTES

1. REFER TO SHEET E0.0 FOR SYMBOLS AND

ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.

2. PROJECT SHALL CONFORM TO THE REQUIREMENTS

OF THE NATIONAL ELECTRICAL CODE 2023 VERSION.

3. THE PURPOSE OF THIS SHEET IS TO IDENTIFY

EXISTING CONDITIONS AND EXTENT OF EXISTING

MICRO-GRID EQUIPMENT TO BE REPLACED OR

REMOVED ON NORTH MANITOU.

4. ALL DEMOLITION PLANS AND DEMOLITION NOTES

ARE INTENDED AS A GENERAL GUIDE TO THE

DEMOLITION REQUIRED FOR THIS PROJECT

BUT MAY NOT BE ALL INCLUSIVE. IT SHALL BE THE

RESPONSIBILITY OF THE CONTRACTOR TO

VERIFY EXISTING CONDITIONS AND REMOVE OR

RE-WORK ALL EXISTING ELECTRICAL ITEMS,

EQUIPMENT, DEVICES, ETC... THAT INTERFERE WITH

NEW SCOPE SHOWN WITHIN PROJECT DOCUMENTS.

ELECTRICAL DEMO PLAN - NMI

5. REFER TO DIVISION 1, 017419 SPECIFICATIONS FOR

DISPOSAL REQUIREMENTS OF HAZARDOUS

MATERIALS.

ON MANITOU ISLANDS

M

2 2

EXISTING VILLAGE

FEEDER '1'

3#4/0, 1#3GND

EXISTING VILLAGE

FEEDER '2'

3#4/0, 1#3GND

VILLAGE DISTRIBUTION PANEL

NORTH LODGE

(USLSS LIFEBOAT STATION QTRS)

MAIN LODGE

(USLSS DWELLING QTRS)

SOUTH LODGE

(USLSS CREW READY QTRS)

MAINTENANCE

BUILDING

DOCK

CARE-TAKER HOUSE

(HANS HALSETH HOUSE)

BEACH CART

USCG GENERATOR BUILDING

(LAUNDRY)

WELL PUMP HOUSE

SHEET KEYNOTES

1. VILLAGE DISTRIBUTION PANEL TO BE REMOVED AND

REPLACED. EXISTING PANEL FEEDS TO BE

RE-FED FROM NEW DISTRIBUTION PANEL UNLESS

NOTED OTHERWISE. REFER TO SHEETS ED1.0, ED1.1

& E1.3 FOR ADDITIONAL INFORMATION.

GENERAL NOTES

1. REFER TO SHEET E0.0 FOR SYMBOLS AND

ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.

200A - 120/240V 3W+G

0/

0/

0/

MAINTENANCE SHED

0/

SAWMILL

2. PROJECT SHALL CONFORM TO THE REQUIREMENTS

OF THE NATIONAL ELECTRICAL CODE 2023 VERSION.

4. REMOVE EXISTING TAP CONDUCTORS BETWEEN TAP

BOX AND EXISTING WELL PUMP HOUSE. REFER TO

SHEET ED1.0 FOR ADDITIONAL INFORMATION.

3. EXISTING TAP BOX TO BE REMOVED AND REPLACED

(TYP).

2. EXISTING UNDERGROUND MAIN ELECTRICAL

SERVICE FEEDER LOOP TO BE REMOVED AND

REPLACED. EXISTING SUB FEED TAPS TO REMAIN.

REFER TO SHEETS ED1.0 & E1.3 FOR ADDITIONAL

INFORMATION.

5. ALL DEMOLITION PLANS AND DEMOLITION NOTES

ARE INTENDED AS A GENERAL GUIDE TO THE

DEMOLITION REQUIRED FOR THIS PROJECT

BUT MAY NOT BE ALL INCLUSIVE. IT SHALL BE THE

RESPONSIBILITY OF THE CONTRACTOR TO

VERIFY EXISTING CONDITIONS AND REMOVE OR

RE-WORK ALL EXISTING ELECTRICAL ITEMS,

EQUIPMENT, DEVICES, ETC... THAT INTERFERE WITH

NEW SCOPE SHOWN WITHIN PROJECT DOCUMENTS.

4. THE PURPOSE OF THIS SHEET IS TO IDENTIFY

EXISTING CONDITIONS AND EXTENT OF EXISTING

ELECTRICAL DISTRIBUTION TO BE REPLACED OR

REMOVED ON NORTH MANITOU.

ELECTRICAL DEMO ONE-LINE

DIAGRAM - AC - NMI

3. CONTRACTOR TO FIELD VERITY EXACT LOCATION OF

EXISTING FEEDERS IN ADVANCE OF STARTING

EXCAVATION.

SLEEPING BEAR DUNES NATIONAL LAKESHORE

FACILITY REHABILITATION

ON MANITOU ISLANDS

0 50 100 200 Feet

E1.4

E1.4 SHEET KEYNOTES #

GENERAL NOTES

1. REFER TO SHEET E0.0 FOR SYMBOLS AND

ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.

1. PROVIDE NEW UNDERGROUND FEEDERS FROM MAIN

DISTRIBUTION PANEL IN GENERATOR ROOM IN

MAINTENANCE SHED TO NEW TAP BOX. REFER TO

SHEET E1.3 FOR ADDITIONAL INFORMATION.

2. PROJECT SHALL CONFORM TO THE REQUIREMENTS

OF THE NATIONAL ELECTRICAL CODE 2023 VERSION.

3. PROVIDE NEW CONDUCTORS FROM NEW TAP BOX TO

SERVE NEW CHLORINATION & PRESSURE BUILDING.

REFER TO SHEET E1.3 FOR ADDITIONAL INFORMATION.

NEW CHLORINATION & PRESSURE BUILDING. REFER

TO SHEET EK1.0 FOR ADDITIONAL INFORMATION.

5.

PROVIDE NEW UNDERGROUND FEEDER FROM NEW

TAP BOX TO EXISTING TRUDE COTTAGE. REFER TO

SHEET E1.3 FOR ADDITIONAL INFORMATION.

TRUDE COTTAGE. REFER TO SHEET EJ1.0 FOR NEW

ELECTRICAL SYSTEM DESIGN.

7.

PROVIDE NEW 11"X9"X6-3/4" QUAZITE BOX FOR TAP OF

EXISTING RESIDENTIAL FEED AT EXISTING WELL PUMP

HOUSE LOCATION. PROVIDE NEW UNDERGROUND

CONDUCTORS TO NEW CHLORINATION & PRESSURE

BUILDING PANEL. REFER TO SHEETS E1.3 & EK1.0 FOR

ADDITIONAL INFORMATION.

8.

PROVIDE NEW UNDERGROUND CABLING FROM PV

ARRAYS BACK TO PV INVERTERS LOCATED IN

EQUIPMENT ROOM IN MAINTENANCE SHED. REFER

TO E1.4 FOR ADDITIONAL INFORMATION.

6.

4.

2. PROVIDE NEW 11"X18"X12" TAP BOX & RECONNECT

EXISTING TAP FEEDER TO NEW MAIN LOOP FEEDER.

REFER TO SHEET E1.3 FOR ADDITIONAL

INFORMATION.

3. REFER TO SHEET CU1.0 FOR BUILDING/FACILITY

NAMES AND LOCATIONS ON NORTH MANITOU ISLAND.

ELECTRICAL SITE PLAN - NMI

FIELD VERIFY TAP CONNECTION BOX SIZE

REQUIREMENTS AT ALL LOCATIONS (TYP).

9.

ON MANITOU ISLANDS

#6 GND - STRANDED USED TO GROUND

RACKING SYSTEM

#10 PV WIRE. APPROX 100' (FIELD CONFIRM LENGTH)

STRING #1 (6) MODULES IN SERIES. 2.3 KW (DC)

STC TOTAL

G

STRING #3 (6) MODULES IN SERIES. 2.3 KW (DC) STC

TOTAL

G

GND

INV-1

5.8 KW, 208 VAC, TRANSFORMERLESS

INTERNAL GFCI, AFCI, RAPID SHUTDOWN AC AND DC

DISCONNECT

L1

N

OUTSIDE INSIDE

TO AC DISTRIBUTION SYSTEM.

REFER TO SHEET E1.3.

L2

L1

GENERATOR

CONTACTOR AND

CIRCUIT BREAKERS

L3

L1 L2 L3 N G

L2

L1

L3

N

N

B-INV-1

BATTERY INVERTER

6.0 KW, 120 VAC,

TRANSFORMERLESS

L1

N G

L1

L2

L3

N G

G

BATTERY

DISCONNECT

G L3

L2

N G

TO GND

REPEATS FOR B-INV 2 & 3

REPEATS FOR INV 2,3,4,5 & 6

AC-1

AC COMBINER PANEL 200A, 3PH, 4W

SCCR: 10KA

CALCULATED FAULT CURRENT: 0.97 KA

B-INV-2

96 KWH BATTERY STRING

GND

GND

L2

L1

L3

N

G

L2

L1

L3

N

L2

L1

L3

N

EXISTING

GEN - 40KW, 208V 3P 4W

EXISTING

GEN - 40KW, 208V 3P 4W

L2

L1

L3

N

30A/2P

LOAD SHEDDING

CONTACTOR AND CIRCUIT

BREAKERS

BATTERY CONTACTORS AND

CIRCUIT BREAKERS

L2

200A/3P

A

A

A

A

A

0A

/3 P

150A/3P

150A/3P

B-INV-3

DUAL GENERATOR AUTOMATIC

TRANSFER SWITCH

150A, 208V, 3PH

B-INV-5

MC-1

MULTI CONTROLLER BOX

200A - 208V, 3PH, 4W

SCCR: 10KA

CALCULATED FAULT CURRENT: 0.98 KA

INVERTER CIRCUIT BREAKER

200A/3P

GENERAL NOTES

1. REFER TO SHEET E0.0 FOR SYMBOLS AND

ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.

2. PROJECT SHALL CONFORM TO THE REQUIREMENTS

OF THE NATIONAL ELECTRICAL CODE 2023 VERSION.

SHEET KEYNOTES

1. EXISTING GENERATOR RELOCATED FROM SOUTH

ISLAND. CONTRACTOR RESPONSIBLE FOR

RELOCATION OF BOTH GENERATORS IN THIS

CONTRACT.

INV-2

INV-3

INV-4

INV-5

3#3/0, 1#3/0 N, 1#6 G, 2"C

3#1/0, 1#1/0 N, 1#6G, 2"C

3#4, 1#4 N, 1#10 G, 1-1/4"C

3.

#1/0

1#6 G

B-INV-4

A

L1

B-INV-6

INV-6

30A/2P

30A/2P

30A/2P

30A/2P

30A/2P

2#10, 1#10 N, 1#10 G, 3/4"C

DATA MANAGER

TO B-INV-1

TO AC DISTRIBUTION METER

TO EXISTING DATA RACK IN

MAINTENANCE OFFICE

0A

/3 P

3#1/0, 1#1/0 N, 1#6G, 2"C

ELECTRICAL ONE-LINE DIAGRAM -

MICROGRID - NMI

3#4, 1#4 N, 1#10 G, 1-1/4"C

RS-485

G

G

3#1/0, 1#1/0 N, 1#6G, 2"C

G

TO GND

TO GND

EQUIPMENT SUMMARY:

· 5.8 KW PV INVERTERS: 6 INVERTERS, ARRANGED

FOR THREE PHASES.

· 6.0 KW BATTERY INVERTERS: 6INVERTERS, 2 PER

PHASE.

· 96 KWH BATTERY STRINGS: 6 REQUIRED, TOTAL

CAPACITY OF 576 KWH.

· 445 W PV MODULES: 90 MODULES. MOUNTING:

GROUND.

· MULTI-CONTROLLER BOX: INTEGRATES PV,

BATTERY, AND GENERATOR INPUTS AND

OUTPUTS TO LOAD.

· DUAL GENERATOR AUTOMATIC TRANSFER

SWITCH: ALTERNATES USAGE BETWEEN 2

GENERATORS BASED ON RUN TIME. INCLUDES

COMMUNICATIONS MODULE FOR REMOTE

MONITORING VIA EXISTING ISLAND

COMMUNICATIONS SYSTEM.

· 40 KW GENERATORS: EXISTING (RELOCATED),

208V, THREE PHASE, DIESEL FROM EXISTING

CENTRAL STORAGE TANK.

· 200A AC COMBINER PANEL: 208V, THREE PHASE.

· DATA MANAGER: CAT5E ENABLED DEVICE ABLE

TO INTERFACE WITH INVERTERS TO PUBLISH PV

PRODUCTION DATA TO WEB PORTAL.

2. 2-WIRE GENERATOR START SIGNAL FROM MASTER

BATTERY INVERTER.

TO INV-2 THRU 6

CAT-5E

DATA MANAGER

TO B-INV-2

THRU 6RS-485

#1/0

MICRO-GRID CONTROL

1. SOLAR PV ENERGY SHALL SUPPLY THE DISTRIBUTION

SYSTEM AND BATTERY ENERGY STORAGE.

2. WHEN PV PRODUCTION IS INSUFFICIENT FOR THE

DISTRIBUTION SYSTEM, STORED BATTERY ENERGY

SHALL BE USED IN ADDITION TO PV PRODUCTION.

3. BATTERY STORAGE LEVELS BELOW 30% SHALL START

THE GENERATOR. GENERATOR AND PV ENERGY SHALL

THEN SUPPLY THE DISTRIBUTION SYSTEM AND

BATTERY ENERGY STORAGE SYSTEM.

4. BATTERY STORAGE LEVELS ABOVE 80% SHALL SHUT

OFF THE GENERATOR. SYSTEM SHALL RETURN TO

RELYING ON SOLAR PV ENERGY AND/OR STORED

BATTERY ENERGY AS ABOVE.

GENERATOR AUTOMATIC TRANSFER SWITCH (ATS)

CONTROL

1. BATTERY INVERTER TO SEND AUTO-START SIGNAL TO

GENERATOR ATS UPON BATTERY STATE OF CHARGE

REACHING PROGRAMMED LEVELS.

2. ATS TO HAVE ALTERNATE SELECTOR SWITCH

ACTIVATED:

2.1. GENERATOR 1 AND GENERATOR 2 WILL ALTERNATE

IN THEIR STARTING PREFERENCE. UPON SIGNAL

FORM INVERTER TO START, IF GENERATOR 1 IS

SELECTED TO START, ON NEXT START SIGNAL,

GENERATOR 2 WILL BE SIGNALED TO START. AND

VICE VERSA.

2.2. IF PREFERRED GENERATOR FAILS TO START,

STANDBY GENERATOR IS SIGNALED TO START.

3. GENERATOR 1 PREFERRED SOURCE SWITCH

ACTIVATED

3.1. UPON SIGNAL FORM INVERTER TO START,

GENERATOR 1 IS SELECTED TO START. IN THE

EVENT GENERATOR 1 FAILS TO START, GENERATOR

2 SHALL BE SIGNALED TO START.

4. GENERATOR 2 PREFERRED SOURCE SWITCH

ACTIVATED

4.1. UPON SIGNAL FORM INVERTER TO START,

GENERATOR 2 IS SELECTED TO START. IN THE

EVENT GENERATOR 2 FAILS TO START, GENERATOR

1 SHALL BE SIGNALED TO START.

5. BATTERY INVERTER NO LONGER REQUESTS THE

GENERATOR SYSTEM:

5.1. UPON SIGNAL FROM BATTERY INVERTER TO SHUT

DOWN GENERATORS, THE ATS WILL BEGIN

RETRANSFER TO NORMAL SEQUENCE.

5.2. ATS INITIATES COOLDOWN CYCLE OF GENERATOR.

6. BATTERY INVERTER CARRIES OUT LOAD FREE

DISCONNECTION OF GENERATOR.

CONTROL SEQUENCE

3. PROVIDE 120V, 1P, 20A CIRCUIT TO DATA MANAGER

USING 2#12 AND 1#12 GND IN 3/4"C FROM EXISTING

LOAD CENTER IN MAINTENANCE SHED.

ON MANITOU ISLANDS

SOLAR PV SYSTEM - MODULE DETAILS SOLAR PV SYSTEM - SYSTEM SUMMARY

Module Make LONGI SOLAR Estimated Annual System Production (Helioscope) 51,310 kWh/yr

Module LR4-72HBD-445M Tilt Angle / Azimuth of Arrays 25/180 Deg.

Rated Maximum Power (STC) 455 W System kW (dc) 40.1 kW (dc)

System kW (ac) 34.6 kW (ac)

SOLAR PV INVERTER - DC SYSTEM DETAILS DC / AC ratio 1.16

Inverter Make SMA

Inverter Model SUNNY BOY SOLAR PV SYSTEM - OVERALL SUMMARY Maximum System Voltage 480 V Quantity of Modules - PV Module Array Typical 90 Maximum Input Current / Maximum Short-Circuit Current 15A/60A Quantity of Inverters 6 Quantity of Inverters 6

SOLAR PV INVERTER - AC SYSTEM DETAILS (EACH INVERTER)

Rated Power at Nominal Voltage 5760 W Maximum Apparent Power 5760 VA Nominal AC Voltage / AC Voltage Range 240 V Maximum Output Current 24 A

Quantity of Modules - PV Module Array Typical 90

MICROGRID SYSTEM

PERFORMANCE SUMMARY - NMI

ELECTRICAL SHOCK HAZARD

LABEL LOCATION: TERMINALS IN INVERTERS, DISCONNECTS, AC

COMBINER BOXES, AND AC COMBINER PANELBOARDS.

WARNING!

MULTIPLE POWER SOURCES

WARNING!

LABEL LOCATION: ENERGY MONITORING EQUIPMENT AND INVERTERS.

WARNING!

PHOTOVOLTAIC PANEL

LABEL LOCATION: AC DISCONNECTS

WARNING!

LABEL LOCATION: DC TERMINALS IN INVERTERS AND DC COMBINER

BOXES

WARNING!

LABEL LOCATION: MULTICLUSTER BOX, MAIN DISTRIBUTION PANEL, AND POINT OF

INTERCONNECTION.

SOLAR

PHOTOVOLTAIC

MODULES

LABEL LOCATION: EVERY 8' ALONG DC CONDUITS, BEFORE AND AFTER EACH WALL OR

ROOF PENETRATION, EACH DC COMBINER BOX, AND ALL DC JUNCTION BOXES.

DO NOT TOUCH TERMINALS.

TERMINALS ON BOTH LINE

AND LOAD SIDES MAY BE

ENERGIZED IN OPEN

POSITION.

ELECTRICAL SHOCK HAZARD

ELECTRICAL SHOCK HAZARD

IF GROUND FAULT

INDICATED, ALL GROUNDED

CONDUCTORS MAY BE

UNGROUNDED AND

ENERGIZED.

THE DC CONDUCTORS OF

THIS PHOTOVOLTAIC

SYSTEM ARE

UNGROUNDED AND MAY

BE ENERGIZED.

GENERATOR POWER,

BATTERY POWER AND

SOLAR PHOTOVOLTAIC

POWER SOURCES

SUPPLYING THIS SYSTEM.

LABEL LOCATION: MULTICLUSTER BOX, MAIN DISTRIBUTION

PANEL, AND POINT OF INTERCONNECTION.

LABEL LOCATION: MULTICLUSTER BOX, MAIN DISTRIBUTION PANEL, AND AS REQUIRED BY AUTHORITY HAVING JURISDICTION.

PHOTOVOLTAIC SYSTEM HAS RAPID

SHUTDOWN DEVICE

WARNING

PHOTOVOLTAIC POWER SOURCE

SOLAR PV SYSTEM EQUIPPED

WITH RAPID SHUTDOWN

DO NOT ADD LOADS, THIS IS

A PHOTOVOLTAIC

COMBINER PANEL ONLY.

TURN RAPID

SHUTDOWN SWITCH

TO THE "OFF"

POSITION TO SHUT

DOWN PV SYSTEM

AND REDUCE SHOCK

HAZARD IN THE

ARRAY.

ON MANITOU ISLANDS

M

M M M

M

14 14

VILLAGE FEEDER '1'

3#350, 1#500N, 1#1G - 3"C

VILLAGE FEEDER '2'

3#350, 1#500N, 1#1G - 3"C

VILLAGE DISTRIBUTION PANEL

SCCR: 10KA

CALCULATED FAULT CURRENT: 0.96 KA

DOCK

BEACH CART

TRUDE COTTAGE

100A 120/208V, 4W+G

SHEET KEYNOTES

1. FEEDER OVERSIZED FOR VOLTAGE DROP UP TO

1200FT.

GENERAL NOTES

1. REFER TO SHEET E0.0 FOR SYMBOLS AND

ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.

NEW NEW

CHLORINATION &

PRESSURE BUILDING

60A 120/240V, 3W+G

200A - 208V, 3PH, 4W+G

PRIVATE

RESIDENCE

2#4/0, 1#4/0 N, 1#3G - 2"C

0/

0/

SAWMILL

3. LIGHT LINEWEIGHT IS EXISTING TO REMAIN AND

DARK LINEWEIGHT IS NEW WORK UNLESS NOTED

OTHERWISE.

3#10 & 1#10G - 3/4"C

2. EXTEND EXISTING CONDUCTORS TO NEW NEW

CHLORINATION & PRESSURE BUILDING PANEL.

CONFIRM EXISTING WIRE SIZES AND MATCH IF

DIFFERENT. REFER TO SHEETS E1.0 & EK1.0 FOR

ADDITIONAL INFORMATION.

2. PROJECT SHALL CONFORM TO THE REQUIREMENTS

OF THE NATIONAL ELECTRICAL CODE 2023 VERSION.

3#4/0, 1#350N, 1#1G - 3"C

3. PROVIDE NEW UNDERGROUND FEEDER FROM NEW

TAP BOX TO SERVE NEW NEW CHLORINATION &

PRESSURE BUILDING PANEL. REFER TO SHEET E1.0

FOR ADDITIONAL INFORMATION.

4. PROVIDE NEW 20/1 BREAKER AND 20A, 120V POWER

CONNECTION FOR DIESEL TANK PUMP FROM

EXISTING MAINTENANCE SHED LOAD CENTER. FEED

TO BE RUN UNDERGROUND. REFER TO SHEET CF1.0

FOR EXACT LOCATION & SHEET E1.4 FOR

CIRCUITING INFORMATION.

1#12, 1#12N, 1#12G - 3/4"C

5. RECONNECT EXISTING TAP FEEDER TO NEW MAIN

LOOP FEEDER. REFER TO SHEET E1.0 FOR

ADDITIONAL INFORMATION. TAP TO COMPLY WITH

TAP RULES IN NEC 240.21(B)(5).

TYP

6. PROVIDE NEW UNDERGROUND FEEDER FROM

NEW TAP BOX TO EXISTING TRUDE COTTAGE.

REFER TO SHEET E1.0 FOR ADDITIONAL

INFORMATION.

7. RECONNECT EXISTING FEED TO NEW DISTRIBUTION

PANEL.

TO MICROGRID SYSTEM.

REFER TO SHEET E1.1.

8. CONNECT EXISTING TO REMAIN FEEDS TO NEW

DISTRIBUTION FEEDER USING PHASE 1, PHASE 2,

NEUTRAL AND GROUND.

9. CONNECT EXISTING TO REMAIN FEEDS TO NEW

DISTRIBUTION FEEDER USING PHASE 2, PHASE 3,

NEUTRAL AND GROUND.

10. CONNECT EXISTING TO REMAIN FEEDS TO NEW

DISTRIBUTION FEEDER USING PHASE 1, PHASE 3,

NEUTRAL AND GROUND.

3#1/0, 1#1/0 N, 1#6 G, 2"C

USCG GENERATOR BUILDING

(LAUNDRY)

MAINTENANCE SHED

11. PROVIDE NEW 20/1 BREAKER AND 20A, 120V POWER

CONNECTION FOR GASOLINE TANK PUMP FROM

EXISTING MAINTENANCE SHED LOAD CENTER. FEED

TO BE RUN UNDERGROUND. REFER TO SHEET CF1.0

FOR EXACT LOCATION & SHEET E1.4 FOR

CIRCUITING INFORMATION. ALL CONDUITS,

CONDUCTORS, HOUSINGS, EQUIPMENT, ETC SHALL

BE CLASS I, DIV I RATED.

ELECTRICAL ONE-LINE DIAGRAM -

AC - NMI

GB

/2

SP

AR

E

0/

SP

AR

E

MAINTENANCE BUILDING

12. GROUNDING ELECTRODE FOR ENTIRE SYSTEM.

SIZED PER NEC TABLE 250.66.

1#12, 1#12N, 1#12G - 3/4"C

NORTH LODGE

(USLSS LIFEBOAT STATION QTRS)

MAIN LODGE

(USLSS DWELLING QTRS)

SOUTH LODGE

(USLSS CREW READY QTRS)

CARE-TAKER HOUSE

(HANS HALSETH HOUSE)

/1

SP

AR

E

/1

SP

AR

E

MAIN

#6G

13. TYPICAL, EXISTING TAP TO BUILDING LOAD CENTERS

NOTED AS 3#4, 1#8G.

14. BREAKER FRAME TO ACCEPT OVERSIZED FEEDERS.

0A

T

0A F

0A

T

0A F

200AT

400AF

SLEEPING BEAR DUNES NATIONAL LAKESHORE

FACILITY REHABILITATION

ON MANITOU ISLANDS

3 42 10

SHEET KEYNOTES

1. WALL MOUNTED, TYPICAL.

# GENERAL NOTES

1. REFER TO SHEET E0.0 FOR SYMBOLS AND

ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.

2. PV MODULES, TYPICAL. NEW ARRAY IS TO BE

INSTALLED IN THE SAME LOCATION AND FOOTPRINT

AS THE EXISTING ARRAY TO MINIMIZE SITE IMPACT.

IF NEW ARRAY FOOTPRINT WILL BE LARGER, THIS

MUST BE BROUGHT TO THE CONTRACTING

OFFICER'S ATTENTION FOR APPROVAL

3. CONTRACTOR TO PROVIDE NEW GROUND MOUNT

BALLASTED RACKING SYSTEM.

4. REFER TO SHEET E1.1 FOR CONDUIT AND WIRE

SIZES. REFER TO SHEET E1.0 FOR CONDUIT AND

WIRE ROUTING.

5. PROVIDE NEW 20/1 BREAKER AND 20A, 120V POWER

CONNECTION FOR DIESEL TANK PUMP FROM

EXISTING MAINTENANCE BUILDING LOAD CENTER.

REFER TO SHEET CF1.0 FOR EXACT LOCATIONS &

SHEET E1.3 FOR ADDITIONAL INFORMATION.

6 EXISTING GENERATOR RELOCATED FROM SOUTH

ISLAND. GENSET ACCESSORIES TO BE POWERED

FROM NEARBY EXISTING RECEPTACLES WITHIN

ROOM.

2. PROJECT SHALL CONFORM TO THE REQUIREMENTS

OF THE NATIONAL ELECTRICAL CODE 2023 VERSION.

7. PROVIDE NEW 20/1 BREAKER AND 20A, 120V POWER

CONNECTION FOR GASOLINE TANK PUMP FROM

EXISTING MAINTENANCE SHED LOAD CENTER. FEED

TO BE RUN UNDERGROUND. REFER TO SHEET CF1.0

FOR EXACT LOCATION & SHEET E1.3 FOR

ADDITIONAL INFORMATION. ALL CONDUITS,

CONDUCTORS, HOUSINGS, EQUIPMENT, ETC SHALL

BE CLASS I, DIV I RATED.

ENLARGED EQUIPMENT PLAN - NMI

3. REFER TO 263110 PV SPECIFICATION FOR PV SYSTEM

REQUIREMENTS.

8. EMERGENCY POWER OFF DEVICE SHALL

DISCONNECT POWER TO GASOLINE PUMP.

9. FLOOR MOUNTED DISTRIBUTION PANEL.

4. MAINTAIN 6" CLEARANCE AROUND PV INVERTERS

AND 12" CLEARANCE AROUND BATTERY INVERTERS.

CONFIRM RECOMMENDED EQUIPMENT CLEARANCES

WITH MANUFACTURER.

10. CONTRACTOR TO COORDINATE WITH GROUND

MOUNT MANUFACTURER TO PRODUCE A WIND-LIFT

STUDY. STUDY SHALL DETERMINE THE QUANTITY

AND LOCATION OF BALLAST BLOCKS TO BE

PROVIDED AND INSTALLED BY CONTRACTOR.

ON MANITOU ISLANDS

Feet 0 60 120

SMI UTILITIES OVERVIEW

ON MANITOU ISLANDS

Feet 0 40 80

SMI SANITARY SEWER PLAN

ON MANITOU ISLANDS

Feet

SMI SANITARY SEWER PLAN

ON MANITOU ISLANDS

SMI WATER DISTRIBUTION PLAN

Feet

ON MANITOU ISLANDS

SMI WATER DISTRIBUTION PLAN

ON MANITOU ISLANDS

SMI CHLORINATION AND PRESSURE BUILDING

PLAN

0 2 4

LIMIT OF

WILDERNESS

REMOVE AND REPLACE

EXISTING DIESEL LINES

FROM DIESEL TANK TO

GENERATOR / PUMP

HOUSE BUILDING

ABANDON

FUEL LINES

DSL

DSL

DSL

DSL

DSL

DS

L

DSL

DSL

DSL

DSL

DSL

GENERATOR /

PUMP HOUSE

MAINTENANCE

SHOP

EXISTING DIESEL

TANK TO REMAIN

EXISTING GAS

TANK REMOVE

AND DISPOSE

REMOVE AND DISPOSE

OF EXISTING GAS FILL

PUMP

CONCRETE

BOLLARD TO

REMAIN (TYP.)

CLEAR AND REMOVE ALL

MATERIALS INSIDE FENCED

AREA IN PREPARATION

FOR NEW CONCRETE PAD

GASOLINE AND

DIESEL FUEL DISPENSER

TO REMAIN

EXISTING CONCRETE

PAD TO REMAIN

TANK TO REMAIN

EXISTING CHAIN LINK

FENCE TO REMAIN

REMOVE & REPLACE 6'

OF CHAIN LINK FENCE TO

REPLACE DIESEL LINES

REMOVE & REPLACE 4'

OF CHAIN LINK FENCE TO

REPLACE DIESEL LINES

TREELINE

EX ELECTRICAL

LINE TO REMAIN

EX WATERLINE

TO REMAIN

ELECTRICAL

LINE TO REMAIN

ELECTRICAL LINES TO BE

REPLACED (SEE ELECTRICAL

DRAWINGS FOR ADDITIONAL

INFORMATION)

EX ELECTRICAL

LINE TO REMAIN

LIMIT OF

WILDERNESS

DSL

DSL

DSL

DSL

DSL

DS

L

DSL

DSL

DSL

DSL

DSL

PROPOSED DIESEL LINES

(TWO - 1.5" DOUBLE WALL

FLEXIBLE PIPES)

GENERATOR /

PUMP HOUSE

MAINTENANCE

SHOPNEW UL-2085

DOUBLE-WALLED

1,000-GALLON GASOLINE

TANK WITH ALL

REQUIRED

APPURTANCES

NEW 6" THICK

REINFORCED

CONCRETE

CF3.0

CF3.0

EXPANSION

JOINT (TYP.)

CONTROL

JOINT (TYP.)

CF3.0

CF3.0

GRAVEL STRIP

ADJACENT TO

CHAIN LINK

FENCE

CF3.0

SLEEPING BEAR DUNES NATIONAL LAKESHORE

FACILITY REHABILITATION

ON MANITOU ISLANDS

ST

ATE OF MICHIGAN

LICENSED PROFESSIONAL ENG

INE

ER

TIMOTHY J.

HOGAN

License No.

6201065299

5/10/2024

DEMOLITION PLAN PROPOSED PLAN

0 10 20 40 Feet

1. ALL FUEL SYSTEM WORK SHALL BE CONDUCTED IN ACCORDANCE WITH

APPLICABLE FEDERAL, STATE, AND LOCAL CODES, STANDARDS, AND

REGULATIONS.

2. GASOLINE TANKS MUST BE IN COMPLIANCE WITH UL-2085 STANDARD

Notes

ON MANITOU ISLANDS

SMI DOCK DEMO PLAN

0 250 500

ON MANITOU ISLANDS

SMI DOCK PLAN

0 10 20

ON MANITOU ISLANDS

SMI DOCK PLAN

ON MANITOU ISLANDS

SMI DOCK FRAMING PLAN

ON MANITOU ISLANDS

SMI DOCK FRAMING PLAN

ON MANITOU ISLANDS

SMI DOCK MOORING PLAN

0 30 60

SMI DOCK PROFILE

SMI DOCK PROFILE

ON MANITOU ISLANDS

Feet 0 60 120

SMI SWPPP PLAN

0 20 40

SLEEPING BEAR DUNES NATIONAL LAKESHORE

FACILITY REHABILITATION

SMI CHICAGO RD SITE PLAN

ON MANITOU ISLANDS

SMI CHICAGO RD GRADING PLAN

© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS

0 150 300

SLEEPING BEAR DUNES NATIONAL LAKESHORE

FACILITY REHABILITATION

SMI CHICAGO RD

SMI CHICAGO RD TYPICAL SECTION

ON MANITOU ISLANDS

TYPICAL VAULT TOILET

FOUNDATION DETAILS

ON MANITOU ISLANDS

TYPICAL VAULT TOILET

FOUNDATION DETAILS

ON MANITOU ISLANDS

SMI CHICAGO RD CHLORINATION AND

PRESSURE BUILDING

0 2 4

SMI CHLORINATION AND PRESSURE

BUILDING STRUCTURAL PLAN

SLEEPING BEAR DUNES NATIONAL LAKESHORE

FACILITY REHABILITATION

ON MANITOU ISLANDS

ST

AT E OF MICHIGAN

L ICENSED PROF ES S IONAL ENG

I N

EE

R

PHILIP J.

JOHNSON

License No.

6201038200

BUILDING STRUCT ELEV AND DTLS

SLEEPING BEAR DUNES NATIONAL LAKESHORE

FACILITY REHABILITATION

ON MANITOU ISLANDS

COMPONENT & CLADDING PRESSURES

ZONE 10 SF 20 SF 50 SF 100 SF

2n,2r,3e

COMPONENTS & CLADDING WIND PRESSURE (PSF)

3r

1,2e

ST

AT E OF MICHIGAN

L ICENSED PROF ES S IONAL ENG

I N

EE

R

PHILIP J.

JOHNSON

BUILDING FRAMING DETAILS

SLEEPING BEAR DUNES NATIONAL LAKESHORE

FACILITY REHABILITATION

ON MANITOU ISLANDS

ST

AT E OF MICHIGAN

L ICENSED PROF ES S IONAL ENG

I N

EE

R

PHILIP J.

JOHNSON

SMI CHICAGO RD STRUCTURAL

FOUNDATION PLAN & DETAILS

SLEEPING BEAR DUNES NATIONAL LAKESHORE

FACILITY REHABILITATION

ON MANITOU ISLANDS

ZONE ≤ 19.4 9 (ft )>19.4≤ 77.4 >77.4

COMPONENTS & CLADDING WIND PRESSURE (PSF)

COMPONENT & CLADDING WIND PRESSURES:

4,5

DESIGN WIND PRESSURE FOR ROOF END WALL (PSF)

4,5

ZONE 10 SF 20 SF 50 SF 100 SF

ST

AT E OF MICHIGAN

L ICENSED PROF ES S IONAL ENG

I N

EE

R

PHILIP J.

JOHNSON

ROOF PLANS AND DETAILS

SLEEPING BEAR DUNES NATIONAL LAKESHORE

FACILITY REHABILITATION

ON MANITOU ISLANDS

ST

AT E OF MICHIGAN

L ICENSED PROF ES S IONAL ENG

I N

EE

R

PHILIP J.

JOHNSON

SECTIONS AND DETAILS

SLEEPING BEAR DUNES NATIONAL LAKESHORE

FACILITY REHABILITATION

ON MANITOU ISLANDS

ST

AT E OF MICHIGAN

L ICENSED PROF ES S IONAL ENG

I N

EE

R

PHILIP J.

JOHNSON

ON MANITOU ISLANDS

SMI CHLORINATION AND PRESSURE /

BATTERY BUILDING

SMI PAVILION - DETAILS

L5

L5

GFCI

SLEEPING BEAR DUNES NATIONAL LAKESHORE

FACILITY REHABILITATION

ON MANITOU ISLANDS

ELECTRICAL CHICAGO RD PLANS -

SMI

GENERAL NOTES

1. REFER TO SHEET E0.0 FOR SYMBOLS AND

ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.

SHEET KEYNOTES #

1. PROVIDE 20A, 240V 1-PHASE POWER CONNECTION

FOR WELL PUMP CONTROLLER.

#10 PV WIRE W/#10 THWN GROUND.

APPROX 100' (FIELD CONFIRM LENGTH)

OUTSIDE INSIDE

#6 GND - STRANDED USED ON RACKING.

BARE OR GREEN (250.120 (C))STRING #1 (1) MODULE PER OPTIMIZER. (4)

OPTIMIZERS IN SERIES. 3.8 KW (DC) STC TOTAL

G

APPROX 10' FROM INVERTERS TO

COMBINER PANEL

INV-1

3.8 KW, 240 VAC, TRANSFORMERLESS

INTERNAL GFCI, AFCI, RAPID SHUTDOWN

AC AND DC DISCONNECT

L1 L2 N G

BATTERY DISCONNECT

TO GROUND ROD

20A

20A

GG

L1 L2

N

G

20A WELL PUMP

20A

LIGHTS

20A

DRINKING FOUNTAINS

20A

RECEPTACLES

30KWH BATTERY STRING

2. MOUNT FIXTURE JUST BELOW ROOF TRUSS BOTTOM

VIA SUPPLIED CHAIN.

3. PV MODULE (TYP).

2. PROJECT SHALL CONFORM TO THE REQUIREMENTS

OF THE NATIONAL ELECTRICAL CODE 2023 VERSION.

3#10, 1#10G - 3/4"C

#10 PV WIRE W/#10 THWN GROUND.

4. PROVIDE GROUND ROD TIED TO PV SYSTEM.

445W PV

MODULE (TYP)

TO WATER SERVICE

#8G

20A

PAVILION RECEPTACLES

5. NEUTRAL TO GROUND BOND.

6. ALL CONDUIT, EQUIPMENT, DEVICES, ETC. WITHIN

BUILDING SHALL BE RATED FOR CORROSIVE

ENVIRONMENT. NEMA 4X PANELBOARD.

AC-1

AC COMBINER PANEL 20A, 1PH, 3W

SCCR: 10KA

CALCULATED FAULT CURRENT: 0.02 KA

BENTH JOHNSON/KELDERHOUSE QTRS

TOBIN, JOHN & LOTTIE HOUSE QTRS

HUTZLER, GEORGE I & SELMA QTRS

ON MANITOU ISLANDS

HUTZLER, GEORGE C & MARY ANN

FARMHOUSE

HUTZLER, GEORGE C & MARY ANN BARN

HUTZLER, GEORGE C & MARY ANN BARN

HUTZLER, GEORGE C & MARY ANN SHED #1

HUTZLER, GEORGE C & MARY ANN SHED #2

HUTZLER, GEORGE C & MARY ANN SHED #2

ON MANITOU ISLANDS

KEELER, ORY & BETTY HOUSE QTRS

(SHIRK HOUSE)

SMI MAINTENANCE SHOP

SMI MAINTENANCE SHOP

ON MANITOU ISLANDS

USLSS DWELLING QTRS (SMI LIFE SAVING

STATION)

ON MANITOU ISLANDS

USLSS DWELLING QTRS (SMI LIFE SAVING

STATION)

KRAMER QTRS

KRAMER QTRS

ON MANITOU ISLANDS

ROBINETTE, RAY AND VIOLET HOUSE /

BURDICK

USLSS WOOD SHED

USLSS BOAT HOUSE #2

POST OFFICE TOM THOMPSON

ON MANITOU ISLANDS

HUTZLER, GEORGE C & MARY ANN CHICKEN

COOP

E. TOBIN COTTAGE

E. TOBIN COTTAGE

SMI ADDITIONAL BUILDING SCOPE

ON MANITOU ISLANDS

0 15 30 60 Feet

GENERAL NOTES

1. REFER TO SHEET E0.0 FOR SYMBOLS AND

ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.

SHEET KEYNOTES

1. EXISTING FEEDER WIRES FROM MAIN DISTRIBUTION

PANEL TO VILLAGE DISTRIBUTION PANEL TO BE

REMOVED AND REPLACED. CONDUIT IS EXISTING TO

REMAIN AND RE-USED. REFER TO SHEETS ED2.3,

E2.0 & E2.3 FOR ADDITIONAL INFORMATION.

2. PROJECT SHALL CONFORM TO THE REQUIREMENTS

OF THE NATIONAL ELECTRICAL CODE 2023 VERSION.

2. EXISTING VILLAGE DISTRIBUTION PANEL TO BE

REMOVED AND REPLACED. EXISTING FEEDS TO BE

RE-FED FROM NEW DISTRIBUTION PANEL. REFER TO

SHEETS ED2.3 & E2.0 FOR ADDITIONAL

INFORMATION.

3. EXISTING METERS TO BE DISCONNECTED AND

REMOVED.

4. EXISTING PULLBOX TO BE RE-USED FOR SPLICES TO

EXISTING VILLAGE POWER FEEDS.

5. EXISTING FEED FROM GENERATORS IN GENERATOR

BUILDING TO PV INVERTER IN MAINTENANCE

BUILDING TO BE REMOVED AND REPLACED. REFER

TO SHEETS ED2.3 & E2.0 FOR ADDITIONAL

INFORMATION.

3. CONTRACTOR TO FIELD VERITY EXACT LOCATION OF

EXISTING FEEDERS IN ADVANCE OF STARTING

EXCAVATION.

6. EXISTING FEED FROM PV INVERTER TO MAIN

DISTRIBUTION PANEL TO BE REMOVED AND

REPLACED. REFER TO SHEETS ED2.3 & E2.0 FOR

ADDITIONAL INFORMATION.

4. REFER TO SHEET CU2.0 FOR BUILDING/FACILITY

NAMES AND LOCATIONS ON SOUTH MANITOU ISLAND.

ELECTRICAL SITE DEMO PLAN -

SMI

5. THE PURPOSE OF THIS SHEET IS TO IDENTIFY

EXISTING CONDITIONS AND EXTENT OF EXISTING

MICRO-GRID EQUIPMENT TO BE REPLACED OR

REMOVED ON SOUTH MANITOU.

6. ALL DEMOLITION PLANS AND DEMOLITION NOTES

ARE INTENDED AS A GENERAL GUIDE TO THE

DEMOLITION REQUIRED FOR THIS PROJECT

BUT MAY NOT BE ALL INCLUSIVE. IT SHALL BE THE

RESPONSIBILITY OF THE CONTRACTOR TO

VERIFY EXISTING CONDITIONS AND REMOVE OR

RE-WORK ALL EXISTING ELECTRICAL ITEMS,

EQUIPMENT, DEVICES, ETC... THAT INTERFERE WITH

NEW SCOPE SHOWN WITHIN PROJECT DOCUMENTS.

ON MANITOU ISLANDS

2 3

5 6

SHEET KEYNOTES

1. REMOVE EXISTING BATTERY BANK #1 & #2.

2. REMOVE EXISTING 250 AMP DISCONNECTS THAT

SERVE BATTERY BANK #1 & #2.

3. REMOVE EXISTING SOLAR PV ARRAY

DISCONNECTS #1 & #2.

4. REMOVE EXISTING 25KVA POWER INVERTER.

5. 125 AMP INVERTER LOAD DISCONNECT TO BE

REMOVED AND REPLACED.

6. REMOVE EXISTING 250 AMP DISCONNECTS THAT

SERVE BATTERY BANK #3 & #4.

7. REMOVE EXISTING BATTERY BANK #3 & #4.

8. REMOVE EXISTING 25KW ROOF MOUNTED PV

ARRAY.

GENERAL NOTES

1. THE PURPOSE OF THIS SHEET IS TO IDENTIFY

EXISTING CONDITIONS AND EXTENT OF EXISTING

MICRO-GRID EQUIPMENT TO BE REPLACED OR

REMOVED ON SOUTH MANITOU.

2. ALL DEMOLITION PLANS AND DEMOLITION NOTES

ARE INTENDED AS A GENERAL GUIDE TO THE

DEMOLITION REQUIRED FOR THIS PROJECT

BUT MAY NOT BE ALL INCLUSIVE. IT SHALL BE THE

RESPONSIBILITY OF THE CONTRACTOR TO

VERIFY EXISTING CONDITIONS AND REMOVE OR

RE-WORK ALL EXISTING ELECTRICAL ITEMS,

EQUIPMENT, DEVICES, ETC... THAT INTERFERE WITH

NEW SCOPE SHOWN WITHIN PROJECT DOCUMENTS.

3. REFER TO DIVISION 1, 017419 SPECIFICATIONS FOR

DISPOSAL REQUIREMENTS OF HAZARDOUS

MATERIALS.

ELECTRICAL DEMO PLAN - SMI

ON MANITOU ISLANDS

2 34

SHEET KEYNOTES

1. EXISTING 40 KW GENERATORS A AND B TO BE

RELOCATED. REFER TO SHEETS ED2.3, E1.1 &

E1.4 FOR ADDITIONAL INFORMATION.

2. REMOVE EXISTING TRANSFER SWITCH.

3. REMOVE EXISTING MAIN DISTRIBUTION PANEL.

4. GENERATOR A AND B 125 AMP DISCONNECT

SWITCHES TO BE REMOVED.

5. EXISTING GENERATOR BLDG BRANCH PANEL

AND METER TO REMAIN.

3. THE PURPOSE OF THIS SHEET IS TO IDENTIFY

EXISTING CONDITIONS AND EXTENT OF EXISTING

MICRO-GRID EQUIPMENT TO BE REPLACED OR

REMOVED ON SOUTH MANITOU.

GENERAL NOTES

1. REFER TO SHEET E0.0 FOR SYMBOLS AND

ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.

2. PROJECT SHALL CONFORM TO THE REQUIREMENTS

OF THE NATIONAL ELECTRICAL CODE 2023 VERSION.

4. ALL DEMOLITION PLANS AND DEMOLITION NOTES

ARE INTENDED AS A GENERAL GUIDE TO THE

DEMOLITION REQUIRED FOR THIS PROJECT

BUT MAY NOT BE ALL INCLUSIVE. IT SHALL BE THE

RESPONSIBILITY OF THE CONTRACTOR TO

VERIFY EXISTING CONDITIONS AND REMOVE OR

RE-WORK ALL EXISTING ELECTRICAL ITEMS,

EQUIPMENT, DEVICES, ETC... THAT INTERFERE WITH

NEW SCOPE SHOWN WITHIN PROJECT DOCUMENTS.

ELECTRICAL DEMO PLAN - SMI

ON MANITOU ISLANDS

4 4

6 7

MM M M

MAIN DISTRIBUTION PANEL

SHEET KEYNOTES

1. GENERATOR IS EXISTING TO BE RE-USED FOR

NORTH ISLAND. REFER TO SHEETS E1.1 AND E1.4

FOR ADDITIONAL INFORMATION. CONTRACTOR

RESPONSIBLE FOR RELOCATION OF BOTH

GENERATORS IN THIS CONTRACT.

GENERAL NOTES

1. REFER TO SHEET E0.0 FOR SYMBOLS AND

ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.

500A 120/208V, 3P, 4W+G

0/

GENERATOR

BUILDING

2. PROJECT SHALL CONFORM TO THE REQUIREMENTS

OF THE NATIONAL ELECTRICAL CODE 2023 VERSION.

0/

5/

5/

0/

LIGHT HOUSE

MAINTENANCE

SHOP

VANT HOUSE

GENERATOR A

40KW, 208V 3P 4W

GENERATOR B

40KW, 208V 3P 4W

VILLAGE DISTRIBUTION PANEL

500A 120/208V, 3P, 4W+G

0/

BOAT HOUSE NO. 1

0/

5/

0/

COAST GUARD

STATION

(USLSS DWELLING

QTRS)

VISITOR CENTER

(POST OFFICE)

BOAT HOUSE NO. 2

5/

JOHNSON (BENTH

HOUSE QTRS)

BURDICK COTTAGE

(ROBINETTE, RAY

AND VIOLET

HOUSE)

PV INVERTER

PV BATTERIES PV SOLAR

GENERATOR

TRANSFER SWITCH

5/

5. PV INVERTER TO BE REMOVED AND REPLACED.

REFER TO SHEET E2.1 FOR ADDITIONAL

INFORMATION.

9. MAIN DISTRIBUTION PANEL TO BE REMOVED AND

REPLACED. EXISTING PANEL FEEDS TO BE RE-FED

FROM NEW DISTRIBUTION PANEL. REFER TO

SHEETS E2.0, E2.3 & E2.4 FOR ADDITIONAL

INFORMATION.

11. VILLAGE DISTRIBUTION PANEL TO BE REMOVED AND

REPLACED. EXISTING FEEDS FROM PANEL TO BE

RE-FED FROM NEW DISTRIBUTION PANEL. REFER TO

SHEETS E2.0 & E2.3 FOR ADDITIONAL INFORMATION.

2. FEEDER FROM GENERATOR TO TRANSFER PANEL

TO BE REMOVED AND REPLACED. REFER TO SHEETS

E2.0 & E2.1 FOR ADDITIONAL INFORMATION.

3. GENERATOR TRANSFER PANEL TO BE REMOVED

AND REPLACED. REFER TO SHEET E2.1 FOR

ADDITIONAL INFORMATION.

4. FEEDER FROM TRANSFER PANEL TO PV INVERTER

TO BE REMOVED AND REPLACED. REFER TO SHEET

E2.1FOR ADDITIONAL INFORMATION.

6. PV BATTERIES AND FEED TO BE REMOVED AND

REPLACED. REFER TO SHEET E2.1 FOR ADDITIONAL

INFORMATION.

7. PV SOLAR AND FEED TO BE REMOVED AND

REPLACED. REFER TO SHEET E2.1 FOR ADDITIONAL

INFORMATION.

8. FEEDER FROM PV INVERTER TO MAIN DISTRIBUTION

PANEL TO BE REMOVED AND REPLACED. REFER TO

SHEET E2.3 FOR ADDITIONAL INFORMATION.

10. FEEDER WIRES FROM MAIN DISTRIBUTION PANEL TO

VILLAGE DISTRIBUTION PANEL TO BE REMOVED AND

REPLACED. CONDUIT IS EXISTING TO REMAIN AND

RE-USED. REFER TO SHEETS E2.0 & E2.3 FOR

ADDITIONAL INFORMATION.

3. CONTRACTOR TO FIELD VERITY EXACT LOCATION OF

EXISTING FEEDERS IN ADVANCE OF STARTING

EXCAVATION.

SMITH

(BENTH JOHNSON/KELDER

HOUSE QTRS)

5/

KRAMER

QUARTERS

5/

12. PULLBOX EXISTING TO BE RE-USED FOR EXISTING

FEED CONNECTIONS TO NEW DISTRIBUTION

PANELBOARD. REFER TO SHEET E2.3 FOR

ADDITIONAL INFORMATION.

ELECTRICAL DEMO ONE-LINE

DIAGRAM - AC - SMI

4. THE PURPOSE OF THIS SHEET IS TO IDENTIFY

EXISTING CONDITIONS AND EXTENT OF EXISTING

MICRO-GRID EQUIPMENT TO BE REPLACED OR

REMOVED ON SOUTH MANITOU.

5. ALL DEMOLITION PLANS AND DEMOLITION NOTES

ARE INTENDED AS A GENERAL GUIDE TO THE

DEMOLITION REQUIRED FOR THIS PROJECT

BUT MAY NOT BE ALL INCLUSIVE. IT SHALL BE THE

RESPONSIBILITY OF THE CONTRACTOR TO

VERIFY EXISTING CONDITIONS AND REMOVE OR

RE-WORK ALL EXISTING ELECTRICAL ITEMS,

EQUIPMENT, DEVICES, ETC... THAT INTERFERE WITH

NEW SCOPE SHOWN WITHIN PROJECT DOCUMENTS.

ON MANITOU ISLANDS

0 30 60 120 Feet

SHEET KEYNOTES

1. PROVIDE NEW UNDERGROUND WIRE IN EXISTING

CONDUIT FROM NEW MAIN DISTRIBUTION PANEL IN

GENERATOR BUILDING TO NEW VILLAGE DISTRIBUTION

PANEL. REFER TO SHEET E2.3 FOR ADDITIONAL

INFORMATION.

GENERAL NOTES

1. REFER TO SHEET E0.0 FOR SYMBOLS AND

ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.

2. PROVIDE NEW EXTERIOR VILLAGE DISTRIBUTION

PANEL AT EXISTING LOCATION. REFER TO SHEET

E2.3 FOR ADDITIONAL INFORMATION. DISTRIBUTION

PANEL SHALL BE RATED FOR CORROSIVE

ENVIRONMENT, NEMA 4X.

2. PROJECT SHALL CONFORM TO THE REQUIREMENTS

OF THE NATIONAL ELECTRICAL CODE 2023 VERSION.

3. PROVIDE NEW FEED FROM GENERATORS IN

GENERATOR BUILDING TO GENERATOR

CONTROLLER IN MAINTENANCE BUILDING. REFER

TO SHEET E2.1 FOR ADDITIONAL

INFORMATION.

4. PROVIDE NEW FEED FROM MULTI-CONTROLLER BOX

IN MAINTENANCE BUILDING TO MAIN DISTRIBUTION

PANEL IN GENERATOR BUILDING . REFER TO SHEETS

E2.1 & E2.3 FOR ADDITIONAL INFORMATION.

ELECTRICAL SITE PLAN - SMI

3. REFER TO SHEET CU2.0 FOR BUILDING/FACILITY

NAMES AND LOCATIONS ON SOUTH MANITOU ISLAND.

5. PROVIDE NEW 20/1 BREAKER AND 20A, 120V POWER

CONNECTION FOR GASOLINE TANK PUMP FROM

EXISTING GENERATOR BUILDING LOAD CENTER.

FEED TO BE RUN UNDERGROUND. REFER TO SHEET

CF2.0 FOR EXACT LOCATION & SHEET E2.3 FOR

ADDITIONAL INFORMATION. ALL CONDUITS,

CONDUCTORS, HOUSINGS, EQUIPMENT, ETC SHALL

BE CLASS I, DIV I RATED.

ON MANITOU ISLANDS

TO AC DISTRIBUTION

SYSTEM. REFER TO

SHEET E2.3.

L2

L1

GENERATOR

CONTACTOR AND

CIRCUIT BREAKERS

L3

L1 L2 L3 N G

INV-2

L2

L1

L3

N

N

B-INV-1

BATTERY INVERTER

6.0 KW, 120 VAC,

TRANSFORMERLESS

L1

N G

L1

L2

L3

N G

G

BATTERY

DISCONNECT

G L3

L2

L1

N G

TO GND

REPEATS FOR B-INV 2 THRU 9

REPEATS FOR INV 2, 3, 4, & 5

INV-6 SHALL HAVE ONE STRING OF 5 AND TWO STRINGS OF 4, 1.8 KW (DC).

INV-7,8, & 9 SHALL HAVE THREE STRINGS OF 4 EACH.

AC-1

AC COMBINER PANEL 250A, 3PH, 4W

SCCR: 10KA

CALCULATED FAULT CURRENT: 1.37 KA

B-INV-2

96 KWH BATTERY STRING

GND

L2

L1

L3

N

G L2

L1

L3

N

GEN - 60KW, 208V 3P 4W

LOAD SHEDDING

CONTACTOR AND CIRCUIT

BREAKERS

BATTERY CONTACTORS AND

CIRCUIT BREAKERS

250A/3P

A

A

A

A

A

A

0A

/3 P

250A/3P

B-INV-3

INV-3

INV-4

INV-5

INV-6

B-INV-8

B-INV-9

MC-1

MULTI CONTROLLER BOX

250A - 208V, 3PH, 4W

SCCR: 10KA

CALCULATED FAULT CURRENT: 1.38 KA

INVERTER CIRCUIT BREAKER

250A/3P

A

A

A

L3

L2

B-INV-4

B-INV-7

G N

B-INV-5

B-INV-6

GENERAL NOTES

1. REFER TO SHEET E0.0 FOR SYMBOLS AND

ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.

2. PROJECT SHALL CONFORM TO THE REQUIREMENTS

OF THE NATIONAL ELECTRICAL CODE 2023 VERSION.

3#8, 1#8 N, 1#10 G, 3/4"C

3-250KCMIL, 1-250KCMIL N, 1#4 G, 2-1/2"C

3-250kcmil, 1-250kcmil N, 1#4 G, 2-1/2"C

3#4, 1#4 N, 1#10 G, 1-1/4"C

3#4, 1#4 N, 1#10 G, 1-1/4"C

3#4, 1#4 N, 1#10 G, 1-1/4"C

3.

3-250KCMIL, 1-250KCMIL N, 1#4 G,

2-1/2"C (UNDERGROUND)

GENERATOR BUILDING

(REFER TO DETAIL 3/E2.4)

MAINTENANCE BUILDING

(REFER TO DETAIL 1/E2.4)

#1/0

1#6 G

TO GND

#1/0

#6 GND - STRANDED USED TO GROUND

RACKING SYSTEM

#10 PV WIRE. APPROX 100' (FIELD CONFIRM LENGTH)

STRING #1 (1) MODULE PER OPTIMIZER. (5)

OPTIMIZERS IN SERIES. 2.3 KW (DC) STC TOTAL

G

STRING #3 (1) MODULE PER OPTIMIZER. (5) OPTIMIZERS

IN SERIES. 2.3 KW (DC) STC TOTAL

G

GND

INV-1

5.8 KW, 208 VAC, TRANSFORMERLESS

INTERNAL GFCI, AFCI, RAPID SHUTDOWN AC AND DC

DISCONNECT

L1

N

OUTSIDE INSIDE

GND

L2

DATA MANAGER

TO B-INV-1

TO AC DISTRIBUTION METER

TO EXISTING DATA RACK IN

MAINTENANCE OFFICE

RS-485

TO INV-2 THRU 6

CAT-5E

30A/2P

30A/2P

30A/2P

30A/2P

30A/2P

30A/2P

INV-7

30A/2P

INV-8

30A/2P

INV-9

30A/2P

0A

/3 P

EQUIPMENT SUMMARY:

· 5.8 KW PV INVERTERS: 9 INVERTERS, ARRANGED

FOR THREE PHASES.

· 6.0 KW BATTERY INVERTERS: 9 INVERTERS, 2 PER

PHASE.

· 96 KWH BATTERY STRINGS: 9 REQUIRED, TOTAL

CAPACITY OF 864 KWH.

· 445 W PV MODULES: 124 MODULES. MOUNTING:

ROOF.

· MULTI-CONTROLLER BOX: INTEGRATES PV,

BATTERY, AND GENERATOR INPUTS AND

OUTPUTS TO LOAD.

· DUAL GENERATOR AUTOMATIC TRANSFER

SWITCH: ALTERNATES USAGE BETWEEN 2

GENERATORS BASED ON RUN TIME. INCLUDES

COMMUNICATIONS MODULE FOR REMOTE

MONITORING VIA EXISTING ISLAND

COMMUNICATIONS SYSTEM.

· NEW 60 KW GENERATORS: 208V, THREE PHASE,

DIESEL FROM EXISTING CENTRAL STORAGE

TANK

· 250A AC COMBINER PANEL: 208V, THREE PHASE.

· DATA MANAGER: CAT5E ENABLED DEVICE ABLE

TO INTERFACE WITH INVERTERS TO PUBLISH PV

PRODUCTION DATA TO WEB PORTAL.

L2

L1

L3

N

DUAL GENERATOR AUTOMATIC

TRANSFER SWITCH

250A, 208V, 3PH

G

TO GND

L1

DATA MANAGER

TO B-INV-2

THRU 6RS-485

G

L2

L1

L3

N

GEN - 60KW, 208V 3P 4W

250A/3P

G

SHEET KEYNOTES

1. 2-WIRE GENERATOR START SIGNAL FROM MASTER

BATTERY INVERTER.

TO GND

ELECTRICAL ONE-LINE DIAGRAM -

MICROGRID - SMI

2. PROVIDE 120V, 1P, 20A CIRCUIT TO DATA MANAGER

USING 2#12 AND 1#12 GND IN 3/4"C FROM EXISTING

LOAD CENTER IN MAINTENANCE SHOP.

MICRO-GRID CONTROL

1. SOLAR PV ENERGY SHALL SUPPLY THE DISTRIBUTION

SYSTEM AND BATTERY ENERGY STORAGE.

2. WHEN PV PRODUCTION IS INSUFFICIENT FOR THE

DISTRIBUTION SYSTEM, STORED BATTERY ENERGY

SHALL BE USED IN ADDITION TO PV PRODUCTION.

3. BATTERY STORAGE LEVELS BELOW 30% SHALL START

THE GENERATOR. GENERATOR AND PV ENERGY SHALL

THEN SUPPLY THE DISTRIBUTION SYSTEM AND

BATTERY ENERGY STORAGE SYSTEM.

4. BATTERY STORAGE LEVELS ABOVE 80% SHALL SHUT

OFF THE GENERATOR. SYSTEM SHALL RETURN TO

RELYING ON SOLAR PV ENERGY AND/OR STORED

BATTERY ENERGY AS ABOVE.

GENERATOR AUTOMATIC TRANSFER SWITCH (ATS)

CONTROL

1. BATTERY INVERTER TO SEND AUTO-START SIGNAL TO

GENERATOR ATS UPON BATTERY STATE OF CHARGE

REACHING PROGRAMMED LEVELS.

2. ATS TO HAVE ALTERNATE SELECTOR SWITCH

ACTIVATED:

2.1. GENERATOR 1 AND GENERATOR 2 WILL ALTERNATE

IN THEIR STARTING PREFERENCE. UPON SIGNAL

FORM INVERTER TO START, IF GENERATOR 1 IS

SELECTED TO START, ON NEXT START SIGNAL,

GENERATOR 2 WILL BE SIGNALED TO START. AND

VICE VERSA.

2.2. IF PREFERRED GENERATOR FAILS TO START,

STANDBY GENERATOR IS SIGNALED TO START.

3. GENERATOR 1 PREFERRED SOURCE SWITCH

ACTIVATED

3.1. UPON SIGNAL FORM INVERTER TO START,

GENERATOR 1 IS SELECTED TO START. IN THE

EVENT GENERATOR 1 FAILS TO START, GENERATOR

2 SHALL BE SIGNALED TO START.

4. GENERATOR 2 PREFERRED SOURCE SWITCH

ACTIVATED

4.1. UPON SIGNAL FORM INVERTER TO START,

GENERATOR 2 IS SELECTED TO START. IN THE

EVENT GENERATOR 2 FAILS TO START, GENERATOR

1 SHALL BE SIGNALED TO START.

5. BATTERY INVERTER NO LONGER REQUESTS THE

GENERATOR SYSTEM:

5.1. UPON SIGNAL FROM BATTERY INVERTER TO SHUT

DOWN GENERATORS, THE ATS WILL BEGIN

RETRANSFER TO NORMAL SEQUENCE.

5.2. ATS INITIATES COOLDOWN CYCLE OF GENERATOR.

6. BATTERY INVERTER CARRIES OUT LOAD FREE

DISCONNECTION OF GENERATOR.

CONTROL SEQUENCE

ON MANITOU ISLANDS

SOLAR PV SYSTEM - MODULE DETAILS SOLAR PV SYSTEM - SYSTEM SUMMARY

Module Make LONGI SOLAR Estimated Annual System Production (Helioscope) 62,940 kWh/yr

Module LR4-72HBD-445M Tilt Angle / Azimuth of Array 18.4/217.5 Deg.

Rated Maximum Power (STC) 455 W System kW (dc) 56.4 kW (dc)

System kW (ac) 52.2 kW (ac)

SOLAR PV INVERTER & STRING COMBINER - DC SYSTEM DETAILS DC / AC ratio 1.08 Inverter Make SMA Inverter Model SUNNY BOY SOLAR PV SYSTEM - OVERALL SUMMARY Maximum System Voltage 480 V Quantity of Modules - PV Module Array Typical 124 Maximum Input Current / Maximum Short-Circuit Current 15A/60A Quantity of Inverters 9 Quantity of Inverters 9

SOLAR PV INVERTER - AC SYSTEM DETAILS (EACH INVERTER)

Rated Power at Nominal Voltage 5760 W Maximum Apparent Power 5760 VA Nominal AC Voltage / AC Voltage Range 240 V Maximum Output Current 24 A

Quantity of Modules - PV Module Array Typical 124

ELECTRICAL SHOCK HAZARD

LABEL LOCATION: TERMINALS IN INVERTERS, DISCONNECTS, AC

COMBINER BOXES, AND AC COMBINER PANELBOARDS.

WARNING!

MULTIPLE POWER SOURCES

WARNING!

LABEL LOCATION: ENERGY MONITORING EQUIPMENT AND INVERTERS.

WARNING!

PHOTOVOLTAIC PANEL

LABEL LOCATION: AC DISCONNECTS

WARNING!

LABEL LOCATION: DC TERMINALS IN INVERTERS AND DC COMBINER

BOXES

WARNING!

LABEL LOCATION: MULTICLUSTER BOX, MAIN DISTRIBUTION PANEL, AND POINT OF

INTERCONNECTION.

SOLAR

PHOTOVOLTAIC

MODULES

LABEL LOCATION: EVERY 8' ALONG DC CONDUITS, BEFORE AND AFTER EACH WALL OR

ROOF PENETRATION, EACH DC COMBINER BOX, AND ALL DC JUNCTION BOXES.

DO NOT TOUCH TERMINALS.

TERMINALS ON BOTH LINE

AND LOAD SIDES MAY BE

ENERGIZED IN OPEN

POSITION.

ELECTRICAL SHOCK HAZARD

ELECTRICAL SHOCK HAZARD

IF GROUND FAULT

INDICATED, ALL GROUNDED

CONDUCTORS MAY BE

UNGROUNDED AND

ENERGIZED.

THE DC CONDUCTORS OF

THIS PHOTOVOLTAIC

SYSTEM ARE

UNGROUNDED AND MAY

BE ENERGIZED.

GENERATOR POWER,

BATTERY POWER AND

SOLAR PHOTOVOLTAIC

POWER SOURCES

SUPPLYING THIS SYSTEM.

LABEL LOCATION: MULTICLUSTER BOX, MAIN DISTRIBUTION

PANEL, AND POINT OF INTERCONNECTION.

LABEL LOCATION: MULTICLUSTER BOX, MAIN DISTRIBUTION PANEL, AND AS REQUIRED BY AUTHORITY HAVING JURISDICTION.

PHOTOVOLTAIC SYSTEM HAS RAPID

SHUTDOWN DEVICE

WARNING

PHOTOVOLTAIC POWER SOURCE

SOLAR PV SYSTEM EQUIPPED

WITH RAPID SHUTDOWN

DO NOT ADD LOADS, THIS IS

A PHOTOVOLTAIC

COMBINER PANEL ONLY.

MICROGRID SYSTEM

PERFORMANCE SUMMARY - SMI

TURN RAPID

SHUTDOWN SWITCH

TO THE "OFF"

POSITION TO SHUT

DOWN PV SYSTEM

AND REDUCE SHOCK

HAZARD IN THE

ARRAY.

ON MANITOU ISLANDS

M M M M M

M M M M M M M M

M

MAIN DISTRIBUTION PANEL

SCCR: 10KA

CALCULATED FAULT CURRENT: 0.92 KA

250A 120/208V, 3P, 4W+G

0/

0/

5/

5/

0/

LIGHT HOUSEMAINTENANCE

SHOP

VANT HOUSE

SHEET KEYNOTES

1. PROVIDE SPLICE FOR EXISTING FEED TO NEW

DISTRIBUTION PANEL. CONFIRM EXISTING WIRE

SIZES AND MATCH IF DIFFERENT.

GENERAL NOTES

1. REFER TO SHEET E0.0 FOR SYMBOLS AND

ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.

2. PROJECT SHALL CONFORM TO THE REQUIREMENTS

OF THE NATIONAL ELECTRICAL CODE 2023 VERSION.

TO MICROGRID SYSTEM.

REFER TO SHEET E2.1.

3. LIGHT LINEWEIGHT IS EXISTING TO REMAIN AND

DARK LINEWEIGHT IS NEW WORK UNLESS NOTED

OTHERWISE.

3-250KCMIL, 1-250KCMIL N, 1#4 G, 2-1/2"C

(UNDERGROUND)

NEW 3-250KCMIL, 1-250KCMIL N, 1#4 G IN

EXISTING UNDERGROUND 6"C

VILLAGE DISTRIBUTION PANEL

(NEMA 4X, STAINLESS STEEL OUTDOOR ENCLOSURE)

SCCR: 10KA

CALCULATED FAULT CURRENT: 0.75 KA

250A 120/208V, 3P, 4W+G

0/

BOAT HOUSE NO. 1

0/

5/

0/

BOAT HOUSE NO. 2

5/

5/

5/

5/

TYP

2. RECONNECT EXISTING FEEDS TO NEW

DISTRIBUTION PANELBOARD.

EXISTING PULLBOX

2#3/0, 1#3/0 N, 2-1/2"C

2-300KCMIL, 1-300KCMIL N, 3"C

2#3/0, 1#3/0 N, 2-1/2"C 3#3/0, 1#3/0 N, 2-1/2"C

2#3/0, 1#3/0 N, 2"C

2-300KCMIL, 1-300KCMIL N, 3"C

2#4/0, 1#4/0 N, 2-1/2"C

3#4/0, 1#4/0 N, 2-1/2"C

COAST GUARD

STATION

(USLSS DWELLING

QTRS)

VISITOR CENTER

(POST OFFICE)

JOHNSON (BENTH

HOUSE QTRS)

BURDICK COTTAGE

(ROBINETTE, RAY

AND VIOLET

HOUSE)

SMITH

(BENTH JOHNSON/KELDER

HOUSE QTRS)

KRAMER

QUARTERS

GB

3. GROUNDING ELECTRODE FOR ENTIRE SYSTEM.

SIZED PER NEC TABLE 250.66.

/3

SP

AR

E

0/

SP

AR

E

ELECTRICAL ONE-LINE DIAGRAM -

AC - SMI

5/

SP

AR

E

5/

SP

AR

E

5/

SP

AR

E

MAIN

5/

SP

AR

E

5/

SP

AR

E

GENERATOR

BUILDING

1#12, 1#12N, 1#12G - 3/4"C

4. PROVIDE NEW 20/1 BREAKER AND 20A, 120V POWER

CONNECTION FOR GASOLINE TANK PUMP FROM

EXISTING GENERATOR BUILDING LOAD CENTER.

FEED TO BE RUN UNDERGROUND. REFER TO SHEET

CF2.0 FOR EXACT LOCATION & SHEET E2.3 FOR

ADDITIONAL INFORMATION. ALL CONDUITS,

CONDUCTORS, HOUSINGS, EQUIPMENT, ETC SHALL

BE CLASS I, DIV I RATED.

5/

SP

AR

E

SLAND MNTS

60KW GENERATOR 60KW GENERATOR

SLEEPING BEAR DUNES NATIONAL LAKESHORE

FACILITY REHABILITATION

ON MANITOU ISLANDS

SHEET KEYNOTES

1. PV MODULE, TYPICAL. REFER TO SHEET E2.2 FOR

ADDITIONAL INFORMATION AND QUANTITIES.

2. ROOF MOUNTED PV MODULES. ATTACH TO

EXISTING RAIL SYSTEM.

3. WALL MOUNTED, TYPICAL.

GENERAL NOTES

1. REFER TO SHEET E0.0 FOR SYMBOLS AND

ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.

2. PROJECT SHALL CONFORM TO THE REQUIREMENTS

OF THE NATIONAL ELECTRICAL CODE 2023 VERSION.

4. ROOF MOUNTED PV MODULES. ATTACH TO NEW RAIL

SYSTEM. CONTRACTOR TO PROVIDE AND INSTALL

NEW FLUSH RAIL AND MOUNTING SYSTEM

COMPATIBLE WITH EXISTING SHINGLE ROOF.

5. ROOF RIDGE.

ENLARGED EQUIPMENT PLAN -

SMI

3. REFER TO 263110 PV SPECIFICATION FOR PV SYSTEM

REQUIREMENTS. COORDINATE WITH STRUCTURAL.

4. MAINTAIN 6" CLEARANCE AROUND PV INVERTERS

AND 12" CLEARANCE AROUND BATTERY INVERTERS.

CONFIRM RECOMMENDED EQUIPMENT CLEARANCES

WITH MANUFACTURER.

TYPICAL ARCHITECTURAL DETAILS

TYPICAL CIVIL SEPTIC DETAILS

TYPICAL CIVIL WATER DETAILS

TYPICAL SWPPP DETAILS

ON MANITOU ISLANDS

ST

ATE OF MICHIGAN

LICENSED PROFESSIONAL ENG

INE

ER

TIMOTHY J.

HOGAN

License No.

6201065299

5/10/2024

NOTES:

1. PROVIDE EXPANSION JOINTS WHENEVER CONCRETE SLABS MEET OR ARE

ADJACENT TO WALLS OR FIXED STRUCTURES. (TYP)

2. MAX 30' SPACING BETWEEN EXPANSION JOINTS. (TYP)

3. MAXIMUM 10' SPACING BETWEEN EXPANSION & CONTROL JOINTS. (TYP)

4. ONE COMPONENT SILICONE SEALANT TO MEET ASTM C-920, TYPE S, GRADE

P, CLASS 25. COLOR SHALL BE GRAY.

2" MAX. JOINT

X X X X X X

6" BROOM FINISH CONCRETE

PAVING W/6x6 W2.9 X W2.9

WELDED WIRE MESH

CENTERED IN SLAB

4" AGGREGATE BASE COURSE

COMPACTED SUBGRADE

6" REINFORMCED CONCRETE

NOT TO SCALE

CF3.0

CONCRETE JOINT

NOT TO SCALE

CF3.0

TROWELED CONTROL JOINT

1/4" WIDE AND 1" DEEP

CONCRETE PAVING (TYP)

CONTROL JOINT (TYP)

TOOLED EDGE

1/4"RADIUS ON

EXPOSED SURFACES

TOOLED EDGE

1/4"RADIUS ON

EXPOSED

SURFACES

PRE-MOLDED EXPANSION

JOINT

NOTE:

1. 12 GA. TRACER WIRE TO BE BURIED WITH NON-METALLIC DIESEL LINE.

2. SEE SPECIFICATION SECTION 33 40 20 FOR WARNING TAPE AND TRACER WIRE

INFORMATION.

CF3.0

DIESEL PIPE TRENCH

NOT TO SCALE

FINISHED GRADE

DIESEL FUEL

LINE (TYP.)

6" MIN.

12 GA. TRACER

WIRE (TYP.)6" MIN.

6" MIN.

3' MAX.

SLOPE PER O.S.H.A.

STANDARDS

HAND PLACED AND TAMPED

GRANULAR BACKFILL PER

SPECIFICATIONS

DETECTABLE MARKING

TAPE (TYP.)

8" TO 10"

FINISHED SURFACE VARIES

GRANULAR BEDDING

PER SPECIFICATIONS

4'

1'

6" OVERLAP

FILTER FABRIC

GRAVEL STRIP ADJACENT TO EXISTING FENCE

NOT TO SCALE

CF3.0

X X X X X X

6"

AGGREGATE

BASE COURSE

6" BROOM FINISH

CONCRETE

COMPACTED

GRAVEL

EXISTING FENCE

TO REMAIN

EXISTING FENCE FOOTER

TO REMAIN (DEPTH AND

DIAMETER UNKNOWN)

ONE COMPONENT SILICONE

CONCRETE SEALANT

ONE COMPONENT SILICONE

CONCRETE SEALANT

TYPICAL DOCK DETAILS

TYPICAL PRECAST DETAILS

ABUTMENT & MOORING DETAILS

SAFETY LADDER DETAILS

TYPICAL STRUCTURAL DETAILS

FACILITY REHABILITATION

ON MANITOU ISLANDS

ST

AT E OF MICHIGAN

L ICENSED PROF ES S IONAL ENG

I N

EE

R

PHILIP J.

JOHNSON

Sheets and Views
COVER
G0.0 SHEET INDEX
G0.1 PROJECT VICINITY MAP
G0.2 STAGING PLAN
G0.3 STAGING PLAN
G0.4 NMI STAGING PLAN
G0.5 SMI STAGING PLAN
G0.6 SMI CHICAGO RD STAGING PLAN
G0.7 NMI CLIN DEFINITION
G0.8 NMI EXTERIOR IMPROVEMENT CLINS DEFINITION
G0.9 SMI CLIN DEFINITION
G0.10 SMI EXTERIOR IMPROVEMENT CLINS DEFINITION
C0.0 CIVIL NOTES
CU0.0 CIVIL UTILITY NOTES
CS0.0 CIVIL SEPTIC NOTES
CW0.0 CIVIL WATER NOTES
CT0.0 CIVIL TRANSPORTATION NOTES
CT0.1 CIVIL TRANSPORTATION NOTES
S0.0 STRUCTURAL NOTES
S0.1 STRUCTURAL NOTES
CU1.0 NMI UTILITIES OVERVIEW
CS1.0 NMI SANITARY SEWER PLAN
CS1.1 NMI SANITARY SEWER PLAN
CS1.2 NMI SANITARY SEWER PLAN
CW1.0 NMI WATER DISTRIBUTION PLAN
CW1.1 NMI WATER DISTRIBUTION PLAN
CW1.2 NMI WATER DISTRIBUTION PLAN
CK1.0 NMI CHLORINATION AND PRESSURE BUILDING PLAN
SK1.0 NMI CHLORINATION AND PRESSURE BUILDING STRUCTURAL PLAN
SK1.1 NMI CHLORINATION AND PRESSURE BUILDING STRUCTURAL DETAILS
CT1.0 NMI DOCK DEMO PLAN
CT1.1 NMI DOCK PLAN
CT1.2 NMI DOCK PLAN
CT1.3 NMI DOCK FRAMING PLAN
CT1.4 NMI DOCK FRAMING PLAN
CT1.5 NMI DOCK MOORING PLAN
CT1.6 NMI DOCK PROFILE
CT1.7 NMI DOCK PROFILE
CG1.0 NMI DOCK PATH PLAN
CN1.0 NMI DOCK OVERVIEW PLAN - BASE BID
CN1.1 NMI DREDGE PLAN - BASE BID
CN1.2 NMI DREDGE CROSS-SECTIONS - BASE BID
CN1.3 NMI DREDGE CROSS-SECTIONS - BASE BID
CN1.4 NMI DREDGE DISPOSAL PLAN - BASE BID
CN1.5 NMI DREDGE DISPOSAL CROSS-SECTIONS - BASE BID
CN1.6 NMI SWPPP PLAN - BASE BID
SJ1.0 TRUDE COTTAGE STRUCTURAL FOUNDATION & ROOF PLANS
SJ1.1 TRUDE COTTAGE STRUCTURAL SECTIONS & DETAILS
CU2.0 SMI UTILITIES OVERVIEW
CS2.0 SMI SANITARY SEWER PLAN
CS2.1 SMI SANITARY SEWER PLAN
CW2.0 SMI WATER DISTRIBUTION PLAN
CW2.1 SMI WATER DISTRIBUTION PLAN
CK2.0 SMI CHLORINATION AND PRESSURE BUILDING PLAN
CT2.0 SMI DOCK DEMO PLAN
CT2.1 SMI DOCK PLAN
CT2.2 SMI DOCK PLAN
CT2.3 SMI DOCK FRAMING PLAN
CT2.4 SMI DOCK FRAMING PLAN
CT2.5 SMI DOCK MOORING PLAN
CT2.6 SMI DOCK PROFILE
CT2.7 SMI DOCK PROFILE
CN2.0 SMI SWPPP PLAN
CL2.0 SMI CHICAGO RD SITE PLAN
CL2.1 SMI CHICAGO RD GRADING PLAN
CL2.2 SMI CHICAGO RD
CL2.3 SMI CHICAGO RD TYPICAL SECTION
CL2.4 TYPICAL VAULT TOILET FOUNDATION DETAILS
CL2.5 TYPICAL VAULT TOILET FOUNDATION DETAILS
CL2.6 SMI CHICAGO RD CHLORINATION AND PRESSURE BUILDING
SL2.0 SMI CHLORINATION AND PRESSURE BUILDING STRUCTURAL PLAN
SL2.1 SMI CHLORINATION AND PRESSURE BUILDING STRUCT ELEV AND DTLS
SL2.2 SMI CHLORINATION AND PRESSURE BUILDING FRAMING DETAILS
SL2.3 SMI CHICAGO RD STRUCTURAL FOUNDATION PLAN & DETAILS
SL2.4 SMI CHICAGO RD STRUCTURAL ROOF PLANS AND DETAILS
SL2.5 SMI CHICAGO RD STRUCTURAL SECTIONS AND DETAILS
CS3.0 TYPICAL CIVIL SEPTIC DETAILS
CW3.0 TYPICAL CIVIL WATER DETAILS
CW3.1 TYPICAL CIVIL WATER DETAILS
CW3.2 TYPICAL CIVIL WATER DETAILS
CN3.0 TYPICAL SWPPP DETAILS
CT3.0 TYPICAL DOCK DETAILS
CT3.1 TYPICAL DOCK DETAILS
CT3.2 TYPICAL DOCK DETAILS
CT3.3 TYPICAL DOCK DETAILS
CT3.4 TYPICAL PRECAST DETAILS
CT3.5 ABUTMENT & MOORING DETAILS
CT3.6 SAFETY LADDER DETAILS
S3.0 TYPICAL STRUCTURAL DETAILS

File details come from the government source that posted it. Updated .