This document is a Preliminary Design Report for the North Manitou Dock at Sleeping Bear Dunes National Lakeshore. The report provides an overview of the proposed rehabilitation of the existing dock facilities on the North Manitou Island, which is part of the Sleeping Bear Dunes National Lakeshore. The report outlines the design approach, key objectives, and proposed improvements to the dock infrastructure to address structural and operational deficiencies. The report includes detailed descriptions of the existing conditions, proposed design concepts, cost estimates, and a project implementation schedule. The proposed rehabilitation project is expected to improve accessibility, safety, and functionality of the dock facilities to support continued public access and use of the North Manitou Island.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Preliminary Design Report
North Manitou Island
Docking Facility
Sleeping Bear Dunes National Lakeshore
U.S. Department of the Interior National Park Service
McNamee, Porter & Seeley, Consulting Engineers
SLEEPING BEAR DUNES NATIONAL LAKESHORE
UNITED STATES DEPARTMENT OF THE INTERIOR
NATIONAL PARK SE~VICE
REPORJ ON ._-l?RELU1INARY<:-,DE_SIGN (Title I Services)
North Manitou Island Docking Facility
Prepared by McNamee, Porter and Seeley
Engineers/Architects Ann Arbor, Michigan
October 1985 ii
TABLE OF CONTENTS
FIELD SURVEYS, SUBSURFACE DATA
AND SOIL BORINGS
FIELD SURVEY
SOIL BORINGS
HYDRAULIC DESIGN
DESIGN STILLWATER LEVEL
DOCK CONFIGURATION
DIRECTIONS AND HEIGHTS OF
APPROACHING WAVES
WAVE HEIGHTS IN PROTECTED AREAS
DESIGN TOP ELEVATION OF THE DOCK
LITTORAL MOVEMENT
STRUCTURAL DESIGN
WAVE FORCES
SERVICE DOCK
WALKWAY
ICE FORCES
SERVICE ROAD
PHASED CONSTRUCTION
COST ESTIMATES
REFERENCES
APPENDICES
A. Wave Force Computations B.. Boring Logs c .. Steel Bin - Type Retaining Wall D .. Timber Walkway iii
.1,3
A-1 B-1 C-1 D-1
DRAWINGS Back Pocket
1. Location Plan
2. 1982 Site Survey
3. 1985 Site Plan
4. Dock Plan and Details iv
FIELD SURVEYS, SUBSURFACE DATA AND SOIL BORINGS
FIELD SURVEY
Topographic and hydrographic surveys were conducted in May 1982 at the Village docking site in North Manitou Island and were used in the design analysis. Drawing 1 shows a location plan. Draw ing 2 shows the contours as well as the location of the soil borings taken in 1982. Additional limited topographic and hydro graphic surveys were conducted in June,,. 1985 in the immediate vicinity of the proposed dock. Drawing 3 shows the contour information utilizing the 1985 survey.
The still water elevation as observed in June 1985 was 581.1 as compared to the elevation of 578.8 observed on May 8, 1982. The lake bottom leeward of water depth of 10 feet below the low water datum remained essentially identical to the one observed in May
1982. However, in shallower depth, there has been some erosion of lake bed and a net deposition on the shore. This issue is further discussed under "Littoral Movement".
SOIL BORINGS
Three new soil borings were drilled in June 1985. The location of these borings are shown on Drawing No. 3 and their logs are in
Appendix B. These borings indicate that the lake bottom soil is very uniform throughout this area, consisting of firm medium sand in the upper 8 feet and compact medium sand below that depth.
They compare closely with those borings taken in May 1982.
-1-
HYDRAULIC DESIGN
DESIGN STILLWATER LEVEL
Lake Michigan elevations refer to the low water datum (LWD) ele vation of 576. 8 feet above mean water level at Father Point, Quebec (IGLD, 1955). The design stillwater level was selected to be +2.5 (579.3), which is 1 foot above the mean lake level for the period 1900 through 1981, and has been exceeded in about one year out of four. Currently lake level is at the historically high elevation of +4.3 (581.1).
DOCK CONFIGURATION
The Village docking site is located on the eastern shore of North
Manitou Island. The site is afforded protection from storms by a land mass to the north, west and south; however, it has exposure to lake wind and wave storms from the northeast, east and south east directions. The lake bottom is very shallow in this area and maintains a slight slope lakeward. Navigable waters at 12 feet of depth are encountered about 400 feet from shore.
AT-configuration, as shown in Drawing 3 is proposed. The walk way structure extending from the shore to the service platform would accommodate passenger ingress and egress and provide a suitable surface for conveyance of equipment, materials and services as well as for a small motorized vehicle.
At this site, boats could moor on calm days on either side of the platform, on the north side of the platform during storms from the south, and on south side of the platform during storms from the north. This configuration essentially provides safe moorage throughout the boating seasono
The draft of the largest boat is expected to be about 5 -feet.
Allowing for the lake water level fluctuations, a twelve foot
-2-deep entrance channel (measured from design still water level) is recommended, and eight foot depth is recommended in the docking area. Periodic dredging would be required in the docking area.
DIRECTIONS AND HEIGHTS OP APPROACHING WAVES
The 1982 Engineering Survey and Design Study analyzed the actual historical wind data observed in Traverse City and developed design deep water and refracted wave characteristics reaching the proposed dock during the boating season. A design wave height of
4.7 feet was calculated, following.the procedures established by
U.S. Corps qf Engineers (see Reference 1). However, U.S. Corps of Engineers has since revised the procedure ( see Re_ference 2).
We have recomputed the wave heights utilizing true fetches rather than effective fetches (as suggested in Reference 2) and a design over -water wind speed of 40 miles per hour.
characteristics are given in Table 1.
The deep water
TABLE 1
Wave Characteristics
Deep Water Wave Refracted Wave Characteristics Characteristics
Wind Fetch Wave Wave Wave Wave Wave Direc- Length Height Length Period Height Wave · Length tion (Miles) (ft.) (ft.). (sec.) (ft.) Angle (ft.)
N45E 54.2 10.1 251 7.0 8.5 24.4° 131 N67.5E 31.4 8 •. 1 191 6.1 7.6 17.1° 112 E 14.4 5.9 138 5.2 5.5 5.0° 93 S45E 13.2 5.7 133 5 .. 1 5.0 24.5° 91
S67.SE 11.4 5 .. 2 118 4 .. 8 4.8 10.7° 84
S22.SE 9.1 5.0 113 4.7 3.7 39.0 82
N22.SE 14.4 5.9 138 5 .. 2 3.2 40.6 93
The directions and dimensions of the waves approaching the docking facility site are affected by wave refraction. The resulting characteristics of the refracted waves are also shown in Table 1.
-3-
WAVE HEIGHTS IN PROTECTED AREAS
Wave heights on the leeward side of the docking facility structures will be controlled by the service dock. Mooring facilities will be provided at the service dock, both on the lakeward and leeward side. Diffracted waves on the leeward side will be less. than two feet in the area shown in Drawing 3 and should be providing adequate protection to moored boats.
DESIGN TOP ELEVATION OF THE DOCK
The design still water surface elevation is +2.5 (elev. 579.3).
Elevation of the top of the dock is proposed at +6.5 (583.3).
This will provide complete protection for wave heights up to 6 feet allowing for one foot of run-up. For higher waves, wave run-up will cause some water to overflow the dock.
LITTORAL MOVEMENT
The shoreline in the vicinity of the proposed dock appears to be very stable. Analysis of wave energy did not indicate a signifi cant net movement of littoral drift to the north or south along the shoreline.
A comparison of lake bottom contours b~sed on May 1982 survey and
June 1985 survey (Drawings 2 and 3 respectively) indicates a net movement on shore. During this period the still water elevation has been rising ( 581 .1 in June 1985 compared to · 5 78. 8 in May
1982). Over a long period of time, no significant littoral move ment has been indicated.
The construction of the proposed dock would require some dredging in the area of entrance channel and to allow for a minimum depth of 8 feet (bottom elev. of -5.5) in the docking area.
-4-
The walkway is open underneath and, therefore, no change is anti cipated in the littoral movement process along shore. There likely will ,be some deposition in the docking area and- would require periodic dredging and corresponding annual maintenance.
-5-
STRUCTURAL DESIGN
WAVE FORCES
Waves as high as 20 feet can be generated in Lake Michigan during winter season with a frequency of about once in 100 years
(Reference 3). However, those higher than 12.5 feet will break before reaching the dock. The dock is, therefore, structurally designed to withstand the forces resulting from a breaking wave with a breake~ height of 12.5 feet, wave period 8.1 seconds and wave length of 154 feet.
SERVICE DOCK
A. Bulkhead Design
The lakeward face of the service dock is located in approximately 12.5 feet of water (measured from design still water level). It is subjected to the force of breaking waves with a maximum breaker heights of 12.5 feet: When the wave breaks over the structure, it induces a very large dynamic force at the still water level of the structure (28,400 lbs.
per foot of wall computed in accordance with procedures established by U.S. Corps of Engineers, see reference 3 and computations in Appendix A.) In using sheet piling with the wale and bracing system, it was found that the passive soil resistance within the bulkhead is not adequate to resist this force and additional supports in the form of battered H-piles are needed. It was also necessary to have a dock width of 16 feet to allow the toe of the sheet piling to clear the battered piles.
The following two other alternate bulkhead systems were also explored:
-6-
Alternate 1. Sheet piling cellular bulkhead with diaphragm.
Alternate 2. Steel bin-type retaining wall (see Appendix C).
It was found that Alternate System No. 1 would require a cell width (front to back) of 40 feet and Alternate System No. 2 does not have the needed stabiltty to resist sliding and overturning therefore they ~ere not used.
B. Fill Material Inside the Bulkheads
This material ·can be crushed stone (to be shipped in) or dredge lake bottom sand. The latter is preferred for economy. However, a geotextile fabric is needed to line the backside of the sheet piling to keep the fine granules from washing out.
C~ Concrete Top Slab
This slab can be designed in two ways:
A. Supported slab resting on sheet piling at each end
B. Slab on grade.sitting on top of the fill material.
Item B is not recommended because of potential settlement from further compaction or loss of the fill material.
WALKWAY
Two support systems were studied:
1. A single large diameter pipe pile filled with concrete.
2. Two H-pile bent system.
The latter was chosen, for it provides greater lateral stability, easier installation and more economical.
-7-
In lieu of the steel walkway, a timber walkway similar to the one on the South Manitou Island dock may be used (see Appendix D).
The advantage of the steel structure is its durability (50 to 75 years vs. 20 to 30 years for timber) and low maintenance. There is no significant difference in the cost of the two walkways.
ICE FORCES
There are many ways in which ice can exert forces on marine structures, some of the more important ones are:
1. Horizontal impact from floating ice.
2. Horizontal thrust from expansion.
3. Vertical uplift from rising water level under ice.
A., Service Dock
The sheet piling bulkhead is designed to resist large impact forces from high waves; ice forces are less severe and therefore not critical.
B. Walkway
This is a flexible structure in open water, ice expansion is not critical on such structures. The structure will need to be designed to resist the horizontal impact of floating ice and vertical uplift from rising water lev·e1. The details will be given in Title II work.
SERVICE ROAD
A service road is needed for access to the new dock as shown on the drawing. A minimal 8" thick gravel road is recommended.
-8-
PHASED CONSTRUCTION
If funding for this project is insufficient to do the who~e project in one year, it will need to be done in phases; the most logical and cost effective division of work is as follows:
Phase I: Walkway and service road
Phase II: T-shape service dock
Any further division of Phase II work will require the widening and strengthening of the 12' stem portion of the T-dock to resist the wave forces, thus will add substantially to the cost.
COST ESTIMATES
The estimated construction costs, (not including engineering and administration costs), based on current Engineering News Record
Cost Index of 4220 are shown below. Unit prices used for these estimates are generally higher than normal construction·due to adjustments made for marine consiruction and the site being away from the main land.
A. ONE-CONTRACT CONSTRUCTION
General Requirements
Sheet Piling - 20270 sq. ft.
at $16.00 =
Wales - 14 tons at $1560 =
Pipe struts - 550 ft. at
$5.00 =
H-pile braces - 11040 ft. at
$22.50 =
Concrete slabs - 252 c.y. at
$205 =
Sand fill
$5.60 =
3420 c.y. at
Geotextile fabric - 2200 s.y.
at $2.50 =
Additional dredging
Armor stone at toe - 615 tons at $30.00 =
Gravel Road - 780 sq. yd.
at $8.80 =
Walkway pile bents and framing - 262 ft. at $225 =
-10-
$10,000
324,300
21,800
2,800
248,400
51,650
19,200
5,500
7,000
18,450
6,860
58,950
Walkway grating - 262 x 12 at $19.20/sq. ft.
Construction Contingencies
(10%)
PROJECT TOTAL
B. PHASED CONSTRUCTION
60,360
83,530
$918,800
Breaking of the project in two phases will result in increased total cost due to extra mobilization and demobilization as well as likelihood of getting less favorable unit prices on smaller contracts. We have assumed a 10% incresae in unit cost for Phase I, but have not changed the unit costs for Phase II.
PHASE I - Service Road and Walkway
Mobilization
Gravel Road - 780 sq. yd.
at $9.70 =
Walkway pile bents and fram~ng - 262 ft. at $248 =
Walkway grating - 262 x 12 at $21.10/sq. ft.
Dredging
Construction Contingencies {10%)
Total Phase I
PHASE II - Service Dock
Mobilization
Sheet Piling - 20270 sq. ft.
at $16.00 =
Wales - 14 tons at $1560 =
Pipe struts - 550 ft. at
$5.00 =
-11-
$ 5,000
7,600
65,000
66,300
2,200
14,900
$10,000
324,300
21,800
2,800 l-:. vJ
\ O'v0
$161,000
H-pile braces - 11040 ft. at
$22.50 = 248,400
Concrete slabs - 252 c.y. at
$205 = 51,650
Sand fill 3420 c.y. at
$5.60 = 19,200
Geotextile fabric - 2200 s.y.
at $2.50 = 5,500
Additional dredging 5,000
Armor stone at toe - 615 tons at $30.00 = 18,450
Construction Contingencies (10%) 70,900
Total Phase II $778,000
Total Phase I and II $939,000 c .. Other Options
Electrical Outlets $ 15,000
-12-
REFERENCES
1. U.S. Army Corps of Engineers, Shore Protection Manual, I and II, 1977.
2. U.S. Army Corps of Engineers, Shore Protection Manual, I and II, 1984.
3. U.S. Army Engineer Division, North Central, Design Wave
Information for the Great Lakes, Report 3, Nov. 1976.
-13-
Vols.
Vols.
APPENDIX A
WAVE FORCE ON BULKHEAD
SUS.J:=CT ----·--·--·· ____________________ _
~~'.I. i1'-.. t·t~:.... ,;1'(ri1 j LCI.)
\" .. ·~ ~i{·~~ ,"'\ \~.\ ~IIC·\~, -- ·-·-·-
-------------------·--·-·-' . l • l I l ! •
;_~ · N dve..~:/br~·e~(j?J~-~IK'hea<i:I_;·-_-··-_·--_~ -~--+-----1 -'-' __.__. .-·-·:-···-=~~:~=~ -~-~ _· .. -
• ' • • : , I I I L--,-- -·_·----~- -~-----[-~H-~--~-:--•t ·---:--1~---_,_! __ · j. __ 7_-_.-, -: -~------~~-=~♦-~~- -~ ~--~ -- -
,----~--- : ' ' : -r-,-!. __ . _,__._' ______ ----'--~ . r/n -, _, ____ ----- - - ---- ---·----- ------~-------- --------- - ... m ... ___________ · _______ :.,__~--------------- . - ----- ----- I -- -- ---------------~==========::===- --, ------·'. ~----. - -------~---·-·---- --··----- ---· -- ·- ·--
-· --- ----_--~--~--~el. f&.s<~~f'\:--~--- . -~----------·- · . i ;~=---=~=~ ::·~~ ·
~-:~~~-=~=~=~3; -~~~-~=:~~~=~~~:- .. ---- - I , \ -------- - - ·- -
--- -----1----···_._-;- ~Z-11- -· ----·--- ----- - - - --- -----•· ____ _,i ____ l_~o~-------- ____ · _· ···-
• i ----------·-----------: --------------·- - --- - ..
-~~-~Rej'~c.-~hi-~.-~~~-;~~;_~~: ; -------~~-~~- _ -~-- - -~=-~-=~=--=-~~ -----S"7Jor-e·-;o;:d~ec.r;on-~,n:,Z=-:_~)9 2¢_. R~es- 7- ;;~ ,i.
--Zles17r1~~ree:1~1nc::1---JA-lav.e....--
• t • I
/i---~·-=pm-~~.1&-1-2£CHt>~-~c1s{;;_~c1sT----~---==-:~~-~----~-
. -- _____________________ LL)· __ IJ ------- . : ------- -- --·
. \ 1 I t -~ ---r--- ~-r------~-~-
' ----0-' -rA-::-. a'◄~ - • -FJ,-~f"'(!----- --·------------ --·-- . ~~--- -· --- .. rm. -~~/~/.t:!;(_, ___ ~- r-.?J.?7~~~~~ .. ~---·- ------·· --
=-· --~::=-~--il6-~~:=llreo,i;er/27Z-:~,-/,<-,S ---t:,g-::;;,zm J _=-~;:=:=ds~;~=~~~if~?~=(~7.t<~--'=~3=-:1Ji:)- -- --
:. ~---------------T _: _P1?~~~-~~~~- -=:~~~! ~~~:-~------- --- ----- --- ----- - . -- I t
.=-=~=-=-·~--L~~-:-:~wa~ve:-?e:-r19 rh-=;h---de~-~-;le~--
. -- --·--··- ------ 1 '': · -w~v.~·-t- :M · ·-c:::i--ht;J--~a- ----- [---- ·· - · - · -· · ·---- ________ ../-<:/. ----·- .. _ ·--·- ·, -~ ··--- - . - - J_c nc.,e,; 1-I- Wav~/e,,o,',; Sec::n<,ad ; -.. --- ~------ ·--z)--~~-=JJe~Jlt_ar-:·~-;q_- -a4~~=zt-jj4v,~/e_;,9;4--Se'~ Wd rel ~- -
· -=~=== :=--4-<~~~~:~--f ~i.s-:--=~r= = =:-==-~;=:-=!=-=~=~: ~- ---- : -_ . - - : ----~ t~ -:::= :7r!.; !;-;.~~ (2.~ y~~-i:OZ:~:=;,:; (,P. 1-1s.s)
· -- -- 2![ : - . - - ; ( 33.l!fi'-!_ _ ____ _ -----~-- d = 3,7% - .. ·: ·· ·-··d -; ···-- -
Lo J,t;~¢. ~- eJ. L>.3} ---- L = ·t:?: t::J2t:J - (;:;. c - 7)
ff) . _(l!;-~ /-I) A=-1
SL'SJ~CT ______________ _
------ ,:,,,: ·.C - -----------------:iuRTER c·. SEELEY
~;, ::--.,~; :\~ q~(t- ii;"Ec ·r::,:
\~., \..,·1 l)'-.! \tC:1l\1·\' .. C0\.1,UTED DY _______ DATE ____ CHr:·. B •· _________ ..::A·::. -·-·--- _________ .. ___ _
I ----- ------------------------------~---·- . r----------- ----------- -- -
_ :.::~=z~:;=~~/(/O) :~;;_-=;;;:=-(;;;aJ;:~--#;)<~~~: __ .
·_ -=-==--==~-:::=!'.::~~ -~j:~_b-z. ___ :(z=z_41::tja:__ 7_~-! q_ _ ;P.s/)
1 l _________ ___,.:_ ____ ...,;__ ___ ___:._ ___________ ·----· ---- -·- - - - ! l
---------------~ ~ ,·-------1 g--- -~1_~~~~~~:i;~~-3!7:~~j- -'1)4~-;P.-~=7-=/~~- - _- .
-. --------d.s __ ::. ~;_.:7;-__ ----:_ -.er.er~~; - m-_;-;r, ;;,;r - -~ - -- -=-~-~ =--~ T-~~----~z-r(~l)_-Z----- ~--- --- ----· - - -
I i ----------1----'-----;.:--
----:_---:=·{;~=-:~ =::.::57.C!.::==-=-==--- _--=====~:-___ -----=~:-< -
A-2
'.L:-,,\,\',i:t ~1 0F,TER 8.: SEELi:Y .--.,,_;··,t::..K:5 \RO l' rcCT~ \~ .• ,, -.~!h.).~. \\ll_::!(~\'-. ---·---
SUBJ:CT ___________________ _
COMIUTED BY __ _ DATE _____ CH" 3Y ________ _
-: ... r-;: ---·--·---·---- ··----·--
.. - ··-- -· --- ---- I - - . ---------- ·-- - . . ------- I ------ -- •• --- . • • .
-:--:-=~~m-:;~~==-rm~~~ff~~r;,_"!_~'1!!!_~--~,,u/~ --( .zg; fl.do '/ft ) ·. -~------ -.----6- ,. __ --------- ·-------- -- ' . . . ; __ =.-=-: ~----: - - -
- .. _ ~~-~¾ ~=-~-~--~!,~-J~'-,,-47~---;c:z_:_~~~~=~= _ _ ( A ? - /9())
--:~==M~: ~~--:-?~~(di--=£~'1/--"'-4=-d-- -~=~--- - __ · , _____ , ____ __ 3 .. ~z __ 1 , • , ------- -- '.--=-··¢.5~ --l'~• ?r-{.5,-7$-f-;J,.¢¢).--!•·¢¢-J-=~-~=---
__ : #--··x£;;¢.j~K!!h- .:-,,~----c--:5'·s.i:J=c-".%£--)•- ,- -- ---m----- ...
---1--- ------ -
1 -----------------,------__.;._-i----- I • i
-----·-- ----- ____________ : ____________ .:..__ 1 ______ ·-·--·
- - - - ----- ·- ,- - I --- i
·- - ---- - . --- -·-- - •· --------1 ---- '.. j . I .
l i I : . r. 1· ---· ---------·----·•- ·----- ---1
___ ---- ---· .- '-------------1------...-------·-7---. --·- -- . ·-
---;·- ------ ------•-i····- •··· ----- ..
.. . -·--- --- ·--- ---· . r. .... -- _I ----------- - -----· ·-··
--1--- ------- - ----- . -· - --f
• I
A-3
APPENDIX B
BORING LOGS
FAIRLANE DRILLING & TESTING Co.
GRANO RAPICS AREA
P. 0. BOX 181
MAIN OFF!CE
GRANO HAVEN, MICHIGAN 49417
AREA 616 - !42-0486
21537 MORLEY
DEARBORN, MICHIGAN 48124
AREA 313 - 562-7275
Pr"'ojecti
For-:
June 14, 1985
REPORT OF SOIL TEST OORINGS
Notional Park Service - North Manitou Island Proposed Docking Faci rity
McNamee, Porter & Seeley Consulting Engineers 3131 South State Street Ann Arbor, Michigan 48104
ALPENA AREA
WEST TRASK LAKE ROAD
BARTON CITY, MICHIGAN 48705
AREA 517 - 736--8446
On June 8-10, 1985 three (3) Soii Test Borings were completed on the above captioned site under our job No. ES-85-061. The borings were dri I led in accordance with A.S.T.M. Test Method D 1586-67 where by samples of undisturbed soi I are r"'e covered in a two (2> inch split spoon_ sampler driven by a 140 lb. hamner fat I ing thirty (30) inches. The number of brows required to drive the sampler twelve (12> inches is recorded as the Standard Penetration Resistance. Please note that the sampler was driven eighteen ( 18> inches, and each six (6) inch increment wi 11 be found on the Test Boring Reports.
The Test Boring Location Plan along with al I recorded field data wi I I be found on the fol lowing pages. Recovered soi'! samples wi 11 be forwarded to your office.
HCF:vf
B-1
Respectfu 11 y submitted, FAIRLANE DRILLING & TESTING CO.
Fa i t e I , Manager
FAIR LANE DRILLll'IG & TESTING Co.
<iRANO RAPIDS AREA
P.O. BOX 181
GRANO HAVEN, MICHIGAN 49417
AREA 616 - 842•0486
\0 ~ Existing Dock
{e+!I lf/t1JJ11or.J IsLAN D.
MAIN OFFICE
21537 MORLEY
DEARBORN, MICHIGAN 48124
AREA 313 - 562•7275
TEST BORJN~ LOCATION PLAN
/11 I( fl I ~A- rJ
( P~oposed Road/Nalkway & Docking Facility
B-2
ALPENA AREA
WEST TRASK LAKE ROAD
BARTON CITY, MICHIGAN 48705
AREA 517 - 736~446
100'± Scale (N. Arrow ,¥.ay Not Be True
Job No. ES-85-061 Sheet I of 4
FAIR LANE DRILLING & TESTING Co.
P. 0. BOX 181
GRANO HAVEN, MICHIGAN 49417
A REA 616 - 842-0486
MAIN OFFICE
21537 MORLEY
DEARBORN, MICHIGAN 48124
AREA 313 - 562-7275
TEST BORING REPORT
ALPENA AREA
'NEST TRASK LAKE ROAD
BARTON CITY, MICHIGAN 48705
A RE A 517 - 736-8446
Proposed Docking Fae i Ii t y - North. Manitou Is I and Soll Test Borings at the site 0£•--------------------------~--------
McN amee, Porter & See I ey - Consu It i ng Engineers For: ___________________________________________ _
I &CRING No
6-8-85 Cate Started
'Nat e.r Surface Elev .............. ?.'.~~ .. ?..~ (. !. .. 6-8-85 Date Completed ..•...•..•......•
Datum ....•......•........•...........••....... Orlller
1'.L&V. D&PTH STRATA! SAM~LK
CHANGE TYPK ''N"
SOIL
CLAa•1~lCATION ___ , ____________________ _
----- 7. - 5 570 6 - 8 - ss
10 - I I ' I I
- 14
- ss 19 -- 16' 9 ss 9 - 13 -
20' 7 - 20 II - ss II -- 24' 15
- 18 - ss 23 -550 - 14 3_o-=
32' 27 - ss 30
~ --40----------------------- .. N" -Stendard Penetration R&1r1,snco 5.S.-2'' 0.0. Split Spoon Sample l.S..-SeeHonal Liner S¾mple S.T.--Sh,$fby T:...-be ~mpJ.
W A T E R
Fi rm gray-brown "wet" medium to coarse SAND
Compact gray-.brown "wet" medium to coarse SANO
Fi t"'m gray-br"'own ''wet" medium
SAND
Fi rm gray "wet'' medium to f tne SAND
Compact & very compact gray
••wet" medium SAND
End of baring
.30' of 2¼" casing used to avdance boring. ·sy wash casing method.
ES-85-061
Job No. -------------
B-3 2 4
Shae'---- of----
GRAND RAPIDS AREA
Fl. O·. BOX 181
GRAND HAVEN, MICHIGAN 49417
AREA 616 - 842-0486
MAIN OFFICE
21537 MORLEY
DEARBORN, MICHIGAN 48124
AREA 313 - S62-7275
TEST BORING REPORT
ALPENA AREA
WEST TRASK LAKE ROAD
BARTON CITY, MICHIGAN 48705
A~EA 517 - 736-8446
Proposed.Docking Facility - North Manitou Island Soil Test Borings et the site ol __________________________________ _
McNernee, Porter & Seeley - Consulting Engineers For: _______________________________________________ _
2 BORING No 6-8-85
Oete Started . .......•
Wat er Surface Elev ........... . ~.
6-8-85 Date Completed .....•
H. Faitel Datum ••..••.....•...•....•....•...•••••....•.. Orllt.r
1:L!IV, OU"TH STRATA SAMPLK
CHANGE TYPII ·'N"
SOIL
CLAS.lf"ICATION
RE.M.A.RKS
---:---------------------------570 -- 10'6" 5 10-- 5 - ss 6 - !8 -- ss -
- t 8' 12
- 17
20- ss 12 -- 11 -- 13
- ss 13 -
550 - 28' 12
- 19
30- ss 33 -- 12 -- 19 - 36' ss 30
540 -
40------------------------ "N" -Standard ?eMtretlon Reslatanco 5.5.-2" 0.0. Split ~'"'!0¢(\ Samplo l.S.--S:e,ct;onal l!ner Semple S.T.--S.."9lby Tuba ~,pie
W AT E R
Fi rm gray-brown "wet" medium
SANO
Compact gray "wet" medium to fin~ SANO
Compact & very compact gray "wet" medium SANO
End o·f bor i ng
B-4
34' of 2¼" casing used to advance boring.
ES-85-061
Job No. ---------·---
3 ShMt ____ of
GRANO RAPIDS AREA
P. 0. BOX 181
GRANO HAVEN, MICHIGAN 49417
AREA 616 - 842-0486
MAIN OFFICE
21537 MORLEY
DEARBORN, MICHIGAN 48124
AREA 313 - 562-7275
TEST BORING REPORT
ALPENA AREA
WEST TRASK LAKE ROAD
BARTON CI..TY, MICHIGAN 48705
A~EA 517 - 736-8446
Propo~ed Docking Facility - North Manitou Island Soll Teat 8oring1 at the site ot. _______________________________________ _
Ni<:Namee, Porter & Seeley - Consulting Engineers For: __________________________ .;._ __________________ _
BORING No
Wat er Surface Elev ............ ~!.~~ .. ~~(./ Datum ............................ '
KLKV. DEPTH STRATA SAMPL.
CHANGE TYPE •'N"
aotL C1.Aee1,-1cATIOH
6-10-85 Date Started ..•
6-10-85 Date Completed
H. Fai tel Orfller
REMARKS ___ , ____________________ _
-- W AT ER
10--- 14 I 5 - 5
- ss 6 37' of 2¼" casing
Fi rm gray-brown "wet" medium
SAND
used to advance borinc.
560 -- ss
20- 22' --- ss ---- 550 - ss -
30---- ss ---- 540 - 39' ss
40------------------------ "N" -Standard Pe~tntlon Re1i1tancie S.S.-2 .. 0.0. Split Spoon Sample !..S.-Sectional Uner Semple
5. T.-Shelby Tuba S.mpl.
IU
II
II
Compact gray-brown "wet" medium
SANO
End of boring
·{:S -85-06 I Job No. ____________ _
B-5 4 4 Shee._ ___ of----
'APPENDIX C
STEEL BIN-TYPE RETAINING WALL
USUAL DEPTH/
HEIGHT COMBINATIONS
WALL HEIG .. H
WALL HffG Hl
I l' o
DESIGN A
• 1' SPACERSj 064 . THtCKI
WA.l.LHEIGHT l 2 o· ~
DESIGN D
r 10 7' SPACERS t 109~ HIICIC I
DESIGN B
a 3 ' SPACERS I Q6.4 • THICKJ
DESIGN E
C- 1
WALL HEIG HT
WALL HEIG HT ~
15 67
-wmp,-------- J O !.l.QQ_
DESIGN C
DESIGN F
I --J
PLAN AND ELEVATION
OF TYPICAL BW 2
TABLE II
PARTS PER TRANSVERSE SECTION-NORMAL WALL(D
WALL
HEIGHT
(F.ei)
4.33 5.67 7.00 8.33 9.67
11.00 12.33 13.67 15.00 16.33 17.67 19.00 20.33 21.67 23.00 24.33 25.67 27.00 28.33
FIIONT VERT. CONN. (F"1)~ AEAA VERT. CONN. (Feet)(D<l')
GRAOI!
TOTAL 1ST 2ND 3RD TOTAL 1ST 2ND 3110 Pl.ATE Hl!IGKT LI" LI" LI" Hl!IGKT LIFT u" LI"
4.33 4.33 1.67 1.67 2
5.67 5.67 3.00 3.00 2
7.00 7.00 4.33 4.33 2
8.33 8.33 5.67 !>.6/ 2
9.67 9.67 7.00 7.00 2
11.00 11.00 8.33 8.33 2
12.33 12.33 9.67 9.67 2
13.67 12.00 1.67 11.00 11.00 2
15.00 12.00 3.00 12.33 12.33 2
16.33 12.08 4.33 13.67 1.67 12.00 2
17.67 12.00 5.67 15.00 3.00 1-2.00 2
19.00 12.00 7.00 16.33 4.33 12.00 2
20.33 12.00 8.33 17.67 5.67 12.00 2
21.67 12.00 9.67 19.00 7.00 12.00 2
23.00 12.00 11.00 20.33 8.33 12.00 2
24.33 12.00 12.33 21.67 9.67 12.00 2
25.67 12.00 12.00 1.67 23.00 11.00 12.00 2
27.00 12.00 12.00 3.00 24.33 12.33 12.00 2
28.33 12.00 12.00 4.33 25.67 1.67 12.00 12.00 2
<D Normal wall has front face 2.67' higher than rear panel. Free standing vertical walls usually have front and rear panels the same height.
~ Use corner vertical- connectors in end transverse sections.
Split vertical connectors are used to connect bins of different de signs. They are 4• shorter than the rear height of the bin with the lesser depth .
• ~ Length and thickness varies with wall depth.
WALL DESIGN
Thickness
Spacer Length
A .064 ..
4.1'
B .064 ..
6.3'
.109"' 10.7'
E ,109• 12.9'
© On normal walls, there are two more stringers in front panel than rear.
F .109• 15.1'
'l> Short stringers and stiffeners (as detailed on curvature charts) may be used in front or rear panel.
~ "Parts per panel section" is the total number of stringers in the front and rear panel.
Rear Split Panel
Corner Stringer Vertical
Connector
Vertical Connector "'
End Transverse
Transverse Spacer Section
Section Closures Spacer
Vertical Front
Connector Panel
Length
C-2
I SPACER CLOSURE
SPASER I (IN ENO TRANS. SECTION ONLY)
(l I 2.tr 4.ocr 5.33' t.17' a.oo· 1 2 2 2 3 2 4 2 5 2 6 2 7 2 2 8 2 2 9 2 2
10 2 2 11 2 2 12 4 13 2 4 14 2 4 15 2 4 16 2 4 17 2 4 18 6 19 2 6
10' Panel Section
Ii I
I I
PARTS PER PANEL SECTION -
NORMAL WALLG)
~iN~~ ,I
! ST~~ER
WALL
HEIGHT
.064·1 .079" .109" .138" ! STIFFENER (F .. I)
4 1 4.33 6 1 5.67 8 1 7.00
10 1 !l.JJ
12 1 9.67 14 1 11.00 14 2 1 12.33 14 4 1 13.67 14 6 1 15.00 14 8 1 16.33 14 8 2 1 17.67 14 8 4 1 19.00 14 8 6 1 20.33 14 8 8 1 21.67 14 8 10 __L.- 23.00 14 8 12 1
I
24.33 14 8 14 1 25.67 14 8 14 2 1 27.00 14 8 14 4 1 28.33
10' 10'
I
I I
A 600-foot-long Armco Type 2 Bin-Wall retains fill along railroad tracks preventing encroachment of fill on access road.
I' I
Armco BW 2 serves as a marina dock and slip on a laJ<.e in Michigan .
Installed in fresh water, this Armco Type 2 Bin-Wall is used to protect the shoreline from the eroding force of the lake's water.
Preassembly can speed installation time. This Armco BW 2 at a power plant site in Michigan was built in sections on shore. later placed in the lake by crane.
APPENDIX D
TIMBER WALKWAY
Li 582.Z 2
-n r£R., ~rVARl£S .. 1.:;.
1 , s,_J
SECTION
Z o 2 4 ...r. I
SCRL£ OF F~l=T
4' c;ALV.
PIP€
I BOLT ---~--+-
511 SC/-180.P!PE.
W£LD£D TO JACKET
- £NT/Rt. ASS€.MBl 1/ qALV.
)}Di€: OIJ i @, @, @j@,~OTAT~
JACXET qc; 0 rROM ShON \.
AIJO WEl05lc€V€ ro 51D€ FOR P!PE'Tt)
8,QT,E'R
TIM8c/G Pile
3 - % '' BO l TS @ 2½ ''C/C
%8
ST€€l
JACK€.T
... ' l\)
' @,Ji
WRTc le L€V1.';l
V~RIE5 ~
L AUL CLEA~ CT/?.PllE. Ll·EI//\T/ON
Cl05~ OPcAI END C. V.t'-1 o,c 5LEEV£.
Li DETPll M D-1
0 ' !
0 0
I I
. . ~==:t:,~ = ·- - . ~'°'
7/M8€e PILE
S€€ SHT. 4
/A/TE/?101? PILE
(4 ruus,No t3ATT€r?)
4-Pll€ - ~A--,,,,.__ ___ DO l PH I IJ
(3'-Tf/U5) _
5½ ",x11½" ST,€/A/G€,€ eNO Cl0St./A=€ .8e~M ( 3- Pl,QC€ S 7HVS) --
I
. I II C
PL
8 0
I I
SCALE: I
FOR. PL~
E.