This document is a Bidding Clarifications file dated August 19, 2024, for the Shoshone Field Office project by the Bureau of Land Management's Twin Falls District. The document provides technical clarifications for contractors bidding on the project, covering multiple aspects of construction including water use, universal waste management, fences and gates, access control, telecommunications, landscaping, and fire alarm systems. Key clarifications include: acceptable use of onsite fire hydrants, requirements for waste disposal, gate and access control specifications, communication line rerouting, flagpole installation, and details about specific rooms considered normally locked and unoccupied. The document also includes a detailed technical diagram for a concrete mowstrip section, specifying its dimensions and construction requirements, with control joints and slope specifications.

View the file

Other files

File Type Posted
Sol_140L0625R0002_Amd_0008.pdf PDF
B08_Attachment_19_Revised_Final_Specifications_8-7-25_0007.pdf PDF
B08_Attachment_20C_Revised_Final_Drawings_20250804_Part3_0007.pdf PDF
B08_Attachment_20D_Revised_Final_Drawings_20250804_Part4_0007.pdf PDF
B08_Attachment_20A_Revised_Final_Drawings_20250804_Part1_0007.pdf PDF
B08_Attachment_20E_Revised_Final_Drawings_20250804_Part5_0007.pdf PDF
B08_Attachment_20B_Revised_Final_Drawings_20250804_Part2_0007.pdf PDF
Sol_140L0625R0002_Amd_0007.pdf PDF
B08_Attachment_18_Q_A_4_25R0002_0007.pdf PDF
Sol_140L0625R0002_Amd_0006.pdf PDF
B08_Attachment_17_J_A_140L0625R0002_0005.pdf PDF
Sol_140L0625R0002_Amd_0005.pdf PDF
B08_Attachment_16_Q_A_3__25R0002_0004.pdf PDF
Sol_140L0625R0002_Amd_0004.pdf PDF
Sol_140L0625R0002_Amd_0003.pdf PDF
B08_Attachment_15_Past_Perf_Questionnaire_UPDATED_0002.docx DOCX document
B08_Attachment_14_Q_A_2__25R0002_0002.docx DOCX document
Sol_140L0625R0002_Amd_0002.pdf PDF
B08_Attachment_12_Q_A_1_0001.pdf PDF
B08_Attachment_13_Site_Visit_Sign-In_Sheet_0001.pdf PDF
Sol_140L0625R0002_Amd_0001.pdf PDF
B08_Attachment_3_Price_Breakout.xlsx XLSX spreadsheet
B08_Attachment_1B_Shoshone_Drawings_8-14.pdf PDF
B08_Attachment_2B_Revised_Specs_012000_Nov2024.pdf PDF
B08_Attachment_9_Wage_Determination.pdf PDF
B08_Attachment_8_Limitations_on_SubK_Breakout.xlsx XLSX spreadsheet
B08_Attachment_1D_Shoshone_Drawings_59-111.pdf PDF
B08_Attachment_1C_Shoshone_Drawings_15-58.pdf PDF
B08_Attachment_1E_Shoshone_Drawings_112-124.pdf PDF
Sol_140L0625R0002.pdf PDF
B08_Attachment_1A_Shoshone_Drawings_1-7.pdf PDF
B08_Attachment_4_Geotech_Report.pdf PDF
B08_Attachment_7_ACM_Report.pdf PDF
B08_Attachment_6_Idaho_Lead-Based_Paint_Debris_Fact_Sheet.pdf PDF
B08_Attachment_11_SF1442_Completion_Instructions.pdf PDF
B08_Attachment_10_Past_Perf_Questionnaire.docx DOCX document
B08_Attachment_2A_Specifications.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Shoshone Field Office – Twin Falls District Bureau of Land Management Bidding Clarifications August 19, 2024

P a g e | 1 of 2

The following are intended as clarifications to the Drawings, Specifications, and other procurement documents. These statements are not intended to materially change or replace any of the design criteria represented by the Drawings and Specifications.

1. CLARIFICATIONS TO DRAWINGS AND SPECIFICATIONS

1.01 WATER USE

A. Use of onsite fire hydrant for the purposes of filling a water truck is acceptable

1.02 UNIVERSAL WASTE

A. The contractor will be responsible for testing via certified building material testing company and is responsible for managing the disposal of these items. Dispose of such items at appropriate waste facilities, following all local, state, and USEPA regulations.

1.03 FENCES AND GATES

A. Due to the width of driveways, it is acceptable to submit double/bi-part opening gates.

B. Clearance for the south leaf of the 42’ gate is limited.

1. The gates are located inside the fenced perimeter and may extend past the corner post into the landscape area.

C. Both mechanical and hydraulic operators are allowed as specified. Ensure final gate solution utilizes best available operator for the application.

D. Gate opening controls shall be as specified in Spec 323113.53 2.10.

1.04 DOORS AND ACCESS CONTROL

A. PACS devices are not required. All access control device locations are to be junction boxes and raceways with pull-ropes roughed in from device location to I.T./PACS Rm 117. See Sheet E106, Keynote 2.

B. Electrical contractor shall provide conduit and boxes for access control systems to allow for future installation of access control system.

1.05 TELECOM

A. Sheet E102, Note 12 indicates rerouting to new communication enclosure. As part of this work, it is expected that new communication lines, including fiber, will need to be provided per Spec 271000.

1.06 CIVIL / LANDSCAPE

A. Clarification: C103 Keynote 5 describes relocating an existing flagpole. Detail 4 on L502 shows a new flagpole.

1. Contractor to provide new flagpole per spec 107516

1.07 FIRE ALARM PLAN

A. Per Note 5 on Sheet E105, the following rooms are considered normally locked and normally unoccupied rooms:

1. 113 Mechanical Room

2. 117 IT Room

3. 115 Janitor Closet

Shoshone Field Office – Twin Falls District Bureau of Land Management Bidding Clarifications August 19, 2024

P a g e | 2 of 2

1.08 THICKNESS OF MOW STRIP (DRAWING L-301).

A. Mowstrip is 6” thick by 12” wide, see attached Concrete Mowstrip Section for all dimensions.

1. clarifications to Drawings and specifications
1.01 water use
A. Use of onsite fire hydrant for the purposes of filling a water truck is acceptable
1.02 universal Waste
A. The contractor will be responsible for testing via certified building material testing company and is responsible for managing the disposal of these items. Dispose of such items at appropriate waste facilities, following all local, state, and USEPA...
1.03 fences and Gates
A. Due to the width of driveways, it is acceptable to submit double/bi-part opening gates.
B. Clearance for the south leaf of the 42’ gate is limited.
1. The gates are located inside the fenced perimeter and may extend past the corner post into the landscape area.
C. Both mechanical and hydraulic operators are allowed as specified. Ensure final gate solution utilizes best available operator for the application.
D. Gate opening controls shall be as specified in Spec 323113.53 2.10.
1.04 doors and access control
A. PACS devices are not required. All access control device locations are to be junction boxes and raceways with pull-ropes roughed in from device location to I.T./PACS Rm 117. See Sheet E106, Keynote 2.
B. Electrical contractor shall provide conduit and boxes for access control systems to allow for future installation of access control system.
1.05 telecom
A. Sheet E102, Note 12 indicates rerouting to new communication enclosure. As part of this work, it is expected that new communication lines, including fiber, will need to be provided per Spec 271000.
1.06 civil / landscape
A. Clarification: C103 Keynote 5 describes relocating an existing flagpole. Detail 4 on L502 shows a new flagpole.
1. Contractor to provide new flagpole per spec 107516
1.07 fire alarm plan
A. Per Note 5 on Sheet E105, the following rooms are considered normally locked and normally unoccupied rooms:
1. 113 Mechanical Room
2. 117 IT Room
3. 115 Janitor Closet
1.08 thickness of mow strip (drawing l-301).
A. Mowstrip is 6” thick by 12” wide, see attached Concrete Mowstrip Section for all dimensions.