B08_Attachment_1E_Shoshone_Drawings_112-124.pdf

PDF 13 MB Posted

Attached to
Shoshone Wildland Fire Operations and Field Office
Solicitation number
140L0625R0002
Issued by

About this file

The provided file (pages 112-124 of B08_Attachment_1E_Shoshone_Drawings) is an electrical design and engineering drawing set for a new building project. The drawings detail comprehensive electrical system plans, including site utilities, power distribution, lighting, fire alarm, data infrastructure, and equipment layouts. Key technical specifications include:

Electrical System Overview: The design features a new pad-mount transformer from Idaho Power, two main electrical panels (LP1 and LP2) rated at 400A with 208/120V service, and a relocated 12kW Kohler generator. The electrical infrastructure supports existing warehouse and shop facilities, integrates with an existing solar photovoltaic system, and includes underground conduit routing for power, communications, and access control systems. The drawings also specify twenty-two new LED area lights with wireless networked controls, vehicle access gate systems with card readers, and detailed grounding and equipment mounting requirements.

View the file

Other files

File Type Posted
Sol_140L0625R0002_Amd_0008.pdf PDF
B08_Attachment_19_Revised_Final_Specifications_8-7-25_0007.pdf PDF
B08_Attachment_20C_Revised_Final_Drawings_20250804_Part3_0007.pdf PDF
B08_Attachment_20D_Revised_Final_Drawings_20250804_Part4_0007.pdf PDF
B08_Attachment_20A_Revised_Final_Drawings_20250804_Part1_0007.pdf PDF
B08_Attachment_20E_Revised_Final_Drawings_20250804_Part5_0007.pdf PDF
B08_Attachment_20B_Revised_Final_Drawings_20250804_Part2_0007.pdf PDF
Sol_140L0625R0002_Amd_0007.pdf PDF
B08_Attachment_18_Q_A_4_25R0002_0007.pdf PDF
Sol_140L0625R0002_Amd_0006.pdf PDF
B08_Attachment_17_J_A_140L0625R0002_0005.pdf PDF
Sol_140L0625R0002_Amd_0005.pdf PDF
B08_Attachment_16_Q_A_3__25R0002_0004.pdf PDF
Sol_140L0625R0002_Amd_0004.pdf PDF
Sol_140L0625R0002_Amd_0003.pdf PDF
B08_Attachment_15_Past_Perf_Questionnaire_UPDATED_0002.docx DOCX document
B08_Attachment_14_Q_A_2__25R0002_0002.docx DOCX document
Sol_140L0625R0002_Amd_0002.pdf PDF
B08_Attachment_12_Q_A_1_0001.pdf PDF
B08_Attachment_13_Site_Visit_Sign-In_Sheet_0001.pdf PDF
Sol_140L0625R0002_Amd_0001.pdf PDF
B08_Attachment_3_Price_Breakout.xlsx XLSX spreadsheet
B08_Attachment_1B_Shoshone_Drawings_8-14.pdf PDF
B08_Attachment_2B_Revised_Specs_012000_Nov2024.pdf PDF
B08_Attachment_9_Wage_Determination.pdf PDF
B08_Attachment_8_Limitations_on_SubK_Breakout.xlsx XLSX spreadsheet
B08_Attachment_1D_Shoshone_Drawings_59-111.pdf PDF
B08_Attachment_1C_Shoshone_Drawings_15-58.pdf PDF
Sol_140L0625R0002.pdf PDF
B08_Attachment_1A_Shoshone_Drawings_1-7.pdf PDF
B08_Attachment_4_Geotech_Report.pdf PDF
B08_Attachment_7_ACM_Report.pdf PDF
B08_Attachment_5_Clarifications.pdf PDF
B08_Attachment_6_Idaho_Lead-Based_Paint_Debris_Fact_Sheet.pdf PDF
B08_Attachment_11_SF1442_Completion_Instructions.pdf PDF
B08_Attachment_10_Past_Perf_Questionnaire.docx DOCX document
B08_Attachment_2A_Specifications.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X X

X X

X

X X X X X X

X

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

ELEVATION

UG

P

U G

P

UGP

UGP

UGP

UGP

UGP

UGP

UGP

U G

P

U G

P

U G

P U

G P

UGP

U G

P U

G P

U G

P

U G

P U

G P

U G

P

G P

P

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

TC

TC

TC

TC

TC

TC

TC

TC

TC

TC

TC

TC

TC

TC

TC

TC

TC

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UG

P

UG

P

X

X

XXX

XXXXXXXXXXXXXX

X

OHP

OHP

OH

U G

XXXXXXXXXXXXXXXX

XXXXXXXXXXXX

XXXXXXXXXXXXXXXX

XXXXXXXXXXXX

XXXXXXXXXXXXXX

XXXXXXXXXXXXX

XXXXXXXXXXXXXX

XXXXXXXXXXXXXXXX

X

X

OHPOHP

POHPOHPOHPHPOH

OHPPPOHP

OHPO

OHPOOOOOOOOOOOOO

OHP

OHP

OHP

OHO

ELEVATIONLEVATIO

UGP

UGP GPPUGPUGUGUGUUUUGUGUGUUGUGGPUUUGGGPUGGPUGUGGPPU

GPGGPUGP

TC

TC

TC

TC

TC

TC

TC

UGP

UGP

UGP

UGP

UGP

UGP

U

P U

PGP

U

UGP

UGP

UGPGP

U

UG

P

UG

GPUGUUUU

HP

X

X

X

X

X

XXXXXXXXXXXXXXXXXXXXXXXXX

XXXXX

XXXXXXXXXX

XXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXX

X

X X

X

XXXX

X

UG

P

UG

P

UG

P

UG

P

UUG

P

UGUUUG

P

UGUG

P

UG

P

UGUUG

P

UUGUGUGGGG

P

G

PPP

UUUUUUUUUUUU

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

UGP

UGP

UGP

UGP

UGP

UGP

UGP

U XX

U G

P

U G

P

U G

P U

G P

PP

UGPGP

TC

TC

TC

TC

TC

XXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

U

G P

GG

P

G P

U G

P G

PPPPP

G

P G

P G

PP

G

P G

P G

P G

PPPP

G

P G

PP

G

P G

P G

PPP

G

P

GG

P

GG

P G

P G

P

TC

TC

TC

TC

HPPPOHP

OHP

OHPOHH

OHPOHOHO

U G

PP

G

UU

P

G

UU

P

GG

UU

GG

P

GG

P G

U P

G U

PP

G

U P

G

UU

G

PPPP

G

UUUU

G

PP

UU

G

PP

UU

G

PP

U

GG

P

UU

G P

U

GG

PP

G

UU

P

G

UUU

GG

PP

U

GG

P U

GG

P

U

GG

PP

GG

UU

GG

P U

GG

PP

GG

U

P

GG

UU

P

G

UUU

G P

U G

PPP

G

U G

UUU

PP

G

UUUU

PPP

G

P U

G U

P

GG

U P

GG

UU

GG

U

P

GG

P

UU

GGGG

PP

U

GGGG

PP

U

GG

PP

GG

U

PPPP

GG

UU

PPPP

GGG

U

G

UU

PP

GGGG

UU

PPP

GGGG

UU

P

GGG

U G

U

PP

G

UUUU

G

PP

UU

GG

PPPPPPP

GG

UUUUUUUU

GG

PPPP

UU

G U

P U

P G

PP

UU

G U

P U

P G

PP

UUUU

GG

PPPP

UU

GGGG

PP

UU

G U

G P

U P

GG

PP

UU

G

U P

U P

G

PP

UU

GGGG

PP

UU

G P

U P

G

PP

G

UU

P G

UU

P

GG

UUUU

PP

GG

UUU

G

P U

GG

U

G U

GG

U

G U

GG

P

UU

GGGG

PP

U

G U

GG

P

G

PP

GG

U

P

GG

U P

GG

UU

GG

P

UU

GGGG

PPPP

UU

GGGG

PPP

GG

U

P

GG

U

PP

GGGG

UUUU

PP

GGG

UUUU

U G

P

UU

G

PP

UU

G

PP

UUU

G U

P G

PPP

U

GG

P

U

GG

PP

GG

P U

GG

U

PP

GGGG

UU

PP

GGGG

UU

P

GG

UU

GG

P

UUUU

GG

PP

UUUU

GGGG

PP

UU

GGGG

PP

UU

GGGG

PP

U

G U

GG

P

UU

G

PP

GG

UU

PP

GGG

UUUUU

GG

PPPP

GG

UUUU

PP

G

P U

P U

G

UU

PP

G

P U

P U

G

UU

PP

GG

UUUU

PPPP

GG

UU

PP

G

P U

P U

G

UU

PP

G

P U

P U

G

UU

PPPP

GG

UU

PP

G P

U P

U G

UUUU

G

UU

G

PP

UU

G

PP

UU

GG

PPPP

U

G P

G U

P

GG

U

PP

GGGG

UU

P G

P

GG

U G

UU

GG

P U

GG

P

U G

PP

GG

U

PP

GGGG

UU

P

GGGGG

PP

GGGG

UUU

GG

P U

GG

P

UU

GG

PPPP

UU

GG

PP

U G

PPPP

G

UU

PPPP

GG

UUUU

PPP

G

P U

G

UUU

P

GG

U

GG

UU

GG

U P

GG

P

UU

GGGG

PP

UU

GGGG

PP

U

GG

P U

GG

PP

G P

GG

U

G U

PPPP

GG

UUUU

PPPP

GG

U

G U

G

UU

P

GGG

UU

P

GG

UU

P G

P

GG

U

PPPP

GG

UUUU

G U

P U

P G

PP

U

GG

PPPPPPP

GG

UUUUUU

GG

PPPP

UU

G

U P

U P

G

PP

UU

G

PP

UUUU

GG

PP

UU

GGGG

PP

UU

G U

G P

U P

GG

PP

UU

G

PP

UU

GGGG

P

UU

G

U P

U P

G

PPP

G

UU

PP

GG

UUUU

PP

GG

UUUUU

G P

U

GG

U

GG

P G

P U

GG

PP

U G

U

GGG

P

GG

U P

GG

U

P G

P

GG

U G

UU

G

U

GG

P G

P

UU

GGGG

PP

UU

GGG

PP

GG

U

GG

U P

GG

UUU

PP

GGGG

UUUU

U

G

PPPP

G P

U G

UUU

PPPP

GG

UUUU

PP

G

UUU

PP

GG

U

G U

P

GG

P U

GGG

PP

U

GG

P U

GG

P

U

GG

PP

G

P

GG

U G

U

PP

GG

UUUU

PPP

GG

U G

U

PP

GGGG

UU

PPP

GGGG

UU

P

G P

GG

U

G U

PPPP

GG

UUUUUU

G

U P

U P

G

PP

UU

GG

PPPPPPP

GG

UUUUUUU

GG

PPPP

UU

G

PP

UU

G

U P

U P

G

PP

UUUU

GG

PPPP

U

GGGG

PP

UU

P

GG

PP

UU

G

U P

U P

G

PP

UUU

GGGG

PP

UU

G

PPP

G

UU

P G

UU

PP

GG

UUUU

PP

GG

UUUU

GGGG

UU

GGG

P G

U G

P G

U G

U

GG

P G

P

UU

GGGG

PP

U G

U

GG

P G

PP

GG

U P

GG

U

G P

GG

U

G

UU

G U

GG

P

G P

UU

GGGG

PP

UU

GGGG

PPP

GG

U

P

GG

U

PP

GGGG

UUUU

PP

GGGG

UUUU

U G

P U

PP

UU

P

OHP

OHP

UGP

UGP

UGPGP

U

UGP

U

P U

PGP

UTILITIES LEGEND

EXISTING TELECOM

EXISTING UNDERGROUND ELECTRIC

EXISTING

GYM

EXISTING SOLAR

PHOTOVOLTAIC

INVERTER

ENCLOSURE

EXISTING

WAREHOUSE

EXISTING

SHOP

EXISTING

TRANSFORMER &

CT AND JUNCTION

CABINET ENCLOSURE

DEMOLITION SEQUENCE 1

DEMOLITION NOTES

DEMOLITION SEQUENCE 2

1. DEMOLITION SHALL BE SEQUENCED SUCH THAT EXISTING BUILDING

REMAINS FULLY OPERATIONAL DURING CONSTRUCTION OF NEW

FIELD OFFICE.

2. DEMOLITION MAY CONSIST OF THREE SEPARATE SEQUENCES AS

SHOWN OR AS APPROVED BY THE CO.

3. REMOVABLE ITEMS WITHIN EACH SEQUENCE SHALL BE DETERMINED

BY THE CONTRACTOR AND APPROVED BY GOVERNMENT.

4. COORDINATE NEW UTILITY CONNECTIONS AND ROUTING TO ENSURE

ALL SITE BUILDINGS REMAIN OPERATIONAL DURING CONSTRUCTION.

5. EXISTING UNDERGROUND POWER UTILITIES IMPACTED BY THE

PLACEMENT/CONSTRUCTION OF NEW BUILDING SHALL BE

TEMPORARILY REROUTED TO EXISTING FACILITY TO MAINTAIN

CONTINUOUS OPERATIONS.

6. SEE SHEET C-102, MASTER DEMOLITION PLAN, FOR ADDITIONAL

DEMOLITION NOTES.

1. MAINTAIN THE EXISTING SOUTHEAST ACCESS GATE AS

OPERATIONAL UNTIL DEMOLITION AND CONSTRUCTION WORK ON

SOUTHEAST ROADWAY AREA BEGINS. BEFORE DEMOLITION AND

CONSTRUCTION WORK ON SOUTHEAST ROADWAY BEGINS,

NORTHWEST GATE SHALL BE PROVIDED WITH AN ACCESS GATE

CONTROLLER AND MADE OPERATIONAL WITH TEMPORARY POWER.

AFTER NORTHWEST GATE IS MADE OPERATIONAL, DEMOLISH OR CAP

AND ABANDON IN PLACE UNDERGROUND POWER SERVICE FROM

EXISTING BUILDING TO SOUTHEAST ACCESS GATE CONTROLLER.

RETAIN SOUTHEAST ACCESS GATE CONTROLLER IN PLACE AND

RELOCATE POWER FEED TO NEW BUILDING

2. DEMOLISH EXISTING TELECOM SERVICE TO EXISTING BUILDING

AFTER NEW SERVICE HAS BEEN ESTABLISHED TO NEW BUILDING.

3. REMOVE POWER SERVICE FROM SOLAR PANEL INVERTER

ENCLOSURE TO EXISTING BUILDING AND RELOCATE TO NEW

BUILDING.

4. DEMOLISH EXISTING TRANSFORMER AND CT & JUNCTION CABINET

ENCLOSURE AND DEMOLISH OR CAP AND ABANDON IN PLACE

UNDERGROUND POWER SERVICE TO EXISTING BUILDINGS AFTER

NEW TRANSFORMER AND/OR TEMPORARY SERVICE IS PUT INTO

SERVICE TO NEW AND EXISTING BUILDINGS.

5. DEMOLISH OR CAP AND ABANDON IN PLACE POWER FEED TO

EXISTING WAREHOUSE AND SHOP AFTER NEW POWER FEED FROM

NEW TRANSFORMER HAS BEEN ACCOMPLISHED.

6. DEMOLISH ELECTRICAL EQUIPMENT AND APPARATUS IN EXISTING

BUILDING AFTER NEW BUILDING IS OPERATIONAL.

7. REMOVE EXISTING 12KW GENERATOR AND TRANSFER SWITCH / LOAD

PANEL AND REINSTALL AT NEW BUILDING DURING OFFICE

TRANSFER.

8. DEMOLISH LIGHT POLES AND FIXTURES AND DEMOLISH OR CAP AND

ABANDON IN PLACE POWER FEED TO EXISTING LIGHT POLES

FIXTURES.1

EXISTING ACCESS

GATE (SOUTHEAST)

EXISTING

TELECOMM

SERVICE

ENCLOSURE

EXISTING

BUILDING

TC

UGP

DEMOLITION SEQUENCE 3

EXISTING ACCESS

GATE (NORTHWEST)

1954303:17:06 PM 07-11-2022 (-04'00' GMT)

X X

X X

X X

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

UG

P

U G

P

UG

P

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

TC

TC

TC

TC

TC

TC

TC

TC

TC

TC

TC

TC

UG

P

UG

P

U G

P U

G P

U G

P U

G P

UG

P

UGP

UGP

U G

P U

G P

U G

P

UGP

UGP

UGP

UGP

UGP

U G

P U

G P

U G

P U

G P

U G

P

TC TC TC TC TC

LTP

LTP

LTP LTP LTP

LTP

LTP

LTP

LT

P

LTP

LTP

LTP

LTP LTP LTP LTP LTPLTP

LTP

LTP

LTP

LTP

LTP

LTP

LTP

LTP

LTP

LTP

LTP

LT

P

LT

P

LT

P

LT

P

LT

P

LTP

LTP

LTP

LTP

LTP

LTP

LTP

LTP

UGP UGP UGP UGP UGP UGP

TC

TC

TC

TC

TC

TC

TC

TC

TC

TC

U G

P U

G P

UG

P

UGP

LTP

LTP

LTP

LT

P

LT

P

LTP

LT

P

LT

P

LT

P

LTP

LTP

LTP

LTP

LTP

CR

CR

CR

CR

PACS

PACS

PACS

PACS

PACS

PACS

PACS

PACS

PACS

PACS

PACS PACS

PACS

PACS

PACS

PACS

PACS

PACS

PACS

PACS

PACS

PACS

PACS

PACS

PAC

S

PACS

PACS

PACS

PA

C

S

PA

C S

PA

C

S

PA

C S

PA

CS

PA

CS

PACS

COM

C O

M C

O M

C O

M C

O M

UG

P

LTPLTP

LT

P

CR

20' 10' 30'030'

KEY NOTES

1. PROVIDE NEW SERVICE AND TRANSFORMER. COORDINATE WITH IDAHO POWER COMPANY FOR

OBTAINING TRANSFORMER AND NECESSARY PERMITS.

2. PROVIDE NEW PAD MOUNT SECONDARY CONNECTION ENCLOSURE. REROUTE POWER

CONDUIT RUNS FROM EXISTING CT & JUNCTION CABINET TO NEW SECONDARY CONNECTION

ENCLOSURE.

3. PROVIDE NEW UNDERGROUND POWER FEED FROM NEW SECONDARY CONNECTION

ENCLOSURE TO NEW 400A NEMA 3R DISCONNECT WITH 400A FUSES, MOUNTED ON SIDE OF

NEW BUILDING. PROVIDE NEW POWER FEEDS FROM NEW DISCONNECT TO PANELBOARDS LP1

& LP2 IN MEP ROOM. SEE SINGLE LINE DIAGRAM ON SHEET E-603.

4. REMOVED NOTE.

5. PROVIDE NEW UNDERGROUND POWER FEED FROM NEW SECONDARY CONNECTION

ENCLOSURE TO EXISTING WAREHOUSE. FIELD LOCATE AND TIE INTO EXISTING POWER FEED,

SEE SINGLE DIAGRAM ON SHEET E-603.

6. PROVIDE NEW UNDERGROUND POWER FEED FROM NEW SECONDARY CONNECTION

ENCLOSURE TO EXISTING SHOP. FIELD LOCATE AND TIE INTO EXISTING POWER FEED, SEE

SINGLE DIAGRAM ON SHEET E-603.

7. PROVIDE NEW UNDERGROUND POWER FEED FROM EXISTING SOLAR POWER CONVERTER

INVERTER ENCLOSURE TO NEW PV SYSTEM DISCONNECT PANEL ON SIDE OF NEW BUILDING.

SEE SINGLE LINE DIAGRAM ON SHEET E-603.

8. PROVIDE #2/0 AWG BARE CU GROUND RING, WITH (4) GROUND RODS LOCATED 5FT FROM

BUILDING FOOTPRINT BURIED MINIMUM 36" BELOW FINISHED GRADE. GROUND RING SHALL

BOND WITH ELECTRICAL GROUND BUS BAR (EGB) LOCATED IN MAIN BUILDING MEP ROOM. SEEN

SINGLE LINE DIAGRAM ON SHEET E-603.

9. PROVIDE NEW UNDERGROUND 3" FEED FROM NEW BUILDING I.T./PACS ROOM TO VEHICLE

ACCESS GATE CONTROLLERS.

10. PROVIDE NEW ELECTRIC VEHICLE ACCESS GATE SYSTEM WITH SLIDE GATE OPERATOR. GATE

CONTROLLER TO HAVE BATTERY BACKUP. EACH VEHICLE GATE REQUIRES ACCESS CARD

READERS ON ENTRY AND EXIT. EACH PEDESTAL TO CONTAIN 2 CARD READERS, ONE LOCATED

LOW FOR CARS AND ONE LOCATED HIGHER FOR LARGER VEHICLES. EACH PEDESTAL TO

CONTAIN AN AUDIO/ VIDEO STATION. CONDUCTORS SHALL BE SIZED IN ACCORDANCE WITH

MANUFACTURES RECOMMENDATIONS. CONTRACTOR SHALL PROVIDE A FULLY FUNCTIONAL

GATE OPENING SYSTEM.

11. PROVIDE TWENTY-TWO (22) NEW LED AREA LIGHTS, 25' TALL LIGHT POLE, CONTROLLED WITH

EMBEDDED WIRELESS NETWORKED CONTROLS, WITH PHOTOCELL AND DIMMING CAPABILITY.

PROVIDE UNDERGROUND CONDUIT FROM NEW BUILDING MEP ROOM. INSTALL HANDHOLES AS

NECESSARY. REFER TO DETAIL 22 ON SHEET C-505 AND PANEL SCHEDULE LP2 ON SHEET E-601.

12. PROVIDE NEW COMMUNICATION ENCLOSURE, REROUTE EXISTING COMMUNICATION CONDUIT

RUNS FROM EXISTING CT & JUNCTION CABINET ENCLOSURE TO NEW COMMUNICATION

ENCLOSURE.

13. PROVIDE NEW UNDERGROUND COMM CONDUIT FROM NEW COMMUNICATION ENCLOSURE TO

NEW BUILDING COMM ROOM. (2) 3" PVC.

14. REMOVED NOTE.

15. PROVIDE NEW UNDERGROUND COMM CONDUIT TO EXISTING SHOP. FIELD LOCATE AND TIE

INTO EXISTING COMM CONDUIT FEEDS.

16. PROVIDE NEW UNDERGROUND COMM CONDUIT TO EXISTING WAREHOUSE. FIELD LOCATE AND

TIE INTO EXISTING COMM CONDUIT FEEDS.

17. PROVIDE NEW 3' UNDERGROUND COMM CONDUIT FROM EXISTING TELCOM ENCLOSURE TO

NEW BUILDING I.T./PACS ROOM.

18. REMOVED NOTE.

19. PROVIDE TWO (2) 3" UNDERGROUND CONDUITS AND HANDHOLE FOR FUTURE ELECTRIC

VEHICLE CHARGING AREA.

20. PROVIDE NEW UNDERGROUND FEED FROM MEP ROOM TO RELOCATED GENERATOR. SEE

SINGLE LINE DIAGRAM ON SHEET E-601 AND VIEW 2/E103 ON SHEET E-103.

UTILITIES LEGEND

TC

UGP

EXISTING TELECOM

EXISTING UNDERGROUND ELECTRIC

PROPOSED TELECOM

PROPOSED UNDERGROUND ELECTRIC

TC

UGP

EXISTING ACCESS

VEHICLE GATE

CONTROLLER

NEW

OFFICE

BLDG

NEW ACCESS

VEHICLE GATE 2

EXISTING

GYM

EXISTING SOLAR

PHOTOVOLTAIC INVERTER

ENCLOSURE

EXISTING

WAREHOUSE

EXISTING

SHOP

GENERAL NOTES

1. COORDINATE CONNECTIONS AND ROUTING WITH OTHER SITE UTILITIES.

EXISTING

TRANSFORMER &

CT AND JUNCTION

CABINET ENCLOSURE

EXISTING ACCESS

VEHICLE GATE IN

TEMPORARY USE

DURING

CONSTRUCTION

EXISTING

TELECOMM

SERVICE

ENCLOSURE

CR

PACS PROPOSED ACCESS CONTROL SYSTEM

CARD READER STATION

J HANDHOLE /JUNCTION BOX

LTP PROPOSED UNDERGROUND ELECTRIC

FOR LIGHTING

NEW ACCESS

VEHICLE GATE 1

EXISTING ACCESS

VEHICLE GATE

(CURRENTLY NOT

IN OPERATION)

RELOCATED 12KW

GENERATOR

8EXISTING BUILDING

OUTLINE

FUTURE ELECTRIC

VEHICLE CHARGING

AREA

NEW ACCESS

VEHICLE GATE 1

OPERATOR

STATION

R

EV

IS

ED

/1 1/

BC

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CHK'D BY:

AutoCAD SHX Text

AutoCAD SHX Text

DESIGN OFFICE:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

PROJECT NO:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

SHEET

AutoCAD SHX Text A

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text

OF

AutoCAD SHX Text

DATE:

AutoCAD SHX Text B

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

MARK

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

DATE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

UNITED STATES DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text PLOT DATE:4/11/2023 2:51 PM PLOTTED BY:Darrell Dean 4/11/2023 2:51 PM PLOTTED BY:Darrell Dean PLOTTED BY:Darrell Dean Darrell Dean \\nwindenv.com\nwi2\Idaho Falls\Engineering Division\70048 BLM AE IDIQ\030 Shoshone Field Office Replacement\Design Activities\2.0 Drawings\2.1 Dwg\2.1.2 Current\E-102

AutoCAD SHX Text

SHOSHONE FIELD OFFICE REPLACEMENT

AutoCAD SHX Text

TWIN FALLS DISTRICT

AutoCAD SHX Text

IDAHO

AutoCAD SHX Text 70048-030

AutoCAD SHX Text

LBYD FEDERAL, IDAHO FALLS

AutoCAD SHX Text 07/11/2022

AutoCAD SHX Text

AutoCAD SHX Text

ELECTRICAL SITE PLAN

AutoCAD SHX Text

DD

AutoCAD SHX Text

DD

AutoCAD SHX Text

JR

AutoCAD SHX Text

BC

AutoCAD SHX Text E102

AutoCAD SHX Text darrell.dean DD - Idaho

P L O T

D A T E

P L O T T E D

B Y

C H K 'D

B Y

D E S

IG

N O F F

IC

E

D E S

IG

N E D

B Y

P R O J E C T

N O

D R A W N

B Y

A P P R O V E D

B Y

U N

IT

E D

S T A T E S

D E P A R T M E N T

O F

T H E

IN

T E R

IO

R B U R E A U

O F

L A N D

M A N A G E M E N T

D A T E

D E S C R

IP

T

IO

N M A R K

A P P R O V E D

D A T E

SHEET OF

:0

:1

A M

C

U s e rs a ri c o D o c u m e n ts A u to

C a d R e v it

L o c a l

F il e N W B L M D O E L E C T a lf re d o ri c o .r v t

P O W E R

P L A N

E103

S H O S H O N E

F

IE

L D

O F F

IC

E R E P L A C E M E N T

D D

J R

L B Y D

F E D E R A L

ID

A H O

F A L L S

D D B C

T W

IN

F A L L S

D

IS

T R

IC

T

ID

A H O

114 124

1954303:17:30 PM 07-11-2022 (-04'00' GMT)

O T

D A T E

P L O T T E D

B Y

C H K 'D

B Y

D E S

IG

N O F F

IC

E

D E S

IG

N E D

B Y

P R O J E C T

N O

D R A W N

B Y

A P P R O V E D

B Y

U N

IT

E D

S T A T E S

D E P A R T M E N T

O F

T H E

IN

T E R

IO

R B U R E A U

O F

L A N D

M A N A G E M E N T

D A T E

D E S C R

IP

T

IO

N M A R K

A P P R O V E D

D A T E

SHEET OF

:0

:2

A M

C

U s e rs a ri c o D o c u m e n ts A u to

C a d R e v it

L o c a l

F il e N W B L M D O E L E C T a lf re d o ri c o .r v t

L

IG

H T

IN

G P L A N

E104

S H O S H O N E

F

IE

L D

O F F

IC

E R E P L A C E M E N T

D D

J R

L B Y D

F E D E R A L

ID

A H O

F A L L S

D D B C

T W

IN

F A L L S

D

IS

T R

IC

T

ID

A H O

115 124

1954303:17:30 PM 07-11-2022 (-04'00' GMT)

O T

D A T E

P L O T T E D

B Y

C H K 'D

B Y

D E S

IG

N O F F

IC

E

D E S

IG

N E D

B Y

P R O J E C T

N O

D R A W N

B Y

A P P R O V E D

B Y

U N

IT

E D

S T A T E S

D E P A R T M E N T

O F

T H E

IN

T E R

IO

R B U R E A U

O F

L A N D

M A N A G E M E N T

D A T E

D E S C R

IP

T

IO

N M A R K

A P P R O V E D

D A T E

SHEET OF

:0

:2

A M

C

U s e rs a ri c o D o c u m e n ts A u to

C a d R e v it

L o c a l

F il e N W B L M D O E L E C T a lf re d o ri c o .r v t

F

IR

E A L A R M

P L A N

E105

S H O S H O N E

F

IE

L D

O F F

IC

E R E P L A C E M E N T

D D

J R

L B Y D

F E D E R A L

ID

A H O

F A L L S

D D B C

T W

IN

F A L L S

D

IS

T R

IC

T

ID

A H O

116 124

1954303:17:31 PM 07-11-2022 (-04'00' GMT)

O T

D A T E

P L O T T E D

B Y

C H K 'D

B Y

D E S

IG

N O F F

IC

E

D E S

IG

N E D

B Y

P R O J E C T

N O

D R A W N

B Y

A P P R O V E D

B Y

U N

IT

E D

S T A T E S

D E P A R T M E N T

O F

T H E

IN

T E R

IO

R B U R E A U

O F

L A N D

M A N A G E M E N T

D A T E

D E S C R

IP

T

IO

N M A R K

A P P R O V E D

D A T E

SHEET OF

:0

:2

A M

C

U s e rs a ri c o D o c u m e n ts A u to

C a d R e v it

L o c a l

F il e N W B L M D O E L E C T a lf re d o ri c o .r v t

D A T A

P L A N

E106

S H O S H O N E

F

IE

L D

O F F

IC

E R E P L A C E M E N T

D D

J R

L B Y D

F E D E R A L

ID

A H O

F A L L S

D D B C

T W

IN

F A L L S

D

IS

T R

IC

T

ID

A H O

117 124

1954303:17:31 PM 07-11-2022 (-04'00' GMT)

LP1-1 LP1-1 LP1-1

L O T

D A T E

P L O T T E D

B Y

C H K 'D

B Y

D E S

IG

N O F F

IC

E

D E S

IG

N E D

B Y

P R O J E C T

N O

D R A W N

B Y

A P P R O V E D

B Y

U N

IT

E D

S T A T E S

D E P A R T M E N T

O F

T H E

IN

T E R

IO

R B U R E A U

O F

L A N D

M A N A G E M E N T

D A T E

D E S C R

IP

T

IO

N M A R K

A P P R O V E D

D A T E

SHEET OF

:0

:2

A M

C

U s e rs a ri c o D o c u m e n ts A u to

C a d R e v it

L o c a l

F il e N W B L M D O E L E C T a lf re d o ri c o .r v t

E L E C T R

IC

A L

D E T A

IL

S

E501

S H O S H O N E

F

IE

L D

O F F

IC

E R E P L A C E M E N T

D D

J R

L B Y D

F E D E R A L

ID

A H O

F A L L S

D D B C

T W

IN

F A L L S

D

IS

T R

IC

T

ID

A H O

118 124

1954303:17:32 PM 07-11-2022 (-04'00' GMT)

O T

D A T E

P L O T T E D

B Y

C H K 'D

B Y

D E S

IG

N O F F

IC

E

D E S

IG

N E D

B Y

P R O J E C T

N O

D R A W N

B Y

A P P R O V E D

B Y

U N

IT

E D

S T A T E S

D E P A R T M E N T

O F

T H E

IN

T E R

IO

R B U R E A U

O F

L A N D

M A N A G E M E N T

D A T E

D E S C R

IP

T

IO

N M A R K

A P P R O V E D

D A T E

SHEET OF

:0

:2

A M

C

U s e rs a ri c o D o c u m e n ts A u to

C a d R e v it

L o c a l

F il e N W B L M D O E L E C T a lf re d o ri c o .r v t

E L E C T R

IC

A L

D E T A

IL

S

E502

S H O S H O N E

F

IE

L D

O F F

IC

E R E P L A C E M E N T

D D

J R

L B Y D

F E D E R A L

ID

A H O

F A L L S

D D B C

T W

IN

F A L L S

D

IS

T R

IC

T

ID

A H O

119 124

1954303:17:32 PM 07-11-2022 (-04'00' GMT)

O T

D A T E

P L O T T E D

B Y

C H K 'D

B Y

D E S

IG

N O F F

IC

E

D E S

IG

N E D

B Y

P R O J E C T

N O

D R A W N

B Y

A P P R O V E D

B Y

U N

IT

E D

S T A T E S

D E P A R T M E N T

O F

T H E

IN

T E R

IO

R B U R E A U

O F

L A N D

M A N A G E M E N T

D A T E

D E S C R

IP

T

IO

N M A R K

A P P R O V E D

D A T E

SHEET OF

:0

:3

A M

C

U s e rs a ri c o D o c u m e n ts A u to

C a d R e v it

L o c a l

F il e N W B L M D O E L E C T a lf re d o ri c o .r v t

E L E C T R

IC

A L

D E T A

IL

S

E503

S H O S H O N E

F

IE

L D

O F F

IC

E R E P L A C E M E N T

D D

J R

L B Y D

F E D E R A L

ID

A H O

F A L L S

D D B C

T W

IN

F A L L S

D

IS

T R

IC

T

ID

A H O

120 124

1954303:17:33 PM 07-11-2022 (-04'00' GMT)

O T

D A T E

P L O T T E D

B Y

C H K 'D

B Y

D E S

IG

N O F F

IC

E

D E S

IG

N E D

B Y

P R O J E C T

N O

D R A W N

B Y

A P P R O V E D

B Y

U N

IT

E D

S T A T E S

D E P A R T M E N T

O F

T H E

IN

T E R

IO

R B U R E A U

O F

L A N D

M A N A G E M E N T

D A T E

D E S C R

IP

T

IO

N M A R K

A P P R O V E D

D A T E

SHEET OF

:0

:3

A M

C

U s e rs a ri c o D o c u m e n ts A u to

C a d R e v it

L o c a l

F il e N W B L M D O E L E C T a lf re d o ri c o .r v t

E L E C T R

IC

A L

D E T A

IL

S

E504

S H O S H O N E

F

IE

L D

O F F

IC

E R E P L A C E M E N T

D D

J R

L B Y D

F E D E R A L

ID

A H O

F A L L S

D D B C

T W

IN

F A L L S

D

IS

T R

IC

T

ID

A H O

121 124

1954303:17:33 PM 07-11-2022 (-04'00' GMT)

O T

D A T E

P L O T T E D

B Y

C H K 'D

B Y

D E S

IG

N O F F

IC

E

D E S

IG

N E D

B Y

P R O J E C T

N O

D R A W N

B Y

A P P R O V E D

B Y

U N

IT

E D

S T A T E S

D E P A R T M E N T

O F

T H E

IN

T E R

IO

R B U R E A U

O F

L A N D

M A N A G E M E N T

D A T E

D E S C R

IP

T

IO

N M A R K

A P P R O V E D

D A T E

SHEET OF

:0

:3

A M

C

U s e rs a ri c o D o c u m e n ts A u to

C a d R e v it

L o c a l

F il e N W B L M D O E L E C T a lf re d o ri c o .r v t

E L E C T R

IC

A L

S C H E D U L E S

E601

S H O S H O N E

F

IE

L D

O F F

IC

E R E P L A C E M E N T

D D

J R

L B Y D

F E D E R A L

ID

A H O

F A L L S

D D B C

T W

IN

F A L L S

D

IS

T R

IC

T

ID

A H O

122 124

1954303:17:44 PM 07-11-2022 (-04'00' GMT)

O T

D A T E

P L O T T E D

B Y

C H K 'D

B Y

D E S

IG

N O F F

IC

E

D E S

IG

N E D

B Y

P R O J E C T

N O

D R A W N

B Y

A P P R O V E D

B Y

U N

IT

E D

S T A T E S

D E P A R T M E N T

O F

T H E

IN

T E R

IO

R B U R E A U

O F

L A N D

M A N A G E M E N T

D A T E

D E S C R

IP

T

IO

N M A R K

A P P R O V E D

D A T E

SHEET OF

:0

:3

A M

C

U s e rs a ri c o D o c u m e n ts A u to

C a d R e v it

L o c a l

F il e N W B L M D O E L E C T a lf re d o ri c o .r v t

E L E C T R

IC

A L

S C H E D U L E S

E602

S H O S H O N E

F

IE

L D

O F F

IC

E R E P L A C E M E N T

D D

J R

L B Y D

F E D E R A L

ID

A H O

F A L L S

D D B C

T W

IN

F A L L S

D

IS

T R

IC

T

ID

A H O

123 124

1954303:17:45 PM 07-11-2022 (-04'00' GMT)

SCALE: NTS1 ELECTRICAL SINGLE LINE DIAGRAM

NOTES:

1. NEW PAD MOUNT TRANSFORMER PROVIDED BY IDAHO POWER.. GROUND SECONDARY

SERVICE CONDUCTOR WITH A GROUNDING ELECTRODE PER NEC 250.24(A)(2).

2. REFER TO SHEET E601 & E602 FOR PANEL SCHEDULES.

3. ALL CONNECTIONS TO GROUNDING BUS BARS SHALL BE MINIMUM #4 AWG CU

4. VERIFY EXISTING WAREHOUSE & SHOP TERMINATION POINTS AND ROUTING.

5. PROVIDE ADVANCED METERING AS REQUIRED BY ENERGY POLICY ACT 2005 § 103 (42

U.S.C. § 8253(e))

6. EXISTING PV METERING NOT SHOWN

NEW PAD MOUNT

UTILITY PROVIDED

TRANSFORMER

3PH 4W

208/120V12.47KV

PANELBOARD 'LP1', 3PH, 4W

120/208V, 400A BUS, 84CKT,

22KAIC

SERVICE

UTILITY POLE

RISER GN

400A

COLD

WATER

PIPE

BUILDING

STEEL

GROUND

RING/

RODS

CONCRETE

ENCASED

ELECTRODE

COMM RM

GND BAR

'TGB'

MEP ROOM GROUND BAR, 'EGB'

TO FACP

DSW-1

800A, 4W

600A FUSE

1 2

NOTE: FACP ONE-LINE DIAGRAM IS SCHEMATIC ONLY. REFER TO PLANS FOR DEVICE QUANTITIES & LOCATIONS.

ALL DEVICES SHALL COMPLY WITH ADA REQUIREMENTS. DEVICES SHALL BE LOCATED PER NFPA & ADA REQUIREMENTS. HORNS SHALL BE CAPABLE OF BEING SILENCED WHILE MAINTAINING STROBE ACTIVATION.

PHOTO-ELECTRIC

DETECTORS

THERMAL

DETECTORS

FACP

HORNS AND STROBES ON SEPARATE CIRCUITS

120VAC CONTROL

CIRCUIT, LPX-XX

1" CONDUIT TO

ANNUNCIATOR

PANEL

SCALE: NTS

FACP SINGLE LINE DIAGRAM2

E602

NOTE 1

NOTE 2

PANELBOARD 'LP2', 3PH, 4W

120/208V, 400A BUS, 84CKT,

22KAIC

400A

NOTE 2

FEEDER SCHEDULE

NUMBER DESCRIPTION

(3) 3" CONDUIT, EA. W/ (3) 300MCM & #2/0 GND

(2) 3" CONDUIT, EA. W/ (4) 350MCM & #1 GND

2" CONDUIT, W/ (3) #4/0 & #2/0 NEUTRAL

#2/0 GEC

(1) 3" CONDUIT, W/ (4) 250MCM & #4 GND

(2) 3" CONDUIT, EA. W/ (4) #4/0 & #2 GND

1-1/4" CONDUIT, W/ (4) #4 & #8 GND

PV SYSTEM

DISCONNECT

SWITCH

400A, 4W

200A FUSE

NEW 1000A

SECONDARY

CONNECTION

ENCLOSURE

EXISTING WAREHOUSE

EXISTING SHOP

NOTE 3

EXISTING

INVERTER

PANEL

TO SOLAR

ARRAY

70A

RELOCATED

KOHLER

GENERATOR

12RESVL SERIES

12 KVA, 240/120 V,

1ɸ, 3W, 60HZ

70 A

GEN

RELOCATED KOHLER

MODEL RXT AUTOMATIC

TRANSFER SWITCH, ATS1,

2P, 3W, SOLID NEUTRAL,

WITH 12-SPACE LOAD

CENTER

100A

NOTE 2

NOTE 4

M

ADVANCED

METER

SEE NOTE 5

NOTE 6

R

EV

IS

ED

/1 1/

BC

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CHK'D BY:

AutoCAD SHX Text

AutoCAD SHX Text

DESIGN OFFICE:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

PROJECT NO:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

SHEET

AutoCAD SHX Text A

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text

OF

AutoCAD SHX Text

DATE:

AutoCAD SHX Text B

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

MARK

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

DATE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

UNITED STATES DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text PLOT DATE:4/11/2023 2:50 PM PLOTTED BY:Darrell Dean 4/11/2023 2:50 PM PLOTTED BY:Darrell Dean PLOTTED BY:Darrell Dean Darrell Dean \\nwindenv.com\nwi2\Idaho Falls\Engineering Division\70048 BLM AE IDIQ\030 Shoshone Field Office Replacement\Design Activities\2.0 Drawings\2.1 Dwg\2.1.2 Current\E-603

AutoCAD SHX Text

SHOSHONE FIELD OFFICE REPLACEMENT

AutoCAD SHX Text

TWIN FALLS DISTRICT

AutoCAD SHX Text

IDAHO

AutoCAD SHX Text 70048-030

AutoCAD SHX Text

LBYD FEDERAL, IDAHO FALLS

AutoCAD SHX Text 07/11/2022

AutoCAD SHX Text

AutoCAD SHX Text M

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text T

AutoCAD SHX Text D

AutoCAD SHX Text

SINGLE LINE DIAGRAM

AutoCAD SHX Text

DD

AutoCAD SHX Text

DD

AutoCAD SHX Text

DR

AutoCAD SHX Text

BC

AutoCAD SHX Text E603

AutoCAD SHX Text darrell.dean DD - Idaho

File details come from the government source that posted it. Updated .