B08_Attachment_3_Price_Breakout.xlsx
XLSX spreadsheet 19 KB Posted
- Solicitation number
- 140L0625R0002
About this file
This is a Price Breakout spreadsheet for the Bureau of Land Management Shoshone Field Office Replacement project, detailing a comprehensive construction project with both base and optional line items. The base schedule includes 13 line items covering critical construction phases such as mobilization, site preparation, erosion control, demolition, excavation, structural fill, field office construction, site utilities, landscaping, exterior concrete work, pavements, and fencing, with each line item currently showing zero cost.
The optional schedule provides additional construction elements including pavement and striping, gravel driving surface, landscaping enhancements, a pre-engineered steel structure (cabana), light poles, and casework. The project is associated with Solicitation Number 140L0625R0002 for the Shoshone Wildland Fire Operations and Field Office, under the Department of the Interior Bureau of Land Management National Office. The price breakout document appears to be a template or draft pricing document, with placeholder line items awaiting specific cost inputs for the construction project.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Breakout
| Bureau of Land Management |
| Shoshone Field Office Replacement |
| Price Breakout |
| BASE SCHEDULE | |||||
| Line Item No. | Description | Estimated Quantity | Unit | Unit Cost | Total |
| BUILDING: | |||||
| 1 | Mobilization & Construction Management | 1 | LS | $ - 0 | |
| 2 | Erosion Control and Storm Water Pollution Prevention | 1 | LS | $ - 0 | |
| 3 | Construction Staking | 1 | LS | $ - 0 | |
| 4 | Select Demolition | 1 | LS | $ - 0 | |
| 5 | Site Clearing and Grubbing, Excavation, and Preparation | 1 | LS | $ - 0 | |
| 6 | Site Rock Removal | 60 | BCY | $ - 0 | |
| 7 | Structural Fill | 1 | LS | $ - 0 | |
| 8 | Field Office Construction | 1 | LS | $ - 0 | |
| 9 | Site Utilities - Excluding Irrigation | 1 | LS | $ - 0 | |
| 10 | Landscaping - Irrigation Only | 1 | LS | $ - 0 | |
| 11 | Exterior Concrete Work (e.g. walkways, bollards, curbs, and gutters) | 1 | LS | $ - 0 | |
| 12 | Pavements - Excluding SCHEDULE A | 1 | LS | $ - 0 | |
| 13 | Fences and Gates | 1 | LS | $ - 0 | |
| Total Base Schedule | $ - 0 | ||||
| OPTIONAL ITEMS: | |||||
| O1 | SCHEDULE A - Pavement and Striping | 1 | LS | $ - 0 | |
| O2 | Gravel Driving Surface - Wareyard | 1 | LS | $ - 0 | |
| O3 | Landscaping - Planting, Pavers, Site Furnishing, and Receptacles | 1 | LS | $ - 0 | |
| O4 | Pre-Engineered Steel Structure (Cabana) and Foundation | 2 | EA | $ - 0 | |
| O5 | Light Poles and Luminaires | 1 | LS | $ - 0 | |
| O6 | Casework | 1 | LS | $ - 0 | |
| Total Optional Schedule | $ - 0 |
Total All Schedules $ - 0