B08_Attachment_4_BAND_MOD7_Exceptions_Report_Signed.pdf

PDF 1 MB Posted

Attached to
Update Utilities
Solicitation number
140P2026R0063
Issued by

About this file

This is a Technical Memorandum documenting culvert design exceptions for the Bandelier National Monument Underground Utilities Rehabilitation project (BAND 266697) managed by Jacobs Engineering Group, Inc. for the National Park Service Denver Service Center.

The project addresses repairs to an existing corrugated metal pipe (CMP) culvert beneath Route 0010 Entrance Road at Bandelier National Monument. The culvert inlet, buried over 6 feet below ground level near the Visitors Center, features historic stone headwalls that the National Park Service required be preserved in place. The design involves uncovering the silted culvert invert, restoring the existing historic stone headwall, and regrading a roadside ditch to direct flows to the culvert inlet. The road is classified as a Class I Principal Park Road with a posted speed limit of 25 mph and current average daily traffic of approximately 250 vehicles. The design exception pertains to the clear zone requirement, which specifies 6 feet per AASHTO Guidelines for Geometric Design of Low-Volume Roads 2019 but is designed at 3 feet due to the historic headwall preservation constraint. Risk analysis indicates low risk given lower vehicle speeds, low traffic volumes, and no historical accident records. Mitigation features include installation of a drop inlet with flatter design slopes, reduced speed limit signs, guardrail, curb, and edge stripe. The exception and associated risk mitigation were reviewed and formally approved by the National Park Service on March 9, 2026, with recommendations from Jacobs project personnel and NPS management.

View the file

Other files

File Type Posted
B09_Solit_Clauses_Construction_7_9_26_0007.pdf PDF
B09_BAND-266697_ContractPriceSchedule_Addendum1_20260701_0007.xlsx XLSX spreadsheet
Sol_140P2026R0063_Amd_0007.pdf PDF
B09_QR_Tracker_BAND_266697_7_9_26_0007.pdf PDF
Sol_140P2026R0063_Amd_0006.pdf PDF
Sol_140P2026R0063_Amd_0005.pdf PDF
B08_Solit_Clauses_Construction_6_23_26_0005.pdf PDF
B09_QR_Tracker_BAND_266697_6_23_26_0005.pdf PDF
B09_PowerPoint_Presentation_5_27_26_0004.pdf PDF
B09_QR_Tracker_BAND_266697_5_27_26_0004.pdf PDF
B03_Wage_Determination_Heavy_5_27_26_0004.pdf PDF
B08_Solit_Clauses_Construction_5_27_26_0004.pdf PDF
B08_Attachment_1_000_ALL_SPECIFICATIONS_AddendumNo1_02APR2026_unlocked_5_27_26_0004.pdf PDF
B08_Attachment_9_Solit_PSP_Vol_I_PastPerf_REQD_5_27_26_0004.pdf PDF
Sol_140P2026R0063_Amd_0004.pdf PDF
B08_Attachment_1_BAND_266697_Underground_Utilities_Rehab_100Percent_15APR2025_0001_unlocked_5_27_26_0004.pdf PDF
Sol_140P2026R0063_Amd_0003.pdf PDF
B09_BAND_266697_-_Pre-Proposal_Sign_In_Roster_-_2026_5_12_0002.pdf PDF
Sol_140P2026R0063_Amd_0002.pdf PDF
B09_BAND-266697_DD_InPersonMeeting_Presentation_0002.pdf PDF
Sol_140P2026R0063_Amd_0001.pdf PDF
B08_Attachment_2_BAND_266697_Construction_Drawings_Full_Size_Combined_Part3_0001.pdf PDF
B08_Attachment_2_BAND-266697_Final_GeotechnicalReport_Sept2024_0001.pdf PDF
B08_Attachment_2_BAND_266697_Construction_Drawings_Full_Size_Combined_Part2_0001.pdf PDF
B08_Attachment_2_BAND_266697_Construction_Drawings_Full_Size_Combined_Part1_0001.pdf PDF
B08_Attachment_2_BAND_266697_Construction_Drawings_Full_Size_Combined_Part4_0001.pdf PDF
B08_Attachment_1_BAND_266697_Underground_Utilities_Rehab_100Percent_15APR2025_0001.pdf PDF
B08_Clauses_and_Provisions_Construction_Amd_001_0001.pdf PDF
Sol_140P2026R0063.pdf PDF
B08_Attachment_10_Solit_PSP_Vol_II_BidBond.pdf PDF
B08_Attachment_7_Construction_Contract_Administration.pdf PDF
B08_Attachment_3_01_33_23I_Sup01_ADD1_SubmittalList-ReviewEstimate_Template_1-27-21_v508.xlsx XLSX spreadsheet
B08_Attachment_13_BAND-266697_ContractPriceSchedule_Final_CD_20250407.xlsx XLSX spreadsheet
B08_Attachment_1_000_ALL_SPECIFICATIONS_AddendumNo1_02APR2026.pdf PDF
B08_Attachment_12_Solit_PSP_Vol_II_SubKPlan.pdf PDF
B08_Attachment_2_BAND_266697_DRAWINGS_ADDENDUM_01_07APR2026_Stamped.pdf PDF
B08_Attachment_5_FINAL_-_BAND_MOD7_Addendum_Memo_02APR2026.pdf PDF
B08_Attachment_6_Wage_Determination.pdf PDF
B08_Attachment_8_Solit_PSP_Vol_I_Exp_REQD.pdf PDF
B08_Attachment_9_Solit_PSP_Vol_I_PastPerf_REQD.pdf PDF
B08_Attachment_11_Solit_PSP_Vol_II_GenRefs.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mills, James (Denver) Typewriter 03/09/2026

MEYERCJ

Image

MEYERCJ

03/09/2026

2026-03-09T14:15:05-0600
James Mills

File details come from the government source that posted it. Updated .