B09_PowerPoint_Presentation_5_27_26_0004.pdf

PDF 34 MB Posted

Attached to
Update Utilities
Solicitation number
140P2026R0063
Issued by

About this file

This is a PowerPoint presentation file related to a utilities update project at Bandelier National Monument in New Mexico under National Park Service solicitation 140P2026R0063. The presentation appears to be a briefing or informational document prepared for stakeholders regarding the Update Utilities project, though the specific content details are not fully accessible from the file metadata provided. The project falls under the Department of the Interior's National Park Service National Office and is classified as a solicitation opportunity, indicating this represents an active federal contracting vehicle seeking qualified vendors or contractors to perform utility-related work at the monument location. Without access to the full presentation content, specific details regarding scope of work, technical requirements, budget parameters, response deadlines, or evaluation criteria cannot be definitively summarized from this file alone.

View the file

Other files

File Type Posted
B09_BAND-266697_ContractPriceSchedule_Addendum1_20260701_0007.xlsx XLSX spreadsheet
B09_Solit_Clauses_Construction_7_9_26_0007.pdf PDF
Sol_140P2026R0063_Amd_0007.pdf PDF
B09_QR_Tracker_BAND_266697_7_9_26_0007.pdf PDF
Sol_140P2026R0063_Amd_0006.pdf PDF
Sol_140P2026R0063_Amd_0005.pdf PDF
B08_Solit_Clauses_Construction_6_23_26_0005.pdf PDF
B09_QR_Tracker_BAND_266697_6_23_26_0005.pdf PDF
B09_QR_Tracker_BAND_266697_5_27_26_0004.pdf PDF
B03_Wage_Determination_Heavy_5_27_26_0004.pdf PDF
B08_Solit_Clauses_Construction_5_27_26_0004.pdf PDF
B08_Attachment_1_000_ALL_SPECIFICATIONS_AddendumNo1_02APR2026_unlocked_5_27_26_0004.pdf PDF
B08_Attachment_9_Solit_PSP_Vol_I_PastPerf_REQD_5_27_26_0004.pdf PDF
Sol_140P2026R0063_Amd_0004.pdf PDF
B08_Attachment_1_BAND_266697_Underground_Utilities_Rehab_100Percent_15APR2025_0001_unlocked_5_27_26_0004.pdf PDF
Sol_140P2026R0063_Amd_0003.pdf PDF
B09_BAND_266697_-_Pre-Proposal_Sign_In_Roster_-_2026_5_12_0002.pdf PDF
Sol_140P2026R0063_Amd_0002.pdf PDF
B09_BAND-266697_DD_InPersonMeeting_Presentation_0002.pdf PDF
B08_Attachment_2_BAND_266697_Construction_Drawings_Full_Size_Combined_Part3_0001.pdf PDF
B08_Attachment_2_BAND-266697_Final_GeotechnicalReport_Sept2024_0001.pdf PDF
B08_Attachment_2_BAND_266697_Construction_Drawings_Full_Size_Combined_Part2_0001.pdf PDF
Sol_140P2026R0063_Amd_0001.pdf PDF
B08_Attachment_2_BAND_266697_Construction_Drawings_Full_Size_Combined_Part1_0001.pdf PDF
B08_Attachment_2_BAND_266697_Construction_Drawings_Full_Size_Combined_Part4_0001.pdf PDF
B08_Attachment_1_BAND_266697_Underground_Utilities_Rehab_100Percent_15APR2025_0001.pdf PDF
B08_Clauses_and_Provisions_Construction_Amd_001_0001.pdf PDF
B08_Attachment_7_Construction_Contract_Administration.pdf PDF
B08_Attachment_3_01_33_23I_Sup01_ADD1_SubmittalList-ReviewEstimate_Template_1-27-21_v508.xlsx XLSX spreadsheet
B08_Attachment_13_BAND-266697_ContractPriceSchedule_Final_CD_20250407.xlsx XLSX spreadsheet
B08_Attachment_4_BAND_MOD7_Exceptions_Report_Signed.pdf PDF
B08_Attachment_1_000_ALL_SPECIFICATIONS_AddendumNo1_02APR2026.pdf PDF
B08_Attachment_12_Solit_PSP_Vol_II_SubKPlan.pdf PDF
B08_Attachment_2_BAND_266697_DRAWINGS_ADDENDUM_01_07APR2026_Stamped.pdf PDF
Sol_140P2026R0063.pdf PDF
B08_Attachment_10_Solit_PSP_Vol_II_BidBond.pdf PDF
B08_Attachment_5_FINAL_-_BAND_MOD7_Addendum_Memo_02APR2026.pdf PDF
B08_Attachment_6_Wage_Determination.pdf PDF
B08_Attachment_8_Solit_PSP_Vol_I_Exp_REQD.pdf PDF
B08_Attachment_9_Solit_PSP_Vol_I_PastPerf_REQD.pdf PDF
B08_Attachment_11_Solit_PSP_Vol_II_GenRefs.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NATIONAL PARK SERVICE – BANDELIER NATIONAL MONUMENT

REPLACE UNDERGROUND UTILITIES

N P S – B a n d e l i e r N a t i o n a l M o n u m e n t R e p l a c e U n d e r g r o u n d U t i l i t i e s

Pre-Bid In-Person Meeting May 12, 2026

PMIS: 266697

Welcome from the Jacobs and NPS Teams!

©Jacobs 2026

Agenda

Project Location Overview Contract Line Items (CLINs) Construction Challenges - Summarized Site Walkthrough

Project Location Overview

Historical cornucopia: 1150 CE – 1550 CE

Ancestral lands for at least 23 tribal nations

Rich in archaeological artifacts:

− Cavates − Pottery shards − Tools − Paleoindian points − Burial grounds

Where are we?

Cochiti Pueblo guided Adolf Bandelier to the cliffs in 1880.

Established as monument in 1916 by Woodrow Wilson

Civil Conservation Corp (CCC) – constructed infrastructure (1930s)

Historic Mission 66 Corridor

NPS starting counting visitors in 1932 with 4,200. Peaked in 1994 with 430,000 visitors with a current steady annual visitation of 200,000 – 250,000.

Projected to have 18 Million visitors in 100 years.

Why Bandelier?

©Jacobs 20267

Location Overview

Mesa Top

Canyon Area

Contract Line Items (CLINs) (Dwg. 00G003)

CLIN 0001 - Main Park Water System

Partial scope:

− New 10-inch, 8-inch and 6-inch PVC water mains from existing Blue Tank (Mesa Top) through Abert’s Squirrel Loop, along Campground Road and Entrance Road, ending in Canyon Area maintenance yard.

− Replace meters, service lines and fire hydrants

− New 24,000-gallon cast-in-place concrete water storage tank

− New prefabricated Canyon Mechanical Building

Challenges:

− LANL coordination − Public visitors safety on Entrance Road − Narrow Entrance Road utility corridor

(existing electric/fiber and force main)

CLIN 0002 - Mesa Housing and Field Operations Center (FOC) Water Mains and Service Lines

Partial Scope:

− New 6-inch PVC water mains from Campground Road to FOC and

Mesa Housing (Saltbrush Ct. and Paintbrush Ct.)

− Replace service lines, water meters and fire hydrants

Challenges:

− Residential area

CLIN 0003 - Primary Electrical Distribution

Partial scope:

− New primary service from LANL to the Mesa Top

System.

− New primary distribution system in the Mesa Top areas: Entrance Station, Juniper Campground, Mesa Top Housing, and FOC.

− New Fiber-Optic conduits and handholes

Challenges:

− Continued LANL coordination for service − Los Alamos County maintains voltage system (need to meet County requirements) − Built in parallel to prevent massive outages (sequence construction) − Long lead items: pad-mount switch gears, pad-mount residential transformers and standby gas-generator

CLIN 0004 - Cellular Network

Scope:

− Remote Monitoring Systems for Main Blue Tank, PRV Vault and Main Lift

Station

Challenges:

− Ensuring signal within Canyon

CLIN 0005 - Rock Excavation Scope:

− Rock Excavation (during trenching)

Challenges:

− Slows trenching operations − May require special equipment

CLIN 0006 - Roadway

Partial scope:

− Remove, dispose, and replace asphalt pavement on roads and parking to match existing curbs at Entrance Road and Frijoles Canyon Visitor Center area. Protect historic curbs, stone drainage, and retaining walls.

Challenges:

− Construction in public Entrance Road and parking areas – visitor safety − Projection of historic features

CLIN Option A - Primary Electrical Inter-Connection Between Frijoles Canyon and Mesa Top Systems

Partial scope:

− Provide new electrical duct banks and access vaults to facilitate future interconnection tie between the Mesa Top and the Frijoles Canyon distribution systems.

− Install duct banks in the shared utility corridor parallel to the water and gas lines between Campground Road and the Fire Tower Lane.

− Construction in shared utility corridor with water and gas

CLIN Option B - Frijoles Canyon Water and Natural Gas Main Loop

Partial scope:

− Replace all existing 6-inch distribution waterlines, service lines to meters, fire hydrants, and water meters from Canyon Maintenance Yard inter-tie and loop around admin. buildings, casitas, and Visitor Center

− Replacement of all existing natural gas distribution lines (mains) and service lines for Frijoles Canyon areas (Visitor Center and Buildings).

Challenges:

− Construction in shared, narrow utility corridor with electric and communication − Existing utilities’ location is not exact − Historic flagstone walkways − Hand dig/small excavating equipment within casita courtyard

Dwg 02C200

CLIN Option C - Frijoles Canyon Wastewater System

Partial scope:

− Replace vitrified clay sewers and manholes and sagging ductile and

PVC pipes (from existing CCTV results) and install new 4-inch through 8-inch C900 PVC pipes.

− Dispose (only if needed) of DDT contaminated soil − Remove and dispose sewer laterals and associated receiving manholes and install new Schedule C900 PVC laterals to cleanout.

Challenges:

− Traffic control needed; visitor safety − Historic flagstone walkways − Hand dig/small excavating equipment within casita courtyard − Includes contact with DDT soil – excess soil to be disposed of per Hazardous Waste regulations. Use it as backfill!

CLIN Option D - Frijoles Canyon Natural Gas Laterals

Partial Scope:

− Replace service lines for each building within the Frijoles Canyon

Loop up to the regulator for buildings where the regulator and meter are adjacent to the building.

Challenges:

− Construction in shared, narrow utility corridor with electric, communication and water.

− Hand dig/small excavating equipment within casita courtyard − Existing utilities’ location is not exact − Historic flagstone walkways

CLIN Option E - Fiber-Optic Cable from Existing Fiber Handhole Near the Entrance road (Pajarito) Microwave Tower to FOC and Entrance Station

Scope:

− Provide 12-strand fiber-optic cables from Frijoles Canyon IT room in Building #15 to FOC, and from FOC to Entrance

Station. Existing duct bank conduits and innerduct will be utilized from the Canyon IT room to an existing communications handhole near Fire Tower Lane. New underground dedicated fiber-optic duct bank conduits from the existing handhole to the FOC and Entrance Station are included under CLINs 0003 and Option A.

Challenges:

− None expected

CLIN Option F - Frijoles Canyon Visitor Center Fiber Pathway Scope:

− Provide underground conduit pathway between the Building 15 IT room and the Visitor Center Server Room.

− Provide building penetrations for new conduits.

− None expected

CLIN Option G – Demolition of Utility Features

Scope:

− After new utility systems are active and functional, remove above ground features and underground valves of abandoned utility systems under CLINs 0001 to Option D.

CLIN Option H – Demolition of Existing Canyon Underground Concrete Water Tank and Exposed Suspended Utilities

Challenges:

− Foot traffic only − Removal of water and gas pipes and rock façade on cliff − Vault to be demolished in place and filled with native, local material

− Exposed equipment and pipe to be manually removed and disposed

Dwg 02C003

CLIN Option I – Juniper Campground Water Mains and Service Lines

Partial Scope:

− Install new 4-inch PVC water lines in the three Juniper Campground loops (Abert’s Squirrel, Black Bear, and Coyote) and install HDPE water service lines to the comfort stations, and existing and new Camp Host sites.

− Remove and replace existing fire and yard hydrants.

− Remove above ground features and underground valves of abandoned utility systems.

Asphalt pavement patching of paved roadways and parking areas impacted.

Challenges:

− Sequencing construction within campground loops (only one loop closure at a time) − Visitor safety

Dwg 02C207 Dwg 02C208A Dwg 02C2011A

CLIN Option J – Mesa Top Wastewater System

Partial Scope:

− Mesa Housing and FOC:

Replace vitrified clay sewers and manholes and sagging ductile and PVC pipes (from existing CCTV results) and install new 4-inch through 8-inch C900 PVC pipes.

Open cut and replace asbestos cement pipes and install new 4-inch to 8-inch Schedule C900 PVC pipes.

Remove and replace sewer laterals and associated receiving manholes.

Pulverize pavement in place and provide full depth asphalt pavement reclamation.

− Juniper Campground:

Remove and replace identified sewer laterals. Remove and replace identified sewer manholes.

Point repairs on segments of sewer pipes identified by CCTV.

Challenges:

− Residential area safety − Public visitor (campers) safety

Dwg 02C014A

CLIN Option K – Agoyo Lane Electrical System

Partial Scope:

− Provide new single-phase buried electrical duct banks. Intercept the single-phase circuit near Building 25 transformer and extend to new sectionalizing cabinet. Provide single-phase primary circuit for Agoyo Lane.

− Provide a new transformer near the existing storage building and refeed secondary service to existing pole-mounted panelboard near RV Site #1.

− Provide new transformer near the existing Bunkhouse and refeed secondary service to the existing pole-mounted panelboard near the Bunkhouse.

− Demolish and dispose of the existing electrical equipment and wood poles.

− Asphalt pavement patching of areas impacted by this Option.

CLIN Option L – Fire Tower Lane Water and Natural Gas Line Replacement

Partial Scope:

− Install new 2-inch HDPE water service and 1-inch gas lateral from Entrance Road along Fire Tower Lane to the Fire Tower building.

− Asphalt pavement patching areas impacted by this Option

Challenges:

Dwg 02C023

CLIN Option M – Cottonwood Comfort Station (Building #1) Utility Connections

Partial Scope:

− Install new 4-inch Schedule C900 PVC sewer lateral from the comfort station to the manhole at the Canyon Visitor

Center, electric to reactivate existing Building 1 Comfort Station. Install utilities under the pedestrian bridge across the Frijoles Creek.

− Install new NEMA 4X enclosed control panel, 208V, single-phase.

− Provide a new secondary electrical feed from the Visitor Center to serve the comfort station.

− Asphalt pavement patching of areas impacted.

− Visitor Safety

CLIN Option N – Natural Gas System

Partial Scope:

− Replacement of all existing natural gas distribution lines and service lines for Mesa Top (Mesa housing and FOC) and Frijoles Canyon areas (Stone House Road).

Challenges − Construction around residential area − Construct parallel with new 6” waterline − Minimize utility outage

Dwg 02C015

CLIN Option O – Culvert and Erosion Repairs

Partial Scope:

− Grading, culvert repair, riprap installation, etc.

Challenges − Deeply eroded arroyo − Protect large tree in-place − Construction adjacent to public Entrance Road

Dwg 04C104

Dwg 04C105

Construction Challenges - Summarized

Construction Challenges - Summarized

Sequencing of utility outages Public visitors (safety and curiosity) Utility provider coordination (electric, gas and water) – Los Alamos County and LANL Some existing/proposed utility corridor are narrow and utility-dense Location of existing utilities is medium accuracy Archaeological/historical preservation Potential work stoppage if artifact is discovered Others…

Site Walkthrough

Canyon Area