B08_Attachment_2_BAND_266697_Construction_Drawings_Full_Size_Combined_Part1_0001.pdf
PDF 42 MB Posted
- Attached to
- Update Utilities
- Solicitation number
- 140P2026R0063
About this file
This is a comprehensive set of construction drawings for utility rehabilitation at Bandelier National Monument in New Mexico, including site plans, profiles, and detailed specifications for water, natural gas, sanitary sewer, and electrical systems.
The project encompasses installation of new water distribution mains (4" to 10" PVC and ductile iron pipe) extending approximately 184 linear miles throughout the monument, replacement of sanitary sewer lines and manholes, natural gas distribution system installation, and electrical conduit placement. Key infrastructure elements include connection to the existing 35,000-gallon Main Blue Water Tank, replacement of an underground 20,000-gallon concrete storage tank in the canyon area, installation of hydropneumatic tanks and pumps at comfort stations, and multiple water service laterals to residential and administrative buildings. The drawings specify construction details for trench work, pipe bedding, CLSM (controlled low-strength material) encasement at utility crossings, valve installations with boxes, fire hydrants, air release valves, and pressure reducing valves throughout multiple baselines including Highway 4, Entrance Road, Agoyo Lane, and various campground and residential loops. Design criteria reference the 2021 New Mexico Building Code, ASCE 7-16 standards, and ACI 350.3 for hydraulic loads, with seismic design category D requirements. Special inspection and observation protocols are required for concrete work, structural steel, reinforcing, and utility installation per IBC Sections 1704 and 1705. The contractor is responsible for field verification of existing conditions, coordination with Los Alamos National Laboratory for gas connections, protection of archaeological sites and historic stone gutters, management of contaminated soil disposal, and compliance with environmental permits including NPDES requirements and wetlands protection.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4/ 8/
1:
A
M B
AN
D
BA
SE
G
1_
D
8.
D
W G
FI
G
U
ER
O
AJ
R
Digitally signed by Micah E. Johnson Date: 2025.04.14
12:50:09-06'00'
INDEX TO DRAWINGS
30 -MESA TOP COMFORT STATION
15 - ENTRANCE ROAD WATER TANK
10 - CANYON MECHANICAL BUILDING
08 - INSTRUMENTATION & CONTROLS
03 - VAULTS
02-SITE UTILITIES
01-GENERAL 02-SITE UTILITIES CONTINUES
02-ELECTRICAL
3/
/2
3:
P
M X
G -B or de r_
BA
N D
G
2_
D
8.
D
W G
IK
H
AN
R
04 - ROADWAY IMPROVEMENTS
(NOT USED)
Digitally signed by Micah E. Johnson Date: 2025.04.08
15:18:14-06'00'
TWO FULL BUSINESS DAYS PRIOR TO WORK CALL 811. SEE nm811.org
T
4/ 8/
2:
P
M X
G -B or de r_
BA
N D
G
3_
D
8.
D
W G
FI
G
U
ER
O
AJ
R
Digitally signed by Micah E. Johnson
15:20:16-06'00'
US
FM
D
USFMD
UCD
UCD
UCD
UCD
UGD
UGD
UGD
UGD
UGD
UGD
U G
D
W
AT
ER
TA
NK
AR
EA
UWB
UWB
UW
B
UWB
UW
B
UW
B
UFOB
UFOB
UFOB
UEB
UEB
UEB
UEB
UEB
UEB
UEB
UE
B
U
EB
UEB
UEB
UEB
UEB
UEB
U
EB
UEB
UCB
UCB
UCB
UCB
UCB
U C
B
UCB
UGB
UGB
UGB
UGB
UGB
UG
B
UGB
UGB
UED
UED
UED
UED
UED
UED
UED
UED
UED
UED
UED
USSC
UFOD
UFOD
UFOD
UFOD
UFOD
UFOD
U
FO
D
USFMD
USFMD
USFMD
USFMD
USFMD
USFMD
UGC
UGC
OE
UFOB
UFOB
UFOB
UFOB
E
E
EC
E C
EC
E
E
E
E
C
E
C
E
W
SS
SS
E E
SS
G
E E
C
W
W
W
C
SSW
E
SSSS
C
W
SS
E
EC
EE
E
SS
W
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SSSS
SS
SS
SS
SS
SS
SS
SSSSSSSS
SS
SS
SS
SS
SS SS
SS
SS
SSES
S
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
C
E
E
E
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SSS
S
SS
SS
SS
SS
SS
SS
SS
SSSS
SS
ST
SS
SS
SS
E
E
E
SS
SS
SS
T
W
E
FO
E
E
T
FO
E
W
E E
T
T
T
T
G
E
E
W E
G
E
E W
E
W
W
W
W W
W
W W
W
E
E
E
FO
EE
C E
E
E
E
E
E
EE
T
T G
G G
G G
T
T G
W
SSSS
G
WWWW
WW
E
G
SS
W
W
SS
SS
G W
G
T
G
T
FO
FO
W
G
W
W W
W
W
G
W
W
W
GG
G
W
FO
FO
W
W
W
G
T
T
T
T
T
T
EE
E
T E
E
E
E
E
T T
W
WW
W W
W
W
E
E
T
T T E
E
E
W
W
W
W
W
W
WW
G
E
E
E
E
T
E T
T
T
T
T
T
T T
T T
W
E
W W
E
E
E
E
E
E E
E
E
E
E
E
E
E
E
G
G
G G
G
G
E
E
E
E
E
E
E
E E
EE
E
W
W
W
T
T
W W
G G
GG G
G
W
W
G
GG
G G
WW
E
G
E
W
W W
WW
W
W
T
T
W
WW
WW
W W
W W
W
G G
G G G
T G G
W W W
WW
W
W
G G
GG
G
T
ST
G G
T
W
E
W
EW W
WW W E WW
WW
T
G
GG
G
W
W
W
W W
W
G
W
W
E
T
E
G G
G
G
G
G
G
G
T
G
T
G
TE
ET
WWW
W
WWW
W W W
T E
T
E
W G
T
T
T
T
T
T
T
T
T
T
E
G
E
E
W
W
W W
G
W
G
G
G
FO
E
SS
W
SS
W
WW
SS
E
U
AC
AC
E
E
AC
AC
AC
E
E
E
E
W
W
X
SS
G
W W
W W
SS
UEB
BENCHMARK # NORTHING EASTING ELEVATION DESCRIPTION
1213.00 1739437.96 1635701.14 6529.42 2" ALUMINUM
CAP
2004.00 1737644.64 1635153.78 6075.16 3" BRASS CAP
NMSR4 1744417.41 1633879.80 6639.08 3" BRASS CAP
BL 'HWY4'
BL 'MESA'
BL 'ASLP'
BL 'CGRD'
BL 'ENRD'
BL 'BBLP'
BL 'CYLP'
BL 'SBCT'
BL 'PBCT'
BL 'CHRD'
BL 'ENRD'
BL 'FTLN'
BL 'AH'
BL 'ENRD'
BL 'AGLN'
"BONE YARD"
STAGING AREA
GATE
MONUMENT
ENTRANCE
ENTRANCE STATION
BASELINE ABBREVIATIONS
- HIGHWAY 4
- ABERT'S SQUIRREL LOOP
- ENTRANCE ROAD
- COYOTE LOOP
- CAMPGROUND ROAD
- SALTBRUSH COURT
- COOPERS HAWK ROAD
- PAINTBRUSH CT
- FIRE TOWER LN
- ALCOVE HOUSE
- AGOYO LN
'HWY4'
'ASLP'
'ENRD'
'CYLP'
'CGRD'
'SBCT'
'CHRD'
'PBCT'
'FTLN'
'AH'
'AGLN'
BASELINE INTERSECTIONS
'HWY4' & 'ASLP'
'HWY4' & 'ENRD'
'CYLP' & 'CGRD'
'CGRD' & 'ASLP'
'CGRD' & 'SBCT'
'CGRT' & 'ENRD'
'SBCT' & 'CHRD'
'CHRD' & 'PBCT'
FIELD OPERATIONS
CENTER (FOC)
MESA HOUSING
JUNIPER
CAMPGROUND
LOOPS
EXISTING MAIN BLUE WATER TANK
(35,000 GALLONS)
NM HWY 4
AGOYO LANE
EXISTING CANYON UNDERGROUND CONCRETE
WATER TANK
(20,000 GALLONS; TO BE ABANDONED IN-PLACE)
VISITOR CENTER
FIRE TOWER LANE
ENTRANCE ROAD
#1213.000
#2004.000
#NMSR4
STAGING AREA
ALTERNATIVE
PARKING AREA
ALTERNATIVE PARKING AREAS
AVAILABLE ALONG THIS
OVERFLOW PARKING ALCOVE
HOUSE ROAD
STAGING AREA
STAGING AREA
COOPERS HAWK ROAD
COYOTE LOOP ROAD CAMPGROUND ROAD
ADMINISTRATION BUILDINGS
AND CASITA HOUSING
BUILDING #1
COTTONWOOD COMFORT STATION
7 8
4/ 8/
1:
A
M
X G
-B or de r_
BA
N
D X
C -B
AN
D
_2 D
-E G
-M as te r
X C
-R O
AD
W
AY
G
4_ D
8.
D W
G
FI
G U
ER
O
AJ
R
Digitally signed by Micah E. Johnson
15:22:13-06'00'
DESIGN CRITERIA:
1. FOR ABBREVIATIONS NOT LISTED, SEE ASME Y14.38 “ABBREVIATIONS AND ACRONYMS: PUBLICATION AS
DISTRIBUTED BY THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME).
2. STANDARD DETAILS ARE INTENDED TO BE TYPICAL AND SHALL APPLY TO SIMILAR SITUATIONS OCCURRING THROUGHOUT THE PROJECT, WHETHER OR NOT THEY ARE INDIVIDUALLY CALLED OUT.
3. VERIFY FINAL OPENING DIMENSIONS IN WALLS, SLABS, AND DECKS WITH OTHER DISCIPLINE DRAWINGS
PRIOR TO CONSTRUCTION OF THESE ELEMENTS.
4. FOR NUMBER, TYPE, SIZE, ARRANGEMENT, AND/OR LOCATION OF EQUIPMENT PADS, SEE OTHER DISCIPLINE DRAWINGS. COORDINATE WITH EQUIPMENT SUPPLIER PRIOR TO PLACING SLABS, WALLS
AND FOUNDATIONS. COORDINATE PIPING OPENINGS WITH OTHER DISCIPLINE DRAWINGS.
5. DO NOT CUT OR MODIFY STRUCTURAL MEMBERS FOR PIPES, DUCTS, ETC, UNLESS SPECIFICALLY
DETAILED OR APPROVED IN WRITING BY THE CONTRACTING OFFICER.
6. VISITS TO THE JOB SITE BY THE CONTRACTING OFFICER TO OBSERVE THE CONSTRUCTION DO NOT IN
ANY WAY MEAN THAT CONTRACTING OFFICER IS GUARANTOR OF CONSTRUCTOR’S WORK, NOR
RESPONSIBLE FOR THE COMPREHENSIVE OR SPECIAL INSPECTIONS, COORDINATION, SUPERVISION, OR
SAFETY AT THE JOB SITE.
7. INFORMATION (DETAILING, DIMENSIONS, CONFIGURATIONS, AND ELEVATIONS, ETC.) OF EXISTING
CONSTRUCTION SHOWN REFLECTS AVAILABLE EXISTING DESIGN DOCUMENTS, AND DOES NOT
NECESSARILY REPRESENT THE AS-CONSTRUCTED CONDITIONS. THE CONTRACTOR SHALL FIELD VERIFY DIMENSIONS, ELEVATIONS AND DETAILING OF THE EXISTING STRUCTURES PRIOR TO UNDERTAKING ANY WORK THAT IS AFFECTED BY THE EXISTING STRUCTURE. NOTIFY CONTRACTING OFFICER IF CONDITIONS
VARY FROM THAT SHOWN PRIOR TO STARTING WORK.
7. WALL CORNER AND WALL INTERSECTION REINFORCEMENT BARS SHALL BE CONTINUOUS
AROUND CORNERS AND THROUGH COLUMNS OR PILASTERS. REINFORCEMENT SHALL BE
EXTENDED INTO CONNECTING WALLS AND LAPPED ON THE OPPOSITE FACE OF THE
CONNECTING WALLS, AS INDICATED IN DETAIL 0330-003 ON DRAWING 15SM504.
8. WALL FOOTING CORNER AND INTERSECTION REINFORCEMENT BARS SHALL BE EXTENDED
INTO CONNECTING FOOTINGS AND LAPPED ON THE OPPOSITE FACE OF THE CONNECTING
FOOTING. OUTSIDE FACE WALL FOOTING REINFORCEMENT SHALL BE LAPPED WITH CORNER
ARS. ALL WALL FOOTING REINFORCEMENT SHALL BE CONTINUOUS THROUGH COLUMNS
OR PILASTERS FOOTINGS.
9. LAP VERTICAL WALL BARS WITH DOWELS FROM BASE SLABS AND EXTEND INTO TOP FACE OF
FULL HEIGHT VERTICAL BARS WITH MATCHING DOWELS AT WALL ENDS, CORNERS AND
INTERSECTIONS WITH SIZE TO MATCH TYPICAL VERTICAL REINFORCING STEEL SHOWN OR
REQUIRED BY NOTES ABOVE.
10. LOCATE ELEVATED SLAB AND BEAM TOP BAR SPLICES AT MIDSPAN AND BOTTOM BAR SPLICES
AT SUPPORTS.
11. REINFORCING STEEL FOR FOOTINGS AND SLABS ON GRADE SHALL BE ADEQUATELY
SUPPORTED ON BAR SUPPORTS WITH SPACERS TO KEEP REINFORCING ABOVE THE PREPARED
GRADE. LIFTING REINFORCING OFF GRADE DURING CONCRETE PLACEMENT IS NOT PERMITTED.
12. REFER TO OPENING REINFORCING DETAIL 0330-001 ON DRAWING 15SM504.
13. REINFORCEMENT BENDS AND LAPS, UNLESS OTHERWISE NOTED, SHALL SATISFY THE FOLLOWING
MINIMUM REQUIREMENTS:
1. LAP LENGTHS ARE BASED ON MINIMUM CONCRETE COVER OF 2”. LONGER LENGTHS ARE REQUIRED
FOR CONCRETE COVER LESS THAN 2”.
2. TOP BARS SHALL BE DEFINED AS ANY HORIZONTAL BARS PLACED SUCH THAT MORE THAN 12 INCHES OF CONCRETE IS CAST IN THE MEMBER BELOW THE BAR IN ANY SINGLE POUR. HORIZONTAL WALL
BARS ARE CONSIDERED TOP BARS.
3. WHERE 3000 PSI CONCRETE IS USED, INCREASE ABOVE LENGTHS BY 16 PERCENT. WHERE 3500 PSI
CONCRETE IS USED, INCREASE ABOVE LENGTHS BY 7 PERCENT.
4. WHERE CONCRETE STRENGTH IS GREATER THAN 4000 PSI, USE THE ABOVE LENGTHS LISTED IN THE
TABLE.
1. 2021 NEW MEXICO BUILDING CODE, BASED ON THE 2021 INTERNATIONAL BUILDING CODE (IBC) AND ASCE 7-16, MINIMUM DESIGN LOADS AND ASSOCIATED CRITERIA FOR BUILDINGS AND STRUCTURES.
2. RISK CATEGORY IS IV
3. REFER TO THE DRAWINGS FOR ADDITIONAL AND SPECIFIC STRUCTURE LOADINGS AND REQUIREMENTS.
4. DEAD LOADS: SELF WEIGHT
5. ROOF LOADS:
SNOW LOADS
GROUND SNOW LOAD, Pg 30 PSF
IMPORTANCE FACTOR, I 1.15
LIVE LOAD 20 PSF
COLLATERAL LOAD 10 PSF
DEFLECTION CRITERIA FOR CONTRACTOR DESIGNED ROOF FRAMING MEMBERS:
TOTAL LOAD L/180
LIVE LOAD L/240
SNOW LOAD L/240
6. FLOOR LIVE LOADS:
PROCESS/ MECHANICAL ROOM 200 PSF
WALKWAYS AND ELEVATED PLATFORMS 100 PSF
7. WIND LOADS:
ASCE 7 METHOD MWFRS DIRECTIONAL PROCEDURE
BASIC WIND SPEED (3-SECOND GUST) 115 MPH
EXPOSURE CATEGORY C
IMPORTANCE FACTOR, Iw 1.0
8. SEISMIC LOADS:
MAPPED SPECTRAL RESPONSE ACCELERATIONS
SS 0.507g S1 0.166g
DESIGN SPECTRAL RESPONSE ACCELERATIONS
SDS 0.439g SD1 0.166g
SITE CLASS C
SEISMIC DESIGN CATEGORY D
IMPORTANCE FACTOR, Ie 1.50
STRUCTURES HAVE BEEN ANALYZED USING THE EQUIVALENT LATERAL FORCE PROCEDURES OF ASCE HYDRODYNAMIC FORCES HAVE BEEN DETERMINED IN ACCORDANCE WITH ACI 350.3 AS MODIFIED BY ASCE 7-16.
9. HYDRAULIC LOADS: SEE PLANS FOR STRUCTURE SPECIFIC DESIGN FLUID ELEVATIONS. FLUID LOAD
BASED ON FLUID DENSITY OF 63 PCF. HYDRAULIC PRESSURE FOR EACH
STRUCTURE BASED ON MAXIMUM WATER SURFACE ELEVATION SHOWN ON
HYDROPHILIC PROFILE.
10. SOIL DESIGN PARAMETERS:
A. NET ALLOWABLE SOIL BEARING PRESSURES: 6000 PSF
B. GROUND WATER: GROUND WATER WAS NOT ENCOUNTERED
AT DEPTHS THAT WOULD AFFECT THE
PROPOSED STRUCTURES IN THIS PROJECT.
C. LATERAL EARTH PRESSURE:
FOR GRANULAR FILL MEETING
SPECIFICATION REQUIREMENTS
AT REST: 59 PCF
DYNAMIC (SEISMIC): 89 PCF
D. VERTICAL SURCHARGE: 2 FT OF SOIL WEIGHT
E. COEFFICIENT OF FRICTION W/ 1.5 FOS: 0.35
F. NATIVE SOIL UNIT WEIGHT 125 PCF
1. 28-DAY COMPRESSIVE STRENGTHS:
TYPICAL, UNO: 4500 PSI
CONCRETE FILL: 3500 PSI
CURBS AND SIDEWALKS: 3500 PSI
DUCT BANKS AND PIPE ENCASEMENTS
NOT INTEGRAL WITH FOUNDATIONS: 3500 PSI
2. CONTINUOUS WATERSTOP AS SPECIFIED SHALL BE INSTALLED IN CONSTRUCTION JOINTS OF HYDRAULIC STRUCTURES, CHANNELS, AND BELOW GRADE STRUCTURES, EXCEPT WHERE SPECIFICALLY NOTED
OTHERWISE.
3. CONSTRUCTION JOINTS INDICATED ARE SUGGESTED LOCATIONS. CONTRACTOR MAY REVISE LOCATION OF JOINTS, SUBJECT TO SPECIFIED REQUIREMENTS. LAYOUT SHOWING ALL CONSTRUCTION JOINT
LOCATIONS SHALL BE SUBMITTED FOR REVIEW BY ENGINEER.
4. ROUGHEN AND CLEAN CONSTRUCTION JOINTS IN WALLS AND SLABS AS SPECIFIED PRIOR TO PLACING
ADJACENT CONCRETE.
5. COORDINATE PLACEMENT OF OPENINGS, PIPE PENETRATIONS, CURBS, DOWELS, SLEEVES, CONDUITS, BOLTS AND INSERTS PRIOR TO PLACEMENT OF CONCRETE.
6. NO ALUMINUM CONDUIT OR PRODUCTS CONTAINING ALUMINUM OR ANY OTHER MATERIAL INJURIOUS TO
THE CONCRETE SHALL BE EMBEDDED IN THE CONCRETE.
7. DO NOT PLACE CONDUIT PARALLEL TO BEAM OR COLUMN REINFORCEMENT UNLESS SPECIFICALLY
INDICATED IN DRAWINGS.
8. PATCH FORM TIE HOLES IN ACCORDANCE WITH DETAILS 0310-051 AND/OR 0310-052.
GENERAL INFORMATION:
1. STRUCTURES SHOWN ON THE DRAWINGS HAVE BEEN DESIGNED FOR STABILITY UNDER FINAL
CONDITIONS ONLY. DESIGN SHOWN DOES NOT INCLUDE NECESSARY COMPONENTS OR EQUIPMENT
FOR STABILITY OF THE STRUCTURES DURING CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR
WORK RELATING TO CONSTRUCTION ERECTION METHODS, BRACING, SHORING, RIGGING, GUYS,
SCAFFOLDING, FORMWORK, AND OTHER WORK AIDS REQUIRED TO SAFELY PERFORM THE WORK
SHOWN.
2. TEMPORARY SHORING SHALL REMAIN IN PLACE UNTIL ELEVATED CONCRETE FLOOR OR SLABS HAVE REACHED 80 PERCENT OF THE 28 DAY COMPRESSIVE STRENGTH AS DETERMINED BY FIELD CYLINDER
BREAKS.
1. SPECIAL INSPECTION DOES NOT INCLUDE OR WAIVE THE RESPONSIBILITY FOR INSPECTIONS REQUIRED BY THE BUILDING OFFICIAL. THE CONTRACTOR SHALL SCHEDULE BOTH INSPECTIONS.
2. SPECIFIED CONCRETE AND OTHER MATERIAL TESTING RELATED TO SPECIAL INSPECTION
DURING CONSTRUCTION WILL BE CONTRACTOR FURNISHED.
3. SPECIFIED LABORATORY TEST MIXES AND SIMILAR TEST RESULTS TO VERIFY MATERIAL QUALITY
AND CONFORMANCE TO SPECIFICATIONS, AND SUBMITTED FOR REVIEW PRIOR TO ACCEPTANCE
FOR USE ON THE PROJECT, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
4. SPECIAL INSPECTION, TESTING AND OBSERVATION (CONTRACTOR FURNISHED) IS REQUIRED IN ACCORDANCE WITH IBC SECTIONS 110 AND 1704 AS INDICATED IN THE STATEMENT OF SPECIAL INSPECTIONS. REFER TO SPECIFICATIONS 01 40 00 - QUALITY REQUIREMENTS AND 01 45 33 -
SPECIAL INSPECTION, OBSERVATION AND TESTING.
1. REFER TO GEOTECHNICAL REPORT BY SHANNON AND WILSON, PROJECT NO. 107523-001, NPS
BANDELIER NATIONAL MONUMENT, UTILITY REHABILITATION, DATED FEBRUARY 17, 2022 AND
GEOTECHNICAL REPORT BY SHANNON AND WILSON, PROJECT NO. 107523-002, NPS BANDELIER
NATIONAL MONUMENT, UTILITY REHABILITATION, DATED SEPTEMBER 26, 2024.
2. EXCAVATIONS SHALL BE SHORED TO PREVENT SUBSIDENCE AND DAMAGE TO ADJACENT EXISTING
STRUCTURES, ROADS, UTILITIES, ETC.
3. FOUNDATION SLABS, SLABS-ON-GRADE AND WALL AND COLUMN FOUNDATIONS SPECIFICALLY NOTED TO BE ON FILL SHALL BEAR ON A MINIMUM OF 12 INCHES OF COMPACTED STRUCTURAL FILL AFTER
OVER EXCAVATION OF FILL TO ALLUVIUM.
4. FOUNDATION BEARING SURFACES SHALL BE OBSERVED BY THE GEOTECHNICAL ENGINEER OR
QUALIFIED DESIGNEE PRIOR TO PLACEMENT OF FORMWORK OR REINFORCING STEEL. THE
OBSERVATION SHALL VERIFY IF THE ACTUAL EXPOSED SUBGRADE IS AS ANTICIPATED BY THE SITE
SPECIFIC BORINGS AND DATA REPORTS.
5. NO BACKFILL SHALL BE PLACED BEHIND WALLS UNTIL THE WALL'S CONCRETE HAS ATTAINED 100 PERCENT AND TOP SUPPORTING SLAB’S CONCRETE HAS ATTAINED 80 PERCENT OF THEIR SPECIFIED 28 DAY COMPRESSIVE STRENGTH, OR UNTIL TOP-OF-WALL FRAMING SYSTEMS, INCLUDING STEEL
DIAPHRAGMS, HAVE BEEN COMPLETED.
6. NO BACKFILL SHALL BE PLACED BEHIND CANTILEVERED, FREE TOP WALLS UNTIL THE CONCRETE HAS
ATTAINED 100 PERCENT OF ITS SPECIFIED 28 DAY COMPRESSIVE STRENGTH.
7. USE OF EXPLOSIVES IS NOT PERMITTED.
1. REINFORCING STEEL:
TYPICAL: ASTM A615, GRADE 60
WELDED ASTM A706, GRADE 60 (WELDING IS ONLY PERMITTED
WITH WRITTEN PERMISSION FROM ENGINEER)
2. FABRICATION AND PLACEMENT OF REINFORCING STEEL SHALL BE IN ACCORDANCE WITH CRSI MSP-1 “MANUAL OF STANDARD PRACTICE”AND ACI 301 “SPECIFICATIONS FOR STRUCTURAL CONCRETE”.
3. MINIMUM REINFORCING FOR CONCRETE WALLS AND SLABS SHALL BE AS FOLLOWS:
THICKNESS REINF EACH WAY LOCATION
6” #4@12” CENTERED
8” #5@12” CENTERED
10” #4@12” EACH FACE
12” #5@12” EACH FACE
PROVIDE LARGER SIZES AND MORE REINFORCING IN SECTIONS OF CONCRETE WHERE
REQUIRED BY THE DETAILS ON THE DRAWINGS OR BY THE SPECIFICATIONS.
4. CONCRETE COVER FOR REINFORCING, UNLESS SHOWN OTHERWISE, SHALL BE:
WHEN CAST AGAINST EARTH: 3”
CONCRETE EXPOSED TO EARTH, LIQUID, WASHDOWN, OR WEATHER:
WALLS AND SLABS 2”
BEAM STIRRUPS AND COLUMN TIES 2”
BEAM AND COLUMN PRIMARY REINFORCING 2 1/2"
5. REFER TO WALL CORNER AND WALL INTERSECTION REINFORCING DETAIL 0330-003 ON DRAWING 15SM504. WALL CORNER REINFORCING SIZES AND SPACINGS SHALL BE AS SHOWN ON THE DRAWINGS AND REFERENCED TO THIS DETAIL. TYPICAL HORIZONTAL WALL REINFORCING SHALL LAP WITH THE
CORNER HORIZONTAL REINFORCING.
6. 90 DEGREE BENDS, UNLESS OTHERWISE SHOWN, SHALL BE ACI 318 STANDARD HOOKS.
INSPECTION AND TESTING:
FOUNDATIONS:
FORMWORK, SHORING, AND BRACING:
CONCRETE REINFORCING:
CAST IN PLACE CONCRETE:
4/ 4/
0:
A
M X
G -B or de r_
BA
N D
G
5_
D
8.
D
W G
SM
ET
C
AL
F R
17930
R E
E
NIGNE LANOIS
SE
F O
R P
OC
IXEM WE
N
EG
IA
P .E SAMOHT
JANUARY 17, 2025
Thomas Paige 2025.04.10 11:02:42 -06'00'
Thomas Paige
1. WELDS SHALL CONFORM TO AMERICAN WELDING SOCIETY (AWS):
D1.1, STRUCTURAL WELDING CODE STEEL
D1.2, STRUCTURAL WELDING CODE ALUMINUM
D1.3, STRUCTURAL WELDING CODE SHEET STEEL
D1.4, STRUCTURAL WELDING CODE REINFORCING STEEL
D1.6, STRUCTURAL WELDING CODE STAINLESS STEEL
2. REPAIR WELDS FOUND DEFECTIVE IN ACCORDANCE WITH AWS D1.1 SECTION 5.26.
3. USE INTERMITTENT WELDS AT FIELD WELDS OF EMBED PLATES AND ANGLES TO AVOID
SPALLING OR CRACKING OF THE EXISTING CONCRETE.
4. BUTT JOINT WELDS SHALL BE COMPLETE JOINT PENETRATION (CJP) UNLESS INDICATED
OTHERWISE.
1. STRUCTURAL STEEL SHALL CONFORM TO THE ASTM STANDARDS AS STATED IN THE
SPECIFICATIONS.
2. ALUMINUM SHALL CONFORM TO THE ASTM STANDARDS AS STATED IN THE SPECIFICATIONS.
3. STRUCTURAL STEEL SHALL BE FABRICATED AND ERECTED IN CONFORMANCE WITH THE AISC
MANUAL OF STEEL CONSTRUCTION, CURRENT EDITION, AND CURRENT OSHA STANDARDS.
4. FASTENERS SHALL BE HIGH STRENGTH BOLTS CONFORMING TO THE FOLLOWING ASTM
STANDARDS EXCEPT 3.1. WHERE SPECIFICALLY INDICATED OTHERWISE:
UNLESS SHOWN OTHERWISE A325-N
ANCHOR BOLTS (AB)
STAINLESS STEEL F593, AISI TYPE 316, CONDITION CW
STEEL OR GALVANIZED STEEL F1554, GR 36 / A153
MACHINE BOLTS (MB)
STEEL A307
STAINLESS STEEL F593, AISI TYPE 316, CONDITION CW
GALVANIZED STEEL A307 / A153
ALUMINUM F468, ALLOY 2024-T4
5. ITEMS TO BE EMBEDDED IN CONCRETE SHALL BE CLEAN AND FREE OF OIL, DIRT AND PAINT.
6. NO HOLES OTHER THAN THOSE SPECIFICALLY DETAILED SHALL BE ALLOWED THROUGH
STRUCTURAL STEEL MEMBERS. NO CUTTING OR BURNING OF STRUCTURAL STEEL IS PERMITTED
WITHOUT THE APPROVAL OF THE ENGINEER.
1. DEFERRED SUBMITTALS ARE THOSE PORTIONS OF THE DESIGN WHICH ARE NOT SUBMITTED AT
THE TIME OF PERMIT APPLICATION AND WHICH ARE TO BE SUBMITTED TO THE PERMITTING
AGENCY FOR ACCEPTANCE PRIOR TO INSTALLATION OF THAT PORTION OF THE WORK OR ARE
REQUIRED TO BE SUBMITTED FOR REVIEW ONLY BY THE CONTRACTING OFFICER.
2. WHERE DEFERRED SUBMITTALS INCLUDE ADDITIONAL MATERIALS, INSTALLATION, ANCHORAGE, OR CERTIFICATION OF COMPONENTS THAT REQUIRE SPECIAL INSPECTION AND/OR
STRUCTURAL OBSERVATION TO MEET CODE REQUIREMENTS, THE DEFERRED SUBMITTAL
SHALL INCLUDE SPECIFIC LINE ITEMS TO BE ADDED TO THE APPROPRIATE TABLES IN THE
PROJECT'S STATEMENT OF SPECIAL INSPECTIONS PLAN IF THEY ARE NOT ALREADY IDENTIFIED.
3. THE FOLLOWING IS A LIST OF DEFERRED SUBMITTALS PER CBC SECTION 107.3.4.1 THAT ARE
EXPECTED TO CONTAIN STRUCTURAL CALCULATIONS OR SAFETY RELATED SYSTEM
INFORMATION FOR REVIEW TO MEET BUILDING PERMITTING REQUIREMENTS FOR DESIGNED
SYSTEMS. PRIOR TO INSTALLATION OF THE INDICATED STRUCTURAL ELEMENT, EQUIPMENT,
DISTRIBUTION SYSTEM, OR COMPONENT OR ITS ANCHORAGE, THE CONTRACTOR SHALL SUBMIT
THE REQUIRED CALCULATIONS AND SUPPORTING DATA AND DRAWINGS FOR REVIEW AND
ACCEPTANCE BY THE CONTRACTING OFFICER. ADDITIONALLY, ACCEPTANCE INDICATED ON
THE CONTRACTING OFFICER’S COMMENT FORM, ALONG WITH THE COMPLETED, FINAL
SUBMITTAL SHALL THEN BE SUBMITTED BY THE CONTRACTOR TO THE PERMITTING AGENCY
AND APPROVED PRIOR TO INSTALLATION OF THESE ITEMS.
SPECIFICATION
SECTION
CODE REQUIRED DEFERRED SUBMITTALS FOR REVIEW
BY PERMITTING AGENCY
ANY EQUIPMENT OR COMPONENT IN WHICH A TECHNICAL
SPECIFICATION REQUIRES SUBMITTAL OF EQUIPMENT OR
ANCHORAGE SYSTEM CALCULATIONS
01 88 15 ANCHORAGE AND BRACING
PIPING SUPPORT SYSTEMS40 05 15
OTHER
CHECKERED PLATE
STEEL
CONCRETE FILL, CLSM BACKFILL
SAND
GRANULAR FILL OR BACKFILL,
STRUCTURAL FILL OR BACKFILL
DRAIN, DRAINAGE, UNDERDRAIN ROCK
STRUCTURAL STEEL AND METAL FABRICATIONS:
DEFERRED SUBMITTALS:
13 34 20 PRECAST CONCRETE BUILDINGS
LEGEND:
UNDISTURBED, EXISTING SOIL
WELDING:
03 40 00 PRECAST CONCRETE STRUCTURES
4/ 4/
0:
A
M X
G -B or de r_
BA
N D
G
6_
D
8.
D
W G
SM
ET
C
AL
F R
17930
R E
E
NIGNE LANOIS
SE
F O
R P
OC
IXEM WE
N
EG
IA
P .E SAMOHT
JANUARY 17, 2025
Thomas Paige 2025.04.10 11:04:27 -06'00'
GENERAL NOTES
SPECIAL INSPECTION
GEOTECHNICAL OBSERVATION
STRUCTURAL OBSERVATION
1. ALL FOUNDATION BEARING SURFACES SHALL BE INSPECTED BY GEOTECHNICAL ENGINEER PRIOR TO
PLACEMENT OF GRANULAR FILL AND REINFORCING STEEL. ADDITIONAL SPECIAL INSPECTION
REQUIREMENTS ARE LISTED IN TABLE 1.
2. GEOTECHNICAL TESTING REQUIREMENTS ARE LISTED IN TABLE 3.
1. SPECIAL INSPECTIONS REQUIREMENTS FOR WIND RESISTANCE IN ACCORDANCE WITH IBC
SECTION 1705.10 ARE NOT APPLICABLE TO THIS PROJECT.
SPECIAL INSPECTIONS FOR WIND RESISTANCE
SPECIAL INSPECTIONS FOR SEISMIC RESISTANCE
1. THE STATEMENT OF SPECIAL INSPECTIONS PROVIDE PROJECT COMPLIANCE WITH THE PROVISIONS OF THE INTERNATIONAL BUILDING CODE (IBC) CHAPTER 17 FOR SPECIAL INSPECTION, AND STRUCTURAL
OBSERVATION, AND TESTING.
2. STANDARD SPECIAL INSPECTION REQUIREMENTS FOR NONSTRUCTURAL COMPONENTS ARE CONTAINED
IN TABLE 1.
3. STANDARD SPECIAL INSPECTION REQUIREMENTS FOR STRUCTURAL COMPONENTS, REGARDLESS OF WIND OR SEISMIC DESIGN CATEGORIES, ARE CONTAINED IN TABLE 2. STANDARD TESTING REQUIREMENTS
FOR STRUCTURAL COMPONENTS ARE CONTAINED IN TABLE 3.
4. PROJECT SPECIFIC REQUIREMENTS FOR STRUCTURES ASSIGNED TO SEISMIC DESIGN CATEGORIES C, D, E, OR F ARE CONTAINED IN TABLE 4. ADDITIONAL TESTING REQUIREMENTS FOR STRUCTURAL RESISTANCE
ARE CONTAINED IN TABLE 6.
5. PROJECT SPECIFIC REQUIREMENTS FOR STRUCTURES SUBJECT TO NOMINAL DESIGN WIND SPEEDS IN
EXCESS OF 110 MPH (ALLOWABLE STRESS DESIGN) ARE CONTAINED IN TABLE 5.
6. FOR ADDITIONAL REQUIREMENTS, REFER TO SPECIFICATION SECTION 01 45 33, SPECIAL INSPECTION, OBSERVATION AND TESTING. THESE INCLUDE:
A. CONTRACTOR'S REQUIREMENTS TO PROVIDE ACCESS TO THE WORK FOR REQUIRED INSPECTIONS, AND TO PROVIDE NOTICE OF REQUIRED INSPECTIONS AND STRUCTURAL OBSERVATION.
B. CONTRACTOR'S STATEMENT OF RESPONSIBILITY FOR WORK TO BE PERFORMED ON SYSTEMS
DESIGNATED UNDER THE STATEMENT OF SPECIAL INSPECTIONS PLAN FOR WIND OR SEISMIC
RESISTANCE.
C. DEFINITIONS AND TERMINOLOGY USED IN THIS STATEMENT OF SPECIAL INSPECTIONS.
1. SPECIAL INSPECTIONS REQUIREMENTS FOR SEISMIC RESISTANCE WILL BE IN ACCORDANCE
WITH IBC SECTION 1705.12 TOGETHER WITH LOCAL AND STATE AMENDMENTS.
2. SPECIAL INSPECTIONS REQUIREMENTS FOR SEISMIC RESISTANCE SHALL APPLY TO THE
SYSTEMS AND COMPONENTS LISTED IN TABLE 4.
3. MAIN SYSTEMS REQUIRED TO BE COVERED UNDER PROJECT SPECIAL INSPECTION
REQUIREMENTS INCLUDE ALL STRUCTURES TOGETHER WITH THEIR CONNECTIONS. REFER
TO SPECIFICATION 01 45 33, SPECIAL INSPECTION, OBSERVATION AND TESTING.
1. STRUCTURAL OBSERVATION WILL BE IN ACCORDANCE WITH IBC SECTION 1704.6. REFER TO PROJECT
SPECIFIC NOTES ON SHEET.
2. STRUCTURAL OBSERVATION DOES NOT INCLUDE OR WAIVE THE RESPONSIBILITIES FOR ANY REQUIRED
SPECIAL INSPECTIONS.
3. STRUCTURAL OBSERVATION REPORTS, NOTING ANY DEFICIENCIES, WILL BE DELIVERED TO CONTRACTING OFFICER WITHIN ONE WEEK OF THE OBSERVATION. THE CONTRACTOR WILL BE NOTIFIED ON-SITE AND
IN WRITING PROMPTLY UPON FINDING DEFICIENCIES.
4. AT THE CONCLUSION OF CONSTRUCTION, A WRITTEN STATEMENT WILL BE PROVIDED TO VERIFY THAT THE STRUCTURAL OBSERVATION SITE VISITS WERE MADE AND WHETHER THERE REMAIN ANY STRUCTURAL
DEFICIENCIES THAT HAVE NOT BEEN RESOLVED.
5. STRUCTURAL OBSERVATION WILL INCLUDE VISUAL OBSERVATION OF THE STRUCTURAL SYSTEM AT SIGNIFICANT CONSTRUCTION STAGES AND AT COMPLETION OF THE STRUCTURAL SYSTEM FOR EACH
STRUCTURE CONTAINED IN THE WORK.
1. SPECIAL INSPECTION WILL BE IN ACCORDANCE WITH IBC SECTIONS 1704 AND 1705 TOGETHER WITH LOCAL AMENDMENTS. REFER TO THE TABLES CONTAINED ON THESE GENERAL SHEETS FOR PROJECT SPECIFIC
INSPECTION TYPES AND FREQUENCIES.
2. SPECIAL INSPECTIONS SHALL BE PROVIDED BY A CERTIFIED OR QUALIFIED INSPECTOR AND ASSOCIATED TESTING SHALL BE PERFORMED BY AN APPROVED ACCREDITED INDEPENDENT AGENCY. THE CONTRACTOR SHALL SECURE AND PAY FOR THE SERVICES OF THE AGENCY TO PERFORM ALL SPECIAL INSPECTION AND ASSOCIATED TESTS. INSPECTORS FOR EACH SYSTEM AND MATERIAL SHALL BE INTERNATIONAL CODE
COUNCIL (ICC) CERTIFIED OR OTHERWISE APPROVED BY THE CONTRACTING OFFICER.
3. THE CONTRACTOR SHALL PROVIDE THE CONTRACTING OFFICER NOTICE OF UPCOMING INSPECTIONS A
MINIMUM OF 48 HOURS PRIOR TO INSPECTION.
4. THE SPECIAL INSPECTOR SHALL OBSERVE THE INDICATED WORK FOR COMPLIANCE WITH THE APPROVED CONTRACT DOCUMENTS AND SUBMIT RECORDS OF INSPECTION. ALL DISCREPANCIES SHALL BE BROUGHT
TO THE IMMEDIATE ATTENTION OF THE CONTRACTING OFFICER FOR CORRECTION.
5. SPECIAL INSPECTION AND ASSOCIATED TESTING REPORTS SHALL BE SUBMITTED TO CONTRACTING OFFICER AND THE BUILDING OFFICIAL WITHIN ONE WEEK OF INSPECTION OR WITHIN ONE WEEK OF TEST COMPLETION.
INSPECTIONS FOR WHICH REPORTING WILL BE REQUIRED ARE NOTED IN THE TABLES CONTAINED ON THIS STATEMENT OF SPECIAL INSPECTIONS. PROVIDE COPIES OF ALL REPORTS TO CONTRACTING OFFICER.
6. AT THE CONCLUSION OF CONSTRUCTION, A FINAL REPORT DOCUMENTING REQUIRED SPECIAL INSPECTIONS
AND CORRECTION OF PREVIOUSLY NOTED DISCREPANCIES SHALL BE SUBMITTED.
STATEMENT OF SPECIAL INSPECTIONS PLAN
4/
4/
0:
A M
X G
-B or de r_
BA
N
D
G
7_ D
8.
D W
G
SM
ET
C
AL
F R
17930
R E
E
NIGNE LANOIS
SE
F O
R P
OC
IXEM WE
N
EG
IA
P .E SAMOHT
JANUARY 17, 2025
Thomas Paige 2025.04.10 11:04:51 -06'00'
0:
A
M X
G -B or de r_
BA
N D
G
8_
D
8.
D
W G
SM
ET
C
AL
F R
17930
R E
E
NIGNE LANOIS
SE
F O
R P
OC
IXEM WE
N
EG
IA
P .E SAMOHT
JANUARY 17, 2025
Thomas Paige 2025.04.10 11:05:09 -06'00'
0:
A
M X
G -B or de r_
BA
N D
G
9_
D
8.
D
W G
SM
ET
C
AL
F R
17930
R E
E
NIGNE LANOIS
SE
F O
R P
OC
IXEM WE
N
EG
IA
P .E SAMOHT
JANUARY 17, 2025
Thomas Paige 2025.04.10 11:05:38 -06'00'
0:
A
M X
G -B or de r_
BA
N D
G
0_
D
8.
D
W G
SM
ET
C
AL
F R
27845
R E
E
NIGNE LANOIS
SE
F O
R P
OC
IXEM WE
N
EC
IR
P E
NYAW ROYR
B
04-09-2025
NOTES:
1. NOT ALL VALVES AND INSTRUMENTS ARE SHOWN FOR CLARITY.
4/
9/
1:
A M
X G
-B or de r_
BA
N
D
G
1_
8.
D
W G
IK
H
AN
R
FLOW METER
VAULT, SEE
03M401
FLOW CONTROL
VAULT, SEE
03M401
PRESSURE TEST
POINT
WATER SERVICE
TO BUILDING
27845
R E
E
NIGNE LANOIS
SE
F O
R P
OC
IXEM WE
N
EC
IR
P E
NYAW ROYR
B
04-09-2025
INSTRUMENT IDENTIFICATION
EXAMPLE SYMBOLS
DIGITAL SYSTEM INTERFACES
GENERAL INSTRUMENT OR
FUNCTIONAL SYMBOLS
TRANSDUCERS
INSTRUMENT IDENTIFICATION LETTERS TABLE
SPECIAL CASESACCESSORY DEVICES
LINE LEGEND
INTERFACE SYMBOLS
EQUIPMENT TAG NUMBERS
ABBREVIATIONS & LETTER SYMBOLS
GENERAL NOTES
X X X L L L o
P
3/
/2
:0
AM
X
G -B or de r_
BA
N D
G
2_
D
8.
D
W G
EK
R
IS
TE
L R
Digitally signed by Jonathan James
Date: 2025.04.11 12:18:20-06'00'
VALVE SYMBOLS
GATE SYMBOLS
ACTUATOR SYMBOLS
MISCELLANEOUS SYMBOLS
PRIMARY ELEMENT SYMBOLS
FLOW STREAM IDENTIFICATION
V
S
M
S
M
LS
V
PUMP AND COMPRESSOR SYMBOLS
3/
/2
:0
AM
X
G -B or de r_
BA
N D
G
3_
D
8.
D
W G
EK
R
IS
TE
L R
Digitally signed by Jonathan James
12:18:20-06'00'
V
L
U
AA
AA
NGRNGR
M
CRX
TDR
X
T
GEN
T
GEN
RER
ETM
DPM
MPR
EUM
MO
SPD
F
3/
/2
:0
AM
X
G -B or de r_
BA
N D
G
4_
D
8.
D
W G
ZH
U
N
ER
S R
Digitally signed by Jonathan James
12:18:21-06'00'
30 2a or or or or
60/40 or
XXXX
G
N
LPXXA
100/40 or
XX
L20R
MCC-A
G
G
[A1]
T or or
J
G
EUH
AC
LPXXA
XX
C or
T
3A
3/
/2
:1
AM
X
G -B or de r_
BA
N D
G
5_
D
8.
D
W G
AC
U
G
LI
AT
R
Digitally signed by Jonathan James
12:18:22-06'00'
3/
/2
:1
AM
X
G -B or de r_
BA
N D
G
6_
D
8.
D
W G
AC
U
G
LI
AT
R
Digitally signed by Jonathan James
12:18:23-06'00'
:1
PM
X G
-B or de r_
BA
N
D
G
7_ D
8.
D W
G
IK
H
AN
R
Gregory Scott Hinte 2025.04.08 14:20:53-05'00'
:1
PM
X G
-B or de r_
BA
N
D
G
8_ D
8.
D W
G
IK
H
AN
R
Gregory Scott Hinte 2025.04.08 14:19:44-05'00'
3/
/2
1:
P
M
X G
-B or de r_
BA
N
D X
C -B
AN
D
_2 D
-E G
-M as te r
X C
-L
AY
O U
T-
SH
EE
TS
C
1_
D
8.
D
W G
FI
G
U
ER
O
AJ
R
Digitally signed by Micah E. Johnson
15:24:27-06'00'
X X X X
EXIST FLAGSTONE PAVEMENT
EXIST ASPHALT PAVEMENT
EXIST BUILDING
ELECTRIC MANHOLE
POWER POLE
WATER METER
SIGN
WATER GATE VALVE
LEGENDEXISTING NEW
CONTOUR LINE
BUILDINGS, WATER TANK
FIRE HYDRANT
AIR RELIEF VALVE
WATERLINE REDUCER
SANITARY MANHOLE
E
TRANSFORMER
ELECTRIC GEAR
LIGHT POLE
W
SS
T
ST STORM MANHOLE
PRESSURE REDUCING VALVE
BENCHMARK LOCATION
BANDELIER NATIONAL
MONUMENT BOUNDARY
LOD LOD LIMITS OF DISTURBANCE
COMBINATION AIR RELIEF VALVE MANHOLE A
SANITARY SEWER
STORM DRAINAGE
NATURAL GAS
WATER
G G G G
UGA
UGA
UGA
USD [SUE LEVEL]
USS [SUE LEVEL]
UW [SUE LEVEL]
ELECTRICUGA UE [SUE LEVEL]
1. EXISTING UTILITIES MAY HAVE A PREFIX OF U FOR UNDERGROUND OR O FOR OVERHEAD.
THE LAST LETTER OF THE TEXT EMBEDDED IN THE LINETYPE DENOTES THE LEVEL OF
SUBSURFACE UTILITY ENGINEER (SUE) ACCURACY IN ACCORDANCE WITH STANDARD ASCE
38-02.
2. EXISTING UTILITY INFORMATION COLLECTED IN ACCORDANCE WITH ASCE 38-22 GUIDELINES.
THE QUALITY LEVEL AS DEFINED BY ASCE 38-22 ARE AS FOLLOWS:
3. UTILITY QUALITY LEVEL A: PRECISE HORIZONTAL AND VERTICAL LOCATION OF UTILITIES
OBTAINED BY THE ACTUAL EXPOSURE (FOR VERIFICATION OF PREVIOUSLY EXPOSED AND
SURVEYED UTILITIES) AND SUBSEQUENT MEASUREMENT OF SUB-SURFACE UTILITIES,
USUALLY AT A SPECIFIC POINT. MINIMALLY INTRUSIVE EXCAVATION EQUIPMENT IS TYPICALLY
USED TO MINIMIZE THE POTENTIAL FOR UTILITY DAMAGE. A PRECISE HORIZONTAL AND
VERTICAL LOCATION, AS WELL AS OTHER UTILITY ATTRIBUTES, IS SHOWN ON PLAN
DOCUMENTS. ACCURACY IS TYPICALLY SET TO 15-MM VERTICAL AND TO APPLICABLE
HORIZONTAL SURVEY AND MAPPING ACCURACY AS DEFINED OR EXPECTED BY THE PROJECT
OWNER.
4. UTILITY QUALITY LEVEL B: INFORMATION OBTAINED THROUGH THE APPLICATION OF
APPROPRIATE SURFACE GEOPHYSICAL METHODS TO DETERMINE THE EXISTENCE AND
APPROXIMATE HORIZONTAL POSITION OF SUBSURFACE UTILITIES. QUALITY LEVEL B DATA
SHOULD BE REPRODUCIBLE BY SURFACE GEOPHYSICS AT ANY POINT OF THEIR DEPICTION.
THIS INFORMATION IS SURVEYED TO APPLICABLE TOLERANCES DEFINED BY THE PROJECT
AND REDUCED ONTO PLAN DOCUMENTS.
5. UTILITY QUALITY LEVEL C: INFORMATION OBTAINED BY SURVEYING AND PLOTTING VISIBLE
ABOVE-GROUND UTILITY FEATURES AND BY USING PROFESSIONAL JUDGMENT IN
CORRELATING THIS INFORMATION TO QUALITY LEVEL D INFORMATION.
6. UTILITY QUALITY LEVEL D: INFORMATION DERIVED FROM EXISTING RECORDS OR ORAL
RECOLLECTIONS.
EXISTING UTILITIES NEW UTILITIES
GENERAL SITE NOTES:
1. FIELD SURVEY LOCATED UNDERGROUND UTILITY LINES MARKED BY OTHERS, FOUND BY
GEOPHYSICAL METHODS, AND ABOVE GROUND EVIDENCE. UNDERGROUND UTILITIES FROM
RECORD DRAWINGS ARE ALSO SHOWN. THERE IS A RISK OF UNDETECTED UNDERGROUND
UTILITIES.
2. THE CONTRACTOR SHALL VERIFY ALL LOCATIONS AND ELEVATIONS AND SHALL TAKE ALL
PRECAUTIONARY MEASURES NECESSARY TO PROTECT UTILITY LINES WHETHER SHOWN OR
NOT. THE UTILITY NOTIFICATION CENTER AND AFFECTED UTILITIES SHALL BE NOTIFIED IN
ADVANCE A MINIMUM OF TWO FULL BUSINESS DAYS PRIOR TO CONSTRUCTION, NOT
INCLUDING DAY OF CALL. UTILITY LOCATIONS SHOWN ON THE DRAWINGS ARE APPROXIMATE,
AND THE POSITION OF UTILITIES SHOWN ARE NOT WARRANTED TO BE EXACT, NOR IS IT
WARRANTED THAT ALL UNDERGROUND OR EXPOSED STRUCTURES ARE SHOWN. THE
CONTRACTOR SHALL MAKE EXPLORATORY EXCAVATIONS OR POTHOLES IN ADVANCE OF THE
PIPELINE CONSTRUCTION, UNLESS OTHERWISE DIRECTED, TO VERIFY UTILITY LOCATIONS AND
AVOID CONFLICTS WITH THE DESIGN ALIGNMENT OR GRADE OF THE PIPELINE. THE
CONTRACTOR SHALL RECORD THE LOCATION AND DEPTH OF ALL UNDERGROUND OR
EXPOSED UTILITY INFORMATION AND INCLUDE THIS INFORMATION IN THE RECORD DRAWINGS.
3. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING TRAFFIC AND USAGE OF THE EXISTING
ROADS ADJACENT TO THE PROJECT, INCLUDING ENTRANCE ROAD AND CAMPGROUND ROAD.
CONTRACTOR IS RESPONSIBLE FOR MAINTAINING SIGNAGE AND BARRIERS TO DIRECT
PEDESTRIAN TRAFFIC. TRAFFIC CONTROL AND MAINTENANCE SHALL FOLLOW NEW MEXICO
MUTCD. COORDINATE ALL WORK ASSOCIATED WITH LANE CLOSURES, TRAFFIC CONTROL,
WATER SERVICE CROSSOVER WITH THE CONTRACTING OFFICER TO AVOID PEAK USE TIMES
OF MONUMENT.
4. WATER MANAGEMENT/EROSION AND SEDIMENT CONTROL. CONTRACTOR SHALL ADHERE TO
ALL GENERAL CONDITIONS AND SPECIAL CONDITIONS INCLUDED IN THE NPDES GENERAL
PERMIT, PLANS AS APPROVED BY NEW MEXICO DEPARTMENT OF THE ENVIRONMENT, AND
DIRECTIONS OF REGULATORY INSPECTORS.
5. PROJECT TESTING: ALL TESTING REQUIRED WILL BE CONDUCTED BY THE CONTRACTOR, AS
SPECIFIED.
6. CONTRACTOR SHALL WORK IN A LAWFUL MANNER AND COMPLY WITH ALL PERMIT
REQUIREMENTS AND APPLICABLE STANDARDS.
7. CONTRACTOR SHALL TEMPORARILY SUPPORT ALL EXISTING UTILITIES IN SERVICE THAT ARE IN
CLOSE PROXIMITY OF WORK AND/OR CROSSING THE PROPOSED UTILITIES.
PROJECT SPECIFIC NOTES:
1. CONSTRUCTION MUST COMPLY WITH HISTORICAL PRESERVATION (SEE DWG 00G003), NATURAL RESOURCE PROTECTION (SEE DWG
00G003), SAFETY FOR MONUMENT VISITORS AND STAFF, AND COORDINATION ON NECESSARY DETOURS AND TEMPORARY SERVICE
OUTAGES.
2. CONTRACTOR MAY PROPOSE VALUE ENGINEERED PROPOSITIONS FOR CONSIDERATION BY CONTRACTING OFFICER, INCLUDING ALIGNMENTS, CONSTRUCTION METHODS, AND SEQUENCING. VALUE ENGINEERED PROPOSITIONS MUST COMPLY WITH CONSTRAINTS AND PERFORMANCE REQUIREMENTS DEFINED IN SPECIFICATIONS. WRITTEN APPROVAL FROM THE CONTRACTING OFFICER IS REQUIRED PRIOR TO CONSTRUCTING ANY VALUE ENGINEERED PROPOSITIONS. CERTAIN PROPOSITIONS MAY REQUIRE THE SIGNATURE
AND SEAL OF A PROFESSIONAL ENGINEER OF RECORD.
3. SEE PAVEMENT DWGS 04C101 TO 04C514 FOR RESTORATION OF PAVEMENT AFTER THE UTILITY INSTALLATION.
4. COORDINATE WITH CONTRACTING OFFICER ON CLOSING CAMPGROUND SITES ALONG ABERT'S SQUIRREL LOOP, BLACK BEAR LOOP, AND COYOTE LOOP AS NEEDED FOR CONSTRUCTION. SEE RECOMMENDED CONSTRUCTION SCHEDULE BELOW:
5. ELECTRICAL AND FIBER CONDUIT ARE SHOWN ON THE CIVIL DRAWINGS AS PART OF THE COMMON TRENCH FOR REFERENCE ONLY.
REFER TO ELECTRICAL PLANS FOR DETAILED DESIGN AND ALIGNMENT.
6. EXCEPT FOR PREAPPROVED TEMPORARY SHUTDOWNS, ALL EXISTING UTILITIES MUST REMAIN IN SERVICE DURING CONSTRUCTION UNTIL A SCHEDULED SWITCHOVER IS COORDINATED WITH THE CONTRACTING OFFICER. REFER TO SECTION 01 11 00 SUMMARY OF OF WORK. CAP AND ABANDON ALL EXISTING WATERLINES AND GAS LINES IN PLACE AFTER PROPOSED WATERLINES AND CONNECTIONS
ARE IN SERVICES, UNLESS OTHERWISE NOTED ON DRAWINGS.
7. MAINTAIN AT LEAST 4-FT OF COVER FOR WATER MAINS AND 2-FT OF COVER FOR DRY UTILITIES. MAINTAIN AT LEAST 3-FT OF COVER FOR
WATER SERVICE LINES.
8. MAINTAIN A MINIMUM OF 10-FT OF HORIZONTAL CLEARANCE BETWEEN SANITARY SEWER AND PROPOSED WATER MAINS. WHERE 10-FT CANNOT BE MAINTAINED, WATER MAIN TO BE INSTALLED IN SEPARATE TRENCH AND CLSM ENCASED PER DETAIL 5 OF 02C300.
9. WATER MAINS CROSSING SANITARY SEWERS SHALL BE LAID TO PROVIDE A MINIMUM VERTICAL DISTANCE OF 18 INCHES BETWEEN THE BOTTOM OF THE WATER MAIN AND THE TOP OF THE SEWER. AT CROSSINGS, ONE FULL LENGTH OF WATER PIPE SHALL BE PLACED SO BOTH JOINTS ARE AS FAR FROM THE SEWER AS POSSIBLE. IN THE CASE THAT THE WATER MAIN MUST PASS BELOW THE SEWER PIPE, A MINIMUM OF 18 INCHES OF VERTICAL SEPARATION SHALL BE PROVIDED BETWEEN THE TOP OF WATER MAIN AND BOTTOM OF SEWER AND THE WATER MAIN SHALL BE ENCASED IN CLSM PER DETAIL 2 OF 02C300 TO EXTEND 10 FEET ON EITHER SIDE OF SEWER PIPE UNLESS OTHERWISE SHOWN ON DRAWINGS. IN THE CASE THAT THE SEWER LINE IS NEW, CONSTRUCT SEWER PIPE OF MINIMUM 160 PSI
WORKING PRESSURE RATED AWWA PIPE AND PRESSURE TESTED TO 50 PSI.
10. EXISTING GROUND SHOWN IN PROFILE IS AT ROAD CENTERLINE. PROFILE SHOWS PROPOSED WATERLINE WHERE COMMON TRENCH INCLUDE A WATERLINE. REFER TO TYPICAL TRENCH DETAIL 5 ON DWG 02C300 FOR LOCATION OF OTHER UTILITIES IN COMMON TRENCH IN REFERENCE TO WATERLINE. APPROXIMATE PROPOSED WATERLINE HORIZONTAL ALIGNMENT IS SHOWN IN PLAN VIEW. CONTRACTOR TO ADAPT VERTICAL AND HORIZONTAL ALIGNMENT IN THE FIELD AND INSTALL STANDARD BENDS OR PULL JOINTS (PVC) AS NECESSARY.
11. ALL WATERLINE PIPE AND APPURTENANCES TO BE MECHANICALLY RESTRAINED. NO THRUST BLOCKS UNLESS OTHERWISE SHOWN ON
DRAWINGS.
12. MAINTAIN SANITARY SEWER SERVICES AT ALL TIME TO RESIDENCES. PORTA POTTIES TO BE INSTALLED NEAR COMFORT STATIONS DURING SCHEDULED OUTAGES. COORDINATE WATER SERVICE OUTAGE WITH CONTRACTING OFFICER BY GIVING 72 HOURS NOTICE
FOR DISTRIBUTION UTILITY OUTAGES AND 24 HOURS NOTES FOR SERVICE LINE OUTAGES.
13. PVIs IN WATERLINE PROFILES ARE SHOWN AS GUIDANCE ONLY. HIGH POINTS BETWEEN CARVs ARE NOT ALLOWED. FIELD ADJUST PVIs
TO MINIMIZE BEND FITTINGS.
14. CONTRACTOR TO RELOCATE, LOWER OR RAISE EXISTING ELECTRICAL, TELECOM, FIBER OPTIC AND NATURAL GAS LINES AS NEEDED TO
INSTALL THE NEW WATERLINES AT NO ADDITIONAL COST TO THE GOVERNMENT.
15. MAINTAIN MINIMUM OF 18 INCHES VERTICAL SEPARATION BETWEEN NEW DRY UTILITIES (ELECTRICAL, FIBER, AND GAS) AND NEW
WATERLINES WITH WATERLINE INSTALLED BENEATH DRY UTILITIES.
16. DEFLECT PVC PIPE ALIGNMENT AT LOCATIONS INDICATED IN PLANS. USE SOLID SLEEVE OR HIGH DEFLECTION STOP COUPLINGS FOR CHANGES IN ALIGNMENT UP TO 5 DEGREES. CONTRACTOR TO PLAN FOR MINOR DEFLECTION BETWEEN IDENTIFIED STANDARD DEGREE FITTINGS BY DEFLECTING PVC JOINTS. BELL- JOINTS MAY BE DEFLECTED TO 75% OF THE MANUFACTURER'S ALLOWABLE DEFLECTION ANGLE, IF ONE INCLUDED ON THE PRINT LINE OF THE PIPE. LONGITUDINAL BENDING OF PIPE IS NOT PERMITTED. CONTRACTOR TO DEFLECT WATERLINE IN ADVANCE OF CROSSINGS OF EXISTING UTILITIES TO REMAIN IN SERVICE THAT ARE NOT BEING RELOCATED, LOWERED OR RAISED.
17. ALL WATER, SANITARY SEWER AND NATURAL GAS UTILITIES ARE TO BE NEW MATERIALS. WATER TRANSMISSION AND DISTRIBUTION MAINS AND SERVICE LINES GREATER THAN 3-INCH DIAMETER ARE TO BE PVC MATERIAL; YARD PIPING IS TO BE DUCTILE IRON MATERIAL. WATER SERVICE LINES 3-INCH AND SMALLER ARE TO BE HDPE MATERIAL. SANITARY SEWER COLLECTOR LINES AND SERVICE
LATERALS ARE TO BE PVC MATERIAL. GAS LINES ARE TO BE MDPE MATERIAL.
UGA USFM [SUE LEVEL]
COMMUNICATIONUGA UC [SUE LEVEL]
SITE UTILITIES LEGEND AND NOTES
UGA UG [SUE LEVEL]
SITE UTILITIES ABBREVIATIONS
BAND/ BANDELIER NATIONAL MONUMENT
BL BASELINE
CARV COMBINATION AIR RELEASE VALVE
CCC CIVILIAN CONSERVATION CORPS
CMP CORRUGATED METAL PIPE
DIP DUCTILE IRON PIPE
DTL DETAIL
EC ELECTRIC CONDUIT
EL/ELEV ELEVATION
EXIST EXISTING
FC FIBER CONDUIT
FOC FIELD OPERATIONS CENTER
FH FIRE HYDRANT
FM FORCE MAIN
FO FIBER OPTIC
GV GATE VALVE
INV INVERT
LAC LOS ALAMOS COUNTY
LANL LOS ALAMOS NATIONAL LABORATORY
LF LINEAR FEET
LT LEFT
NC NORMALLY CLOSED
OHWM ORDINARY HIGH WATER MARK
PROP PROPOSED
PRV PRESSURE REDUCING VALVE
PVC POLYVINYL CHLORIDE
R&D REMOVE AND DISPOSE
R&R REMOVE AND REPLACE
RT RIGHT
S SLOPE
SS SANITARY SEWER
STA STATION
VCP VITRIFIED CLAY PIPE
WL WATER LINE
YH YARD HYDRANT
YARD HYDRANT
BH
BOREHOLE
NATURAL GAS VALVE
NATURAL GAS METERG
W
G SS SS
FIBER OPTICUGA UFO [SUE LEVEL]
SS
TH
POTHOLE
W W
SEWER FORCE MAIN
W
GAS LINE TO ABANDONUGA UG [SUE LEVEL]
SEWER LINE TO ABANDONUGA USS [SUE LEVEL]X X X X
UGA UW [SUE LEVEL]X X X X WATERLINE TO ABANDON
3/
/2
:1
AM
B
AN
D
BA
SE
X
C -B
AN
D
-E G
-M as te r
X G
-B or de r_
BA
N
D
C
2_ D
8.
D W
G
FI
G U
ER
O
AJ
R
Digitally signed by Micah E. Johnson
15:25:19-06'00'
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD LOD LOD LOD LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LO
D
LO
D
LOD
LO
D
U G
D
U G
D
U G
D
U G
D
U G
D
U G
D
U G
D
UGD
UGD
UGD
UGD
UGD
UGDUGD
UEA
UEA
UEA
UEA
UEA
UEA
U
EA
U
EA
U
EA
U
EA
U
EA
U
EA
U
EA
U
EA
U W
D
U W
D
U W
D
U W
D
U W
D
U W
D
U W
D
U W
D
UWD
UWD
UWD
UWD
UWD
UWD
UED
UWB
UWB
UWB
U W
B U
W B
U W
B
UWB
UG
A
UG
A
UG
A
UG
A
UGA
UGA
UGA
UGA
UGA
UGA
UGA
UGA
UWA
UWA
UWA
UWA
UWA
UWA
UWA
UWA
UWA
UWA
UWA
UEA
UEA
UEA
UEA
UEA
UEA
UEA
UEA
UEA
UEA
E
W
EW W
WW W E WW
WW
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X
X
X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
XXXXXXXXXXXXXXXXX
XXXXXXXXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
KEYPLAN
GENERAL AREAS OF EXPOSED PIPING AND
CONDUITS ON THE GROUND TO BE CUT,
AND REMOVED, TYP. SEE NOTE 3.
EXISTING CANYON UNDERGROUND CONCRETE TANK
(APPROX 20,000 GALLONS). SEE NOTE 1.
NOTES:
1. CLIN 0001: ABANDONMENT OF EXISTING CONCRETE TANK
AND ASSOCIATED PIPING SHALL OCCUR AFTER THE NEW
WATER SYSTEM AND NATURAL GAS SYSTEM ARE ACTIVE
AND WITH CONCURRENCE FROM CONTRACTING OFFICER.
ABANDON TANK BY DRAINING ALL WATER AND GROUTING
INLETS AND OUTLETS OF BURIED PIPING 2 FEET MIN.
CLIN OPTION B: DEMOLISH AND REMOVE ABOVEGROUND
EQUIPMENT, PIPING, ACCESS HATCHES, ETC. DRILL 4-INCH
DIAMETER HOLES IN TANK FLOOR SPACED 3-FEET APART
FROM EACH OTHER. SAW CUT CONCRETE TANK ROOF AND
DISPOSE CUT PIECES INTO TANK. FILL REMAINING EMPTY
SPACE IN TANK WITH WITH NATIVE SOIL AND 3-INCH MAX
CRUSHED ROCK FROM THE "BONEYARD" AREA VIA
HELICOPTER. SEE DWG 00G004. PROVIDE NON-VEGEATIVE
SURFACE RESTORATION BY HAND-GRADING TO EXISTING
GRADE. DEMOLISH AND DISPOSE EXPOSED WATER AND
NATURAL GAS PIPES, AND ELECTRICAL CONDUIT AGAINST
THE CLIFF. AFTER ALL UTILITIES HAVE BEEN REMOVED,
DEMOLISH THE ROCK FACADE.
ALL DEMOLITION AND ABANDONMENT OF STRUCTURES
SHALL COMPLY WITH ALL FEDERAL, STATE, AND LOCAL
CODES AND REQUIREMENTS.
2. NO ACCESS ROAD IS PERMITTED TO BE CONSTRUCTED TO
ACCESS THE CONCRETE TANK AND PIPING. ACCESS
PERMITTED ON FOOT ONLY AND WITHIN LIMITS OF
DISTURBANCE (SEE DWG 02C004). VEHICULAR ACCESS
NOT PERMITTED.
3. ALL EXPOSED GAS, WATER AND COMMUNICATIONS
CONDUITS, PIPING AND OTHER APPURTENANCES
BETWEEN BASE OF THE CLIFF AND THE BURIED
CONCRETE TANK ARE TO BE CUT AND REMOVED
MANUALLY. CONTRACTOR TO BE ACCOMPANIED BY NPS
ARCHAEOLOGIST WHEN REMOVING EXPOSED PIPING
OUTSIDE OF LIMITS OF DISTURBANCE.
4. ALL CAVATES AND NATIVE VEGETATION IS TO BE
PROTECTED AND NOT DISTURBED.
SHEET NOTES
CAVATES (TYP).
SEE NOTE 4.
EXPOSED 2-INCH WATER LINE AND
GAS LINE (NOT SHOWN) TO BE CUT
AND REMOVED. TYP. SEE NOTE 3.
BASE OF CLIFF
EXPOSED ELECTRICAL
CONDUIT TO BE CUT AND
REMOVED. DEMOLISH
AND REMOVE WATER AND
GAS LINES BEHIND ROCK
FACADE. THEN DEMOLISH
ROCK FACADE. SEE DWG
02C004 AND NOTE 1.
3/
/2
:1
AM
X G
-B or de r_
BA
N
D X
C -L
AY
O
U T-
SH
EE
TS
X
C -B
AN
D
_2 D
-E G
-M as te r
X C
-R O
AD
W
AY
X
C -B
AN
D
_P av em en t a nd
L O
D H at ch
X C
-U
TI
LI
TY
S
IT
E
C
3_ D
8.
D W
G
FI
G U
ER
O
AJ
R
CLIN 0001 - MAIN PARK WATER SYSTEM: ABANDON UNDERGROUND
CONCRETE TANK. FOR DETAILS SEE SPECIFICATION 01 27 00.
CLIN OPTION H - DEMOLITION OF EXISTING CANYON UNDERGROUND CONCRETE
WATER TANK AND EXPOSED SUSPENDED UTILITIES: INCLUDES DEMOLITION AS
DESCRIBED ON THIS SHEET. FOR DETAILS SEE SPECIFICATION 01 27 00.
UNDERGROUND 20,000-GAL CONCRETE STORAGE TANK
EXPOSED UTILITY PIPING AT BASE OF CLIFF
GENERAL AREA
OF ROCK FACADE
WITH HIDDEN
AND EXPOSED
UTILITIES TO BE
CUT AND
REMOVED, TYP.
SEE NOTE 1.
CONCRETE
STORAGE
TANK
Digitally signed by Micah E. Johnson
15:26:08-06'00'
U G
D
U G
D
UGD
U G
D
U G
D
U
SS
D
USSD
UW
D
UW
D
U W
D
U G
D
UGD
UGD
UGD
UGD
UGD
U G
D U
G D
U G
D
UGD
UGD
UGD
UGD
UGD
UGD
UGD
UGDUGDUGDUGD
U G
D
U
EA
UEA UEA UEA UEA
UEA
UEA
UEA
UEA
U W
D
UW
D
UW
D
UW
D
UW
D
U W
D U
W D
UW
D
UWD
UW
D
UWD
UWD
UWDUWDUWD
U W
D
U
ED
UED
UWD
U
SD
D
USSC
USSC
U W
B
UWB
UWB
UW
B
U W
B
UW
B
UW
B
UW
B
UWB
UWB
UWB
UEBUEB
UEB
UE
B
UEB
U
EB
UEB
U
EB
U
EB
UEB
UEB
UEB
U
EB
U
EB
UEB
UEB
UEB
UEB
UEB
U
EB
UEB
U
EB
UEB
UEB
UCB
UCB
UCB
U C
B
U C
B
UCB
UCB
UCB
U C
B
U C
B
UCB
UCB
UC
B
UCB
U C
B
UCB
UCB
UCB
UCB
U C
B
UCB
UCB
UG
B
UG
B
UG
B
UGB
UG
B
U G
B
U G
B
UGB
UGB
U G
B
U G
B
U G
B
U G
B
U G
B
U G
B
U G
B
U G
B
U G
B
U G
B
U G
B
U G
B
UGB
UG
C
UG
C
UG
C
UG
C
U G
C
U G
C
U G
C
U G
C
U G
C
U G
C
U G
C
U G
C
UGCUGC
UGC
UGC
UG
C
UGC
UGC
UGCUGC
UGC
UGC
UGA
UGA
U G
A
UF
O
B
UF
O
B
UF
O
B
U W
A U
W A
U
EA
U
EA
91774
SSMH
91793
SSMH
91886
FOLM.3 FOHH
20826
ECLT ECLM.1 B
20831
ECLT ECLM.1
20834
ECLT ECLM.1
20839
ECLT ECLM.1
20849
ECLT ECLM.2
20853
ECLT ECLM.3 E
20857
ECLT ECLM.2
20874
ECLT ECLM.1
20885
ECLT ECLM.120892
ECLT ECLM.1
20901
ECLT ECLM.2 E
91186
SSMH
91207
SSCO
91226
SSCO
91227
SSCO
91427
FOLM.1 FOHH
40126
SSMH
40127
SSCO
40236
SSCO
40237
SSCO
40238
SSCO
40251
SSCO
40252
SSCO
40253
SSCO
40254
SSCO
40257
SSCO
40258
SSMH
40259
SSMH
40260
SSMH
40261
SSMH
40262
SSCO
W
SS
SS
SS
SS
SS
SS
SS SS
SS
SS
SS
SS
SS
SS
SS
E
E
W
W
W
W
W W W
WW W
E
E
E
FO
E
E
C
E
E
E
E E
E
EE
T
T G
GG
GG
T
T
G
W
SSSS
G
WWW
W
W W
E
G
SS
W
W
SS
W
W
W
T T
W W
G
G G
G G
G
W
W
GGG
G G
W W
E
G
E
W
W
W
W W
W
W
T
T
WW
W
W W
W W
WWW
GG
G
GGTGG
W W W W
WW
W
G
GGG
G G
T
W
E
W E
W
WW
W W
E W
WW
W
T
GGG
G
FO
SS
52633
FOBX
? 53730
SNPT
U
SS 49573
6086.068
SSMH
SS 49574
6084.933
SSMH
UWD
UWD
UWD UWD
UW
D
UW
D
UWD
UWD
U W
D
U W
D
U W
D
U W
D
U W
D
U W
D
U W
D
UW
D
UW
D
UW
D
W W
W
W
SS
6'' W
6'' W
6'' W 6'' W
6'' W 6'' W
6'' W
6'' W
6'' W
6'' W 6'' W
6'' W
6'' W 1'' G
2'' G 2'' G
2'' G 2'' G
2'' G
2'' G
2'' G
2'' G 2'' G
2'' G
2'' G
1'' G4'' W
2' ' G
2'' G
1'' G
6'' W
6'' W
6'' W
6'' W
6'' W
6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
4'' G
4'' G
4'' G
4'' G
4'' G
4'' G
4'' G 4'' G
4'' G 4'' G
4'' G 4'' G
4'' G 4'' G
X
X
X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
XX
X X
X X
X
X
X
X
X X
X
X X
XX
X
X X
X X
X X
X X
X
X
X X
X
X
X
X X
X X
X
X X
X
X
X
X
X
X
X X
X
X X
X
X
X
XX
X
X
X X
X
X X
X
X X
X
X X
X
X X
X
X X
X
X X
X
X X X
X
X X
X
X
X
X
X
X
X X
X
X
X
X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X X
XX
X
X X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X
X
X
X
X
X
X
X
X X
X X
X X
X
X X
X X
X X
X X
X
X
X
X X
X
X X X
X
X
X X
X X
X X
X X
X X
X
X X
X
X
X
X
X
X
X
X
X
X X
X X
X
X X X
X
X
X
X
XXXXXX
X
X
X
XX
X
X X
X X
X
X
X
X
XXXXXXXXXXXXXXX
X X
X X
X X
X
X
X
X X
X
XXXX
X
X
X
X
X
X
X
X
X X
XX
XXXXXX
X
X X
X X
X X
X X X X X X X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X
X X X X X X
X
X
X
X
XX
X
X X
X
X
X
X
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LOD
LO
D
LOD
LO
D
LO
D
LOD
LOD
LOD
LO
D
LO
D
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLODLOD
LO
D
LO
D
LO
D
LO
DLOD
LOD
LO
D
LO
D
LOD
LO
D
LO
D
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
100'-0"
100'-0"
100'-0"100'-0"
100'-0"
100'-0"
100'-0"
ELEVATION GRADE
NOTES:
1. APPROXIMATE ELEVATION GRADE SHOWN FOR
REFERENCE ONLY.
APPROX. LOCATION OF
EXISTING GATE.
COORDINATE VEHICLE
ACCESS WITH
CONTRACTING OFFICER.
EN
TR
AN
C
E R O
AD
SOLENOID VALVE VAULT EXTERIOR
ELECTRICAL CONDUIT
(VIEW FROM AIR RELEASE VALVE
VAULT FACING DOWNHILL
TOWARDS CANYON PARKING LOT)
CUT AND REMOVE 3/4-INCH
ELECTRICAL CONDUIT
BETWEEN BASE OF CLIFF AND
SOLENOID VALVE VAULT ONLY.
CUT AND REMOVE EXPOSED 2-INCH
WATERLINE, 2-INCH GAS LINE AND
3/4-INCH ELECTRICAL CONDUIT
BETWEEN BASE OF CLIFF, CONCRETE
TANK AND RETAINING WALL BEHIND
ADMINISTRATION BUILDINGS.
CONTRACTOR TO BE ACCOMPANIED BY
NPS ARCHAEOLOGIST WHEN REMOVING
EXPOSED PIPING.
APPROXIMATE BASE OF CLIFF.
DEMOLISH AND REMOVE
SOLENOID VALVE VAULT AND
INTERIOR PIPING. RE-GRADE
TO MATCH EXISTING GRADE.
KEYPLAN
SOLENOID VALVE VAULT INTERIOR
LIMITS OF DISTURBANCE
3/
/2
:3
AM
C
4_ D
8.
D W
G
FI
G U
ER
O
AJ
R
CLIN OPTION H - DEMOLITION OF EXISTING CANYON UNDERGROUND
CONCRETE WATER TANK AND EXPOSED SUSPENDED UTILITIES:
INCLUDES DEMOLITION AS DESCRIBED ON THIS SHEET. FOR
DETAILS SEE SPECIFICATION 01 27 00.
APPROXIMATE TOP
OF CLIFF.
X G
-B or de r_
BA
N
D X
C -L
AY
O
U T-
SH
EE
TS
X
C -B
AN
D
P R
O
FI
LE
S
X C
-B
AN
D _2
D -E
G -M as te r X
C -L
AY
O
U T-
SH
EE
TS
C
AN
N
YO
N A
R
EA
X C
-U
TI
LI
TY
S
IT
E X
C -R
O
AD
W
AY
X C
-B
AN
D _P av em en t a nd L
O D
H at ch
Digitally signed by Micah E. Johnson
15:26:51-06'00'
-0+40 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00
S=-5.42%
S=-0.01%
S=-6.73% S=-12.38%
S=-33.08%
S=-17.73%
S=-8.59%
S=-7.38%
S=-1.49%
M
AT
C H
LI
N
E 0+
(S
EE
S
H
EE
T
C
0)
24" DIAMETER 0.312" (MIN) THICK STEEL CASING
10" WL, 4" FC 10" WL, 4" FC, 4" NG
HWY 4 ROW
ST
A:
+7
APPROX. LOCATION
EXIST GAS METER
NEW 4" NG METER
(SEE DETAIL 1, DWG
02C501)
EN
D
O F
ST
EE
L C
AS
IN
G
ST
A:
+4
M
AT
C
H
LI
N E
ST
A
9+
(S
EE
S H
EE
T
C
7)
JU
N
C
TI
O N
'A
SL
P' A
N D
'M
ES
A'
EXIST GROUND
ST
A:
+0
WORKSHAFT/PIT.
CONTRACTOR TO
DETERMINE ACTUAL
SHAPE AND DIMENSION
WORKSHAFT/PIT.
CONTRACTOR TO DETERMINE
ACTUAL SHAPE AND
DIMENSION
ST
AR
T O
F
ST
EE
L
C
AS
IN
G
EDGE OF
PAVEMENT
EDGE OF
PAVEMENT
HIGHWAY 4
CENTERLINE
EX
IS
T G
AS
2"
G
TO
P U
N
KN
O W
N
(2 )E
XI
ST
W
AT
ER
6"
W
TO
P U
N
KN
O W
N
(2 ) E
XI
ST
W
AT
ER
LI
N E
6" W
TO
P
U N
KN
O
W N
EX
IS
T G
AS
2"
G
TO
P U
N
KN
O W
N
EX
IS
T G
AS
2"
G
TO
P U
N
KN
O W
N
EX
IS
T W
AT
ER
LI
N
E 6"
W
TO
P U
N
KN
O W
N
EX
IS
T C
O M
M D
IA
U
N
KN
O W
N
TO
P U
N
KN
O W
N
EX
IS
T W
AT
ER
LI
N
E 6"
D
IA
TO
P
U N
KN
O
W N
EX
IS
T G
AS
2"
G
TO
P U
N
KN
O W
N
ST
A
4+
ST
A
6+
120' TRENCHLESS
CROSSING
EXIST GROUND
(APPROX)
ST
A:
+0
3'
.2 5°
V
ER
T
BE
N D
C L
EL
: 6
4.
6'
ST
A:
+2
9'
.2 5°
V
ER
T
BE
N D
C L
EL
: 6
6.
1'
PV
I S
TA
: 4
+1
C L
EL
: 6
6'
PV
I S
TA
0+
C L
EL
: 6
4.
1'
PV
I S
TA
: 7
+1
C L
EL
: 6
6.
1'
PV
I S
TA
: 0
+6
C L
EL
: 6
0.
0'
PV
I S
TA
: 2
+1
C L
EL
: 6
0.
2'
PV
I S
TA
: 3
+2
C L
EL
: 6
1.
2'
PV
I S
TA
: 8
+0
C L
EL
: 6
8.
9'
PV
I S
TA
: 9
+4
C L
EL
: 6
6.
9'
RESTRAINED JOINTS
TRENCH PLUG, SEE
DETAIL 6, DWG 02C300.
UWB
UWB
UWB
UWB
UWB
UWB
UWB
UWB
UWB
UWB
UWB
UWB
UWB
UFO
B
UFO
B
UFO
B
UFO
B
UF
OB
UFO
B
UFO
B
U
FO
B
UF
O
B
UFO
B
UCB
UCB
UCB
UCB
UCB
UCB
UCB
UCB
UCB
UC
B
UC
B
UGB
UGB
UGB
UGB
UGB
UGB
UGB
UGB
UGB
UGB
UGB
UGB
UGB
UGB
UGB
UGB
UGB
UGB
UGB
UGB
UGB
UGB
UGB
UGB
W
W
W
G G
G
W
FO FO
W
W
G
G G G
W
BH
X
X
OE
UW
B
UW
B
OE
OE
OE
OE
OE
OE
OE
OE
TH
TH T
H
TH
TH T
H TH
W
BH
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
UW
D
UW
D
UW
D
UW
D
LO
D
LOD
LOD
LO
D
LO
D
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
4'' W
4'' W
4'' G
4'' G
4'' G
4'' G
4'' G
4'' G
4'' G
4'' G
4'' G 4'' G
4'' G
4'' G
'' W
'' W
10'' W
10'' W
10'' W
10'' W
10'' W
10'' W
8'' W
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
10'' W
X
X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
W
COGO POINT TABLE
COGO POINT
DESCRIPTION
10" 45° BEND
10" 45° BEND
10" 45° BEND
10" 90° BEND
10" 22.5° BEND
10"x10"x4" TEE, 10"x8" REDUCER, 10" GV, 8" GV, 4" GV
10" GV
10" GV
10" 11.25° BEND
NORTHING
1745938.39
1745799.01
1745806.66
1745752.93
1745331.36
1745320.79
1745709.35
1745551.81
1745970.96
EASTING
1631798.84
1632001.82
1632041.63
1632120.93
1631835.94
1631834.48
1632090.71
1631980.37
1631792.79
KEYPLAN
SHEET KEYNOTES
INSTALL UTILITIES IN 24" STEEL CASING VIA TRENCHLESS
METHOD PER SPECIFICATION 31 40 00 AND 31 42 00,
AND DETAIL 1, SHEET 02C300
NEW GAS METER INSTALLATION WITHIN ENCLOSURE BY LANL.
COORDINATE WITH LANL TO CONNECT GAS LINE. INSTALL 4"
GAS LINE AS SHOWN.
SURFACE SETTLEMENT MONITORING (SM) POINT ARRAY
SHALL BE CENTERED ON THE PIPE ALIGNMENT WITH ONE
POINT DIRECTLY OVER THE CENTER LINE AND ONE POINT
SPACED AT 5 FEET ON EACH SIDE OF THE CENTER LINE AS
SPECIFIED IN SECTION 31 44 00.
INSTALL 4" GAS BALL VALVE PER DETAIL 2, SHEET 02C501.
3/
/2
1:
P
M
X G
-B or de r_
BA
N
D X
C -L
AY
O
U T-
SH
EE
TS
X
C -B
AN
D
P R
O
FI
LE
S
X C
-B
AN
D _2
D -E
G -M as te r X
C -U
TI
LI
TY
S
IT
E
X E-
El ec tri ca l P ro po se d an d Ex is tin g M as te r X
C -R
O
AD
W
AY
X C
-B
AN
D _P av em en t a nd L
O D
H at ch
C
5_ D
8_
H W
Y4 W
L
PN
P.
D
W G
FI
G
U
ER
O
AJ
R
BL 'MESA'
HW
Y 4
EXIST GUARDRAIL
GRAVEL
JUNCTION 'MESA' AND 'ASLP
BL 'MESA' STA 9+40
BL 'ASLP' STA 5+92
BL 'ALSP'
SEE 02C100 FOR BLUE
WATER TANK SITE PLAN
NEW GAS METER IN
EXISTING GAS ENCLOSURE
AND GAS LINE TRENCHLESS
CROSSING
EXST POWER POLE, TYP
ABERT'S SQUIRREL
LOOP
WORKSHAFT/PIT FOOTPRINT. CONTRACTOR
TO DETERMINE ACTUAL SHAPE AND
DIMENSION
WORKSHAFT/PIT FOOTPRINT. CONTRACTOR TO
DETERMINE ACTUAL SHAPE AND DIMENSION
BH SW-17
SETTLEMENT MONITORING POINT ARRAY, TYPICAL OF 2.
GAS VALVE
LO
S A
LA
MOS N
ATIO
NAL L
ABORATO
RY
BANDELIE
R N
ATIO
NAL M
ONUMENT
SEE INSET A
CLIN 0001 - MAIN PARK WATER SYSTEM: BLUE TANK
CONNECTION TO STA 9+40. FOR DETAILS SEE
SPECIFICATION 01 27 00.
CLIN OPTION N - NATURAL GAS SYSTEM: CONNECTS TO
EXISTING GAS ENCLOSURE AND CONTINUES TO STA
9+40. FOR DETAILS SEE SPECIFICATION 01 27 00.
10"X10"X4" TEE
10X8 REDUCER
10" GV
8" GV
4" GV
10" WL
8" WL
4" W
L
INSET A
BL 'MESA'
26748
R E
E
NIGNE LANOIS
SE
F O
R P
OC
IXEM WE
N
NI
TR
AM .W TREBOR
Digitally signed by Micah E. Johnson Date: 2025.04.10
16:14:32-06'00'
Digitally signed by Robert W. Martin
Date: 2025.04.10 17:06:05-05'00'
UFOB UFOB UFOB UFOB UFOB UFOB UFOB UFOB UFOB UFOB UFOB
UFOB UFOB
UFOB
UFOB
UFOB
UFOB
UFOB
UFOB
UFOB
U
EB
U
EB
U
EB
U
EB
U
EB
U
EB
U
EB
U
EB
U
EB
U
EB
U
EB
UCB UCB UCB UCB UCB UCB UCB UCB UCB UCB UCB UCB
UCB
UCB
UCB
UCB
UCB
UCB
UCB U
C
B UCB
UCB
UGB UGB UGB UGB UGB UGB UGB UGB UGB UGB UGB UGB UGB
UGB
UGB
UGB
UGB
UGB
UGB
UGB
UGB
UGB
T
G
T
FO
FO
W
G
W
W W
W
W
G
E
E
E
2'
H W
Y
R O
W
OE OE OE
7'-0" (MIN) SEPARATION
X X
X X
X X
X X
X X
LOD
LO
D
LOD
LOD LOD LOD LOD LOD LOD
LO
D
LO
D
LO
D
LO
D
LODLODLODLODLODLOD
LOD
-1+00 0+00 1+00 2+00 3+00 3+40
HWY 4 ROW
EC
PC STA 1+96.91
EL 6664.7
EC
EXIST GROUND
UL 651A 5" SCHEDULE
80 CONDUIT IN
ACCORDANCE WITH
SECTION 26 05 33
SEE SHEET 02E102.
DRILL PATH
M
IN
INSTALL USING HORIZONTAL DIRECTIONAL
DRILLING (HDD)
HDD EXIT POINT
#1 AND # 2
STA: 0+30
ELEV: 6671.7
HDD ENTRY POINT
#1 AND # 2
STA: 2+20
ELEV: 6669.6
PC STA 0+63.13
EL 6664.7
PT STA 0+83.93
EL 6662.5
PT STA 1+76.11
EL 6662.5
EC
ST
A
0+
.4
ST
A
1+
.4
° 12°
R=100' (MIN) R=100' (MIN)
ELECTRICAL CONDUIT SEE
ELECTRICAL DRAWING
02E102 FOR CONTINUITY
CONNECT ELECTRICAL
CONDUIT FROM HDD TO
NEW ELECTRICAL
ELECTRICAL CONDUIT SEE
ELECTRICAL DRAWING
02E102 FOR CONTINUITY
CONNECT ELECTRICAL
CONDUIT FROM HDD TO
NEW ELECTRICAL
HWY 4
EN
TR
AN
C
E R O
AD
BL 'HWY4'
EXIST H-FRAME ELECTRICAL STRUCTURE
(SEE ELECTRICAL DRAWINGS 02E102)
EXIST RISER POLE
BL 'HWY 4' STA 0+00
SEE ELECTRICAL SHEET 02E102
FOR CONTINUATION, TIE IN
LOCATION AND REQUIREMENTS
INSTALL USING HORIZONTAL
DIRECTIONAL DRILLING (HDD)
UL 651A 5" SCHEDULE 80
CONDUITS IN ACCORDANCE
WITH SECTION 26 05 33. SHEET KEYNOTES
CONTRACTOR TO DETERMINE THE ACTUAL DRILL PATH IN
ACCORDANCE WITH SPECIFICATION 33 05 23.13 AND
REQUIREMENTS SHOWN ON THE DRAWINGS. SEE
ELECTRICAL DRAWING SHEET 02E102 FOR TIE IN
LOCATION AND REQUIREMENTS.
EXCAVATE TO CONNECT ELECTRICAL CONDUIT FROM
HDD WITH 3 FT COVER TO ELECTRICAL (SEE ELECTRICAL
DRAWINGS). INSTALL FITTINGS AS NECESSARY. SEE
ELECTRICAL DRAWINGS FOR DETAILS AND HORIZONTAL
ALIGNMENT.
KEYPLAN
LOS ALAMOS NATIONAL LABORATORY
BANDELIER NATIONAL MONUMENT
3/
/2
:5
AM
X G
-B or de r_
BA
N
D X
C -L
AY
O
U T-
SH
EE
TS
X
C -B
AN
D
P R
O
FI
LE
S
X C
-B
AN
D _2
D -E
G -M as te r X
E- El ec tri ca l P ro po se d an d
Ex is tin g
M as te r
X C
-R O
AD
W
AY
X
C -B
AN
D
_P av em en t a nd
L O
D H at ch
X C
-U
TI
LI
TY
S
IT
E
C
6_ D
8_
H W
Y4 P
N P.
D W
G
FI
G U
ER
O
AJ
R
CLIN 0003 - PRIMARY ELECTRICAL DISTRIBUTION: CONNECT
TO LANL POWER AND CONTINUE TO STA 2+20 FOR DETAILS
SEE SPECIFICATION 01 27 00.
26748
R E
E
NIGNE LANOIS
SE
F O
R P
OC
IXEM WE
N
NI
TR
AM .W TREBOR
Digitally signed by Micah E. Johnson Date: 2025.04.10
16:17:05-06'00'
Digitally signed by Robert W. Martin Date: 2025.04.10
17:10:13-05'00'
0+00 1+00 2+00 3+00 4+00 5+00 6+00 6+20
M
AT
C H
LI
N
E
ST
A 6+
SH
EE
T
C
7A
8" WL, 4" NG & FC
JU
N
C
TI
O N
'A
SL
P'
AN
D 'A
SL
P'
ST
A:
+0
ST
A:
+9
YA
R
D H
YD
R
AN
T
LA
TE
R
AL
ST
A:
+9
EXIST GROUND AT
ROAD CENTERLINE
JU
N
C
TI
O N
'A
SL
P' A
N D
'M
ES
A'
PV
I S
TA
: 0
+5
C L
EL
: 6
2.
9'
PV
I S
TA
: 6
+1
C L
EL
: 6
7.
8'
PV
I S
TA
: 2
+7
C L
EL
: 6
3.
8'
PV
I S
TA
: 1
+6
C L
EL
: 6
1.
6'
PV
I S
TA
: 5
+2
C L
EL
: 6
2.
3'
S=5.69%
S=1.96%S=-1.15%
S=3.41%
NEW WATERLINE
PROFILE
EX
IS
T
EL
EC
TR
IC
D
IA
U
N
KN
O W
N
TO
P
EL
U N
KN
O
W N
EX
IS
T W
AT
ER
LI
N
E 6"
W
TO
P
EL
U N
KN
O
W N
EX
IS
T G
AS
2"
G
TO
P
EL
U N
KN
O
W N
EX
IS
T G
AS
2"
G
TO
P
EL
U N
KN
O
W N
EX
IS
T W
AT
ER
LI
N
E 6"
W
TO
P
EL
U N
KN
O
W N
EX
IS
T G
AS
2"
G
TO
P
EL
U N
KN
O
W N
EX
IS
T W
AT
ER
LI
N
E 6"
W
TO
P
EL
U N
KN
O
W N
6" P
VC
S
AN
IT
AR
Y
SE
W
ER
IN
V
EL
1.
AP
PR
O
X)
EX
IS
T G
AS
2"
G
TO
P
EL
U N
KN
O
W N
EX
IS
T W
AT
ER
LI
N
E 6"
W
TO
P
EL
U N
KN
O
W N
JU
N
C
TI
O N
'A
SL
P'
AN
D 'C
G R
D
ST
A:
+2
4" WL
LOD
LOD
LOD
LOD
LODLOD
LODLOD
LO
D
LOD
LO
D
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD LOD
LO
D
LOD
LOD
LODLOD
LO
D
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LO
D
LOD
LO
D
LO
D
LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
L…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .