B08_Attachment_3_01_33_23I_Sup01_ADD1_SubmittalList-ReviewEstimate_Template_1-27-21_v508.xlsx
XLSX spreadsheet 106 KB Posted
- Attached to
- Update Utilities
- Solicitation number
- 140P2026R0063
About this file
This is a Submittal List and Review Estimate Template for the Underground Utilities Rehabilitation project (BAND-266697) at Bandelier National Monument in New Mexico, prepared by the National Park Service Denver Service Center. The document serves as a comprehensive checklist for construction service task order negotiations, outlining all required submittals from contractors and the associated architect/engineer review time estimates for each submittal category.
The template organizes submittals across 50 specification sections spanning site clearing and excavation through fiber optic communications systems. Key submittal categories include shop drawings, product data sheets, manufacturer certifications and compliance certificates, test reports and inspection records, calculations, operation and maintenance manuals, and quality control documentation. Notable project components requiring detailed submittals include underground utilities such as water distribution systems, sanitary sewer facilities, natural gas piping, electrical systems, plumbing infrastructure, HVAC equipment, and trenchless crossing methods (horizontal directional drilling, steel casing installation). The template includes dedicated submittal requirements for specialized work including concrete repairs, asbestos remediation, seismic anchorage and bracing, geotextile installation, utility trenching and backfilling, pavement markings, chain-link fencing, and process piping with instrumentation and controls. The document provides a framework for tracking review time allocations across multiple disciplines including civil engineers, structural engineers, mechanical engineers, electrical engineers, landscape architects, and project managers, though specific hour estimates are not populated in this template version.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BAND-266697
| Submittal List |
| National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21 |
| SUBMITTAL LIST | ACTION SUBMITTAL | |||||||||||||||||||||
| REVIEW ESTIMATE | ||||||||||||||||||||||
| Park Acronym/Project Management Information System (PMIS) Number: | BAND-266697 | (Complete this portion for Architect / Engineer (A/E) | ||||||||||||||||||||
| Project Title: | UNDERGROUND UTILITIES REHABILITATION | construction service task order negotiation) | ||||||||||||||||||||
| SUBMITTAL | REQUIREMENTS | ARCHITECT / ENGINEER REVIEW TIME | ||||||||||||||||||||
| (Indicate with X) | (Indicate in whole or partial hours) | |||||||||||||||||||||
| INFORMATIONAL | ACTION | |||||||||||||||||||||
| SPECIFICATION SECTION | PARAGRAPH NUMBER | DESCRIPTION | CERTIFICATIONS OR LABORATORY TESTS | REPORTS OR CALCULATIONS | ||||||||||||||||||
| OR PLAN | MANUFACTURER DATA | |||||||||||||||||||||
| AND INSTRUCTIONS | OTHER | SAMPLES | SHOP DRAWINGS | MANUFACTURER DATA | ||||||||||||||||||
| AND INSTRUCTIONS | OTHER | ARCHITECT | CIVIL ENGINEER | |||||||||||||||||||
| (SITE CIVIL, NATURAL GAS, ROADWAY) | STRUCTURAL ENGINEER | BUILDING MECHANICAL ENGINEER | PROCESS MECHANICAL ENGINEER | ELECTRICAL ENGINEER | I&C ENGINEER | CCA SUBMITTAL PROCESSING | PROJECT MANAGER INTERDISCIPLINARY COORDINATION / QUALITY REVIEW | LANDSCAPE ARCHITECT | ||||||||||||||
| 01 31 00 | 1.4 | Project Management and Coordination | ||||||||||||||||||||
| Coordination Drawing Organization | X | X | ||||||||||||||||||||
| Division 01 Documents | X | X | X | |||||||||||||||||||
| 01 32 16 | 1.3 | Construction Schedule | X | |||||||||||||||||||
| 01 32 33 | 1.2 | Photo Documentation | ||||||||||||||||||||
| Construction Images | X | |||||||||||||||||||||
| 01 35 23 | 1.3 | Safety Requirements | ||||||||||||||||||||
| Accident Prevention Plan | X | |||||||||||||||||||||
| 01 35 91 | 1.3 | Historic Preservation Treatment Procedures | ||||||||||||||||||||
| Historic Preservation Treatment Plan | X | |||||||||||||||||||||
| Alternate Methods and Materials | X | X | ||||||||||||||||||||
| Photographs or Videotape | X | |||||||||||||||||||||
| 01 40 00 | 1.4 | Quality Requirements | ||||||||||||||||||||
| Quality Control Plan | X | |||||||||||||||||||||
| Qualification Data | X | |||||||||||||||||||||
| Contractor Quality Control Daily Reports | X | |||||||||||||||||||||
| Test Reports | X | X | ||||||||||||||||||||
| Accessibility Inspection Report | X | |||||||||||||||||||||
| Offsite Inspection Report | X | |||||||||||||||||||||
| Permits, Licensing and Certificates | X | X | ||||||||||||||||||||
| 01 45 33 | 1.04 | Special Inspection, Observation and Testing | ||||||||||||||||||||
| Special Inspector Qualifications | X | |||||||||||||||||||||
| AISC Certified Steel Fabricator Qualifications | X | |||||||||||||||||||||
| Contractor Statement of Responsibility | X | |||||||||||||||||||||
| 01 57 23 | 1.3 | Temporary Storm Water Pollution Prevention | ||||||||||||||||||||
| Storm Water Pollution Prevention Plan | X | |||||||||||||||||||||
| Inspection Schedule | X | |||||||||||||||||||||
| Erosion Control Products | X | |||||||||||||||||||||
| 01 57 28 | 1.05 | Temporary Flow Control | ||||||||||||||||||||
| Temporary Flow Control Plan | X | |||||||||||||||||||||
| Emergency Cleanup Plan | X | |||||||||||||||||||||
| Special Permits | X | |||||||||||||||||||||
| Names and Qualifications for Personnel | X | |||||||||||||||||||||
| Information on Equipment and Materials | X | |||||||||||||||||||||
| 01 67 00 | 1.3 | Product Requirements | ||||||||||||||||||||
| Material Safety Data Sheets | X | |||||||||||||||||||||
| Affirmative Procurement Reporting Form | X | |||||||||||||||||||||
| Manufacturer's Certificate of Proper Installation | X | |||||||||||||||||||||
| Manufacturer's Certificate of Compliance | X | |||||||||||||||||||||
| 01 73 29 | 1.2 | Cutting and Patching | ||||||||||||||||||||
| Cutting and Patching Plan | X | |||||||||||||||||||||
| 01 73 40 | 1.2 | Execution | ||||||||||||||||||||
| Certificates | X | |||||||||||||||||||||
| Landfill Receipts | X | |||||||||||||||||||||
| Certified As-built Surveys | X | |||||||||||||||||||||
| 01 74 19 | 1.4 | Construction Waste Management and Disposal | ||||||||||||||||||||
| Waste Management Plan | X | |||||||||||||||||||||
| Progress Documentation | X | |||||||||||||||||||||
| Waste Reduction Calculations | X | |||||||||||||||||||||
| Records of Donations | X | |||||||||||||||||||||
| Records of Sales | X | |||||||||||||||||||||
| Recycling and Processing Facility Records | X | |||||||||||||||||||||
| Landfill and Incinerator Disposal Records | X | |||||||||||||||||||||
| Qualification Data | X | |||||||||||||||||||||
| Statement of Refrigerant Recovery | X | |||||||||||||||||||||
| Progress Payment Requirement | X | |||||||||||||||||||||
| Closeout Submittals | X | |||||||||||||||||||||
| 01 77 00 | 1.3 | Closeout Procedures | ||||||||||||||||||||
| Specific Warranties, Guarantees, Workmanship Bonds, Final Certificates, and similar. | X | X | ||||||||||||||||||||
| Project Record Documents, Record Drawings, O&M Manuals, Final Completion Construction Digital Images, and similar | X | X | X | |||||||||||||||||||
| Environmental Record Documents | X | X | ||||||||||||||||||||
| Posted Operating Instructions | X | X | ||||||||||||||||||||
| Keys and Keying Schedule | X | |||||||||||||||||||||
| Approved Pre-Functional Checklist and Performance Testing Reports | X | X | ||||||||||||||||||||
| Test and Balance Report | X | X | ||||||||||||||||||||
| 01 78 23 | 1.2 | Operation and Maintenance Data | ||||||||||||||||||||
| Operation and Maintenance Manual | X | |||||||||||||||||||||
| Equipment Data Sheet | X | |||||||||||||||||||||
| 01 79 00 | 1.3 | Demonstration and Training | ||||||||||||||||||||
| Instruction Program | X | |||||||||||||||||||||
| Demonstration and Training Video | X | |||||||||||||||||||||
| 01 81 13 | 1.3 | Sustainable Design Requirements for Non-LEED™ | ||||||||||||||||||||
| Recycled Content | X | |||||||||||||||||||||
| Certified Wood | X | |||||||||||||||||||||
| Low Emitting Materials - Adhesives and Sealants | X | |||||||||||||||||||||
| Low Emitting Materials - Paints and Coatings | X | |||||||||||||||||||||
| Low Emitting Materials - Flooring | X | |||||||||||||||||||||
| Biopreferred Products | X | |||||||||||||||||||||
| 01 88 15 | 1.05 | Anchorage and Bracing | ||||||||||||||||||||
| Shop Drawings | X | X | ||||||||||||||||||||
| Anchorage and Bracing Calculations | X | |||||||||||||||||||||
| Manufacturer's Hardware Installation Requirements | X | |||||||||||||||||||||
| 01 91 14 | 1.6 | Total System Commissioning | ||||||||||||||||||||
| Two-Week Look Ahead Schedules | X | |||||||||||||||||||||
| Certificate of Readiness | X | |||||||||||||||||||||
| Contractor's Commissioning Representative Qualifications | X | |||||||||||||||||||||
| Commissioning Plan | X | |||||||||||||||||||||
| Pre-functional Checklists | X | |||||||||||||||||||||
| Owner's Project Requirements | X | |||||||||||||||||||||
| Functional Performance Test Forms | X | |||||||||||||||||||||
| List of Test Instrumentation, Equipment and Monitoring Devices | X | X | X | |||||||||||||||||||
| Deficiency Report and Resolution Record | X | |||||||||||||||||||||
| Closeout Documentation | X | X | X | X | ||||||||||||||||||
| 02 41 00 | 1.03 | Demolition | ||||||||||||||||||||
| Demolition Plan | X | |||||||||||||||||||||
| Notifications, Authorizations and Permits | X | |||||||||||||||||||||
| Reports and Other Documentations | X | X | ||||||||||||||||||||
| 02 61 00 | 1.04 | Removal and Disposal of Contaminated Soil | ||||||||||||||||||||
| Permits, Certification and Acceptance Requirements | X | X | ||||||||||||||||||||
| Qualifications | X | |||||||||||||||||||||
| Soil and Debris Analytical and Physical Characterization Testing Plan | X | |||||||||||||||||||||
| Inspection Reports | X | |||||||||||||||||||||
| Excavation and Water Control Plan | X | |||||||||||||||||||||
| Site-specific Health and Safety Plan | X | |||||||||||||||||||||
| Emergency Response Plan | X | |||||||||||||||||||||
| Daily Job Progress Log | X | |||||||||||||||||||||
| Weekly Excavation Plans | X | |||||||||||||||||||||
| Copies of Manifests, Bills of Lading and Receipts | X | |||||||||||||||||||||
| 02 82 00 | 1.04 | Asbestos Remediation | ||||||||||||||||||||
| Product Data Sheets | X | X | ||||||||||||||||||||
| Test Reports | X | X | ||||||||||||||||||||
| Certificates | X | X | ||||||||||||||||||||
| 03 01 32 | 1.03 | Repair of Vertical and Overhead Concrete Surfaces | ||||||||||||||||||||
| Product Data Sheets | X | |||||||||||||||||||||
| Drawings | X | X | ||||||||||||||||||||
| Repair Mortar Systems | X | |||||||||||||||||||||
| Description of Equipment | X | |||||||||||||||||||||
| Certificates | X | |||||||||||||||||||||
| Statement of Qualification | X | X | ||||||||||||||||||||
| Field and Laboratory Test Reports | X | X | ||||||||||||||||||||
| 03 01 33 | 1.03 | Repair of Horizontal Concrete Surfaces | ||||||||||||||||||||
| Product Data Sheets | X | |||||||||||||||||||||
| Drawings | X | X | ||||||||||||||||||||
| Repair Mortar Systems | X | |||||||||||||||||||||
| Description of Equipment | X | |||||||||||||||||||||
| Certificates | X | |||||||||||||||||||||
| Statement of Qualification | X | X | ||||||||||||||||||||
| Field and Laboratory Test Results | X | X | ||||||||||||||||||||
| 03 10 00 | 1.04 | Concrete Forming and Accessories | ||||||||||||||||||||
| Shop Drawings | X | |||||||||||||||||||||
| Product Data | X | |||||||||||||||||||||
| Statement of Qualification | X | |||||||||||||||||||||
| 03 15 00 | 1.02 | Concrete Joints and Accessories | ||||||||||||||||||||
| Shop Drawings | X | |||||||||||||||||||||
| Product Data | X | |||||||||||||||||||||
| Samples | X | |||||||||||||||||||||
| Certification | X | X | ||||||||||||||||||||
| Manufacturer's Written Instruction | X | |||||||||||||||||||||
| 03 21 00 | 1.03 | Steel Reinforcement | ||||||||||||||||||||
| Shop Drawings | X | X | ||||||||||||||||||||
| Welded, Metallic Sleeve Splice, and Mechanical Threaded Connection | X | |||||||||||||||||||||
| Lab Test Reports | X | |||||||||||||||||||||
| Mechanical Threaded Connections | X | |||||||||||||||||||||
| Test Results of Field Testing | X | |||||||||||||||||||||
| Product Data for Recycled Materials | X | |||||||||||||||||||||
| 03 30 00 | 1.03 | Cast-in-Place Concrete | ||||||||||||||||||||
| Mix Designs | X | |||||||||||||||||||||
| Manufacturer’s Certificate of Compliance | X | |||||||||||||||||||||
| Test Reports | X | X | ||||||||||||||||||||
| Aggregates | X | X | ||||||||||||||||||||
| Product Data | X | |||||||||||||||||||||
| Detailed Plan for Cold Weather Placement | X | |||||||||||||||||||||
| Detailed Plan for Hot Weather Placement | X | |||||||||||||||||||||
| Preinstallation Conference Minutes | X | |||||||||||||||||||||
| Manufacturer's Application Instructions | X | |||||||||||||||||||||
| Statement of Qualification | X | |||||||||||||||||||||
| Field Test Reports | X | |||||||||||||||||||||
| Thermal Control Plan | X | |||||||||||||||||||||
| Recorded Temperature Data from Concrete Placement | X | |||||||||||||||||||||
| Liquid Tightness Test Results | X | |||||||||||||||||||||
| Concrete Delivery Tickets | X | |||||||||||||||||||||
| 03 39 00 | 1.02 | Concrete Curing | ||||||||||||||||||||
| Manufacturer's Data | X | |||||||||||||||||||||
| Curing Methods | X | |||||||||||||||||||||
| Manufacturer's Certificate of Compliance | X | |||||||||||||||||||||
| Product Data for Low Emitting Materials - Paint and Coatings | X | |||||||||||||||||||||
| Manufacturer’s Literature Documenting VOC content | X | |||||||||||||||||||||
| 03 40 00 | 1.02 | Precast Concrete Structures | ||||||||||||||||||||
| Experience Record on Production of Precast Structures | X | |||||||||||||||||||||
| Drawings | X | |||||||||||||||||||||
| Manufacturer's Catalog Data | X | |||||||||||||||||||||
| Manufacturer's Design Structural Calculations and Certification | X | X | ||||||||||||||||||||
| Manufacturer's Catalog Data | X | |||||||||||||||||||||
| 03 62 00 | 1.02 | Grouting | ||||||||||||||||||||
| Product Data | X | |||||||||||||||||||||
| Proposed Method for Keeping Concrete Wet Prior to Grouting | X | |||||||||||||||||||||
| Forming Method for Fluid Grout Placements | X | |||||||||||||||||||||
| Curing Method for Grout | X | |||||||||||||||||||||
| Manufacturer's Written Instruction | X | |||||||||||||||||||||
| Manufacturer's Proposed Training Schedule | X | |||||||||||||||||||||
| Manufacturer’s Certificate of Compliance | X | |||||||||||||||||||||
| Statements of Qualification | X | |||||||||||||||||||||
| Test Reports | X | |||||||||||||||||||||
| List of Contractor’s Equipment Installation Staff | X | |||||||||||||||||||||
| 03 63 00 | 1.03 | Concrete Doweling | ||||||||||||||||||||
| Product Data | X | |||||||||||||||||||||
| Manufacturer’s Instructions | X | |||||||||||||||||||||
| Manufacturer’s Written Letter of Certification | X | |||||||||||||||||||||
| ICC Evaluation Services Report | X | |||||||||||||||||||||
| 03 64 23 | 1.03 | Epoxy Resin Injection Grouting | ||||||||||||||||||||
| Physical and Chemical Properties | X | |||||||||||||||||||||
| Technical Data for Metering, Mixing, and Injection Equipment | X | |||||||||||||||||||||
| Marked-up Drawings | X | |||||||||||||||||||||
| Health and Safety Plan | X | |||||||||||||||||||||
| Sample Bottle | X | |||||||||||||||||||||
| Pot Life Test | X | |||||||||||||||||||||
| Plant Shear Test (Bond Strength) | X | |||||||||||||||||||||
| Manufacturer’s Recommended Surface Preparation Procedures | X | |||||||||||||||||||||
| Certificate for NSF 61 Conformance | X | |||||||||||||||||||||
| Statements of Qualification for Epoxy Resin | X | |||||||||||||||||||||
| Sample of Epoxy Resin | X | |||||||||||||||||||||
| Installation Instructions | X | |||||||||||||||||||||
| Test Results of Epoxy Resin Bond Tests | X | |||||||||||||||||||||
| Epoxy Resin Two Component Ratio and Injection Pressure Test Records | X | X | ||||||||||||||||||||
| 03 64 24 | 1.03 | Polyurethane Injection Grouting | ||||||||||||||||||||
| Physical and Chemical Properties for Polyurethane Injection Resin | X | |||||||||||||||||||||
| Technical Data for Metering, Mixing, and Injection Equipment | X | |||||||||||||||||||||
| Marked-up Drawings | X | |||||||||||||||||||||
| Sample Bottle | X | |||||||||||||||||||||
| Manufacturer’s Recommended Surface Preparation Procedures | X | |||||||||||||||||||||
| Certificate for NSF 61 Conformance | X | |||||||||||||||||||||
| Statements of Qualification for Polyurethane Resin Injection | X | |||||||||||||||||||||
| Sample of Polyurethane Resin | X | |||||||||||||||||||||
| Installation Instructions | X | |||||||||||||||||||||
| Polyurethane Resins Injection Pressure Test Records | X | |||||||||||||||||||||
| 05 05 19 | 1.03 | Post-Installed Anchors | ||||||||||||||||||||
| Shop Drawings | X | X | ||||||||||||||||||||
| Manufacturer’s Product Description and Installation Instructions | X | |||||||||||||||||||||
| Current ICC-ES or IAPMO-UES Report | X | |||||||||||||||||||||
| Adhesive Anchor Installer Certification | X | |||||||||||||||||||||
| 05 50 00 | 1.03 | Metal Fabrications | ||||||||||||||||||||
| Shop Drawings | X | X | ||||||||||||||||||||
| Samples | X | |||||||||||||||||||||
| Passivation Method for Stainless Steel Members | X | |||||||||||||||||||||
| 08 16 13 | 1.02 | Fiberglass Doors | ||||||||||||||||||||
| Shop Drawings | X | X | ||||||||||||||||||||
| Samples | X | |||||||||||||||||||||
| Manufacturer’s Installation Instructions | X | |||||||||||||||||||||
| Manufacturer’s Instructions | X | |||||||||||||||||||||
| Executed Guarantee | X | |||||||||||||||||||||
| 08 71 00 | 1.02 | Door Hardware | ||||||||||||||||||||
| Shop Drawings | X | |||||||||||||||||||||
| Product Data | X | |||||||||||||||||||||
| Finish Hardware Schedule | X | |||||||||||||||||||||
| Special Tools | X | |||||||||||||||||||||
| Operation and Maintenance Data | X | |||||||||||||||||||||
| Manufacturer’s Field Service Report | X | |||||||||||||||||||||
| Certification of Hardware Consultant | X | |||||||||||||||||||||
| 09 90 00 | 1.03 | Painting and Coating | ||||||||||||||||||||
| Shop Drawing | X | |||||||||||||||||||||
| Data Sheets | X | |||||||||||||||||||||
| Detailed Chemical and Gradation Analysis | X | |||||||||||||||||||||
| Samples | X | |||||||||||||||||||||
| Factory Applied Coating | X | |||||||||||||||||||||
| Manufacturer’s Written Verification that Submitted Material is Suitable | X | |||||||||||||||||||||
| Coating for Faying Surfaces | X | |||||||||||||||||||||
| Manufacturer’s Written Instructions | X | |||||||||||||||||||||
| 10 14 00 | 1.02 | Signage | ||||||||||||||||||||
| Shop Drawings | X | X | ||||||||||||||||||||
| Manufacturer's Installation Instructions | X | |||||||||||||||||||||
| 10 44 00 | 1.03 | Fire Protection Specialties and Safety Equipment | ||||||||||||||||||||
| Shop Drawings | X | X | ||||||||||||||||||||
| Manufacturer’s Installation Instructions | X | |||||||||||||||||||||
| Operation and Maintenance Data | X | |||||||||||||||||||||
| 13 34 20 | 1.05 | Precast Concrete Building | ||||||||||||||||||||
| Shop Drawings | X | X | ||||||||||||||||||||
| Building Engineering Calculations | X | |||||||||||||||||||||
| Manufacturer's Installation Instructions, and Certifications | X | X | X | |||||||||||||||||||
| 22 07 00 | 1.02 | Plumbing Piping Insulation | ||||||||||||||||||||
| Product Description | X | |||||||||||||||||||||
| Proof of Compliance for Test of Products for Fire Rating, Corrosiveness, | X | |||||||||||||||||||||
| Manufacturer’s Installation Instructions | X | |||||||||||||||||||||
| 22 10 01 | 1.03 | Plumbing Piping and Accessories | ||||||||||||||||||||
| Product Data Sheets | ||||||||||||||||||||||
| 2.03.A Hose Valves and Hydrants | X | |||||||||||||||||||||
| 2.05.D Gate Valves | X | |||||||||||||||||||||
| 2.05.E Ball Valves | X | |||||||||||||||||||||
| 2.05.F Thermoplastic Ball Valves 2 Inches and Smaller for Water Service | X | |||||||||||||||||||||
| 2.06.A Strainers for Water Service | X | |||||||||||||||||||||
| 2.06.B Sleeves | X | |||||||||||||||||||||
| 2.06.C Joint Solder | X | |||||||||||||||||||||
| 2.06.D Rubber Gaskets | X | |||||||||||||||||||||
| 2.07.A Pressure Gauge | X | |||||||||||||||||||||
| 2.08.A Fuel Piping Above Ground | X | |||||||||||||||||||||
| 2.08.B Fuel Piping Below Ground | X | |||||||||||||||||||||
| 2.08.C Flex Connector | X | |||||||||||||||||||||
| 2.08.D Anodeless Riser | X | |||||||||||||||||||||
| 2.08.E Above Grade Ball Valve | X | |||||||||||||||||||||
| 2.08.F Lockwing Ball Valve | X | |||||||||||||||||||||
| 2.08.G Below Grade Polyethylene Ball Valve | X | |||||||||||||||||||||
| 2.08.H Natural Gas Pressure Reducing Valve | X | |||||||||||||||||||||
| 2.08.I Natural Gas Pressure Gauge | X | |||||||||||||||||||||
| 2.08.J Natural Gas Meter | X | |||||||||||||||||||||
| Shop Drawings | X | |||||||||||||||||||||
| Changes in Location of Equipment or Piping | ||||||||||||||||||||||
| Building Mechanical | X | X | ||||||||||||||||||||
| Natural Gas | X | X | ||||||||||||||||||||
| Complete List of Products Proposed for Installation | X | |||||||||||||||||||||
| Test Records | ||||||||||||||||||||||
| 2.08.H Manufacturer's test of pressure reducing valve | X | |||||||||||||||||||||
| 2.08.J Manufacturer's test of meters | X | |||||||||||||||||||||
| 3.02.E.5 Installed system tracer wire continuity testing | X | |||||||||||||||||||||
| 3.02.E.7 Installed system pressure testing | X | |||||||||||||||||||||
| 3.10.A.5 Test Records | X | X | ||||||||||||||||||||
| 22 30 00 | 1.02 | Plumbing Equipment | ||||||||||||||||||||
| Manufacturer’s Product Data | ||||||||||||||||||||||
| 2.02 Backflow Preventer | X | X | ||||||||||||||||||||
| 2.04 Hydropneumatic Pressure Boosters | X | X | ||||||||||||||||||||
| 2.05 Water Fountains | X | X | ||||||||||||||||||||
| Seismic Anchorage and Bracing Drawings and Cut Sheets | X | X | ||||||||||||||||||||
| Seismic Anchorage and Bracing Calculations | X | |||||||||||||||||||||
| Component and Attachment Testing Seismic Certificate of Compliance | X | |||||||||||||||||||||
| 22 40 00 | 1.02 | Plumbing Fixtures | ||||||||||||||||||||
| Catalog Information and Rough-in Dimensions | X | |||||||||||||||||||||
| Product Data Sheets | ||||||||||||||||||||||
| 2.03.A.1 Cleanout (Exterior) | X | |||||||||||||||||||||
| 2.03.A.2 Floor Drain (Finished Areas) | X | |||||||||||||||||||||
| 23 05 48 | 1.03 | Vibration Isolation for HVAC Piping and Equipment | ||||||||||||||||||||
| Shop Drawings | X | |||||||||||||||||||||
| Product Data | X | |||||||||||||||||||||
| Schedule of Vibration Isolator Type | X | |||||||||||||||||||||
| Vibration Isolation Base Details | X | X | ||||||||||||||||||||
| Manufacturer’s Installation Instruction | X | |||||||||||||||||||||
| Manufacturer’s Certificate of Compliance | X | |||||||||||||||||||||
| Manufacturer’s Certificate of Proper Installation | X | |||||||||||||||||||||
| 23 81 00 | 1.03 | Unitary Air-Conditioning Equipment | ||||||||||||||||||||
| Shop Drawings | X | X | ||||||||||||||||||||
| Seismic Anchorage and Bracing Calculations | X | |||||||||||||||||||||
| Manufacturer’s Certificate of Compliance | X | |||||||||||||||||||||
| Detailed Information on Structural, Mechanical, Electrical, or other Modifications | X | |||||||||||||||||||||
| Sample Copy of Guarantee | X | |||||||||||||||||||||
| Test Reports | X | |||||||||||||||||||||
| Operation and Maintenance Data | X | |||||||||||||||||||||
| 23 82 00 | 1.03 | Terminal Heating and Cooling Units | ||||||||||||||||||||
| Shop Drawings | X | X | ||||||||||||||||||||
| Seismic Anchorage and Bracing Calculations | X | |||||||||||||||||||||
| Manufacturer’s Certificate of Compliance | X | |||||||||||||||||||||
| Detailed Information on Structural, Mechanical, Electrical, or other Modifications | X | |||||||||||||||||||||
| Operation and Maintenance Data | X | |||||||||||||||||||||
| 26 05 02 | 1.05 | Basic Electrical Requirement | ||||||||||||||||||||
| Manufacturer's Product Data | X | |||||||||||||||||||||
| Anchorage and Bracing Drawings and Cut Sheets | X | X | ||||||||||||||||||||
| Anchorage and Bracing Calculations | X | |||||||||||||||||||||
| 26 05 04 | 1.02 | Basic Electrical Materials and Methods | ||||||||||||||||||||
| Manufacturer's Product Data | X | |||||||||||||||||||||
| Seismic Anchorage and Bracing Drawings and Cut Sheets | X | X | ||||||||||||||||||||
| Anchorage and Bracing Calculations | X | |||||||||||||||||||||
| 26 05 05 | 1.02 | Conductors | ||||||||||||||||||||
| Manufacturer's Product Data | X | |||||||||||||||||||||
| Cable Pulling Calculations | X | |||||||||||||||||||||
| Journeyman Lineman or Electrician Splicing Credentials | X | |||||||||||||||||||||
| 26 05 26 | 1.02 | Grounding and Bonding for Electrical Systems | ||||||||||||||||||||
| Manufacturer's Product Data | X | X | ||||||||||||||||||||
| 26 05 33 | 1.02 | Raceway Boxes for Electrical Systems | ||||||||||||||||||||
| Manufacturer's Product Data | X | |||||||||||||||||||||
| Precast Manholes, Handholes, and Frames/Covers | X | X | X | |||||||||||||||||||
| Seismic Anchorage and Bracing Drawings and Cut Sheets | X | X | ||||||||||||||||||||
| Anchorage and Bracing Calculations | X | |||||||||||||||||||||
| 26 05 70 | 1.02 | Electrical Systems Analysis | ||||||||||||||||||||
| Short Circuit Studies | X | |||||||||||||||||||||
| Protective Device Coordination Studies | X | |||||||||||||||||||||
| Arc Flash Study | X | |||||||||||||||||||||
| Arc Flash Warning Labels | X | |||||||||||||||||||||
| Electronic Files of Final Studies | X | |||||||||||||||||||||
| 26 08 00 | 1.02 | Commissioning of Electrical Systems | ||||||||||||||||||||
| Testing Firm Qualifications | X | |||||||||||||||||||||
| Schedule for Performing Inspection and Tests | X | |||||||||||||||||||||
| List of References to be used for each test | X | |||||||||||||||||||||
| Sample Copy of Equipment and Materials Inspection Form(s) | X | |||||||||||||||||||||
| Sample Copy of Individual Device Test Form | X | |||||||||||||||||||||
| Sample copy of Individual System Test Form | X | |||||||||||||||||||||
| Energization Plan | X | |||||||||||||||||||||
| Test or Inspection Reports and Certificates | X | X | ||||||||||||||||||||
| Operation and Maintenance Data | X | |||||||||||||||||||||
| Programmable Settings | X | |||||||||||||||||||||
| 26 12 02 | 1.02 | Oil-Filled Pad Mounted Transformers | ||||||||||||||||||||
| Manufacturer's Product Data | X | X | ||||||||||||||||||||
| Seismic Anchorage and Bracing Drawings and Cut Sheets | X | X | ||||||||||||||||||||
| Seismic Anchorage and Bracing Calculations | X | |||||||||||||||||||||
| Component and Attachment Testing Seismic Certificate of Compliance | X | |||||||||||||||||||||
| Operation and Maintenance Data | X | |||||||||||||||||||||
| 26 13 16.02 | 1.02 | Pad-Mounted Switchgear | ||||||||||||||||||||
| Manufacturer's Product Data | X | X | X | |||||||||||||||||||
| Equipment Foundation Pedestals | X | X | ||||||||||||||||||||
| Anchoring Details | X | |||||||||||||||||||||
| Anchorage and Bracing Drawings and Cut Sheets | X | X | ||||||||||||||||||||
| Seismic Anchorage and Bracing Calculations | X | |||||||||||||||||||||
| Component and Attachment Testing Seismic Certificate of Compliance | X | |||||||||||||||||||||
| Factory Test Report | X | |||||||||||||||||||||
| Manufacturer's Installation Instructions | X | |||||||||||||||||||||
| Operation and Maintenance Data | X | |||||||||||||||||||||
| 26 20 00 | 1.04 | Low-Voltage AC Induction Motors | ||||||||||||||||||||
| Manufacturer's Product Data | X | X | ||||||||||||||||||||
| Maximum Brake Horsepower Required by the Equipment Driven by the Motor | X | |||||||||||||||||||||
| Component and Attachment Testing Seismic Certificate of Compliance | X | |||||||||||||||||||||
| Operation and Maintenance Data | X | |||||||||||||||||||||
| 26 22 00 | 1.02 | Low-Voltage Transformers | ||||||||||||||||||||
| Manufacturer's Product Data | X | X | ||||||||||||||||||||
| Anchorage and Bracing Drawings and Cut Sheets | X | X | ||||||||||||||||||||
| Anchorage and Bracing Calculations | X | |||||||||||||||||||||
| Component and Attachment Testing Seismic Certificate of Compliance | X | |||||||||||||||||||||
| 26 24 16 | 1.02 | Panelboards | ||||||||||||||||||||
| Manufacturer's Data Sheets | X | |||||||||||||||||||||
| Manufacturer's Shop Drawings | X | |||||||||||||||||||||
| Tabulation of Features | X | |||||||||||||||||||||
| Anchorage and Bracing Calculations | X | |||||||||||||||||||||
| Manufacturer's recommended Installation Instructions | X | |||||||||||||||||||||
| Component and Attachment Testing Seismic Certificate of Compliance | X | |||||||||||||||||||||
| 26 27 26 | 1.02 | Wiring Devices | ||||||||||||||||||||
| Manufacturer's Product Data | X | |||||||||||||||||||||
| 26 32 13.16 | 1.02 | Natural Gas Engine Generator Set | ||||||||||||||||||||
| Dimensioned Outline Drawing | X | |||||||||||||||||||||
| Specification Compliance Statement | X | |||||||||||||||||||||
| Engine and Generator Weight, and Anchoring Requirements | X | |||||||||||||||||||||
| Complete List of Accessories Provided | X | |||||||||||||||||||||
| Performance Curves | X | |||||||||||||||||||||
| Circuit Breaker Data | X | |||||||||||||||||||||
| Control Panel Instrument Identification Inscriptions | X | |||||||||||||||||||||
| Sample Guarantee | X | |||||||||||||||||||||
| Electrical Schematic and Wiring Diagrams | X | |||||||||||||||||||||
| Engine Generator Set Motor Starting Capability and Percent Voltage Dip curve | X | |||||||||||||||||||||
| Block Heater Size and Voltage | X | |||||||||||||||||||||
| Jacket Water Heater Size and Voltage | X | |||||||||||||||||||||
| Noise Data for Enclosed Engine Generator | X | |||||||||||||||||||||
| Manufacturer’s Certificate of Compliance | X | |||||||||||||||||||||
| Certification, Copies of Analyses, or Test Reports | X | X | ||||||||||||||||||||
| Component and Attachment Testing Seismic Certificate of Compliance | X | |||||||||||||||||||||
| Factory Test Report | X | |||||||||||||||||||||
| Operation and Maintenance Data | X | |||||||||||||||||||||
| Description of Parts and Service Availability | X | |||||||||||||||||||||
| Manufacturer’s Certificate of Proper Installation | X | |||||||||||||||||||||
| Special Guarantee | X | |||||||||||||||||||||
| 26 43 00 | 1.02 | Surge Protective Devices | ||||||||||||||||||||
| Manufacturer's Product Data | X | |||||||||||||||||||||
| Product Data | X | |||||||||||||||||||||
| Manufacturer’s UL Certified Test Data and Nameplate Data | X | X | ||||||||||||||||||||
| 26 50 00 | 1.02 | Lighting | ||||||||||||||||||||
| Shop Drawings | X | X | ||||||||||||||||||||
| Manufacturer's Printed Installation Instructions | X | |||||||||||||||||||||
| Operation and Maintenance Data | X | |||||||||||||||||||||
| 31 10 00 | 1.02 | Site Clearing | ||||||||||||||||||||
| Overall Site Plan | X | |||||||||||||||||||||
| Survey Information | X | |||||||||||||||||||||
| 31 23 16 | 1.02 | Excavation | ||||||||||||||||||||
| Excavation Plan | X | |||||||||||||||||||||
| Excavation Permit | X | |||||||||||||||||||||
| 31 23 19.01 | 1.01 | Dewatering | ||||||||||||||||||||
| Water Control Plan | X | |||||||||||||||||||||
| Well Permits | X | |||||||||||||||||||||
| Discharge Permits | X | |||||||||||||||||||||
| Water Level Elevations Observed in Observation Wells | X | |||||||||||||||||||||
| Settlement Benchmark Elevations | X | |||||||||||||||||||||
| Inflow Measurements | X | |||||||||||||||||||||
| 31 23 23 | 1.03 | Fill and Backfill | ||||||||||||||||||||
| Shop Drawings | X | X | ||||||||||||||||||||
| Samples | X | |||||||||||||||||||||
| Manufacturer's Data Sheets | X | |||||||||||||||||||||
| Certified Test Results | X | |||||||||||||||||||||
| 31 23 23.15 | 1.03 | Trench Backfill | ||||||||||||||||||||
| Shop Drawings | X | X | ||||||||||||||||||||
| Catalog and Manufacturer’s Data Sheets for Compaction Equipment | X | |||||||||||||||||||||
| Certified Gradation Analysis | X | |||||||||||||||||||||
| Controlled Low Strength Material | X | |||||||||||||||||||||
| Shop Drawings | ||||||||||||||||||||||
| 2.01 Marking Tape | X | X | X | |||||||||||||||||||
| 2.02 Trench Stabilization Material | X | X | X | |||||||||||||||||||
| 2.03 Bedding Material and Pipe Zone Material | X | X | X | |||||||||||||||||||
| 2.04 Granular Drain Material | X | X | X | |||||||||||||||||||
| 2.05 Earth Backfill | X | X | X | |||||||||||||||||||
| 2.06 Processed Earth Backfill | X | X | X | |||||||||||||||||||
| 2.07 Controlled Low Strength Material (CLSM) | X | X | X | |||||||||||||||||||
| 31 32 19.16 | 1.03 | Geotextile | ||||||||||||||||||||
| Shop Drawings | X | X | ||||||||||||||||||||
| Samples | X | |||||||||||||||||||||
| Certifications of Geotextile Manufacturer | X | |||||||||||||||||||||
| Field Seam Efficiency Test Results | X | |||||||||||||||||||||
| Shop Drawings | ||||||||||||||||||||||
| 2.01 Nonwoven Geotextile | X | X | ||||||||||||||||||||
| 2.02 Sewing Thread | X | X | ||||||||||||||||||||
| 2.03 Securing Pins | X | X | ||||||||||||||||||||
| 31 37 00 | 1.03 | Riprap | ||||||||||||||||||||
| Shop Drawings | X | X | X | |||||||||||||||||||
| Certified Test Results | X | |||||||||||||||||||||
| Trip Tickets | X | |||||||||||||||||||||
| 31 40 00 | 1.03 | Tunneled Crossings | ||||||||||||||||||||
| Abandonment-Recovery Contingency Plan | X | |||||||||||||||||||||
| 31 41 00 | 1.02 | Shoring | ||||||||||||||||||||
| Excavation Support Plan (Open Cut) | X | |||||||||||||||||||||
| Shaft/Pit Excavation Support Plan | X | |||||||||||||||||||||
| 31 42 00 | 1.03 | Horizontal Auger Boring | ||||||||||||||||||||
| Qualifications | X | |||||||||||||||||||||
| Pre-Construction Surveys | X | X | ||||||||||||||||||||
| Post-Construction Surveys | X | X | ||||||||||||||||||||
| Quality Control Methods | X | |||||||||||||||||||||
| Safety Plan | X | |||||||||||||||||||||
| Schedule | X | |||||||||||||||||||||
| Daily Records | X | |||||||||||||||||||||
| Horizontal Auger Boring Work Plan | X | |||||||||||||||||||||
| Calculations | X | X | ||||||||||||||||||||
| Contingency Plans | X | X | ||||||||||||||||||||
| Abandonment-Recovery Contingency Plan | X | X | ||||||||||||||||||||
| 31 43 00 | 1.03 | Steel Casing Pipe | ||||||||||||||||||||
| Steel Casing Pipe for the Trenchless Crossings | X | |||||||||||||||||||||
| Calculations (1.04.B) | X | |||||||||||||||||||||
| 31 44 00 | 1.02 | Settlement Monitoring | ||||||||||||||||||||
| Qualifications | X | |||||||||||||||||||||
| Instrumentation Schedule | X | |||||||||||||||||||||
| Description of Methods and Materials | X | |||||||||||||||||||||
| Drawings with Locations of Proposed Monitoring Points | X | |||||||||||||||||||||
| Monitoring Plan | X | |||||||||||||||||||||
| Reports and Records (Location of Installed Instruments) | X | |||||||||||||||||||||
| Reports and Records (Preconstruction Survey) | X | |||||||||||||||||||||
| Shop Drawings (Monuments and Posts) | X | X | ||||||||||||||||||||
| 31 45 00 | 1.03 | Installation of Carrier Pipe in Steel Casing | ||||||||||||||||||||
| Carrier Pipe Installation Plan | X | X | ||||||||||||||||||||
| Safety Plan | X | |||||||||||||||||||||
| Emergency Response Plan | X | |||||||||||||||||||||
| Shop Drawings | X | X | ||||||||||||||||||||
| Written Confirmation that the Model, Type and Spacing of the Carrier Pipe Supports Meets the Minimum Requirements | X | |||||||||||||||||||||
| 31 46 00 | 1.04 | Backfilling Grouting | ||||||||||||||||||||
| Work Plan | X | |||||||||||||||||||||
| Shop Drawings | X | X | ||||||||||||||||||||
| Pre-Placement Test Reports and Certifications | X | |||||||||||||||||||||
| Daily Reports and Records of Backfill Grout Placement | X | |||||||||||||||||||||
| Product Data | X | |||||||||||||||||||||
| Equipment | X | |||||||||||||||||||||
| 32 11 23 | 1.03 | Aggregate Base Course(s) | ||||||||||||||||||||
| Certified Test Results on Source Materials | X | |||||||||||||||||||||
| Certified Results of In-Place Density Tests | X | |||||||||||||||||||||
| 32 12 16 | 1.05 | Asphalt Paving | ||||||||||||||||||||
| Asphalt Concrete Job Mix Formula | X | |||||||||||||||||||||
| Test Report for Asphalt Cement | X | |||||||||||||||||||||
| Manufacturer’s Certificate of Compliance | X | |||||||||||||||||||||
| Statement of Qualification for Independent Testing Laboratory | X | |||||||||||||||||||||
| Test Results | X | |||||||||||||||||||||
| WMA Mix Design Information | X | X | ||||||||||||||||||||
| 32 13 13 | 1.02 | Concrete Paving (see 03 30 00 for general Concrete Submittals) | ||||||||||||||||||||
| Jointing Drawings | X | |||||||||||||||||||||
| Colored Concrete Samples | X | |||||||||||||||||||||
| Admixtures: Color Pigment Product Data | X | |||||||||||||||||||||
| 32 16 00 | 1.02 | Curbs and Gutters | ||||||||||||||||||||
| Form Materials | X | |||||||||||||||||||||
| Complete Data on Concrete Mix | X | |||||||||||||||||||||
| Curing Compound | X | |||||||||||||||||||||
| Ready-Mix Delivery Ticket | X | |||||||||||||||||||||
| 32 17 23 | 1.02 | Pavement Markings | ||||||||||||||||||||
| Shop Drawings | X | X | ||||||||||||||||||||
| Description of Proposed Methods for Removal of Drips, Overspray, Improper Markings, Paint and Thermoplastic Material Tracked by Traffic, and Existing Markings | X | |||||||||||||||||||||
| Equipment List | X | |||||||||||||||||||||
| Manufacturer’s Instructions | X | |||||||||||||||||||||
| 32 31 13 | 1.03 | Chain Link Fences and Gates | ||||||||||||||||||||
| Shop Drawings | X | |||||||||||||||||||||
| Product Data | X | |||||||||||||||||||||
| Samples | X | |||||||||||||||||||||
| Manufacturer’s Recommended Installation Instructions | X | |||||||||||||||||||||
| Evidence of Supplier and Installer Qualifications | X | |||||||||||||||||||||
| Shop Drawings | ||||||||||||||||||||||
| 2.01.B.1 Chain Link Fence Fabric | X | X | ||||||||||||||||||||
| 2.01.B.2 Posts | X | X | ||||||||||||||||||||
| 2.01.B.3 Top and Brace Rails | X | X | ||||||||||||||||||||
| 2.01.B.4 Fence Fittings | X | X | ||||||||||||||||||||
| 2.01.B.5 Tension Wire | X | X | ||||||||||||||||||||
| 2.01.B.6 Barbed Wire | X | X | ||||||||||||||||||||
| 2.03 Concrete Mix | X | X | ||||||||||||||||||||
| 32 91 13 | 1.03 | Soil Preparation | ||||||||||||||||||||
| Certified Topsoil Analysis Reports | X | |||||||||||||||||||||
| Samples - Erosion Control Blankets | X | |||||||||||||||||||||
| Manufacturer’s Recommended Installation Instructions - Erosion Control Blankets | X | |||||||||||||||||||||
| Shop Drawings | ||||||||||||||||||||||
| 2.02 Erosion Control Blanket | X | X | ||||||||||||||||||||
| 33 05 01 | 1.02 | Conveyance Piping - General | ||||||||||||||||||||
| Shop Drawings | X | |||||||||||||||||||||
| Product Data | X | |||||||||||||||||||||
| Manufacturer’s Certificate of Compliance | X | |||||||||||||||||||||
| Shop Drawings | ||||||||||||||||||||||
| 2.04 Couplings | X | X | ||||||||||||||||||||
| 2.05 Service Saddles | X | X | ||||||||||||||||||||
| 2.06 Slab, Floor, Wall, and Roof Penetrations | X | X | ||||||||||||||||||||
| 2.07 Flanges, Flange Gaskets and Bolting Materials | X | X | ||||||||||||||||||||
| 2.11 Tracer Wire | X | X | ||||||||||||||||||||
| 2.12 Water Quality Sampling Station | X | X | ||||||||||||||||||||
| 2.13 PRV Enclosure | X | X | ||||||||||||||||||||
| 2.14 Water Bottle Filling Station | X | X | ||||||||||||||||||||
| 33 05 01.02 | 1.02 | Ductile Iron Pipe and Fittings | ||||||||||||||||||||
| Shop Drawings (Pipe and Fittings) | X | X | ||||||||||||||||||||
| Manufacturer’s Certificate of Compliance | X | |||||||||||||||||||||
| Field Hydrostatic Testing Plan | X | |||||||||||||||||||||
| Certifications of Calibration | X | |||||||||||||||||||||
| Test Documentation Form and Results | X | |||||||||||||||||||||
| 33 05 01.09 | 1.02 | Polyvinyl Chloride (PVC) Pressure Pipe and Fittings | ||||||||||||||||||||
| Shop Drawings | X | X | ||||||||||||||||||||
| Manufacturer’s Certificate of Compliance | X | |||||||||||||||||||||
| Hydrostatic Testing Plan | X | |||||||||||||||||||||
| Certification of Calibration | X | |||||||||||||||||||||
| Test Report Documentation | X | |||||||||||||||||||||
| 33 05 01.12 | 1.03 | Gravity Sewer Pipe and Fittings | ||||||||||||||||||||
| Shop Drawings | X | X | ||||||||||||||||||||
| Certificates | X | |||||||||||||||||||||
| Manufacturer’s Written Recommendations for Pipe Handling and Installation | X | |||||||||||||||||||||
| Field Leakage Testing Plan | X | |||||||||||||||||||||
| CCTV Inspection | X | |||||||||||||||||||||
| Leakage Test Results | X | |||||||||||||||||||||
| Pipe Deflection Test Results | X | |||||||||||||||||||||
| Shop Drawings | ||||||||||||||||||||||
| 2.01 Piping | X | X | ||||||||||||||||||||
| 2.02 Joints | X | X | ||||||||||||||||||||
| 2.03 Gaskets | X | X | ||||||||||||||||||||
| 2.04 Gasket Lubricant | X | X | ||||||||||||||||||||
| 2.05 Plugs | X | X | ||||||||||||||||||||
| 2.06 Lateral Service Connection Pipe and Fittings | X | X | ||||||||||||||||||||
| 2.07 Pipe for Waterline Crossings | X | X | ||||||||||||||||||||
| 2.09 Flexible Compression Collar | X | X | ||||||||||||||||||||
| 33 05 13 | 1.02 | Manholes | ||||||||||||||||||||
| Shop Drawings | X | |||||||||||||||||||||
| Product Data | X | |||||||||||||||||||||
| Experience Record | X | |||||||||||||||||||||
| Calculations | X | |||||||||||||||||||||
| Certificate of Compliance | X | |||||||||||||||||||||
| Test Reports | X | X | ||||||||||||||||||||
| Certified Load Test Data | X | |||||||||||||||||||||
| Manufacturer’s Recommended Installation Instructions | X | |||||||||||||||||||||
| Field Quality Control Report | X | |||||||||||||||||||||
| Shop Drawings/Product Data | ||||||||||||||||||||||
| 2.01 General | X | |||||||||||||||||||||
| 2.02 Precast Manholes | X | |||||||||||||||||||||
| 2.03 Manhole Frames and Covers | X | |||||||||||||||||||||
| 2.04 Manhole Frame Connection to Structure | X | |||||||||||||||||||||
| 2.05 Mortar | X | X | ||||||||||||||||||||
| 2.07 Flexible Joints for Sealing Pipes in Manholes | X | |||||||||||||||||||||
| 2.08 Cold-Applied Asphalt Emulsion Damproofing | X | X | ||||||||||||||||||||
| 2.09 Corrosion Resistant Coating (CRC) System | X | X | ||||||||||||||||||||
| 33 05 23.13 | 1.04 | Utility Horizontal Directional Drilling | ||||||||||||||||||||
| Description of Pilot Hole Drilling Procedure | X | |||||||||||||||||||||
| Installation Plan | X | |||||||||||||||||||||
| Descriptions of HDD Drill Rig and Equipment | X | |||||||||||||||||||||
| Contingency Plan | X | |||||||||||||||||||||
| Frac-Out, Surface Spill and Abandonment Contingency Plan | X | |||||||||||||||||||||
| Record Drawing Plan and Profile | X | |||||||||||||||||||||
| 33 12 13 | 1.02 | Water Service Connections | ||||||||||||||||||||
| Shop Drawings | X | |||||||||||||||||||||
| Manufacturer’s Certificate of Compliance | X | |||||||||||||||||||||
| Statement of Qualifications | X | |||||||||||||||||||||
| Procedure for Field Testing Water Mains and Service Connections | X | |||||||||||||||||||||
| Shop Drawings | X | |||||||||||||||||||||
| 2.02 Service Saddles | X | |||||||||||||||||||||
| 2.03 Repair Service Clamps | X | |||||||||||||||||||||
| 2.04 Corporation Stops | X | |||||||||||||||||||||
| 2.05 Miscellaneous Fittings | X | |||||||||||||||||||||
| 2.06 Curb Stops | X | |||||||||||||||||||||
| 2.07 Meter Boxes, Vaults and Covers | X | |||||||||||||||||||||
| 2.08 Meter Yokes | X | |||||||||||||||||||||
| 2.09 Angle Valves | X | |||||||||||||||||||||
| 2.10 Water Meters | X | |||||||||||||||||||||
| 2.11 High Density Polyethylene Plastic Pipe | X | |||||||||||||||||||||
| 33 12 16 | 1.02 | Water Utility Distribution Valves | ||||||||||||||||||||
| Shop Drawings (Gate Valves) | X | X | ||||||||||||||||||||
| Manufacturer's Certificate of Compliance | X | |||||||||||||||||||||
| Method for Hydrostatic Testing | X | |||||||||||||||||||||
| Tests and Inspection Results | X | X | ||||||||||||||||||||
| Operation and Maintenance Data | X | |||||||||||||||||||||
| Manufacturer’s Certificate of Proper Installation | X | |||||||||||||||||||||
| 33 12 16.29 | 1.02 | Air and Vacuum Release Valve Assemblies | ||||||||||||||||||||
| Product Data Sheets | X | |||||||||||||||||||||
| Complete Catalog Information | X | |||||||||||||||||||||
| Maximum Recommended Test Pressure | X | X | ||||||||||||||||||||
| Recommended Seating Materials for Specified Operating Pressures | X | |||||||||||||||||||||
| Manufacturer's Instructions | X | |||||||||||||||||||||
| Operation and Maintenance Data | X | |||||||||||||||||||||
| Affidavit of Compliance in Accordance with AWWA C512 | X | |||||||||||||||||||||
| Affidavit of Compliance that Materials Comply with the Requirements of the EPA Safe Drinking Water Act | X | |||||||||||||||||||||
| Product Data | ||||||||||||||||||||||
| 2.02 Combination Air Release Vacuum Valves | X | X | ||||||||||||||||||||
| 2.03 Connection to Mainline | X | |||||||||||||||||||||
| 2.04 Isolation Valves | X | |||||||||||||||||||||
| 2.05 Piping Between Mainline and Air Valve and Piping for Air Vent | X | |||||||||||||||||||||
| 2.06 Valve Vault | X | X | ||||||||||||||||||||
| 2.07 Accessories | X | |||||||||||||||||||||
| 33 12 19 | 1.02 | Water Utility Distribution Fire Hydrants | ||||||||||||||||||||
| Certificate of Compliance | X | |||||||||||||||||||||
| Shop Drawings | ||||||||||||||||||||||
| 2.01 General | X | X | ||||||||||||||||||||
| 2.02 High Pressure Hydrant | X | X | ||||||||||||||||||||
| 2.03 Flush Type Hydrants | X | X | ||||||||||||||||||||
| 2.04 Yard Hydrant | X | X | ||||||||||||||||||||
| 2.05 Precast Concrete Pier Block | X | X | ||||||||||||||||||||
| 2.06 Gravel for Drainage | X | X | ||||||||||||||||||||
| 2.07 Concrete for Thrust Blocking | X | X | ||||||||||||||||||||
| 33 13 00 | 1.02 | Disinfection of Water Utility Distribution Facilities | ||||||||||||||||||||
| AWWA Standards Conformance Plan | X | |||||||||||||||||||||
| Procedure and Plan for Cleaning System | X | |||||||||||||||||||||
| Procedures and Plans for Disinfection and Testing | X | |||||||||||||||||||||
| Proposed Locations within System where Samples will be Taken | X | |||||||||||||||||||||
| Type of Disinfecting Solution and Method of Preparation | X | |||||||||||||||||||||
| Employee Certification | X | |||||||||||||||||||||
| Method of Disposal for Highly Chlorinated Disinfecting Water | X | |||||||||||||||||||||
| Independent Testing Agency | X | |||||||||||||||||||||
| Certified Bacteriological Test Results | X | |||||||||||||||||||||
| 40 05 15 | 1.03 | Piping Support Systems | ||||||||||||||||||||
| Catalog Information and Drawings of Piping Support System | X | X | ||||||||||||||||||||
| Calculations | X | |||||||||||||||||||||
| Revisions to Support Systems Resulting from Changes in Related Piping System Layout or Addition of Flexible Joints | X | |||||||||||||||||||||
| Anchorage and Bracing Drawings and Cut Sheets | X | |||||||||||||||||||||
| Anchorage and Bracing Calculations | X | |||||||||||||||||||||
| Maintenance Information on Piping Support System | X | |||||||||||||||||||||
| 1.05 | Pedestrian Bridge Beam Clamp and Pipe Hanger System | X | X | |||||||||||||||||||
| Pedestrian Bridge Pipe Insulation and Jacket | X | X | ||||||||||||||||||||
| Pedestrian Bridge Pipe Expansion Assembly | X | X | ||||||||||||||||||||
| 40 27 00 | 1.03 | Process Piping - General | ||||||||||||||||||||
| Shop Fabricated Piping | X | X | X | |||||||||||||||||||
| Pipe Wall Thickness | X | |||||||||||||||||||||
| Hydraulic Thrust Restraint for Restrained Joints | X | X | ||||||||||||||||||||
| Dissimilar Buried Pipe Joints | X | |||||||||||||||||||||
| Pipe Corrosion Protection | X | |||||||||||||||||||||
| Anchorage and Bracing Drawings and Cut Sheets | X | X | ||||||||||||||||||||
| Manufacturer’s Certification of Compliance | X | |||||||||||||||||||||
| Anchorage and Bracing Calculations | X | |||||||||||||||||||||
| Flanged Pipe and Fittings | X | |||||||||||||||||||||
| Qualifications | X | |||||||||||||||||||||
| Welding Procedures | X | |||||||||||||||||||||
| Nondestructive Inspection and Testing Procedures | X | X | ||||||||||||||||||||
| Test Logs | X | X | ||||||||||||||||||||
| Pipe Coating Applicator Certification | X | |||||||||||||||||||||
| Laboratory Testing Equipment | X | X | X | |||||||||||||||||||
| CWI Inspection Records and NDE Test Records | X | X | ||||||||||||||||||||
| 40 27 02 | 1.02 | Process Valves and Operators | ||||||||||||||||||||
| Shop Drawings | ||||||||||||||||||||||
| A. Gate Valves | X | X | ||||||||||||||||||||
| B. Ball Valves | X | X | ||||||||||||||||||||
| C. Butterfly Valves | X | X | ||||||||||||||||||||
| D. Check and Flap Valves | X | X | ||||||||||||||||||||
| E. Self Regulated Valves | X | X | ||||||||||||||||||||
| Anchorage and Bracing Calculations | X | |||||||||||||||||||||
| Manufacturer’s Certificate of Compliance | X | |||||||||||||||||||||
| Component and Attachment Testing Seismic Certificate of Compliance | X | |||||||||||||||||||||
| Tests and Inspection Data | X | X | ||||||||||||||||||||
| Operation and Maintenance Data | X | |||||||||||||||||||||
| Manufacturer’s Certificate of Proper Installation | X | |||||||||||||||||||||
| 40 80 01 | 1.01 | Process Piping Leakage Testing | ||||||||||||||||||||
| Testing Plan | X | |||||||||||||||||||||
| Certifications of Calibration | X | |||||||||||||||||||||
| Certified Test Report | X | |||||||||||||||||||||
| 40 91 00 | 2.04A | Flow Element and Transmitter, Electromagnetic | ||||||||||||||||||||
| Catalog Cuts | X | |||||||||||||||||||||
| Component Data Sheets | X | |||||||||||||||||||||
| Sizing and Selection Calculations | X | |||||||||||||||||||||
| Installation Details | X | |||||||||||||||||||||
| Factory and Field Test Documentation | X | |||||||||||||||||||||
| Operation and Maintenance Data | X | |||||||||||||||||||||
| Manufacturer’s Certificate of Proper Installation | X | |||||||||||||||||||||
| Testing Related Submittals | X | |||||||||||||||||||||
| Maintenance Service Agreement | X | |||||||||||||||||||||
| 40 91 00 | 2.04B | Flow Switch, Paddle: | ||||||||||||||||||||
| Catalog Cuts | X | |||||||||||||||||||||
| Component Data Sheets | X | |||||||||||||||||||||
| Installation Details | X | |||||||||||||||||||||
| Operation and Maintenance Data | X | |||||||||||||||||||||
| Manufacturer’s Certificate of Proper Installation | X | |||||||||||||||||||||
| Maintenance Service Agreement | X | |||||||||||||||||||||
| 40 91 00 | 2.04C | Level Element and Transmitter: Submersible. | ||||||||||||||||||||
| Catalog Cuts | X | |||||||||||||||||||||
| Component Data Sheets | X | |||||||||||||||||||||
| Sizing and Selection Calculations | X | |||||||||||||||||||||
| Installation Details | X | |||||||||||||||||||||
| Factory and Field Test Documentation | X | |||||||||||||||||||||
| Operation and Maintenance Data | X | |||||||||||||||||||||
| Manufacturer’s Certificate of Proper Installation | X | |||||||||||||||||||||
| Testing Related Submittals | X | |||||||||||||||||||||
| Maintenance Service Agreement | X | |||||||||||||||||||||
| 40 91 00 | 2.04D | Intrusion Switch: | ||||||||||||||||||||
| Catalog Cuts | X | |||||||||||||||||||||
| Component Data Sheets | X | |||||||||||||||||||||
| Installation Details | X | |||||||||||||||||||||
| Operation and Maintenance Data | X | |||||||||||||||||||||
| Manufacturer’s Certificate of Proper Installation | X | |||||||||||||||||||||
| Maintenance Service Agreement | X | |||||||||||||||||||||
| 40 91 00 | 2.04E | Pressure Gauge: | ||||||||||||||||||||
| Catalog Cuts | X | |||||||||||||||||||||
| Component Data Sheets | X | |||||||||||||||||||||
| Sizing and Selection Calculations | X | |||||||||||||||||||||
| Installation Details | X | |||||||||||||||||||||
| Operation and Maintenance Data | X | |||||||||||||||||||||
| Manufacturer’s Certificate of Proper Installation | X | |||||||||||||||||||||
| Maintenance Service Agreement | X | |||||||||||||||||||||
| 40 91 00 | 2.04F | Pressure Transmitter: | ||||||||||||||||||||
| Catalog Cuts | X | |||||||||||||||||||||
| Component Data Sheets | X | |||||||||||||||||||||
| Sizing and Selection Calculations | X | |||||||||||||||||||||
| Installation Details | X | |||||||||||||||||||||
| Factory and Field Test Documentation | X | |||||||||||||||||||||
| Operation and Maintenance Data | X | |||||||||||||||||||||
| Manufacturer’s Certificate of Proper Installation | X | |||||||||||||||||||||
| Testing Related Submittals | X | |||||||||||||||||||||
| Maintenance Service Agreement | X | |||||||||||||||||||||
| 40 91 00 | 2.04G | Temperature Element and Transmitter, Resistance: | ||||||||||||||||||||
| Catalog Cuts | X | |||||||||||||||||||||
| Component Data Sheets | X | |||||||||||||||||||||
| Sizing and Selection Calculations | X | |||||||||||||||||||||
| Installation Details | X | |||||||||||||||||||||
| Factory and Field Test Documentation | X | |||||||||||||||||||||
| Operation and Maintenance Data | X | |||||||||||||||||||||
| Manufacturer’s Certificate of Proper Installation | X | |||||||||||||||||||||
| Testing Related Submittals | X | |||||||||||||||||||||
| Maintenance Service Agreement | X | |||||||||||||||||||||
| 40 91 00 | 2.05 | PLC PANEL COMPONENTS | ||||||||||||||||||||
| Bill of Materials | X | |||||||||||||||||||||
| Catalog Cuts | X | |||||||||||||||||||||
| Component Data Sheets | X | |||||||||||||||||||||
| Sizing and Selection Calculations | X | |||||||||||||||||||||
| Preliminary Panel Elevation Drawings | X | |||||||||||||||||||||
| Panel Construction Drawings | X | |||||||||||||||||||||
| Diagrams | X | |||||||||||||||||||||
| Panel Power Requirements and Heat Dissipation | X | |||||||||||||||||||||
| Spares, Expendables, and Test Equipment | X | |||||||||||||||||||||
| PLC I/O List | X | |||||||||||||||||||||
| Identify Proposed Items, Options, Installed Spares, and Other Provisions for Future Work | X | |||||||||||||||||||||
| Color schedule for control panels | X | |||||||||||||||||||||
| Applications Software Documentation | X | |||||||||||||||||||||
| Factory and Field Test Documentation | X | |||||||||||||||||||||
| Legends and Abbreviation Lists | X | |||||||||||||||||||||
| Shop Drawings for Changes Impacting PLC Programming | X | |||||||||||||||||||||
| Proposed Submittal Breakdown Consisting of Sequencing and Packaging of Information | X | |||||||||||||||||||||
| Statements of Qualification | X | |||||||||||||||||||||
| Operation and Maintenance Data | X | |||||||||||||||||||||
| Testing Related Submittals | X | |||||||||||||||||||||
| Maintenance Service Agreement | X | |||||||||||||||||||||
| 40 91 00 | 2.06 | REMOTE MONITORING SYSTEM | ||||||||||||||||||||
| Bill of Materials | X | |||||||||||||||||||||
| Catalog Cuts | X | |||||||||||||||||||||
| Component Data Sheets | X | |||||||||||||||||||||
| Sizing and Selection Calculations | X | |||||||||||||||||||||
| Preliminary Panel Elevation Drawings | X | |||||||||||||||||||||
| Panel Construction Drawings | X | |||||||||||||||||||||
| Diagrams | X | |||||||||||||||||||||
| Panel Power Requirements and Heat Dissipation | X | |||||||||||||||||||||
| Installation Details | X | |||||||||||||||||||||
| Spares, Expendables, and Test Equipment | X | |||||||||||||||||||||
| I/O List | X | |||||||||||||||||||||
| Identify Proposed Items, Options, Installed Spares, and Other Provisions for Future Work | X | |||||||||||||||||||||
| Factory and Field Test Documentation | X | |||||||||||||||||||||
| Operation and Maintenance Data | X | |||||||||||||||||||||
| Manufacturer’s Certificate of Proper Installation | X | |||||||||||||||||||||
| Testing Related Submittals | X | |||||||||||||||||||||
| Maintenance Service Agreement | X | |||||||||||||||||||||
| 40 95 80 | 1.04 | Fiber Optic Communication System | ||||||||||||||||||||
| Site Layout Diagram | X | |||||||||||||||||||||
| Cable Schedule | X | |||||||||||||||||||||
| Component Data | X | X | ||||||||||||||||||||
| Manufacturer’s Statement that Installer is Certified to Perform Installation Work | X | |||||||||||||||||||||
| Subcontractor Qualifications | X | |||||||||||||||||||||
| Manufacturer’s Certificate of Compliance | X | |||||||||||||||||||||
| Manufacturer’s Suggested Installation Practice | X | |||||||||||||||||||||
| Operation and Maintenance Data | X | |||||||||||||||||||||
| Total: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Submittal List with Review Estimate Template | National Park Service (NPS) - Denver Service Center (DSC) &8&K01+021page &P of &N
&K03+000ADDENDUM NO. 1