This file contains construction drawings for utility infrastructure upgrades at Bandelier National Monument in New Mexico, specifically for the "Update Utilities" project (Solicitation Number 140P2026R0063). The drawings are architectural and engineering plans depicting natural gas service laterals, sewer systems, electrical distribution networks, communications infrastructure, and water systems across multiple buildings and facilities within the monument.
The construction drawings detail extensive utility work including: installation of new 1-inch natural gas underground service laterals connecting regulator/meter assemblies to various buildings (numbered 23-29); replacement of existing piping with anodeless risers and plug valves; new gravity sewer pipe installations with pipe hangers and expansion joints; primary and secondary electrical duct banks with multiple electrical manholes and communication handholes throughout the facility; pad-mounted transformers and sectionalizing cabinets; direct burial conduit systems for secondary services; and comprehensive grounding systems. The drawings specify technical details such as pipe materials (including cement-lined carbon steel and polyurethane foam insulation), conduit sizes (ranging from 1-inch to 6-inch), concrete encasement requirements for ductbanks under roadways, and installation methods including trenching, bore locations, and penetration details through existing structures like bridges and building walls. Cross-references to civil drawings (02C series), specifications, and related electrical drawings are provided throughout to ensure coordination across all disciplines.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BA
NEW 1-INCH NG (UG) SERVICE LATERAL FROM BLDG 23
A AND 23 B REGULATOR/METER ASSEMBLY TO
CONNECTION TO THE BUILDING ENTRANCE.
G H
LIMIT OF CONSTRUCTION. REMOVE EXISTING SERVICE
UPSTREAM OF UNION AND REPLACE WITH ANODELESS
RISER AND 1-INCH PIPE FROM METER/REGULATOR
ASSEMBLY FOR EACH SERVICE.
G
H
LIMIT OF CONSTRUCTION. REPLACE
EXISTING PLUG VALVE AND INSTALL
ANODELEES RISER TO THIS POINT.
A
DC
B
NEW 1-INCH NG (UG) SERVICE LATERAL
FROM BLDG 24 D REGULATOR/METER
ASSEMBLY TO CONNECTION TO THE
BUILDING ENTRANCE.
NEW 1-INCH NG (UG) SERVICE LATERAL FROM BLDG
24 D, 27 B, AND 27 C REGULATOR/METER ASSEMBLY
TO CONNECTION TO THE 2-INCH DIAMETER MAIN IN
THE SERVICE ROAD NORTHWEST OF BLDG. 27.
NEW 1-INCH NG (UG)
SERVICE LATERAL FROM
BLDG 27 B AND 27 C
REGULATOR/METER
ASSEMBLY TO
CONNECTION TO THE
BUILDING ENTRANCE.
REPLACE EXISTING PLUG VALVE
AND INSTALL NEW 1-INCH DIAMETER
PIPING AND UNION, TYP OF 3.
INSTALL NEW
ANODELESS RISER.
CONNECT AT THE
UNION, TYP OF 3
REMOVE HEADER
PIPING TO ALL THREE
METER ASSEMBLIES
INSTALL NEW
ANODELESS RISER AND
PLUG VALVE ON 1-INCH
SERVICE LINE CONNECT
AT THE UNION, TYP OF 3
B
NEW 1-INCH NG (UG) SERVICE LATERAL
FROM BLDG 24 D REGULATOR/METER
ASSEMBLY TO CONNECTION TO THE
BUILDING ENTRANCE.
LIMIT OF CONSTRUCTION.
REMOVE EXISTING SERVICE
UPSTREAM OF UNION AND
REPLACE WITH ANODELESS
RISER AND 1-INCH PIPE FROM
METER/REGULATOR ASSEMBLY
FOR BLDG. 24 D.
A
E
NEW 1-INCH NG (UG) SERVICE LATERAL
FROM 2-INCH MAIN TO BLDGS. 24 D, 27 B,
AND 27 C REGULATOR/METER ASSEMBLY. 1-INCH LINE VALVE ON
SERVICE LATERAL IN 6-INCH
VALVE ACCESS SLEEVE
2-INCH LINE VALVE ON MAIN IN 6-INCH
VALVE ACCESS SLEEVE
2-INCH NG (UG) MAIN
NOTE:
BUILDING 24 D, 27 B, AND 27 C SERVICE LINE ROUTING FROM REGULATOR
METER ASSEMBLY TO 2-INCH MAIN IN SERVICE ROAD NW OF BLDG 27.
C
D
NEW 1-INCH NG (UG) FROM
BLDGS. 27 B, AND 27 C
REGULATOR/METER ASSEMBLY
TO BUILDING CONNECTION.
NOTE:
BUILDING 27 B, AND 27 C SERVICE LINE ROUTING FROM REGULATOR
METER ASSEMBLY TO BUILDING CONNECTIONS.
TREE TO REMAIN
F G
3/
/2
9:
P
M X
G -B or de r_
BA
N D
C
6_
D
8_ D
ET
AI
LS
.D
W G
FI
G
U
ER
O
AJ
R
E
Digitally signed by Micah E. Johnson Date: 2025.04.08
17:17:57-06'00'
G F
NEW 1-INCH NG (UG) FROM
BLDGS. 27 B, AND 27 C
REGULATOR/METER ASSEMBLY
TO BUILDING CONNECTION.
NEW 1-INCH NG (UG) FROM
BLDGS. 27 B, AND 27 C
REGULATOR/METER ASSEMBLY
TO BUILDING CONNECTION.
LIMIT OF CONSTRUCTION. REMOVE
EXISTING SERVICE UPSTREAM OF UNION
AND REPLACE WITH NEW ANODELESS
RISER AND 1-INCH (UG) PIPE FROM
METER/REGULATOR ASSEMBLY.
B
NEW 1-INCH NG (UG) FROM
BLDGS. 27 A
REGULATOR/METER ASSEMBLY
TO BUILDING CONNECTION.
LIMIT OF CONSTRUCTION. REMOVE EXISTING SERVICE UPSTREAM
OF UNION AND REPLACE WITH NEW ANODELESS RISER AND
1-INCH (UG) PIPE FROM METER/REGULATOR ASSEMBLY.
B
A
NEW 1-INCH NG (UG) FROM BLDGS.
27 A REGULATOR/METER ASSEMBLY
TO BUILDING CONNECTION.
NOTE:
BUILDING 27 A SERVICE LINE ROUTING FROM REGULATOR
METER ASSEMBLY TO BUILDING CONNECTION.
A
C
D
NEW 1-INCH NG (UG) SERVICE
LATERAL FROM BLDG 27 A,
28 A, AND 28 B REGULATOR/METER
ASSEMBLY TO CONNECTION TO THE
2-INCH DIAMETER MAIN IN THE
SERVICE ROAD EAST OF BLDG. 28.
NEW 1-INCH NG (UG) FROM BLDGS. 27 A REGULATOR/
METER ASSEMBLY TO BUILDING CONNECTION.
NEW 1-INCH NG (UG) FROM
BLDGS. 28 B
REGULATOR/METER
ASSEMBLY TO BUILDING
CONNECTION.
INSTALL NEW ANODELESS RISER AND
PLUG VALVE ON 1-INCH SERVICE LINE
CONNECT AT THE UNION, TYP OF 3
INSTALL NEW ANODELESS
RISER. CONNECT AT THE
UNION, TYP OF 3
NEW 1-INCH NG (UG) FROM BLDGS. 28 A REGULATOR/
METER ASSEMBLY TO BUILDING CONNECTION.
D C
NEW 1-INCH NG (UG) FROM BLDGS. 28 A
REGULATOR/METER ASSEMBLY TO
BUILDING CONNECTION.
NEW 1-INCH NG (UG) FROM BLDGS. 28 B
REGULATOR/METER ASSEMBLY TO
BUILDING CONNECTION.
E
F
NEW 1-INCH NG (UG) FROM BLDGS. 28
A REGULATOR/METER ASSEMBLY TO
BUILDING CONNECTION.
NEW 1-INCH NG (UG) FROM BLDGS. 28
B REGULATOR/METER ASSEMBLY TO
BUILDING CONNECTION.
LIMIT OF CONSTRUCTION. REMOVE
EXISTING SERVICE UPSTREAM OF
UNION AND REPLACE WITH
ANODELESS RISER AND 1-INCH
PIPE FROM METER/REGULATOR
ASSEMBLY FOR EACH SERVICE.
E F
NEW 1-INCH NG (UG) SERVICE LATERAL
FROM 2-INCH MAIN TO BLDGS. 29 A
REGULATOR/METER ASSEMBLY .
LIMIT OF CONSTRUCTION. REPLACE
EXISTING PLUG VALVE AND INSTALL
ANODELEES RISER TO THIS POINT.
LIMIT OF CONSTRUCTION. REPLACE
EXISTING PLUG VALVE AND INSTALL
ANODELEES RISER TO THIS POINT.
NEW 1-INCH NG (UG) SERVICE LATERAL
FROM 2-INCH MAIN TO BLDGS. 29 B
REGULATOR/METER ASSEMBLY .
3/
/2
9:
P
M X
G -B or de r_
BA
N D
C
7_
D
8_ D
ET
AI
LS
.D
W G
FI
G
U
ER
O
AJ
R
Digitally signed by Micah E. Johnson Date: 2025.04.08
17:18:33-06'00' w w w
USSD
USSD
USSD
USSD
USSD
USSD
USSD
USSD
USSD
USSD
USSD
USSD
USSD
USSD
6066.68
PLAN
ELEVATION
NEW GRAVITY
SEWER PIPE, SEE
DWG 02C052
NEW BEAM CLAMP
AND PIPE HANGER
ASSEMBLY, SEENEW PIPE
EXPANSION
JOINT, SEE
PIPE PENETRATION
THROUGH ABUTMENT,
BOTH SIDES, SEE
12'-0" MAX
SPACING
EXISTING ANGLE BRACING
TYP. 10 LOCATIONS
EXISTING 3"X8" SOLID
SAWN PLANK (STAINED)
EXISTING W24X55
EXISTING W24X55
2' -4
2'
-4
45° TYP.
EXISTING BRIDGE ℄ 7'
-0
" E
XI
ST
IN
G
AB
U
TM
EN
T
6'-0" TYP.
1. RECORD DRAWING OF THE BRIDGE MAY BE OBTAINED FROM THE PARK SERVICE,
DRAWINGS PMIS NO. 258864.
2. DESIGN SPECIFICATIONS
2021 INTERNATIONAL BUILDING CODE.
3. FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR TO STARTING
CONSTRUCTION WORK.
4. FOR PIPE HANGER SUBMITTAL REQUIREMENTS SEE PROJECT SPECIFICATION
SECTION 40 05 15, PIPING SUPPORT SYSTEMS.
GENERAL BRIDGE NOTES:
58'-0" MAX. INSIDE FACE OF CONCRETE
BRIDGE 2
VISITOR CENTER
BANDELIER NATIONAL MONUMENT
FLOW
NEW 2" CONDUIT
FOR ELECTRICAL,
SEE DWG 02E134
NEW ELECTRICAL,
LOCATION
APPROXIMATE,
SEE ELECTRICAL
DWG 02E134
NEW GRAVITY
SEWER
FOR PIPE MATERIAL
TRANSITION SEE
DWG 02C052
FOR PIPE MATERIAL
TRANSITION SEE
DWG 02C052
4/ 8/
2:
P
M
X C
-L
AY
O U
T-
SH
EE
TS
X C
-A
LI
G N
B
AN
D X
E- El ec tri ca l P ro po se d an d
Ex is tin g
M as te r
X C
-U
TI
LI
TY
S
IT
E X
C -B
AN
D
-G
IS
A
PE
P ar k bo un da ry
B
AN
D A
PE
e xt en si on s X
S-
BR
ID
G
E0 2_
D
X
S-
BR
ID
G
E0 1_
D
X
C -B
AN
D
_2 D
-E G
-M as te r
X C
-R O
AD
W
AY
_S
1_ D
8.
D W
G
FI
G U
ER
O
AJ
R
INSULATION FACE TO FACE
WITH ABUTMENT, TYP
CLIN OPTION M - COTTONWOOD COMFORT STATION (BLDG #1)
UTILITY CONNECTIONS: GRAVITY SEWER AND ELECTRICAL
CREEK CROSSING SUSPENDED FROM BRIDGE. SEE ALSO DWG
02C052. FOR DETAILS SEE SPECIFICATION 01 27 00.
Digitally signed by David G Johnson Date: 2025.04.09
18:01:35-06'00'
STAINLESS STEEL
REVERSIBLE C-TYPE
BEAM CLAMP
PIPE CLEVIS HANGER ASSEMBLY
(1000 LBS MINIMUM LOAD CAPACITY) WITH
GALVANIZED STEEL INSULATION PROTECTION
SHIELD DESIGNED FOR PROTECTING FOAM
INSULATION WHEN USED WITH PIPE HANGERS.
FOR PIPE HANGER SUBMITTAL
REQUIREMENTS SEE PROJECT SPECIFICATION
SECTION 40 05 15, PIPING SUPPORT SYSTEMS.
EXISTING W24x55 STEEL
GIRDER
BEFORE CORING THROUGH CONCRETE, VERIFY WALL
THICKNESS (T) AT CORING LOCATION AND LOCATE
EXISTING REBAR WITH A PACHOMETER OR SIMILAR
DEVICE. IF EXISTING REBAR CROSSES INTENDED CORING LOCATION,
DETERMINE QUANTITY OF REBARS THAT
WOULD BE CUT DURING CORING PROCESS. UP TO
ONE (1) VERTICAL AND ONE (1) HORIZONTAL REBAR
MAY BE CUT. IF THIS QUANTITY IS EXCEEDED CONTACT
THE EOR. DIAMETER FOR PENETRATION SHALL BE LARGE
ENOUGH TO FACILITATE INSTALLATION OF THE PIPE WITH
INSULATION , WATERSTOPS AND REPAIR GROUT
WATERSTOP. TYP
EXIST ABUTMENT CONC
WALL 1'-2" THK
4" PIPE WITH
INSULATION
ROUGHEN SURFACE TO 14"
AMPLITUDE. TYP
GROUT
EXIST ABUTMENT CONC
WALL 1'-2" THK
4" PIPE WITH INSULATION.
SEE DETAIL 3 FOR
INSULATION DETAILS
NON-SHRINK CEMENTITIOUS
REPAIR GROUT. CATEGORY II
DO NOT DRY PACK
EXIST ABUTMENT CONC
HYDROPHYLIC WATERSTOP BONDED
TO PIPE INSULATION. ALL AROUND
LAP AND ENDS PER MANUFACTURER
RECOMMENDATIONS
HYDROPHYLIC WATERSTOP
BONDED TO EXIST CONC. ALL AROUND
CARRIER PIPE, CEMENT LINING PER
AWWA C205, STANDARD WEIGHT SCH 40
CARBON STEEL NOMINAL 4-INCH ID
POLYURETHANE/
POLYISOCYANURATE
FOAM PER ASTM C921 TYPE II
ALUMINUM DIFFUSION BARRIER
PER ASTM C1729
FRP OUTER JACKET
4" DIA SST
EXPANSION JOINT
GROUT
A
A
2" CONDUIT AND
HANGER ASSEMBLY,
SEE ELECTRICAL
VARIES TO ACHIEVE
DESIGN SLOPE, SEE
DWG 02C052
EXISTING BRIDGE
ANGLE BRACING
(TYP)
3/
/2
:5
AM
X
G -B or de r_
BA
N D
X S-
BR
ID
G E0
2_ D
_S
1_
D
8.
D
W G
FI
G
U
ER
O
AJ
R
FLG X FLG, TYP
Digitally signed by David G Johnson Date: 2025.04.09
18:01:54-06'00'
F
T
L
N
A
G
L
N
A
G
L
N
- (2
M
A
T
C
H
L
I
N
E
S
A
M
A
T
A
H
(2
M
A
T
M
A
T
A
M
A
T
M
A
T
A
H
W
Y
M
A
T
M
A
T
H
W
Y
W
L
C
G
R
D
M A
T C
H
L I N
E
S
T A
M A
T C
H
L I N
E
S
T A
S
B
M
A
T
C
H
LIN
E
S
T
A
: 7+ 94.28
M
A
T
C
H
LIN
E
S
T
A
: 7+ 94.28
P
B
C
H
C
H
R
D
M
A
T
M
A
T
E
N
E
N
R
D
- (2)
ENRD - (3)
EN
R
D
(4
ENRD - (5)
ENRD - (6)
ENRD - (7)
ENRD - (
8)
EN
R
D
- (9)
E
N
R
D
- (1
E
N
R
D
ENRD - (12)
E
N
ENRD - (14)
ENRD - (1
5)
E
N
R
D
16)
ENRD - (1
7)
M
A
T
A
M
A
T
A
M
A
T
M A
T C
H
L I N
E
S
T A
M
A
T
A
M A
T C
H
L I N
E
S
T A
M
A
T
A
M
A
T
A
M
A
T
A
M
A
T
M
A
T
M
A
T
M
A
T
A
M A
T C
H
L I N
E
S
T A
M
A T
N
E
S
T A
M
A
T
A
M A
T C
H
L I N
E
S
T A
M
A
T
A
M
A
T
A
M
A
T
A
M A
T C
H
L I N
E
S
T A
M
A
T
A
M A
T C
H
L I N
E
S
T A
M
A
T
A
M
A
T
A
M
A
T
A
M
A
T
M
A
T
M
A
T
M
A
T
A
M A
T C
H
L I N
E
S
T A
M
A T
N
E
S
T A
M
A
T
A
M A
T C
H
L I N
E
S
T A
C
G
M A
T C
H
L I N
E
S
T A
M A
T C
H
L I N
E
S
T A
S
B
M
A
T
C
H
LIN
E
S
T
A
: 7+ 94.28
M
A
T
C
H
LIN
E
S
T
A
: 7+ 94.28
C
H
C
H
R
D
M
A
T
M
A
T
GENERAL NOTES
1. REFER TO CIVIL DRAWINGS FOR CONSTRUCTION
PHASING AND UTILITY CORRIDOR COORDINATION.
2. REFER TO GENERAL DRAWINGS FOR LEGENDS,
NOTES, AND ABBREVIATIONS.
3. REFER TO CIVIL DRAWING 02C001 FOR
CORRESPONDING CIVIL SITE DRAWING NUMBERS.
a c u g l i a t
M
X
G B o r d e r B
A
X
L A
Y O
U T
S
H E
E T
S E
D
D
W G
R
Digitally signed by Jonathan James Date: 2025.04.11 12:20:52-06'00'
W
G
W
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
F
O
B
U
F
O
B
U
F
O
B
U
F
O
B
U
F
O
B
U
F
O
B
U
F
O
B
U F
O B
U
F
O
B
U
F
O
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
W
W
W
G
G
G
W
F O
F
O
W
W
W
G
G
G
G
G
W
X
X
X
O
E
U
W
B
U
W
B
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
W
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
U T
I L I T
Y
T
E S
T
H
O L E
G R
O U
E
V A
T I O
P
O
Y
B
O P
P
I P
D E
P T
H
T
O
T
P
I P
U T
I L I T
Y
T
E S
T
H
O L E
G R
O U
E
V A
T I O
S
T E
E L
G
P
I P
D E
P T
H
T
O
T
P
I P
U T
I L I T
Y
T
E S
T
H
O L E
G R
O U
E
V A
T I O
S
T E
E L
W
A T
P
I P
D E
P T
H
T
O
T
P
I P
U T
I L I T
Y
T
E S
T
H
O L E
G R
O U
E
V A
T I O
P
O
B
P
I P
D E
P T
H
T
O
T
P
I P
G R
O U
E
V A
T I O
S
T E
E L
T
P
I P
D E
P T
H
T
O
T
P
I P
U T
I L I T
Y
T
E S
T
H
O L E
G R
O U
E
V A
T I O
S
T E
E L
T
P
I P
D E
P T
H
T
O
T
P
I P
U
W
D
U
W
D
U
W
D
U
W
D
L
O
D
L O
D
L
O
D
L O
D
L O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L
O
D
L
O
D
FTLN - (1)
AGLN - (1)
AGLN - (2)
AH - (2)
HWY4 - (2
HWY4WL - (1
CGRD - (
1)
SB
C
T
1)
P
B
C
T
1)
CHRD - (1
CHRD - (2
EN
R
D
(1
ENRD - (2)
ENRD - (3)
ENRD - (4)
ENRD - (5)
ENRD - (6)
ENRD - (7)
ENRD - (8)
ENRD - (9)
ENRD - (10)
ENRD - (11)
ENRD - (12)
EN
R
D
(1
3)
ENRD - (14)
ENRD - (15)
ENRD - (16)
ENRD - (17)
CGRD - (
1)
SB
C
T
1)
CHRD - (1
CHRD - (2
10'' W
W
U
F
O
B
U
F
O
B
U
F
O
B
U
C
B
U
C
B
U
C
B
U
C
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
W
X
X
X
X
O
E
O
E
U
W
B
U
W
B
O
E
O
E
O
E
O
E
O
E
W
X
X
X
X
X
X
X
U W
B
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
KEYPLAN
H
ENLARGED PLAN
1"=20'
1A
DUCT SECTION
NOT TO SCALE
CHH-2
CHH-4
A
SHEET KEYNOTES
1. 4'X4'X4' COMMUNICATIONS HANDHOLE.
2. SEE CIVIL DRAWINGS 02C005 FOR COMBINED
UTILITY ROAD CROSSING DETAILS.
3. EXISTING ELECTRICAL UTILITY OVERHEAD
DISTRIBUTION LINE.
4. WIRE PRESSURE TRANSMITTER TO CELLULAR
DIALER LOCATED IN ABERT'S SQUIRREL COMFORT
STATION VIA UNDERGROUND CONDUIT SYSTEM.
5. FIELD ROUTE CONDUIT FROM INSTRUMENT TO
COMMUNICATIONS HANDHOLE. CORE-DRILL
EXISTING VALVE VAULT WALL FOR CONDUIT
PENETRATION.
GENERAL NOTES
1. REFER TO CIVIL DRAWINGS FOR CONSTRUCTION
PHASING AND UTILITY CORRIDOR COORDINATION.
2. REFER TO GENERAL DRAWINGS FOR LEGENDS,
NOTES, AND ABBREVIATIONS.
CHH-3
PIT-301
1A
1A 1A
1A
1A
BUTTERFLY DIAGRAM
NOT TO SCALE
CCH-1
BUTTERFLY DIAGRAM
NOT TO SCALE
CCH-2
BUTTERFLY DIAGRAM
NOT TO SCALE
CCH-3 & CHH-04
BLUE TANK
TYP.
02E504
02E503
[1"C, 1 TYPE 3]
CHH-01
D B a c u g l i a t
A
M
E
D
D
W G
R
Date: 2025.04.11 12:20:52-06'00'
UFOB
UFOB
UFOB
UFOB
UFOB
UFOB
UFOB
UFOB
UFOB
UFOB
UFOB
U F
O B
U F
O B
U F
O B
U F
O B
U F
O B
U F
O B
U F
O B
U
F
O
B
U
F
O
B
U E
B
U E
B
U E
B
U E
B
U E
B
U E
B
U E
B
U
E
B
U
E
B
U
E
B
U E
B
U C
B
UCB
UCB
UCB
UCB
UCB
UCB
UCB
UCB
UCB
UCB
UCB
U C
B
U C
B
U C
B
U C
B
U C
B
U C
B
U C
B
U C
B
UCB
U C
B
UGB
UGB
UGB
UGB
UGB
UGB
UGB
UGB
UGB
UGB
UGB
UGB
U G
B
U G
B
U G
B
U G
B
U G
B
U G
B
U G
B
U G
B
U G
B
U G
B
T
G
T
F
O
FO
W
G
W
W
W
W
W
G
E
E
E
LOD
L O
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
L O
D
L O
D
L O
D
L O
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
FTLN - (1)
AGLN - (1)
AGLN - (2)
M
A
T
C
H
L
IN
E
S
T
A
.7
M
A
T
C
H
L
IN
E
S
T
A
.7
AH - (2)
M
A
T
C
H
L
IN
E
S
T
A
.9
M
A
T
C
H
L
IN
E
S
T
A
.3
M
A
T
C
H
L
IN
E
S
T
A
.9
M
A
T
C
H
L
IN
E
S
T
A
.3
HWY4 - (2
M
A
T
C
H
L
IN
E
S
T
A
.0
M
A
T
C
H
L
IN
E
S
T
A
.0
HWY4WL - (1
CGRD - (
1)
M A
T C
H L
IN
E
S T
A
.8
M
A T
C
H
L
IN
E S
T A
.8
SB
C
T
1)
MATCH LINE STA: 7+94.28
MATCH LINE STA: 7+94.28
P
B
C
T
1)
CHRD - (1
CHRD - (2
M
A
T
C
H
L
IN
E
S
T
A
.7
M
A
T
C
H
L
IN
E
S
T
A
.7
EN
R
D
(1
ENRD - (2)
ENRD - (3)
ENRD - (4)
ENRD - (5)
ENRD - (6)
ENRD - (7)
ENRD - (8)
ENRD - (9)
ENRD - (10)
ENRD - (11)
ENRD - (12)
EN
R
D
(1
3)
ENRD - (14)
ENRD - (15)
ENRD - (16)
ENRD - (17)
M
A
T
C
H
L
IN
E
S
T
A
.2
M
A
T
C
H
L
IN
E
S
T
A
.2
M
A
T
C
H
L
IN
E
S
T
A
.8
M
A T
C H
L
IN
E S
T A
.0
M
A T
C H
L
IN
E S
T A
.8
M A
T C
H L
IN
E
S T
A
.8
M
A
T
C
H
L
IN
E
S
T
A
.8
M
A
T
C
H
L
IN
E
S
T
A
.1
M
A
T
C
H
L
IN
E
S
T
A
.1
M
A
T
C
H
L
IN
E
S
T
A
.3
M
A
T
C
H
L
IN
E
S
T
A
.8
M
A
T
C
H
L
IN
E
S
T
A
: 1
.5
M
A
T
C
H
L
IN
E
S
T
A
.4
M
A T
C H
L
IN
E S
T A
.3
M
A T
C H
L
IN
E S
T A
.9
M
A
T
C
H
L
IN
E
S
T
A
.8
M
A T
C H
L
IN
E S
T A
.7
M
A
T
C
H
L
IN
E
S
T
A
.2
M
A
T
C
H
L
IN
E
S
T
A
.2
M
A
T
C
H
L
IN
E
S
T
A
.8
M
A T
C H
L
IN
E S
T A
.0
M
A T
C H
L
IN
E S
T A
.8
M A
T C
H L
IN
E
S T
A
.8
M
A
T
C
H
L
IN
E
S
T
A
.8
M
A
T
C
H
L
IN
E
S
T
A
.1
M
A
T
C
H
L
IN
E
S
T
A
.1
M
A
T
C
H
L
IN
E
S
T
A
.3
M
A
T
C
H
L
IN
E
S
T
A
.8
M
A
T
C
H
L
IN
E
S
T
A
: 1
+2
1.
M
A
T
C
H
L
IN
E
S
T
A
.4
M A
T C
H L
IN
E
S T
A
.3
M
A T
C H
L
IN
E S
T A
.9
M
A
T
C
H
L
IN
E
S
T
A
.8
M
A T
C H
L
IN
E S
T A
.7
CGRD - (
1)
M A
T C
H L
IN
E
S T
A
.8
M
A T
C
H
L
IN
E S
T A
.8
SB
C
T
1)
MATCH LINE STA: 7+94.28
MATCH LINE STA: 7+94.28
CHRD - (1
CHRD - (2
M
A
T
C
H
L
IN
E
S
T
A
.7
M
A
T
C
H
L
IN
E
S
T
A
.7
KEYPLAN
NM HIGHWAY 4
E N
T R
A N
A
D
2A
DUCT SECTION
NOT TO SCALE
2B
3A
DUCT SECTION
NOT TO SCALE
3B
SHEET KEYNOTES
GENERAL NOTES
1. 4x8x4 MANHOLE.
2. SEE CIVIL DRAWING 02C006 FOR UTILITY ROAD CROSSING
DETAILS.
3. NEW UTILITY POLE RISER, CONDUIT, AND SERVICE
CONDUCTORS PROVIDE BY ELECTRICAL UTILITY.
4. PAD MOUNT PRIMARY METERING CABINET. COORDINATE
WITH ELECTRICAL UTILITY FOR SPECIFIC SERVICE
DISCONNECT SWITCH REQUIREMENTS. PROVIDE
FIBERGLASS GROUND SLEEVE.
5. PAD MOUNT PRIMARY SERVICE DISCONNECT SWITCH
COORDINATE WITH ELECTRICAL UTILITY FOR SPECIFIC
SERVICE DISCONNECT SWITCH REQUIREMENTS. PROVIDE
FIBERGLASS GROUND SLEEVE.
6. PROVIDE TWO 5-INCH CONDUITS BETWEEN METERING
CABINET AND SERVICE DISCONNECT SWITCH.
7. PROVIDE TWO 5-INCH CONDUITS BETWEEN SERVICE
DISCONNECT SWITCH AND ELECTRICAL MANHOLE.
8. DEMOLISH EXISTING THREE PHASE PRIMARY SERVICE
AND SINGLE PHASE SECONDARY SERVICE, POLES, AND
OVERHEAD CONDUCTORS AFTER NEW PRIMARY SERVICE
IS PROVIDED AND ACCEPTED BY CONTRACTING OFFICER.
9. DEMOLISH EXISTING CONDUCTORS WHERE INSTALLED IN
BELOW GRADE CONDUIT. BELOW GRADE CONDUIT TO BE
ABANDONED IN PLACE. ABANDON DIRECT BURIED
CONDUCTORS AND CONDUCTORS NOT REMOVABLE FROM
BELOW GRADE CONDUIT IN PLACE.
EMH-10
EMH-11
EMH-12
65A
DUCT SECTION
NOT TO SCALE
65B
66A
DUCT SECTION
NOT TO SCALE
66B
3B
3A
65A
65B
3A 3B
66B
66A
65B 65A
BUTTERFLY DIAGRAM
NOT TO SCALE
EMH-10
BUTTERFLY DIAGRAM
NOT TO SCALE
EMH-11
BUTTERFLY DIAGRAM
NOT TO SCALE
EMH-12
PMIS-10
PMMU-10
1. REFER TO CIVIL DRAWINGS FOR CONSTRUCTION
PHASING AND UTILITY CORRIDOR COORDINATION.
2. REFER TO GENERAL DRAWINGS FOR LEGENDS,
NOTES, AND ABBREVIATIONS.
02E506
02E506
TYP.
02E504
TYP.
02E503 a c u g l i a t
A
M
E
D
D
W G
R
Date: 2025.04.11 12:20:53-06'00'
U
F
M
D
U
S
S
D
U
W
D
U
S
S
D
U
S
S
D
U
S
S
D
U
S
S
D
U
S
S
D
U
S
S
D
USSD
USSD
USSD
USSD
USSD
USSD
U
S
S
D
U
W
B
U
W
B
U
W
B
U
W
B
U W
B
UW
B
U
W
B
U
W
B
U W
B
U W
B
UWB
U W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U W
B
U W
B
U W
B
UWB
UWB
UWB
U W
B
U
W
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
G
B
U
G
B
U
G
B
U
G
B
U G
B
UGB
U
G
B
U
G
B
U
G
B
U
G
B
UGB
UGB
UGB
UGB
U G
B
UGB
U
G
B
U
G
B
U
G
B
U
S
S
D
S
S
S
S
S
S
S
T
S
S
W
E
W
W
E
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
S S
W
W
W
W
'' W
'' W
'' W
'' W
'' W
W
W
G
G
G
G
G
G
G
G
'' G
G
G
4'' G
G
G
W
W
W
W
W
W
W
W
W
W
W
G
LO
D
L
O
D
L
O
D
L O
D
L
O
D
L O
D
L O
D
LO
D
LOD
LOD
L
O
D
L
O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
LOD
LOD
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L
O
D
L
O
D
L O
D
L O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
LOD
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
LO
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L
O
D
FTLN - (1)
AGLN - (1)
AGLN - (2)
AH - (2)
HWY4 - (2
HWY4WL - (1
CGRD - (
1)
SB
C
T
1)
P
B
C
T
1)
CHRD - (1
CHRD - (2
EN
R
D
(1
ENRD - (2)
ENRD - (3)
ENRD - (4)
ENRD - (5)
ENRD - (6)
ENRD - (7)
ENRD - (8)
ENRD - (9)
ENRD - (10)
ENRD - (11)
ENRD - (12)
EN
R
D
(1
3)
ENRD - (14)
ENRD - (15)
ENRD - (16)
ENRD - (17)
CGRD - (
1)
SB
C
T
1)
CHRD - (1
CHRD - (2
KEYPLAN
C
A
M
P
G
R
O
U
A
D
ABERT'S SQUIRREL LOOP
SHEET KEYNOTES
GENERAL NOTES
1. 4x8x4 PRIMARY ELECTRIC MANHOLE.
2. 4x4x4 COMMUNICATIONS HANDHOLE.
3. PAD-MOUNTED LOOP FEED TRANSFORMER.
4. COMBINE DUCT BANKS 1 AND 33 INTO COMMON
DUCT BANK.
5. DEMOLISH 480V RACK-MOUNTED DISCONNECTS
FEEDING ABERT'S SQUIRREL AND BLACK BEAR
COMFORT STATIONS.
6. FIELD ROUTE COMFORT STATION SECONDARY
FEED FROM TRANSFORMER INTO COMFORT
STATION UTILITY ROOM AND RE-FEED EXISTING
PANEL LP-A.
7. PENETRATE FIBER COMMUNICATIONS CONDUIT
INTO COMFORT STATION UTILITY ROOM.
8. STUB OUT 4 INCH PRIMARY CONDUIT FOR FUTURE
EXPANSION.
9. RV PEDESTAL FOR NEW CAMP HOST SITE. FIELD
ROUTE FEEDER CONDUIT TO ABERT'S SQUIRREL
COMFORT STATION. COORDINATE LOCATION WITH
FINAL SITE ORIENTATION. INSTALL RV PEDESTAL
ADJACENT TO WATER AND SEWER HOOKUPS.
02E101
1. REFER TO CIVIL DRAWINGS FOR CONSTRUCTION
PHASING AND UTILITY CORRIDOR COORDINATION.
2. REFER TO GENERAL DRAWINGS FOR LEGENDS,
NOTES, AND ABBREVIATIONS.
DUCT SECTION
NOT TO SCALE
33A
DUCT SECTION
NOT TO SCALE
33B
34A
BUTTERFLY DIAGRAM
NOT TO SCALE
EMH-29
BUTTERFLY DIAGRAM
NOT TO SCALE
CHH-25
34B
33A
33B
34A
34B
DUCT SECTION
NOT TO SCALE
33A
33B1A
CHH-25
CHH-4
EMH-29
COMFORT STATION
LT-A
T
02E504
02E504
02E506
TYP.
02E503
RV
LP-A
02E508
[1"C, 3#6, 1#10G]
02E509
D B
CHH-3
a c u g l i a t
A
M
E
D
D
W G
R
Date: 2025.04.11 12:20:54-06'00'
F
M
D
U
S
F
M
D
U
S
F
M
D
U
S
F
M
D
U
S
F
M
D
U
S
F
M
D
U
S
F
M
D
U
S
S
D
U
S
S
D
U
S
S
D
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U E
B U
E B
U E
B
U
E
B
U
E
B
U
E
B
U E
B
S
S
W
E
W
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
W
W
W
W
W
W
4'' W
W
W
W
W
W
W
LO
D
L
O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
LOD
L
O
D
L
O
D
L
O
D
L
O
D
LOD
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L
O
D
L O
D
L
O
D
L O
D
L
O
D
LOD
L
O
D
LOD
L
O
D
L
O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
FTLN - (1)
AGLN - (1)
AGLN - (2)
M
A
T
C
H
L
IN
E
S
T
A
.7
M
A
T
C
H
L
IN
E
S
T
A
.7
AH - (2)
M
A
T
C
H
L
IN
E
S
T
A
.9
M
A
T
C
H
L
IN
E
S
T
A
.3
M
A
T
C
H
L
IN
E
S
T
A
.9
M
A
T
C
H
L
IN
E
S
T
A
.3
HWY4 - (2
M
A
T
C
H
L
IN
E
S
T
A
.0
M
A
T
C
H
L
IN
E
S
T
A
.0
HWY4WL - (1
CGRD - (
1)
M A
T C
H L
IN
E
S T
A
.8
M
A T
C
H
L
IN
E S
T A
.8
SB
C
T
1)
MATCH LINE STA: 7+94.28
MATCH LINE STA: 7+94.28
P
B
C
T
1)
CHRD - (1
CHRD - (2
M
A
T
C
H
L
IN
E
S
T
A
.7
M
A
T
C
H
L
IN
E
S
T
A
.7
EN
R
D
(1
ENRD - (2)
ENRD - (3)
ENRD - (4)
ENRD - (5)
ENRD - (6)
ENRD - (7)
ENRD - (8)
ENRD - (9)
ENRD - (10)
ENRD - (11)
ENRD - (12)
EN
R
D
(1
3)
ENRD - (14)
ENRD - (15)
ENRD - (16)
ENRD - (17)
M
A
T
C
H
L
IN
E
S
T
A
.2
M
A
T
C
H
L
IN
E
S
T
A
.2
M
A
T
C
H
L
IN
E
S
T
A
.8
M
A T
C H
L
IN
E S
T A
.0
M
A T
C H
L
IN
E S
T A
.8
M A
T C
H L
IN
E
S T
A
.8
M
A
T
C
H
L
IN
E
S
T
A
.8
M
A
T
C
H
L
IN
E
S
T
A
.1
M
A
T
C
H
L
IN
E
S
T
A
.1
M
A
T
C
H
L
IN
E
S
T
A
.3
M
A
T
C
H
L
IN
E
S
T
A
.8
M
A
T
C
H
L
IN
E
S
T
A
: 1
.5
M
A
T
C
H
L
IN
E
S
T
A
.4
M
A T
C H
L
IN
E S
T A
.3
M
A T
C H
L
IN
E S
T A
.9
M
A
T
C
H
L
IN
E
S
T
A
.8
M
A T
C H
L
IN
E S
T A
.7
M
A
T
C
H
L
IN
E
S
T
A
.2
M
A
T
C
H
L
IN
E
S
T
A
.2
M
A
T
C
H
L
IN
E
S
T
A
.8
M
A T
C H
L
IN
E S
T A
.0
M
A T
C H
L
IN
E S
T A
.8
M A
T C
H L
IN
E
S T
A
.8
M
A
T
C
H
L
IN
E
S
T
A
.8
M
A
T
C
H
L
IN
E
S
T
A
.1
M
A
T
C
H
L
IN
E
S
T
A
.1
M
A
T
C
H
L
IN
E
S
T
A
.3
M
A
T
C
H
L
IN
E
S
T
A
.8
M
A
T
C
H
L
IN
E
S
T
A
: 1
+2
1.
M
A
T
C
H
L
IN
E
S
T
A
.4
M A
T C
H L
IN
E
S T
A
.3
M
A T
C H
L
IN
E S
T A
.9
M
A
T
C
H
L
IN
E
S
T
A
.8
M
A T
C H
L
IN
E S
T A
.7
CGRD - (
1)
M A
T C
H L
IN
E
S T
A
.8
M
A T
C
H
L
IN
E S
T A
.8
SB
C
T
1)
MATCH LINE STA: 7+94.28
MATCH LINE STA: 7+94.28
CHRD - (1
CHRD - (2
M
A
T
C
H
L
IN
E
S
T
A
.7
M
A
T
C
H
L
IN
E
S
T
A
.7
KEYPLAN
BLACK BEAR LOOP
C
A
M
P
G
R
O
U
A
D
SHEET KEYNOTES
GENERAL NOTES
1. 4x8x4 PRIMARY ELECTRIC MANHOLE.
2. 4x4x4 COMMUNICATIONS HANDHOLE.
3. PAD-MOUNTED LOOP FEED TRANSFORMER.
4. FIELD ROUTE COMFORT STATION SECONDARY
FEED FROM TRANSFORMER INTO COMFORT
STATION UTILITY ROOM AND RE-FEED EXISTING
PANEL LP-B.
5. PENETRATE FIBER COMMUNICATIONS CONDUIT
INTO COMFORT STATION UTILITY ROOM.
6. STUB OUT 4 INCH PRIMARY CONDUIT FOR FUTURE
EXPANSION.
1. REFER TO CIVIL DRAWINGS FOR CONSTRUCTION
PHASING AND UTILITY CORRIDOR COORDINATION.
2. REFER TO GENERAL DRAWINGS FOR LEGENDS,
NOTES, AND ABBREVIATIONS.
37B
38A
BUTTERFLY DIAGRAM
NOT TO SCALE
EMH-38
BUTTERFLY DIAGRAM
NOT TO SCALE
CHH-11
38B
37A
DUCT SECTION
NOT TO SCALE
38A
38B
DUCT SECTION
NOT TO SCALE
37A
37B
CHH-11
EMH-38
COMFORT STATION
LT-B
T
TYP.
02E503
02E504
02E504
02E506
02E509 a c u g l i a t
A
M
E
D
D
W G
R
Date: 2025.04.11 12:20:55-06'00'
D
U
C
D
U
C
D
U
C
D
U
C
D
U
C
D
U
C
D
U
C
D
U
S
S
D
U
G
D
U
G
D
U
W
D
U
W
D
U
W
D
U
C
D
U
C
D
U
C
D
U
C
D
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U E
B
U
E
B
U
E
B
U
E
B
U
E
B
U E
B
U E
B
U
E
B
U E
B
U E
B
U
E
B
U
E
B
U
E
B
U
E
B
U E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
UCB
U
C
B
U
C
B
U C
B U
C B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U C
B
U
C
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
S
D
C
W
E
E
E
T
E
E
E T
T
W
W
W
W
W
T
T
T
E
E
E
G
G
E
E
E
G
A
C
E
E
W
W
8'' W
8'' W
W
W
W
W
W
W
W
G
G
G
G
G
G
G
G
4'' G
4'' G
G
G
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L
O
D
L
O
D
L O
D
LOD
L O
D
L O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
LO
D
L O
D
L O
D
L O
D
LOD
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
FTLN - (1)
AGLN - (1
AGLN - (2)
AH - (2)
HWY4 - (2
HWY4WL - (1)
CGRD - (1
SB
CT
(1
P
B
C
T
1)
CHRD - (
1)
CHRD - (2
EN
RD
(1
ENRD - (2)
ENRD - (3)
ENRD - (4)
ENRD - (5)
ENRD - (6)
ENRD - (7)
ENRD - (8)
ENRD - (9)
ENRD - (10)
ENRD - (1
1)
ENRD - (12)
EN
R
D
(1
3)
ENRD - (14)
ENRD - (15)
ENRD - (16)
ENRD - (17)
CGRD - (1
SB
CT
(1
CHRD - (
1)
CHRD - (2
KEYPLAN
C
A M
P G
R
O
U
A D
E
N
T
R
A
N
A
D
C
O
O
P
E
K
S
A
L
T
B
R
U
S
H
C
T
02E115
EMH-25
CHH-05
CHH-33
CHH-06
EMH-26
SHEET KEYNOTES
1. 4x8x4 PRIMARY ELECTRIC MANHOLE.
2. 4x4x4 COMMUNICATIONS HANDHOLE.
3. PAD-MOUNTED SWITCH CABINET WITH FIBERGLASS
GROUND SLEEVE.
4. PAD-MOUNTED SECTIONALIZING CABINET WITH
FIBERGLASS GROUND SLEEVE.
5. DEMOLISH 480V ABOVE-GRADE DISCONNECT RACK.
ABANDON IN PLACE UNDERGROUND CONDUITS
AND DIRECT BURIED CONDUCTORS.
6. ABANDON IN PLACE UNDERGROUND PRIMARY
CONDUCTORS.
7. DEMOLISH ACCESSIBLE PRIMARY CONDUCTORS
FROM MANHOLE. ABANDON IN PLACE MANHOLE.
8. ABANDON IN PLACE LOW-VOLTAGE UNDERGROUND
SECONDARY CONDUCTORS.
GENERAL NOTES
1. REFER TO CIVIL DRAWINGS FOR CONSTRUCTION
PHASING AND UTILITY CORRIDOR COORDINATION.
2. REFER TO GENERAL DRAWINGS FOR LEGENDS,
NOTES, AND ABBREVIATIONS.
BUTTERFLY DIAGRAM
NOT TO SCALE
EMH-25
BUTTERFLY DIAGRAM
NOT TO SCALE
CHH-05
7B
25B
23A
23B
7C
7D
23C
23D
25C
DUCT SECTION
NOT TO SCALE
25B
25D
25A
DUCT SECTION
NOT TO SCALE
27A
26C
DUCT SECTION
NOT TO SCALE
26B
26D
26A
28C
DUCT SECTION
NOT TO SCALE
28B
28D
28A
7A
25A
25D 25C
BUTTERFLY DIAGRAM
NOT TO SCALE
CHH-06
24C
24D
BUTTERFLY DIAGRAM
NOT TO SCALE
EMH-26
24B
25B
27A
27B
24A
25A
25D 25C
24C 24D
24B 24A
28A 28B
28C 28D
23C
DUCT SECTION
NOT TO SCALE
23B
23D
23A
24C
DUCT SECTION
NOT TO SCALE
24B
24D
24A
26E
SC-04
TYP.
02E503
02E506
PMIS-12
TYP.
02E504
TYP.
02E504
02E507
26E a c u g l i a t
A
M
R
E
D
D
W G
Date: 2025.04.11 12:20:55-06'00'
F
M
D
U
S
F
M
D
USFMD
U
S
F
M
D
U
S
F
M
D
U
S
F
M
D
U
S
S
D
U
S
S
D
U
S
S
D
U
S
S
D
U
S
S
D
U
S
S
D
U
S
S
D
U
S
S
D
U
S
S
D
U
S
S
D
U
S
S
D
U
S
S
D
U
S
S
D
U
S
S
D
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U W
B
U
W
B
U W
B
U
W
B
U
W
B
U
W
B
U
E
B
U
E
B
U E
B
UEB
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U E
B
U
E
B
U E
B U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
C
B
U
C
B
UCB
U C
B
U
C
B
U
C
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U G
B
U
G
B
U G
B
U S
S D
U S
S D
U S
S D
S
S
S
S
S
T
S
S
W
E
E
E
E
E
E
E
W
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
S
S
S
S
S
S
S
S
S
S
S
S
S
S
W
W
W
W
W
G
G
G
G
W
W
W
W
'' W
'' W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
G
G
O
D
L O
D
L
O
D
L
O
D
L
O
D
L O
D
L O
D
L
O
D
L
O
D
L
O
D
LOD
L
O
D
L
O
D
L
O
D
L O
D
LOD
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
LOD
L
O
D
L O
D
L
O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
LO
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L
O
D
L
O
D
L
O
D
LOD
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
FTLN - (1)
AGLN - (1)
AGLN - (2)
AH - (2)
HWY4 - (2
HWY4WL - (1
CGRD - (
1)
SB
C
T
1)
P
B
C
T
1)
CHRD - (1
CHRD - (2
EN
R
D
(1
ENRD - (2)
ENRD - (3)
ENRD - (4)
ENRD - (5)
ENRD - (6)
ENRD - (7)
ENRD - (8)
ENRD - (9)
ENRD - (10)
ENRD - (11)
ENRD - (12)
EN
R
D
(1
3)
ENRD - (14)
ENRD - (15)
ENRD - (16)
ENRD - (17)
CGRD - (
1)
SB
C
T
1)
CHRD - (1
CHRD - (2
KEYPLAN
C A
M P
G R
O U
N D
R O
A D
A B
E R
T
Q U
I R
R E
L
L O
O P
B L A
C K
B E
A R
L O
O P
EMH-28
CHH-08
CHH-07
EMH-27
[1"C, 4#6, 1#8G]
SC-01
02E106
E
E
BUTTERFLY DIAGRAM
NOT TO SCALE
EMH-27
23C
DUCT SECTION
NOT TO SCALE
23B
BUTTERFLY DIAGRAM
NOT TO SCALE
CHH-07
23A
23D
23A
DUCT SECTION
NOT TO SCALE
30A
23B
31A
35A
35B
23C
23D
35C
35D
1A
30A
31C
DUCT SECTION
NOT TO SCALE
31B
31D
31A
36C
DUCT SECTION
NOT TO SCALE
36B
36D
36A
35C
DUCT SECTION
NOT TO SCALE
35B
35D
35A
39C
DUCT SECTION
NOT TO SCALE
39B
39D
39A
30A
31B
31C 31D
32A
33B
BUTTERFLY DIAGRAM
NOT TO SCALE
CHH-08
35C
35D
37B
BUTTERFLY DIAGRAM
NOT TO SCALE
EMH-28
35B
39A
39B
35A
37A
36A
36B
36C
36D
SHEET KEYNOTES
GENERAL NOTES
1. REFER TO CIVIL DRAWINGS FOR CONSTRUCTION
PHASING AND UTILITY CORRIDOR COORDINATION.
2. REFER TO GENERAL DRAWINGS FOR LEGEND,
NOTES AND ABBREVIATIONS.
1. 4x8x4 PRIMARY ELECTRIC MANHOLE.
2. 4x4x4 COMMUNICATIONS HANDHOLE.
3. PAD-MOUNTED SECTIONALIZING CABINET WITH FIBERGLASS
GROUND SLEEVE.
4. PAD-MOUNTED LOOP FEED TRANSFORMER.
5. COMBINE DUCT BANKS 23 AND 30 INTO COMMON DUCT
BANK.
6. REFEED EXISTING PANELBOARD AT CAMPGROUND PAY
STATION. EXISTING PANEL HAS SOLAR GENERATION FEED.
7. DEMOLISH RACK-MOUNTED LOW VOLTAGE DISCONNECT
AND TRANSFORMER. RACK AND PANELBOARD TO REMAIN..
SC-02
C
E
LP-JCES
TYP.
02E503
02E506
LT-JCES
T
02E507
TYP.
02E504
TYP.
02E504
02E507
39C
39D a c u g l i a t
A
M
E
D
D
W G
R
Date: 2025.04.11 12:20:56-06'00'
F
M
D
U
S
F
M
D
U
S
F
M
D
U
S
F
M
D
U
S
F
M
D
U
S
F
M
D
U
S
F
M
D
U
S
F
M
D
USFMD
U
S
F
M
D
U
S
F
M
D
U
S
F
M
D
U
S
F
M
D
U
S
F
M
D
U
S
F
M
D
U
S
F
M
D
U
S
F
M
D
U
S
F
M
D
U
S
F
M
D
U
S
F
M
D
U
W
B
U
W
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
UEB
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
S
S
E
E
E
S
S
S
S
E
E
E
E
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
UWD
UWD
UWD
UWD
UWD
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
W
W
W
W
W
W
'' W
'' W
W
W
W
W
W
4'' W
W
W
W
W
W
''W
''W
''W
W
W
1''W
LOD
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L
O
D
L
O
D
L O
D
L
O
D
LOD
L
O
D
L O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
LOD
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
LOD
L
O
D
L O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
LOD
LO
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
LOD
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
LOD
L
O
D
L
O
D
L
O
D
LOD
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
FTLN - (1)
AGLN - (1
AGLN - (2)
AH - (2)
HWY4 - (2)
HWY4WL - (1)
CGRD - (1
SB
CT
(1
P
B
C
T
1)
CHRD - (
1)
CHRD - (2
EN
R
D
(1
ENRD - (2)
ENRD - (3)
ENRD - (4)
ENRD - (5)
ENRD - (6)
ENRD - (7)
ENRD - (8)
ENRD - (9)
ENRD - (10)
ENRD - (1
1)
ENRD - (12)
EN
R
D
(1
3)
ENRD - (14)
ENRD - (15)
ENRD - (1
6)
ENRD - (17)
CGRD - (1
SB
CT
(1
CHRD - (
1)
CHRD - (2
KEYPLAN
SHEET KEYNOTES
GENERAL NOTES
1. REFER TO CIVIL DRAWINGS FOR CONSTRUCTION PHASING
AND UTILITY CORRIDOR COORDINATION.
2. REFER TO GENERAL DRAWINGS FOR LEGEND, NOTES AND
ABBREVIATIONS.
1. 4x8x4 PRIMARY ELECTRIC MANHOLE.
2. 4x4x4 COMMUNICATIONS HANDHOLE.
3. PAD-MOUNTED SECTIONALIZING CABINET WITH FIBERGLASS
GROUND SLEEVE.
4. PAD-MOUNTED LOOP FEED TRANSFORMER.
5. LOCATE, DISCONNECT, AND REMOVE LOW-VOLTAGE
CONDUCTORS TO 36 INCHES BELOW GRADE. ABANDON IN
PLACE REMAINING UNDERGROUND CONDUCTORS.
6. DEMOLISH ABOVE-GRADE TRANSFORMER.
7. FIELD ROUTE COMFORT STATION SECONDARY FEED FROM
TRANSFORMER INTO COMFORT STATION UTILITY ROOM AND
RE-FEED EXISTING PANEL LP-C.
8. PENETRATE FIBER COMMUNICATIONS CONDUIT INTO COMFORT
STATION UTLITY ROOM.
9. STUB OUT 4 INCH PRIMARY CONDUIT FOR FUTURE EXPANSION.
10. FIELD ROUTE AMPHITEATER SECONDARY FEED FROM
TRANSFORMER INTO STAGE BUILDING AND RE-FEED EXISTING
PANEL LP-AT.
11. STUB COMMUNICATIONS CONDUIT INTO AMPHITEATER STAGE
BUILDING.
CHH-11
EMH-31
CHH-10
EMH-30
CHH-12
EMH-32
EMH-29
CHH-09
SC-03
E
40C
DUCT SECTION
NOT TO SCALE
40B
40D
40A
DUCT SECTION
NOT TO SCALE
DUCT SECTION
NOT TO SCALE
67A
67B
DUCT SECTION
NOT TO SCALE
43A
43B
41A
41C
DUCT SECTION
NOT TO SCALE
44A
44B
DUCT SECTION
NOT TO SCALE
45A
45B
BUTTERFLY DIAGRAM
NOT TO SCALE
EMH-30
BUTTERFLY DIAGRAM
NOT TO SCALE
CHH-10
68B41C
BUTTERFLY DIAGRAM
NOT TO SCALE
EMH-32
44A
45A
BUTTERFLY DIAGRAM
NOT TO SCALE
EMH-31
42A
43A
BUTTERFLY DIAGRAM
NOT TO SCALE
CHH-11
43B
42B
BUTTERFLY DIAGRAM
NOT TO SCALE
CHH-12
45B
44B
BUTTERFLY DIAGRAM
NOT TO SCALE
EMH-29
39B
BUTTERFLY DIAGRAM
NOT TO SCALE
CHH-09
40A 40B
40C 40D
39A 41A
39D
39C 41B
T
LT-C
T
LT-AT
TYP.
02E503
02E504
TYP.
02E504
02E506
02E507
02E506
TYP.
02E509
E
E
CHH-04
DIAGRAM ON
DRAWING 02E110
EMH-39
DIAGRAM ON
DRAWING 02E110
41B
41A
67B
68A
41D 67B
41B
41D
41B
41D
68A
68B
COMBINE DUCT BANKS
67 AND 68 INTO
COMMON DUCT BANK
a c u g l i a t
A
M
E
D
D
W G
R
Date: 2025.04.11 12:20:57-06'00'
SS
S
S
S
W1
G
G
G
W
W
W
W
W
W
6'' W
6'' W 6'' W
G
G
G
G
G
G
G
G
G
1'' G 1'' G
W
W
W
W
U
C
D
U
C
D
U
S
S
D
U
S
S
D
U
G
D
U
G
D
U
W
D
U
W
D
U
G
D
U
G
D
U
G
D
U
G
D
U
G
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U E
B UEB
UEB
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
UCB
UCB
UCB
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
UCB
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U C
B
U
C
D
U
C
D
U
C
D
U
C
D
U
C
D
U
C
D
U
C
D
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
S
S
C
U
S
S
C
U
S
S
C
W
S S
T
T
T
W
W
W
W
W
T
T
T
T
T
E
E
E
E
E
E
E
G
G
U
S
S
C
L
O
D
L
O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
LOD
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
LOD
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
LOD
LOD
LOD
LOD
L O
D
L
O
D
L
O
D
L
O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
FTLN - (1)
AGLN - (1)
AGLN - (2)
AH - (2)
HWY4 - (2
HWY4WL - (1
CGRD - (
1)
SB
C
T
1)
P
B
C
T
1)
CHRD - (1
CHRD - (2
EN
R
D
(1
ENRD - (2)
ENRD - (3)
ENRD - (4)
ENRD - (5)
ENRD - (6)
ENRD - (7)
ENRD - (8)
ENRD - (9)
ENRD - (10)
ENRD - (11)
ENRD - (12)
EN
R
D
(1
3)
ENRD - (14)
ENRD - (15)
ENRD - (16)
ENRD - (17)
CGRD - (
1)
SB
C
T
1)
CHRD - (1
CHRD - (2
KEYPLAN
C
O
O
P
E
K
S
A
L
T
B
R
U
C
A
M
P
G
R
O
U
A
D
SHEET KEYNOTES
GENERAL NOTES
1. REFER TO CIVIL DRAWINGS FOR CONSTRUCTION
PHASING AND UTILITY CORRIDOR COORDINATION.
2. REFER TO GENERAL DRAWINGS FOR LEGEND,
NOTES AND ABBREVIATIONS.
1. 4x8x4 PRIMARY ELECTRIC MANHOLE.
2. 4x4x4 COMMUNICATIONS HANDHOLE.
3. ABANDON IN PLACE UNDERGROUND PRIMARY
CONDUCTORS. DEMOLISH AS NEEDED FOR INSTALLATION
OF NEW DUCT BANK TO FIELD OPERATIONS CENTER.
4. EXISTING COMMUNICATIONS HANDHOLE AND DUCT BANK
TO REMAIN.
E
EMH-33
CHH-23
BUTTERFLY DIAGRAM
NOT TO SCALE
EMH-33
46C
DUCT SECTION
NOT TO SCALE
46B
BUTTERFLY DIAGRAM
NOT TO SCALE
CHH-23
28A
46D
46A
DUCT SECTION
NOT TO SCALE
47A
28B
47A
47B
46A
46B
28C
28D
13C
13D
47B
TYP.
02E503
02E504
02E504
BUTTERFLY DIAGRAM
NOT TO SCALE
EMH-39
BUTTERFLY DIAGRAM
NOT TO SCALE
CHH-04
44A 67A44B 67B
DUCT SECTION
NOT TO SCALE
67A
67B
DUCT SECTION
NOT TO SCALE
68A
68B z h u n e r s
A
M
E
D
D
W G
R
Date: 2025.04.11 12:20:57-06'00'
FTLN - (1)
AGLN - (1)
AGLN - (2)
AH - (2)
HWY4 - (2
HWY4WL - (1
CGRD - (
1)
SB
C
T
1)
P
B
C
T
1)
CHRD - (1
CHRD - (2
EN
R
D
(1
ENRD - (2)
ENRD - (3)
ENRD - (4)
ENRD - (5)
ENRD - (6)
ENRD - (7)
ENRD - (8)
ENRD - (9)
ENRD - (10)
ENRD - (11)
ENRD - (12)
EN
R
D
(1
3)
ENRD - (14)
ENRD - (15)
ENRD - (16)
ENRD - (17)
CGRD - (
1)
SB
C
T
1)
CHRD - (1
CHRD - (2
U
S
S
D
UEB
UEB
U
E
B
U
E
B
U E
B
U E
B
U E
B
U E
B
UEB
UEB
UEB
U
E
B
U E
B
U
E
B
U E
B
U E
B
U
E
B
U
C
B
U
C
B U
C
B
U C
B
U
C
B
UCB
UCB
UCB
UCB
UCB
U C
B
U C
B
U C
B
U C
B
U
C
B
U
C
B
U
C
B
USSC
USSC
USSC
USSC
USSC
USSC
USSC
U
S
S
C
U
S
S
C
U
S
S
C
U
S
S
C
U
S
S
D
U
S
S
D
U
S
S
D
USSD
USSD
USSD
USSD
USSD
USSD
S
S
S
S
S
S
S
S
S
S
T
T
T
E
E
L
O
D
L
O
D
L O
D
L O
D
L O
D
L O
D
LOD
LOD
LOD
L O
D
L O
D
L O
D
LOD
L O
D
LOD
LO
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
LOD
L O
D
L O
D
LOD
LOD
LOD
LOD
L O
D
L O
D
L O
D
L
O
D
L
O
D
KEYPLAN
LP-2
C O
O
PER
S H
AW
K R O
AD
CHH-24
EMH-34
PMIS-13
E
SHEET KEYNOTES
GENERAL NOTES
1. REFER TO CIVIL DRAWINGS FOR CONSTRUCTION
PHASING AND UTILITY CORRIDOR COORDINATION.
2. REFER TO GENERAL DRAWINGS FOR LEGEND,
NOTES AND ABBREVIATIONS.
3. REFER TO SHEET 02C200 FOR BUILDING NUMBER
INDEX TABLE.
1. 4x8x4 PRIMARY ELECTRIC MANHOLE.
2. 4x4x4 COMMUNICATIONS HANDHOLE.
3. PAD-MOUNTED SWITCH CABINET WITH FIBERGLASS
GROUND SLEEVE.
4. ONE 4-INCH PVC CONDUIT, STUB OUT AND CAP FOR
FUTURE SOLAR PV AND EV VEHICLE CHARGER
CONNECTION.
5. PENETRATE CONDUITS INTO BUILDING ABOVE
GRADE TO MECHANICAL ROOM AND IT CLOSET
ADJACENT TO EXISTING.
6. RECONNECT EXISTING PAD-MOUNTED
TRANSFORMER.
7. ABANDON IN PLACE UNDERGROUND PRIMARY
CONDUCTORS. DEMOLISH AS NEEDED FOR
INSTALLATION OF NEW DUCT BANK TO FIELD
OPERATIONS CENTER.
8. RECONNECT EXISTING PAD-MOUNTED
TRANSFORMER.
9. TWO 2-INCH CONDUITS FROM LCP TO IT CLOSET.
10. MOUNT LCP TO WALL WITH CHANNEL STRUT.
RELOCATE HOSE RACK, COORINATE NEW
LOCATION WITH CONTRACTING OFFICER.
11. EXISTING COMMUNICATIONS HANDHOLE AND DUCT
BANK TO REMAIN.
BUTTERFLY DIAGRAM
NOT TO SCALE
EMH-34
48C
DUCT SECTION
NOT TO SCALE
48B
BUTTERFLY DIAGRAM
NOT TO SCALE
CHH-24
46A
48D
48A
DUCT SECTION
NOT TO SCALE
49A
DUCT SECTION
NOT TO SCALE
50B50A
46B
48C
48A
48D
48B
46C
46D
50A
T
LT-FOC, EXST
TYP.
02E503
02E506
TYP.
02E504
TYP.
02E504
A
DP-1
NIP-101
WATER
HEATER
IT CLOSET
MECH ROOM
[P2]
FOC ENLARGED PLAN
SCALE 1/4"=1'-0"
A
49A
50B a c u g l i a t
A
M
E
D
D
W G
R
Date: 2025.04.11 12:20:58-06'00'
S
S
S
S
S
S
S
S
S
S
S
S
W
G
W
G
G
A
S
'' G
'' G
'' G
W
W
G
G
'' W
'' W
C
D
U
C
D
U
C
D
U
C
D
UCD
U
C
D
U
E
D
U
E
D
U
G
D
U G
D
U
E
D
U
E
D
U
C
D
U
W
D
U
W
B
U W
B
U W
B
U W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U W
B
U W
B
U W
B
U
W
B
U
W
B
U
W
B
U W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U W
B
U
W
B
U
W
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
C
B U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U C
B
U
C
B
U C
B
U
C
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U G
B
U
G
BU
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B U
G
B
U
G
B
U
G
B
U G
B
U
G
B
U
G
B
U
S
S
C
U
S
S
C
U
S
S
C
U
S
S
C
U
S
S
C
U
S
S
C
U
S
S
C
U
S
S
C
U
S
S
C
U
S
S
C
W
SS
SS
SS
SS
SS
SS
SS
SS
SS
W
W
W
W
W
W
E
E
T
T
T
E
T
T
T
T
E
E
G
G
T
E
T
E
W
G
T
T
T
T
T
T
T
T
T
T
E
G
E
E
W
W
W
W
G
E
A
C
A
C
AC
E
E
E
E
X
X
X
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L O
D
L
O
D
L
O
D
L O
D
L
O
D
LOD
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
LO
D
L O
D
LO
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L
O
D
LO
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
FTLN - (1)
AGLN - (1)
AGLN - (2)
AH - (2)
HWY4 - (2
HWY4WL - (1
CGRD - (
1)
SB
C
T
1)
P
B
C
T
1)
CHRD - (1
CHRD - (2
EN
R
D
(1
ENRD - (2)
ENRD - (3)
ENRD - (4)
ENRD - (5)
ENRD - (6)
ENRD - (7)
ENRD - (8)
ENRD - (9)
ENRD - (10)
ENRD - (11)
ENRD - (12)
EN
R
D
(1
3)
ENRD - (14)
ENRD - (15)
ENRD - (16)
ENRD - (17)
CGRD - (
1)
SB
C
T
1)
CHRD - (1
CHRD - (2
KEYPLAN
SALTBRUSH CT
SHEET KEYNOTES
GENERAL NOTES
1. REFER TO CIVIL DRAWINGS FOR CONSTRUCTION
PHASING AND UTILITY CORRIDOR COORDINATION.
2. REFER TO GENERAL DRAWINGS FOR LEGEND,
NOTES AND ABBREVIATIONS.
1. PAD MOUNTED LOOP FEED TRANSFORMER.
2. DIRECT BURIED CONDUIT FOR SECONDARY
SERVICE TO RESIDENTAIL UNITS.
3. REFEED EXISTING UTILITY METER AND 120/240V,
200A, SERVICE PANEL ON BUILDING EXTERIOR.
4. STUB, CAP, AND MARK 2" CONDUIT FOR FUTURE
SECONDARY SERVICE.
5. REPLACE RV PEDESTAL WITH SERVICE-ENTRANCE
RATED RV PEDESTAL WITH METER.
6. DEMOLISH PAD-MOUNTED TRANSFORMER.
7. LOCATE, DISCONNECT, AND REMOVE
LOW-VOLTAGE CONDUCTORS TO 36 INCH BELOW
GRADE. ABANDON IN PLACE REMAINING
UNDERGROUND CONDUCTORS.
8. SERVICE ENTRANCE RATED RV PEDESTAL WITH
METER.
9. ABANDON IN PLACE UNDERGROUND PRIMARY
CONDUCTORS.
[2"C, PULLSTRINGS]
C
B
A
E
[2"C, 3#4/0, 1#4G]
TYP
[2"C, 3#4/0, 1#4G]
[2"C, 3#4/0, 1#4G]
[2"C, 3#4/0, 1#4G]
63A
DUCT SECTION
NOT TO SCALE
63A
T
R
V
R
V
R
V
R
V
LT-SB1
T
T
LT-SB2
T
LT-SB4
LT-SB3
RESIDENTAL
UNIT NUMBER,
TYP
63B
DUCT SECTION
NOT TO SCALE
63B
63C
DUCT SECTION
NOT TO SCALE
63C
100 102
TYP.
02E503
02E504
TYP.
02E506
TYP.
02E508
[2"C, 3#4/0, 1#4G]
[2"C, 3#4/0, 1#4G]
[2"C, 3#4/0, 1#4G] a c u g l i a t
A
M
E
D
D
W G
R
Date: 2025.04.11 12:20:59-06'00'
D
U
G
D
U
G
D
U
G
D
U
G
D
U
G
D
U
G
D
U
G
D
U
W
D
U
W
D
U
W
D
U
C
D
U
C
D
U C
D
U
E
D
U E
D
U
E
D
U
E
D
U
G
D
U
G
D
U
G
D
U
G
D
U
G
D
U
G
D
U
G
D
U
G
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U E
D
U
E
D
U
S
S
C
U
S
S
C
U
S
S
C
U
S
S
C
U
S
S
C
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
U
W
B
UWB
U
W
B
U W
B
U W
B
U
W
B
U
W
B
U
W
B
U
E
B
U E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U E
B
U E
B
U
E
B
U
E
B
U
E
B
UEB
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U E
B
U E
B
U
E
B
U E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
C
B
U C
B
U
C
B
U
C
B
U
C
B
UCB
U
C
B
UCB
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U C
B
U C
B
U
C
B
U
C
B
U
C
B
U C
B
U C
B
U
C
B
U C
B
U
C
B
UCB
U C
B
U C
B
U C
B
U
C
B
U
C
B
U
C
D
U C
D
U
C
D
U
C
D
U
C
D
U
C
D
U
C
D
U C
D
U
C
D
U
C
D
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
S
S
C
U
S
S
C
U
S
S
C
U
S
S
C
U
S
S
C
U
S
S
C
U
S
S
C
U
S
S
C
U
S
S
C
U
S
S
C
U
S
S
C
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
T
T
T
E
E
W
W
W
W
W
W
W
W
G
E
E
E
E
T
E T
T
T
T
T
T
T
T
T
T
E
E
E
E
E
E
E
E
XX
U
S
S
C
U
S
S
C
U S
S C
U S
S C
SS
S
S
S
S
S
S
S
S
S S
W
G
G
W
G
2'' G
G
G
G
G
G
G
G
G
G
G
G
W
6'' W
W
W
W
W
W
W
W
W
W
G
W
W
W
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L
O
D
L
O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
LOD
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
LOD
L
O
D
LOD
LO
D
LOD
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
FTLN - (1)
AGLN - (1)
AGLN - (2)
AH - (2)
HWY4 - (2
HWY4WL - (1
CGRD - (
1)
SB
C
T
1)
P
B
C
T
1)
CHRD - (1
CHRD - (2
EN
R
D
(1
ENRD - (2)
ENRD - (3)
ENRD - (4)
ENRD - (5)
ENRD - (6)
ENRD - (7)
ENRD - (8)
ENRD - (9)
ENRD - (10)
ENRD - (11)
ENRD - (12)
EN
R
D
(1
3)
ENRD - (14)
ENRD - (15)
ENRD - (16)
ENRD - (17)
CGRD - (
1)
SB
C
T
1)
CHRD - (1
CHRD - (2
KEYPLAN
SHEET KEYNOTES
GENERAL NOTES
1. REFER TO CIVIL DRAWINGS FOR CONSTRUCTION
PHASING AND UTILITY CORRIDOR COORDINATION.
2. REFER TO GENERAL DRAWINGS FOR LEGEND,
NOTES AND ABBREVIATIONS.
1. PAD-MOUNT LOOP FEED TRANSFORMER.
2. DIRECT BURIED CONDUIT FOR SECONDARY SERVICE TO
RESIDENTIAL UNITS.
3. PROVIDE NEW UTILITY METER AND 120/240V, 200A, NEMA
3R SERVICE RATED PANEL ON BUILDING EXTERIOR.
SUBFEED EXISTING UNIT PANEL FROM NEW PANEL. FIELD
INVESTIGATE REQUIRED SUBFEED SIZE. COORDINATE
UNIT ACCESS WITH CONTRACTING OFFICER. PROVIDE
GROUND ROD AT PANEL LOCATION AND BOND WITH #2
AWG BARE COPPER CONDUCTOR.
4. STUB, CAP, AND MARK 2" CONDUIT FOR FUTURE
SECONDARY SERVICE.
5. 4'X4'X4' COMMUNICATIONS MANHOLE.
6. REPLACE EXISTING PAD-MOUNT TRANSFORMER SERVING
EXISTING TRIPLEX HOUSING UNIT. PROVIDE NEW
SECONDARY CONDUCTORS TO EXISTING METERING
EQUIPMENT.
7. ABANDON IN PLACE UNDERGROUND PRIMARY
CONDUCTORS.
8. LOCATE, DISCONNECT, AND REMOVE LOW-VOLTAGE
CONDUCTORS TO 36 INCHES BELOW GRADE. ABANDON IN
PLACE REMAINING UNDERGROUND CONDUCTORS.
9. DEMOLISH ABOVE GRADE LOW-VOLTAGE ELECTRICAL
EQUIPMENT.
10. SERVICE ENTRANCE RATED RV PEDISTAL WITH METER
AND 100A MAIN BREAKER.
11. DEMOLISH PAD-MOUNTED TRANSFORMER.
12. PROVIDE NEW UTILITY METER AND 120/240V, 100A, NEMA
3R SERVICE RATED PANEL ON LAUNDRY BUILDING
EXTERIOR. SUBFEED EXISTING BUILDING PANEL. PROVIDE
50A CIRCUIT FOR RV PEDESTAL.
13. EXISTING COMMUNICATIONS HANDHOLE AND DUCT BANK
TO REMAIN.
D
[2"C, 3#4/0, 1#4G]
TYP
B
64A
[2"C, 3#4/0, 1#4G]
[2"C, 3#4/0, 1#4G]
[2"C, 3#4/0, 1#4G]
65A
BUTTERFLY DIAGRAM
NOT TO SCALE
CHH-32
64A
DUCT SECTION
NOT TO SCALE
64A
64B
DUCT SECTION
NOT TO SCALE
64B
E
[2"C, 3#4/0, 1#4G]
T
T
T
R V
R V
R V
R V
R V
LT-PB3
LT-PB2
LT-PB1
LT-PB4
64C
LT-PB6
CHH-32
LT-PB5
T
R V
R
V
64C
DUCT SECTION
NOT TO SCALE
64C
64D
DUCT SECTION
NOT TO SCALE
64D
TYP.
02E503
02E504
TYP.
02E506
02E504
T
T
TYP.
02E508
[2"C, 3#4/0, 1#4G]
[2"C, 3#4/0, 1#4G]
[2"C, 3#4/0, 1#4G] a c u g l i a t
A
M
E
D
D
W G
R
Date: 2025.04.11 12:21:00-06'00'
D
U
C
D
U
C
D
U
C
D
U
C
D
U
C
D
U
C
D
U
F
O
B
U
F
O
B
U
F
O
B
U
F
O
B
U
F
O
B
U
E
B
U
E
B
U
E
B
U E
B
U E
B
U E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
C
B
U C
B
U C
B
U
C
B
U
C
B
U
C
B
U
C
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
S
D
C
T
G
T
E
E
E
E
T
T
E
N
T
R
A
N
A
D
L
O
D
L
O
D
L
O
D
L
O
D L
O
D
L
O
D
L
O
D
L
O
D
L O
D
LOD
L
O
D
LO
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
LOD
L O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
FTLN - (1)
AGLN - (1)
AGLN - (2)
AH - (2)
HWY4 - (2
HWY4WL - (1
CGRD - (
1)
SB
C
T
1)
P
B
C
T
1)
CHRD - (1
CHRD - (2
EN
R
D
(1
ENRD - (2)
ENRD - (3)
ENRD - (4)
ENRD - (5)
ENRD - (6)
ENRD - (7)
ENRD - (8)
ENRD - (9)
ENRD - (10)
ENRD - (11)
ENRD - (12)
EN
R
D
(1
3)
ENRD - (14)
ENRD - (15)
ENRD - (16)
ENRD - (17)
CGRD - (
1)
SB
C
T
1)
CHRD - (1
CHRD - (2
KEYPLAN
SHEET KEYNOTES
GENERAL NOTES
1. 4x8x4 PRIMARY ELECTRIC MANHOLE.
2. 4x4x4 COMMUNICATIONS HANDHOLE.
3. 4x4x4 SECONDARY ELECTRIC HANDHOLE.
4. PROVIDE TWO SERVICE ENTRANCE RATED NEMA
3R FUSED DISCONNECTS FOR ENTRANCE STATION
AND MOTORIZED GATE SECONDARY POWER. SEE
ONE-LINE DIAGRAM FOR SIZES. PROVIDE FIELD
FABRICATED SUPPORT RACK.
5. PAD-MOUNTED LOOP FEED TRANSFORMER.
CHH-13
EMH-13
02E102
4C
DUCT SECTION
NOT TO SCALE
4D
4B
4A
BUTTERFLY DIAGRAM
NOT TO SCALE
EMH-13
5A
DUCT SECTION
NOT TO SCALE
DUCT SECTION
NOT TO SCALE
4A 4B
6A
6A
4D
4C
BUTTERFLY DIAGRAM
NOT TO SCALE
CHH-13
5A
1. REFER TO CIVIL DRAWINGS FOR CONSTRUCTION
PHASING AND UTILITY CORRIDOR COORDINATION.
2. REFER TO GENERAL DRAWINGS FOR LEGENDS,
NOTES, AND ABBREVIATIONS.
3. REFER TO SHEET 02C200 FOR BUILDING NUMBER
INDEX TABLE.
EHH-01
SES-ES
4F
4E
BUTTERFLY DIAGRAM
NOT TO SCALE
EHH-01
5B
4E 4F
6B 6C
6B 6C
SES-MG
TYP.
02E503
TYP.
02E504
02E504
T
LT-ES
TYP.
02E509
02E506
66B
66A
02E504
TYP.
a c u g l i a t
A
M
E
D
D
W G
R
Date: 2025.04.11 12:21:01-06'00'
D
U
C
D
U
C
D
U
C
D
U
C
D
U
G
D
U
G
D
U
G
D
U
G
D
U
G
D
U
G
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
C
D
U
C
D
U
C
D
U
C
D
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
E
B
U
C
B
U G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
S
D
C
E
E
E
T
E
E
E
T
T
G
E N
T R
A N
C E
R O
A D
6'' W
6'' W
6'' W
6'' W
6'' W
6'' W
'' W
'' W
'' W
'' W
6'' W
6'' W
W
4'' G
4'' G
4'' G
4'' G
4'' G
4'' G
'' G
'' G
'' G
'' G
4'' G
4'' G
G
O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
LOD
L O
D
L O
D
LO
D
L O
D
L O
D
L O
D
L O
D
LOD
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
LOD
L O
D
L O
D
L O
D
L O
D
LO
D
LO
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
FTLN - (1)
AGLN - (1)
AGLN - (2)
AH - (2)
HWY4 - (2
HWY4WL - (1
CGRD - (
1)
SB
C
T
1)
P
B
C
T
1)
CHRD - (1
CHRD - (2
EN
R
D
(1
ENRD - (2)
ENRD - (3)
ENRD - (4)
ENRD - (5)
ENRD - (6)
ENRD - (7)
ENRD - (8)
ENRD - (9)
ENRD - (10)
ENRD - (11)
ENRD - (12)
EN
R
D
(1
3)
ENRD - (14)
ENRD - (15)
ENRD - (16)
ENRD - (17)
CGRD - (
1)
SB
C
T
1)
CHRD - (1
CHRD - (2
KEYPLAN
SHEET KEYNOTES
GENERAL NOTES
1. 4x8x4 PRIMARY ELECTRIC MANHOLE.
2. 4x4x4 COMMUNICATIONS HANDHOLE.
3. PAD MOUNTED SWITCH CABINET AND FIBERGLASS
GROUND SLEEVE.
4. RECONNECT SECONDARY POWER TO EXISTING
GATE OPERATOR.
5. 4x4x4 SECONDARY ELECTRIC HANDHOLE.
6. 1 INCH CONDUIT FROM HANDHOLE TO GATE
OPERATOR CONTROL PANEL FIELD LOCATE
EXISTING GATE VEHICLE DETECTION LOOPS AND
ADJUST CONDUIT ROUTE ACCORDINGLY.
7. ABANDON IN PLACE LOW-VOLTAGE UNDERGROUND
SECONDARY CONDUCTORS.
8. DEMOLISH ABOVE-GRADE TRANSFORMER AND
DISCONNECTS.
PMIS-11
EMH-14
CHH-14
02E114
EMH-15
CHH-15
1. REFER TO CIVIL DRAWINGS FOR CONSTRUCTION
PHASING AND UTILITY CORRIDOR COORDINATION.
2. REFER TO GENERAL DRAWINGS FOR LEGENDS,
NOTES, AND ABBREVIATIONS.
7C
DUCT SECTION
NOT TO SCALE
9A
BUTTERFLY DIAGRAM
NOT TO SCALE
EMH-14
7D
9B
4A
4B
9C
BUTTERFLY DIAGRAM
NOT TO SCALE
CHH-14
9D
4D
4C
7A 7B
8C
DUCT SECTION
NOT TO SCALE
8D
8A 8B
8A
8C
8B
8D
7A 7B
7C 7D
9C
DUCT SECTION
NOT TO SCALE
10A
BUTTERFLY DIAGRAM
NOT TO SCALE
EMH-15
9D
10B
9A
9B
10C
BUTTERFLY DIAGRAM
NOT TO SCALE
CHH-15
10D
9C
9D
9A 9B
10C
DUCT SECTION
NOT TO SCALE
10D
10A 10B
EHH-02
BUTTERFLY DIAGRAM
NOT TO SCALE
EHH-02
4E
4F
TYP.
02E503
TYP.
02E504
02E504
02E506
TYP.
a c u g l i a t
A
M
E
D
D
W G
R
Date: 2025.04.11 12:21:02-06'00'
D
U G
D
UGD
UGD
U
G
D
U
G
D
U
G
D
U
G
D
U
G
D
U
G
D
U
G
D
U
G
D
U
G
D
U G
D
U G
D
U G
D
U G
D
U
W
D
U W
D
U W
D
U W
D
U W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U W
D
U W
D
UW
D
UW
D
U
G
B
U
G
B
U
G
B
U
G
B
G
E
N
T
R
A
N
A
D
W
W
W
6'' W
6'' W
6'' W
6'' W 6'' W
W
W
W
W
W
W
W
W
W
G
G
G
G
4'' G
4'' G
4'' G
4'' G 4'' G 4
G
G
G
G
G
G
G
G
G
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
LOD
LOD
LOD
LO
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L O
D
LOD
LOD
LOD
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
FTLN - (1)
AGLN - (1)
AGLN - (2)
AH - (2)
HWY4 - (2
HWY4WL - (1
CGRD - (
1)
SB
C
T
1)
P
B
C
T
1)
CHRD - (1
CHRD - (2
EN
R
D
(1
ENRD - (2)
ENRD - (3)
ENRD - (4)
ENRD - (5)
ENRD - (6)
ENRD - (7)
ENRD - (8)
ENRD - (9)
ENRD - (10)
ENRD - (11)
ENRD - (12)
EN
R
D
(1
3)
ENRD - (14)
ENRD - (15)
ENRD - (16)
ENRD - (17)
CGRD - (
1)
SB
C
T
1)
CHRD - (1
CHRD - (2
KEYPLAN
CHH-16
EMH-16
02E115
SHEET KEYNOTES
GENERAL NOTES
1. 4x8x4 PRIMARY ELECTRIC MANHOLE.
2. 4x4x4 COMMUNICATIONS HANDHOLE.
1. REFER TO CIVIL DRAWINGS FOR CONSTRUCTION
PHASING AND UTILITY CORRIDOR COORDINATION.
2. REFER TO GENERAL DRAWINGS FOR LEGENDS,
NOTES, AND ABBREVIATIONS.
11C
11A
BUTTERFLY DIAGRAM
NOT TO SCALE
EMH-16
11D
11B
10A
10B
11C
BUTTERFLY DIAGRAM
NOT TO SCALE
CHH-16
11D
10C
10D
11A 11B
TYP.
02E503
DUCT SECTION
NOT TO SCALE
02E504
02E504 a c u g l i a t
A
M
E
D
D
W G
R
Date: 2025.04.11 12:21:03-06'00'
D
U
G
D
U
G
D
U
G
D
U
G
D
U
W
D
U
W
D
UWD
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U G
B
UGB
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
U
G
B
G
G
E
N
T
R
A
N
A
D
W
W
W
'' W 6
W
W
W
W
'' W
W
W
G
G
G
'' G
G
G
G
G
'' G
G
G
O
D
L
O
D
L
O
D
L
O
D
LO
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
LO
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
LOD
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D L O
D
L
O
D
L
O
D
L
O
D
L
O
D
FTLN - (1)
AGLN - (1)
AGLN - (2)
AH - (2)
HWY4 - (2
HWY4WL - (1
CGRD - (
1)
SB
C
T
1)
P
B
C
T
1)
CHRD - (1
CHRD - (2
EN
R
D
(1
ENRD - (2)
ENRD - (3)
ENRD - (4)
ENRD - (5)
ENRD - (6)
ENRD - (7)
ENRD - (8)
ENRD - (9)
ENRD - (10)
ENRD - (11)
ENRD - (12)
EN
R
D
(1
3)
ENRD - (14)
ENRD - (15)
ENRD - (16)
ENRD - (17)
CGRD - (
1)
SB
C
T
1)
CHRD - (1
CHRD - (2
KEYPLAN
SHEET KEYNOTES
GENERAL NOTES
1. 4x8x4 PRIMARY ELECTRIC MANHOLE.
2. 4x4x4 COMMUNICATIONS HANDHOLE.
1. REFER TO CIVIL DRAWINGS FOR CONSTRUCTION
PHASING AND UTILITY CORRIDOR COORDINATION.
2. REFER TO GENERAL DRAWINGS FOR LEGENDS,
NOTES, AND ABBREVIATIONS.
CHH-17
EMH-17
02E116
12C
DUCT SECTION
NOT TO SCALE
12A
BUTTERFLY DIAGRAM
NOT TO SCALE
EMH-17
12D
12B
11A
11B
12C
BUTTERFLY DIAGRAM
NOT TO SCALE
CHH-17
12D
11C
11D
12A 12B
TYP.
02E503
02E504
02E504 a c u g l i a t
A
M
E
D
D
W G
R
Date: 2025.04.11 12:21:04-06'00'
D
U
C
D
U
C
D
U
C
D
U
C
D
U
C
D
U
G
D
U G
D
U G
D
U G
D
U G
D
U G
D
U
G
D
U
G
D
U
G
D
U G
D
U G
D
U
G
D
U
G
D
U
G
D
U
G
D
U
G
D
U
G
D
U
W
D
U
W
D
U W
D
U W
D
U W
D
U W
D
U
W
D
U
W
D
U W
D
U W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
E N
T R
A N
C E
R O
A D
W
6'' W
6'' W 6'' W
6'' W
'' W
'' W
'' W
'' W
6'' W 6'' W
6'' W 6'' W
6'' W 6'' W
W
W
6'' W
6'' W
G
4'' G
4'' G 4'' G
4'' G
'' G
'' G
'' G
'' G
4'' G 4'' G
4'' G 4'' G
4'' G 4'' G
G
G
4'' G
4'' G
L O
D
LOD
LOD
L O
D
L O
D
L O
D
LO
D
LOD
LOD LOD
LOD
LOD
L O
D
L O
D
L O
D
L O
D
L O
D
LO
D
LO
D
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
L O
D
FTLN - (1)
AGLN - (1)
AGLN - (2)
AH - (2)
HWY4 - (2
HWY4WL - (1
CGRD - (
1)
SB
C
T
1)
P
B
C
T
1)
CHRD - (1
CHRD - (2
EN
R
D
(1
ENRD - (2)
ENRD - (3)
ENRD - (4)
ENRD - (5)
ENRD - (6)
ENRD - (7)
ENRD - (8)
ENRD - (9)
ENRD - (10)
ENRD - (11)
ENRD - (12)
EN
R
D
(1
3)
ENRD - (14)
ENRD - (15)
ENRD - (16)
ENRD - (17)
CGRD - (
1)
SB
C
T
1)
CHRD - (1
CHRD - (2
KEYPLAN
02E117
GENERAL NOTES
1. REFER TO CIVIL DRAWINGS FOR CONSTRUCTION
PHASING AND UTILITY CORRIDOR COORDINATION.
2. REFER TO GENERAL DRAWINGS FOR LEGENDS,
NOTES, AND ABBREVIATIONS.
a c u g l i a t
A
M
E
D
D
W G
R
Date: 2025.04.11 12:21:05-06'00'
D
U
C
D
U
C
D
U
C
D
U
C
D
U
C
D
U
C
D
EN
TR
AN
C
E R O
AD
6'' W
6'' W
6'' W
'' W
'' W
'' W
'' W
6'' W
6'' W
6'' W 6'' W
W
W
W
W
W
W
W
W
4'' G
4'' G
4'' G
'' G
'' G
'' G
'' G
'' G
4'' G 4'' G
4'' G
G
G
G
G
G
G
G
G
4'' G
LOD
LO
D
L O
D
L O
D
L O
D
L O
D
LOD
LOD
LO
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
LOD
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
LOD
LOD
LO
D
L
O
D
L O
D
L O
D
L O
D
LOD
FTLN - (1)
AGLN - (1)
AGLN - (2)
AH - (2)
HWY4 - (2
HWY4WL - (1
CGRD - (
1)
SB
C
T
1)
P
B
C
T
1)
CHRD - (1
CHRD - (2
EN
R
D
(1
ENRD - (2)
ENRD - (3)
ENRD - (4)
ENRD - (5)
ENRD - (6)
ENRD - (7)
ENRD - (8)
ENRD - (9)
ENRD - (10)
ENRD - (11)
ENRD - (12)
EN
R
D
(1
3)
ENRD - (14)
ENRD - (15)
ENRD - (16)
ENRD - (17)
CGRD - (
1)
SB
C
T
1)
CHRD - (1
CHRD - (2
KEYPLAN
02E117
CHH-18
EMH-18
SHEET KEYNOTES
GENERAL NOTES
1. 4x8x4 PRIMARY ELECTRIC MANHOLE.
2. 4x4x4 COMMUNICATIONS HANDHOLE.
1. REFER TO CIVIL DRAWINGS FOR CONSTRUCTION
PHASING AND UTILITY CORRIDOR COORDINATION.
2. REFER TO GENERAL DRAWINGS FOR LEGENDS,
NOTES, AND ABBREVIATIONS.
13C
DUCT SECTION
NOT TO SCALE
13A
BUTTERFLY DIAGRAM
NOT TO SCALE
EMH-18
13D
13B
12A
12B
13C
BUTTERFLY DIAGRAM
NOT TO SCALE
CHH-18
13D
12C
12D
13A 13B
TYP.
02E503
02E504
02E504 a c u g l i a t
A
M
E
D
D
W G
R
Date: 2025.04.11 12:21:06-06'00'
C
U
G
C
U
G
C
U G
C
U G
C
U G
C
U G
C
UGC
UGC
UGC
UGC
UGC
U
G
C
U G
C
U
G
C
U
G
C
U
G
C
U
W
D
U
W
D
U
W
D
U W
D
U
W
D
U W
D
U W
D
U W
D
U W
D
U W
D
UW
D
UW
D
UWD
U
W
D
U
W
D
E N
T R
A N
C
E
R
O
A D
6'' W
W
W
'' W
'' W
'' W
'' W
'' W
6'' W 6'' W
6'' W
6'' W
6'' W
6'' W
6'' W
W
W
W
W
4'' G
G
G
'' G
'' G
'' G
'' G
'' G
'' G
4'' G
4'' G
4'' G
4'' G
4'' G
4'' G
G
G
G
G
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
LOD
LOD LOD
LO
D
L O
D
L O
D
L O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L O
D
L O
D
LO
D
LOD
LOD
LOD
L O
D
L O
D
L O
D
L O
D
L O
D
LO
D
FTLN - (1)
AGLN - (1)
AGLN - (2)
AH - (2)
HWY4 - (2
HWY4WL - (1
CGRD - (
1)
SB
C
T
1)
P
B
C
T
1)
CHRD - (1
CHRD - (2
EN
R
D
(1
ENRD - (2)
ENRD - (3)
ENRD - (4)
ENRD - (5)
ENRD - (6)
ENRD - (7)
ENRD - (8)
ENRD - (9)
ENRD - (10)
ENRD - (11)
ENRD - (12)
EN
R
D
(1
3)
ENRD - (14)
ENRD - (15)
ENRD - (16)
ENRD - (17)
CGRD - (
1)
SB
C
T
1)
CHRD - (1
CHRD - (2
KEYPLAN
CHH-19
EMH-19
02E119
SHEET KEYNOTES
GENERAL NOTES
1. 4x8x4 PRIMARY ELECTRIC MANHOLE.
2. 4x4x4 COMMUNICATIONS HANDHOLE.
1. REFER TO CIVIL DRAWINGS FOR CONSTRUCTION
PHASING AND UTILITY CORRIDOR COORDINATION.
2. REFER TO GENERAL DRAWINGS FOR LEGENDS,
NOTES, AND ABBREVIATIONS.
14C
DUCT SECTION
NOT TO SCALE
14A
BUTTERFLY DIAGRAM
NOT TO SCALE
EMH-19
14D
14B
13A
13B
14C
BUTTERFLY DIAGRAM
NOT TO SCALE
CHH-19
14D
13C
13D
14A 14B
TYP.
02E503
02E504
02E504 a c u g l i a t
A
M
E
D
D
W G
R
Date: 2025.04.11 12:25:14-06'00'
B
U
E
B
U
E
B
U E
B
U
E
B
U
E
B
U E
B
U
E
B
U
C
B
U
C
B
U C
B
U
C
B
U
C
B
U
E
D
U
E
D
U
E
D
U
E
D
U
E
D
U
E
D
U
E
D
U E
D
U E
D
UED
U E
D
U
E
D
U E
D
U
E
D
U
E
D
U
E
D
U
E
D
U
G
C
U
G
C
U
G
C
U
G
C
U
G
C
U
G
C
U
F
O
B
U
F
O
B
U
F
O
B
U
F
O
B
U F
O B
U F
O B
UFOB
U
FO
B
U F
O
B
U
F
O
B
U
F
O
B
U
F
O
B
U
F
O
B
U
F
O
B
U
F
O
B
U
F
O
B
U
F
O
B
U
F
O
B
E
F
O
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
U
W
D
E
N
T
R
A
N
A
D
W
G
W
W
W
W
W
W
W
W
W
6'' W
6'' W
'' W
'' W
'' W
W
G
W
W
W
W
G
G
G
G
G
G
G
G
G
G
4'' G
'' G
'' G
'' G
G
G
G
G
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L O
D
LOD
L O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
LOD
L O
D
L O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
FTLN - (1)
AGLN - (1)
AGLN - (2)
AH - (2)
HWY4 - (2
HWY4WL - (1
CGRD - (
1)
SB
C
T
1)
P
B
C
T
1)
CHRD - (1
CHRD - (2
EN
R
D
(1
ENRD - (2)
ENRD - (3)
ENRD - (4)
ENRD - (5)
ENRD - (6)
ENRD - (7)
ENRD - (8)
ENRD - (9)
ENRD - (10)
ENRD - (11)
ENRD - (12)
EN
R
D
(1
3)
ENRD - (14)
ENRD - (15)
ENRD - (16)
ENRD - (17)
CGRD - (
1)
SB
C
T
1)
CHRD - (1
CHRD - (2
KEYPLAN
E
CHH-20
EMH-20
PMIS-1, EXST
SHEET KEYNOTES
GENERAL NOTES
1. 4x8x4 PRIMARY ELECTRIC MANHOLE.
2. 4x4x4 COMMUNICATIONS HANDHOLE.
3. TERMINATE CONDUITS AT EXISTING PAD MOUNTED
SWTICH CABINET IN SPARE FUSED SWITCH
COMPARTMENT. COORDINATE SWITCH SHUT DOWN
WITH ELECTRIC UTILITY AND CONTRACTING
OFFICER.
4. PENETRATE CONDUITS INTO EXISTING FIBER OPTIC
HAND HOLE.
5. EXISTING PRIMARY ELECTRIC MANHOLE.
6. EXISTING FIBER OPTIC HAND HOLE.
7. INSTALL THREE-CELL INNERDUCT WITHIN EXISTING
4-INCH CONDUIT TO MICROWAVE RADIO TOWER
JUNCTION BOX. UTILIZE ONE INNERDUCT CELL FOR
NEW FIBER CABLE. PROVIDE FIBER PATCH PANEL IN
JUNCTION BOX.
1. REFER TO CIVIL DRAWINGS FOR CONSTRUCTION
PHASING AND UTILITY CORRIDOR COORDINATION.
2. REFER TO GENERAL DRAWINGS FOR LEGENDS,
NOTES, AND ABBREVIATIONS.
15A
DUCT SECTION
NOT TO SCALE
15A
BUTTERFLY DIAGRAM
NOT TO SCALE
EMH-20
DUCT SECTION
NOT TO SCALE
15B
16A 16B
15B
14A
14B
16A
BUTTERFLY DIAGRAM
NOT TO SCALE
CHH-20
16B
14C
14D
TYP.
02E503
02E504
02E504
MICROWAVE
RADIO TOWER
a c u g l i a t
A
M
E
D
D
W G
R
Date: 2025.04.11 12:25:15-06'00'
D
U
E
D
U
E
D
U
E
D
U
E
D
U
E
D
U
E
D
U
E
D
U
E
D
U
E
D
U
E
D
U E
D
U E
D
UED
U
E
D
U
E
D
U
E
D
U
E
D
U
E
D
U
E
D
U
E
D
U
E
D
U
E
D
U
E
D
U
F
O
D
U
F
O
D
U
F
O
D
U
F
O
D
U
F
O
D
U
F
O
D
U
F
O
D
U
F
O
D
U
F
O
D
U
F
O
D
U F
O D
UFOD
U F
O D
U
F
O
D
U
F
O
D
U
F
O
D
U
F
O
D
U
F
O
D
U
F
O
D
U
F
O
D
U
F
O
D
U
F
O
D
E
E
E N
T R
A N
C E
R O
A D
'' W
'' W
'' W
W
W
'' G
'' G
'' G
G
G
G
G
W
W
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L
O
D
LO
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
LOD
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
FTLN - (1)
AGLN - (1)
AGLN - (2)
AH - (2)
HWY4 - (2
HWY4WL - (1
CGRD - (
1)
SB
C
T
1)
P
B
C
T
1)
CHRD - (1
CHRD - (2
EN
R
D
(1
ENRD - (2)
ENRD - (3)
ENRD - (4)
ENRD - (5)
ENRD - (6)
ENRD - (7)
ENRD - (8)
ENRD - (9)
ENRD - (10)
ENRD - (11)
ENRD - (12)
EN
R
D
(1
3)
ENRD - (14)
ENRD - (15)
ENRD - (16)
ENRD - (17)
CGRD - (
1)
SB
C
T
1)
CHRD - (1
CHRD - (2
KEYPLAN
SHEET KEYNOTES
GENERAL NOTES
1. EXISTING PRIMARY ELECTRIC MANHOLE.
2. EXISTING FIBER OPTIC HAND HOLE.
3. NEW DUCT BANK PARALLELING EXISTING.
4. 4x8x4 PRIMARY ELECTRIC MANHOLE. LOCATE
MANHOLE ADJACENT TO EXISTING DUCT BANKS.
5. TERMINATE CONDUITS AT EXISTING PAD MOUNTED
SWITCH CABINET PMS-2 IN SPARE FUSED SWITCH
COMPARTMENT. COORDINATE SWITCH SHUT DOWN
WITH CONTRACTING OFFICER.
6. PROTECT HISTORIC STONE GUTTER IN-PLACE. SEE
NOTES ON SHEET 00G003 AND SPECIFICATION 01 35
91.
1. REFER TO CIVIL DRAWINGS FOR CONSTRUCTION
PHASING AND UTILITY CORRIDOR COORDINATION.
2. REFER TO GENERAL DRAWINGS FOR LEGENDS,
NOTES, AND ABBREVIATIONS.
EMH-21
EMH-22
17A
DUCT SECTION
NOT TO SCALE
18A
BUTTERFLY DIAGRAM
NOT TO SCALE
EMH-21
18A
DUCT SECTION
NOT TO SCALE
19A
DUCT SECTION
NOT TO SCALE
17A
19A
BUTTERFLY DIAGRAM
NOT TO SCALE
EMH-22
18A
PMIS-2, EXST
TYP.
02E503
TYP.
02E504 a c u g l i a t
A
M
E
D
D
W G
R
Date: 2025.04.11 12:25:16-06'00'
M
E
V
U
E
D
U
E
D
U
E
D
U
E
D
U
E
D
U
E
D
U
E
D
U
E
D
U
E
D
U
E
D
UED
UED
U E
D
U
E
D
U
E
D
U
E
D
U
E
D
U
E
D
U
E
D
U
E
D
U
E
D
U
E
D
U
E
D
U
S
F
M
D
U
S
F
M
D
E
E
C
X
X
X
X
E N
T R
A N
C E
R O
A D
W
W
'' W
G
G
'' G
'' G
G
G
W
W
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
LOD
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
LO
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
FTLN - (1)
AGLN - (1)
AGLN - (2)
M
A
T
C
H
L
IN
E
S
T
A
.7
M
A
T
C
H
L
IN
E
S
T
A
.7
AH - (2)
M
A
T
C
H
L
IN
E
S
T
A
.9
M
A
T
C
H
L
IN
E
S
T
A
.3
M
A
T
C
H
L
IN
E
S
T
A
.9
M
A
T
C
H
L
IN
E
S
T
A
.3
HWY4 - (2
M
A
T
C
H
L
IN
E
S
T
A
.0
M
A
T
C
H
L
IN
E
S
T
A
.0
HWY4WL - (1
CGRD - (
1)
M A
T C
H L
IN
E
S T
A
.8
M
A T
C
H
L
IN
E S
T A
.8
SB
C
T
1)
MATCH LINE STA: 7+94.28
MATCH LINE STA: 7+94.28
P
B
C
T
1)
CHRD - (1
CHRD - (2
M
A
T
C
H
L
IN
E
S
T
A
.7
M
A
T
C
H
L
IN
E
S
T
A
.7
EN
R
D
(1
ENRD - (2)
ENRD - (3)
ENRD - (4)
ENRD - (5)
ENRD - (6)
ENRD - (7)
ENRD - (8)
ENRD - (9)
ENRD - (10)
ENRD - (11)
ENRD - (12)
EN
R
D
(1
3)
ENRD - (14)
ENRD - (15)
ENRD - (16)
ENRD - (17)
M
A
T
C
H
L
IN
E
S
T
A
.2
M
A
T
C
H
L
IN
E
S
T
A
.2
M
A
T
C
H
L
IN
E
S
T
A
.8
M
A T
C H
L
IN
E S
T A
.0
M
A T
C H
L
IN
E S
T A
.8
M A
T C
H L
IN
E
S T
A
.8
M
A
T
C
H
L
IN
E
S
T
A
.8
M
A
T
C
H
L
IN
E
S
T
A
.1
M
A
T
C
H
L
IN
E
S
T
A
.1
M
A
T
C
H
L
IN
E
S
T
A
.3
M
A
T
C
H
L
IN
E
S
T
A
.8
M
A
T
C
H
L
IN
E
S
T
A
: 1
.5
M
A
T
C
H
L
IN
E
S
T
A
.4
M
A T
C H
L
IN
E S
T A
.3
M
A T
C H
L
IN
E S
T A
.9
M
A
T
C
H
L
IN
E
S
T
A
.8
M
A T
C H
L
IN
E S
T A
.7
M
A
T
C
H
L
IN
E
S
T
A
.2
M
A
T
C
H
L
IN
E
S
T
A
.2
M
A
T
C
H
L
IN
E
S
T
A
.8
M
A T
C H
L
IN
E S
T A
.0
M
A T
C H
L
IN
E S
T A
.8
M A
T C
H L
IN
E
S T
A
.8
M
A
T
C
H
L
IN
E
S
T
A
.8
M
A
T
C
H
L
IN
E
S
T
A
.1
M
A
T
C
H
L
IN
E
S
T
A
.1
M
A
T
C
H
L
IN
E
S
T
A
.3
M
A
T
C
H
L
IN
E
S
T
A
.8
M
A
T
C
H
L
IN
E
S
T
A
: 1
+2
1.
M
A
T
C
H
L
IN
E
S
T
A
.4
M A
T C
H L
IN
E
S T
A
.3
M
A T
C H
L
IN
E S
T A
.9
M
A
T
C
H
L
IN
E
S
T
A
.8
M
A T
C H
L
IN
E S
T A
.7
CGRD - (
1)
M A
T C
H L
IN
E
S T
A
.8
M
A T
C
H
L
IN
E S
T A
.8
SB
C
T
1)
MATCH LINE STA: 7+94.28
MATCH LINE STA: 7+94.28
CHRD - (1
CHRD - (2
M
A
T
C
H
L
IN
E
S
T
A
.7
M
A
T
C
H
L
IN
E
S
T
A
.7
KEYPLAN
EMH-24
CHH-22
CHH-21
EMH-23
02E125
SHEET KEYNOTES
GENERAL NOTES
1. EXISTING PRIMARY ELECTRIC MANHOLE.
2. EXISTING FIBER OPTIC HAND HOLE.
3. PROVIDE 4-INCH DUCT FROM CHH-21 TO EXISTING
HANDHOLE. PENETRATE INTO EXISTING HANDHOLE.
4. 4x8x4 PRIMARY ELECTRIC MANHOLE. LOCATE MANHOLE
ADJACENT TO EXISTING DUCT BANKS.
5. 4x4x4 COMMUNICATIONS HANDHOLE. LOCATE MANHOLE
ADJACENT TO EXISTING DUCT BANKS.
6. FIELD ROUTE FOUR 1-INCH CONDUITS FROM CANYON
MECHANICAL BUILDING TO ENTRANCE ROAD WATER TANK
FOR RECEPTACLE POWER AND INSTRUMENTATION. SEE
DRAWINGS 10E101 AND 15E101.
7. PAD MOUNT TRANSFORMER. PROVIDE TRANSFORMER PAD
IN ACCORDANCE WITH LOS ALAMOS COUNTY ELECTRICAL
UTILITY STANDARDS.
8. PROTECT HISTORIC STONE GUTTER IN PLACE. SEE NOTES
ON SHEET 00G003 AND SPECIFICATION 01 35 91.
1. REFER TO CIVIL DRAWINGS FOR CONSTRUCTION
PHASING AND UTILITY CORRIDOR COORDINATION.
2. REFER TO GENERAL DRAWINGS FOR LEGENDS,
NOTES, AND ABBREVIATIONS.
20B
DUCT SECTION
NOT TO SCALE
20A
BUTTERFLY DIAGRAM
NOT TO SCALE
EMH-23
20A
21B
DUCT SECTION
NOT TO SCALE
21A
22B
DUCT SECTION
NOT TO SCALE
22A
21A
BUTTERFLY DIAGRAM
NOT TO SCALE
EMH-24
20A
BUTTERFLY DIAGRAM
NOT TO SCALE
CHH-21
20B
BUTTERFLY DIAGRAM
NOT TO SCALE
CHH-22
21B
20B
19A
LT-400
TYP.
02E5
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .