B08_Attach_9_Schematic_Design_Plans.pdf
PDF 17 MB Posted
- Attached to
- GATE 225953 - Rehab Well No. 4 Sandy Hook NJ
- Solicitation number
- 140P2022R0044
About this file
This document provides details on a federal solicitation opportunity and its related schematic design plans file. The solicitation number is 140P2022R0044 for the project "GATE 225953 - Rehab Replace Well No. 4 at Sandy Hook, New Jersey, Gateway National Recreation Area." The opportunity type is a solicitation issued by the Department of the Interior National Park Service National Office seeking bids to rehabilitate and replace Well No. 4 located at Sandy Hook, New Jersey within the Gateway National Recreation Area. The related file is a PDF of schematic design plans for the well rehabilitation and replacement project.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Walt Graham
SHEET INDEX
1 COVER SHEET
2 G1.1 GENERAL NOTES
3 G1.2 GENERAL NOTES AND ABBREVIATIONS
4 G1.3 SHEET INDEX AND STAGING
5 C1.1 WELL #6 SITE PLAN
6 C1.2 UTILITY PLAN
7 C1.3 WELL DECOMMISSIONING PLAN
8 C2.1 SITE DETAILS
9 C2.2 SITE DETAILS
10 C3.1 EROSION & SEDIMENT CONTROL DETAILS
11 A-1 ARCH'L/STRUCTURAL LEGEND & ABBREVIATIONS
12 A-2 WELL BUILDING PLANS, ELEVATIONS, & SECTIONS
13 PR-1 PROCESS NOTES, LEGEND AND ABBREVIATIONS
14 PR-2 PROCESS FLOW SCHEMATICS
15 PR-3 PUMP HOUSE PROCESS PLAN & SECTION
16 PR-4 WATER TREATMENT PLANT PROCESS PLAN
17 PR-5 PROCESS DETAILS I
18 PR-6 PROCESS DETAILS II
19 I-1 INSTRUMENTATION LEDGED, ABBREVIATIONS AND
NOTES
20 I-2 INSTRUMENTATION AND CONTROL DIAGRAMS
21 E1.1 WELL #6 ELECTRICAL & MECHANICAL SITE PLAN
22 E1.2 ELECTRICAL SINGLE LINE DIAGRAM
SHEET
NUMBER
SUBSHEET
NUMBER
SHEET
NAME
FINAL SCHEMATIC DESIGN DOCUMENTS
GENERAL
1. NOTIFY "DIG-SAFE" (1-888-344-7233) AT LEAST 72 HOURS BEFORE EXCAVATING. OBTAIN THE SERVICES OF A PRIVATE UNDERGROUND UTILITY LINE LOCATOR IN ADDITION TO NOTIFYING THE DIG SAFE PROGRAM TO
LOCATE NATIONAL PARK SERVICE (NPS) OWNED UTILITIES.
2. MAINTAIN SITE SECURITY AND JOB SAFETY. CONSTRUCTION ACTIVITIES SHALL BE IN ACCORDANCE WITH OSHA
STANDARDS, NPS AND LOCAL REQUIREMENTS.
3. ACCESSIBLE ROUTES, PARKING SPACES, RAMPS, SIDEWALKS AND WALKWAYS SHALL BE CONSTRUCTED IN CONFORMANCE WITH THE FEDERAL AMERICANS WITH DISABILITIES ACT AND WITH STATE AND LOCAL LAWS
AND REGULATIONS (WHICHEVER ARE MORE STRINGENT).
4. AREAS DISTURBED DURING CONSTRUCTION AND NOT RESTORED WITH IMPERVIOUS SURFACES (PAVEMENTS, WALKS, ETC.) SHALL RECEIVE FOUR (4) INCHES LOAM AND SEED. SEE NOTE 30 FOR ADDITIONAL INFORMATION.
5. WORK WITHIN THE LOCAL RIGHTS-OF-WAY SHALL CONFORM TO LOCAL MUNICIPAL STANDARDS. WORK WITHIN STATE RIGHTS-OF-WAY SHALL CONFORM TO THE LATEST EDITION OF THE STATE HIGHWAY
DEPARTMENTS STANDARD SPECIFICATIONS.
6. MAKE NECESSARY CONSTRUCTION NOTIFICATIONS AND APPLY FOR AND OBTAIN NECESSARY PERMITS, PAY
FEES, AND POST BONDS ASSOCIATED WITH THE WORK INDICATED ON THE DRAWINGS, IN THE
SPECIFICATIONS, AND IN THE CONTRACT DOCUMENTS. DO NOT CLOSE OR OBSTRUCT ROADWAYS, SIDEWALKS, AND FIRE HYDRANTS, WITHOUT APPROPRIATE PERMITS.
7. TRAFFIC SIGNAGE AND PAVEMENT MARKINGS SHALL CONFORM TO THE LATEST EDITION OF THE MANUAL OF
UNIFORM TRAFFIC CONTROL DEVICES.
8. AREAS OUTSIDE THE LIMITS OF PROPOSED WORK DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED BY THE CONTRACTOR TO THEIR ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.
9. IN THE EVENT THAT SUSPECTED CONTAMINATED SOIL, GROUNDWATER, AND OTHER MEDIA ARE ENCOUNTERED DURING EXCAVATION AND CONSTRUCTION ACTIVITIES BASED ON VISUAL, OLFACTORY, OR OTHER EVIDENCE, THE CONTRACTOR SHALL STOP WORK IN THE VICINITY OF THE SUSPECT MATERIAL TO AVOID FURTHER SPREADING OF THE MATERIAL, AND SHALL NOTIFY THE CONTRACTING OFFICER IMMEDIATELY
SO THAT THE APPROPRIATE TESTING AND SUBSEQUENT ACTION CAN BE TAKEN.
10. PREVENT DUST, SEDIMENT, AND DEBRIS FROM EXITING THE SITE. CLEANUP, REPAIR AND TAKE CORRECTIVE ACTION IF SUCH OCCURS. BEST MANAGEMENT PRACTICES SHALL BE EMPLOYED TO PREVENT THE LOSS OF
CONSTRUCTION MATERIALS, DEBRIS, AND SEDIMENT FROM ENTERING THE WATERWAYS.
11. DAMAGE RESULTING FROM CONSTRUCTION LOADS SHALL BE REPAIRED BY THE CONTRACTOR AT NO
ADDITIONAL COST TO THE GOVERNMENT.
12. CONTRACTOR SHALL CONTROL STORMWATER RUNOFF DURING CONSTRUCTION TO PREVENT ADVERSE IMPACTS TO OFF SITE AREAS, AND SHALL BE RESPONSIBLE TO REPAIR RESULTING DAMAGES, IF ANY, AT NO
COST TO THE GOVERNMENT.
13. THIS PROJECT DISTURBS MORE THAN ONE ACRE OF LAND AND FALLS WITHIN THE NPDES CONSTRUCTION GENERAL PERMIT (CGP) PROGRAM AND EPA JURISDICTION. PRIOR TO THE START OF CONSTRUCTION CONTRACTOR IS TO FILE A CGP NOTICE OF INTENT WITH THE EPA AND PREPARE A STORMWATER POLLUTION PREVENTION PLAN IN ACCORDANCE WITH THE NPDES REGULATIONS. CONTRACTOR SHALL CONFIRM THE
GOVERNMENT HAS ALSO FILED A NOTICE OF INTENT WITH THE EPA.
14. MAINTAIN ACCESS FOR NATIONAL PARK SERVICE (NPS) VEHICLES AT ALL TIMES. PROVIDE A MINIMUM
2-WEEK ADVANCE NOTICE FOR ANY PARK ROAD CLOSURE REQUIREMENTS.
15. PROVIDE APPLICABLE BARRICADE/SIGNAGE FOR STAGING AREA SECURITY. KEEP MATERIALS, EQUIPMENT, ETC., ON HARD SURFACES OR MATTING OF THE DESIGNATED STAGING AREA AND WITHIN THE LIMITS OF CONSTRUCTION FOR THIS PROJECT. ADDITIONAL STORAGE/STAGING AREAS, IF NEEDED, ARE SUBJECT TO THE CONTRACTING OFFICER APPROVAL.
16. FIELD LOCATE ALL EXISTING UTILITIES AND SURVEY CONTROL.
17. PRIOR TO ANY LAND DISTURBING ACTIVITIES, DELINEATE IN THE FIELD THE BOUNDARY OF THE STAGING
AREA, CONSTRUCTION ACCESS, AND CONSTRUCTION LIMITS SHOWN ON THIS PLAN. DURING
CONSTRUCTION, NO ACTIVITIES ARE PERMITTED TO OCCUR BEYOND THE CONSTRUCTION LIMITS.
18. TEMPORARILY STABILIZE SOILS AT THE END OF THE SHIFT BEFORE HOLIDAYS AND WEEKENDS. ENSURE
THAT SOILS ARE STABLE DURING RAIN EVENTS AT ALL TIMES OF THE YEAR.
19. REMEDIATE SIGNIFICANT SEDIMENT THAT HAS LEFT THE CONSTRUCTION SITE WITHIN 24 HOURS.
INVESTIGATE THE CAUSE OF THE SEDIMENT RELEASE AND IMPLEMENT STEPS TO PREVENT A
RECURRENCE OF THE DISCHARGE WITHIN 24 HOURS.
20. DO NOT INTENTIONALLY WASH SEDIMENT INTO STORM SEWERS OR DRAINAGE WAYS. USE VACUUMING
OR DRY SWEEPING AND MATERIAL PICKUP TO CLEAN UP RELEASED SEDIMENTS.
21. PROVIDE PERMANENT VEGETATION OR OTHER COVERS ON ALL EXPOSED AREAS AS PER THE
CONSTRUCTION DRAWINGS AND SPECIFICATION FOR SEEDING. DO NOT REMOVE TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES UNTIL PERMANENT VEGETATION OR OTHER COVER OF EXPOSED
AREAS IS ESTABLISHED.
22. PROPERLY DISPOSE OF CONSTRUCTION MATERIAL AND WASTE, INCLUDING SEDIMENTS RETAINED BY
TEMPORARY EROSION AND SEDIMENT MEASURES.
23. CONTROL WATER DURING STORM EVENTS AS NEEDED DURING CONSTRUCTION.
24. MAINTAIN ALL ACCESS ROADS UTILIZED BY THE CONTRACTOR IN THEIR ORIGINAL CONDITION OR BETTER. REHABILITATE/REPAIR IMPACTS TO EXISTING ACCESS ROAD AT NO ADDITIONAL TIME OR COST
TO THE GOVERNMENT.
25. PROVIDE ALL REQUIRED RESOURCES (TEMPORARY POWER, DRINKING WATER, TOILETS). REMOVE ALL
TEMPORARY UTILITIES AT END OF PROJECT.
26. PLACE CLOSURE SIGNAGE AND CONSTRUCTION FENCING AROUND THE CONSTRUCTION AREA TO
PREVENT VISITORS FROM ENTERING AN ACTIVE CONSTRUCTION SITE.
27. SYMBOLS AND LEGENDS OF PROJECT FEATURES ARE GRAPHIC REPRESENTATIONS AND ARE NOT NECESSARILY SCALED TO THEIR ACTUAL DIMENSIONS OR LOCATIONS ON THE DRAWINGS. THE CONTRACTOR SHALL REFER TO THE DETAIL SHEET DIMENSIONS, MANUFACTURERS' LITERATURE, SHOP DRAWINGS AND FIELD
MEASUREMENTS OF SUPPLIED PRODUCTS FOR LAYOUT OF THE PROJECT FEATURES.
28. CLEAR AND GRUB THE TREES AND SHRUBS WITHIN THE LIMITS OF CONSTRUCTION AND LEGALLY DISPOSE OF THE MATERIAL OUTSIDE THE PARK. PROMPTLY AND LEGALLY DISPOSE ALL MATERIALS (SOILS, ROCK, ETC.)
RESULTING FROM CONSTRUCTION FROM THE SITE. DO NOT PILE UP MATERIALS OUTSIDE THE WORK AREA.
29. ARCHEOLOGICAL MONITORING OF ALL OPEN EXCAVATIONS, INCLUDING BUT NOT LIMITED TO THE TRENCHES FOR WATERLINE, ELECTRICAL CONDUITS AND PROPANE GAS IS REQUIRED IN ORDER TO ASSESS THE
POTENTIAL FOR INTACT SOILS CAPABLE OF BEARING SIGNIFICANT ARCHEOLOGICAL
DEPOSITS. ARCHEOLOGICAL MONITORING IS TO BE COMPLETED BY AN ARCHEOLOGIST MEETING THE SECRETARY OF INTERIOR QUALIFICATIONS FOR ARCHEOLOGY. IF AN INADVERTENT DISCOVERY IS MADE, THE PROJECT ARCHEOLOGIST MUST STOP WORK AND IMMEDIATELY NOTIFY THE CULTURAL RESOURCES PROGRAM
MANAGER.
30. INTACT NATIVE TOPSOIL FROM THE PROJECT AREA SHALL BE RETAINED WHENEVER FEASIBLE. SHOULD ADDITIONAL FILL BE NEEDED, ALL FILL MUST BE OF QUALITY SUITABLE FOR USE IN A NATIONAL PARK UNIT. AT SANDY HOOK (SAHO), THIS IS TYPICALLY NJ RESIDENT DIRECT CONTACT STANDARDS, UNLESS OTHERWISE APPROVED IN ADVANCE BY NPS. ANY FILL MATERIALS REQUIRED FOR THE PROJECT MUST BE OBTAINED FROM
A PARK-APPROVED SOURCE.
31. DO NOT INTENTIONALLY DISTURB WILDLIFE NESTING, BREEDING, OR OTHER ACTIVITIES. IF EXTERIOR PROJECT WORK WILL BE IMPLEMENTED DURING PERIOD OF MARCH 15 TO SEPTEMBER 1, PARK NATURAL RESOURCE STEWARDSHIP MUST BE CONTACTED TO CONDUCT AN INSPECTION OF THE WORK AREA PRIOR TO INITIATING WORK TO DETERMINE IF THERE IS ANY NESTING ACTIVITY THAT COULD BE IMPACTED BY THE PROJECT. IF NEST BUILDING BEGINS, BIRDS MUST NOT BE HARASSED IN ANY MANNER TO DETER NESTING ACTIVITY. PARK APPROVAL IS REQUIRED PRIOR TO PLACEMENT OF ANY STRUCTURES TO DETER OSPREY NESTING AND ANY
SUCH STRUCTURE MAY ONLY BE PUT IN PLACE BETWEEN SEPTEMBER 2 AND MARCH 14.
32. PEST CONTROL EFFORTS TO BE CONDUCTED IN ACCORDANCE WITH NPS INTEGRATED PEST MANAGEMENT (IPM) POLICY AND GUIDANCE, INCLUDING BUT NOT LIMITED TO USE AND REPORTING REQUIREMENTS FOR USE OF CHEMICAL TREATMENTS. ANY USE OF CHEMICAL PEST OR PLANT TREATMENTS REQUIRE PRIOR NPS
APPROVAL AND CHEMICAL USE TRACKING IN THE NPS PESTICIDE USE PROPOSAL SYSTEM.
33. TO AVOID IMPACTS TO NORTHERN LONG-EARED BAT (FEDERALLY LISTED), AS WELL AS NESTING MIGRATORY BIRD SPECIES, THE CONTRACTOR SHALL ADHERE TO A SEASONAL RESTRICTION ON THE CLEARING OF ALL
WOODY VEGETATION FROM APRIL 1 THROUGH SEPTEMBER 30 OF EACH CALENDAR YEAR.
34. ALL EXCAVATED MATERIAL SHALL BE DISPOSED OF IN A LAWFUL MANNER. FOR EXAMPLE, IT SHOULD BE PLACED OUTSIDE OF ANY FLOOD HAZARD AREA, RIPARIAN ZONE, REGULATED WATER, FRESHWATER WETLAND AND ADJACENT TRANSITION AREA, AND IN SUCH A WAY AS TO NOT INTERFERE WITH THE POSITIVE DRAINAGE
OF THE RECEIVING AREA.
35. TO PROTECT SENSITIVE HABITAT FOR THE STATE-LISTED OSPREY, THE PERMITTEE SHALL ADHERE TO A SEASONAL RESTRICTION ON THE USE OF HEAVY CONSTRUCTION EQUIPMENT/MACHINERY WITHIN 300 METERS OF ANY ACTIVE OSPREY NEST ALONG THE PROJECT LIMIT OF DISTURBANCE FROM APRIL 1 THROUGH AUGUST 31 OF EACH CALENDAR YEAR. THE INITIATION AND IMPLEMENTATION OF WORK WHICH GENERATES DISTURBANCE (E.G., SOUND LEVELS, VISUAL INTERRUPTION) THAT IS OUT OF CHARACTER WITH WHAT CURRENTLY EXISTS AT OR SURROUNDING THE ANTICIPATED WORK AREA DURING THE RESTRICTED TIME PERIOD RECOMMENDED ABOVE MAY RESULT IN THE PERMITTEE BEING IN VIOLATION OF THE “TAKE” CLAUSE WITHIN STATE OF NEW JERSEY ENDANGERED AND NONGAME SPECIES CONSERVATION ACT (N.J.S.A. 23:2A-1).
PLEASE NOTE THAT ADHERENCE TO THIS SEASONAL RESTRICTION SHALL ALSO BE APPLIED IF NEST BUILDING ACTIVITY IS OBSERVED AT ANY GIVEN OSPREY NEST LOCATION PRIOR TO APRIL 1 OF THE GIVEN CALENDAR
YEAR OF WORK.
36. ALL MACHINERY CONTAINING FUELS AND OILS SHALL HAVE A SPILL KIT AVAILABLE IMMEDIATELY IN THE EVENT OF A SPILL. IN THE EVENT OF A FUEL OR OIL LEAK/SPILL, THE WORK SHALL CEASE IMMEDIATELY, SPILL CONTAINMENT DEPLOYED, NPS PARK POLICE AND OTHER JURISDICTIONAL AUTHORITIES SHALL BE CALLED
IMMEDIATELY, AS DESIGNATED.
37. THE WATER TREATMENT PLANT IS A HISTORIC BUILDING AND CONTRIBUTING RESOURCE TO THE SANDY HOOK AND FORT HANCOCK HISTORIC LANDMARK DISTRICT. PROJECT DESIGNS FOR INSTALLATION OF EQUIPMENT AND/OR OTHER PROJECT DESIGN ELEMENTS IN OR ON THIS BUILDING WILL BE DESIGNED TO AVOID IMPACTS TO THE HISTORIC FABRIC AND STRUCTURE. NPS CULTURAL RESOURCE STAFF CAN PROVIDE TECHNICAL ASSISTANCE AND GUIDANCE TO INFORM DESIGN OF PROJECT ELEMENTS RELATED TO THIS STRUCTURE.
38. USE OF NPS NATIVE SPECIES AND NATIVE GENOTYPES FOR ALL PLANT MATERIAL IS REQUIRED.
39. ALL FILL, ROCK OR ADDITIONAL TOP SOIL MUST MEET OR EXCEED NJ RESIDENTIAL UNRESTRICTED STANDARDS.
40. PROTECTIVE MATTING SHALL BE USED AS NEEDED ON THE GROUND SURFACE TO PREVENT SURFACE RUTTING
AND GROUND DISTURBANCES DURING HEAVY MACHINE MOVEMENT ON THE GROUND SURFACE.
41. ALL AREAS OF TEMPORARY DISTURBANCE SHALL BE RESTORED TO ITS PRE-EXISTING CONDITION AND GRADE.
42. ALL WASTE WILL BE MANAGED AND DISPOSED OF CONSISTENT WITH FEDERAL AND STATE HAZARDOUS AND NON-HAZARDOUS WASTE STORAGE AND DISPOSAL REQUIREMENTS AND NPS SOLID WASTE DISPOSAL
REGULATIONS (36 CFR PART 6).
43. LEAD- AND ASBESTOS-CONTAINING MATERIALS ARE CLASSIFIED AS RCRA HAZARDOUS WASTE AND SHALL BE DISPOSED OF IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL REGULATIONS. UTILIZE THE PARK’S EPA IDENTIFICATION NUMBER, AND SUBMIT COPIES OF ALL HAZARDOUS WASTE MANIFESTS, IF ANY. PROTECTIONS FROM LEAD AND ASBESTOS EXPOSURE HAZARDS SHALL BE PROVIDED IN ACCORDANCE WITH APPLICABLE
OSHA STANDARDS.
44. THE CONTRACTOR SHALL SUBMIT A SAFETY PLAN TO THE PARK SAFETY OFFICER PRIOR TO COMMENCEMENT OF WORK. SAFETY PLAN SHALL DEMONSTRATE COMPLIANCE WITH OSHA AND OTHER APPLICABLE SAFETY LAWS. IT SHALL INCLUDE AN EMERGENCY SAFETY PLAN AND SHALL LIST CONTRACTOR POINTS OF CONTACT.
45. PROJECT INVOLVES WORK AND TRAVEL ALONG ROADS OPEN TO VISITOR USE. IF PROPOSED WORK INTERFERES WITH NORMAL PARK OPERATIONS AND VISITOR USE PATTERNS (INCLUDING ROADS AND CAMPGROUND), THEN TRAFFIC PLAN SHOULD BE PREPARED TO ASSESS POTENTIAL IMPACTS ON PARK VISITORS.
46. EXCESS DRILLING FLUIDS, SLURRY, AND SPOILS SHALL BE CONTAINED UNTIL DISPOSED OF IN COMPLIANCE WITH LOCAL ORDINANCES, REGULATIONS, AND ENVIRONMENTALLY SOUND PRACTICES IN AN APPROVED
DISPOSAL SITE.
47. BEST MANAGEMENT PRACTICES MUST BE EMPLOYED TO PREVENT THE LOSS OF CONSTRUCTION MATERIALS, DEBRIS, AND SEDIMENT FROM ENTERING THE WATERWAYS. SEED-FREE STRAW BALES SHOULD BE DEPLOYED
FOR SEDIMENT/EROSION CONTROL.
48. REPLANTING EXISTING GRASS AREAS WITH NATIVE GRASS SEED MIX AND PLANTING OF NATIVE SHRUBS AND TREES AS MITIGATION FOR VEGETATION DISTURBANCE WILL BE REQUIRED FOR COMPLIANCE WITH CZMA AND ENFORCEABLE POLICIES OF NJ COASTAL MANAGEMENT PROGRAM. IF ANY HOLLY TREES (ANY SIZE) OR WOODY VEGETATION WITH A 4-INCH DIAMETER AT BREAST HEIGHT IS PROPOSED, THEN REPLACEMENT WILL BE REQUIRED. PER NJ DEP (IN CZM FOR PEPC 49465 FOR RELOCATION OF MAINTENANCE FACILITY): REPLACE TREES TO BE REMOVED WITH SIMILAR SPECIES AT A MINIMUM RATIO OF 1:1. REPLACEMENT TREES SHALL BE SIMILAR IN CANOPY COVER AT MATURITY TO EXISTING NATIVE
TREES ON SITE.
49. THE TOTAL FOOTPRINT OF NEW/REHABILITATED IMPERVIOUS SURFACE AS COMPARED TO EXISTING CONDITIONS SHALL BE MINIMIZED. INCORPORATE PERVIOUS SURFACE MATERIALS INTO THE SITE DESIGN
WHERE POSSIBLE TO REDUCE IMPERVIOUS SURFACE AREA. PROVIDE STORMWATER MANAGEMENT
FEATURES ASSOCIATED WITH THE CONSTRUCTION OF VEHICLE ACCESS AREA AT WELL #5A AND #6.
CONTRACTOR SHALL ENSURE COMPLIANCE WITH NJ STORMWATER MANAGEMENT REQUIREMENTS AT
NJAC 7:8-1.2. IN ADDITION, CONTRACTOR SHALL ALSO DIRECT FLOW FROM PROPOSED BUILDING
DOWNSPOUT(S) TOWARDS PROPOSED STORMWATER SYSTEM.
50. WELL #3 AND #4 ARE WITHIN FRESHWATER FORESTED/SHRUB WETLAND AREAS (NWI WETLAND TYPE PFO4/1D). ALL BEST MANAGEMENT PRACTICES DETAILED IN DIRECTOR'S ORDER #77-1: WETLAND PROTECTION, APPENDIX A, MUST BE ADHERED TO. BMPS MAY BE NECESSARY FOR BOTH SIDES OF
CORRIDOR THROUGH WETLAND.
51. EXTERIOR LIGHTING SHALL COMPLY WITH NPS LIGHTING GUIDELINES TO REDUCE IMPACTS TO THE NIGHT SKY AND WILDLIFE. THIS WILL INCLUDE, BUT IS NOT LIMITED TO, LOW-LEVEL LIGHTING, MINIMIZED GLARE, DOWNWARD FOCUSED LIGHT FIXTURES, AND ENERGY EFFICIENT LIGHT SOURCES SUCH AS LOW-PRESSURE SODIUM LAMPS. FILTERED 2700K (OR WARMER) LED LIGHTS ARE RECOMMENDED TO MINIMIZE ADVERSE
IMPACTS ON WILDLIFE.
G 1.
1- N
O T
E S
.D W
G
EROSION CONTROL
1. PRIOR TO STARTING ANY WORK ON THE SITE, NOTIFY APPROPRIATE AGENCIES AND INSTALL EROSION CONTROL MEASURES AS SHOWN ON THE PLANS AND AS IDENTIFIED IN FEDERAL, STATE, AND LOCAL
APPROVAL DOCUMENTS PERTAINING TO THIS PROJECT.
2. INSPECT AND MAINTAIN EROSION CONTROL MEASURES ON A WEEKLY BASIS (MINIMUM) OR AS REQUIRED PER THE STANDARDS FOR SOIL EROSION AND SEDIMENT CONTROL IN NEW JERSEY. PROPERLY DISPOSE OF SEDIMENT SUCH THAT IT DOES NOT ENCUMBER OTHER DRAINAGE STRUCTURES AND PROTECTED AREAS.
3. CONTROL CONSTRUCTION SUCH THAT SEDIMENTATION SHALL NOT AFFECT REGULATORY PROTECTED AREAS, WHETHER SUCH SEDIMENTATION IS CAUSED BY WATER, WIND, OR DIRECT DEPOSIT.
4. PERFORM CONSTRUCTION SEQUENCING SUCH THAT EARTH MATERIALS ARE EXPOSED FOR A MINIMUM OF TIME BEFORE THEY ARE COVERED, SEEDED, OR OTHERWISE STABILIZED TO PREVENT EROSION.
5. UPON COMPLETION OF CONSTRUCTION AND ESTABLISHMENT OF PERMANENT GROUND COVER, REMOVE AND DISPOSE OF EROSION CONTROL MEASURES AND CLEAN SEDIMENT AND DEBRIS FROM ENTIRE DRAINAGE
AND SEWER SYSTEMS.
6. ALL BASE EROSION AND SEDIMENT CONTROL MEASURES ALONG THE STAGING AREA, AND ALONG THE PERIMETER OF THE CONSTRUCTION AREA MUST BE IN-PLACE, FUNCTIONAL, AND APPROVED IN AN INITIAL INSPECTION PRIOR TO COMMENCEMENT OF CONSTRUCTION ACTIVITIES. IMPLEMENT BEST MANAGEMENT PRACTICES CONSISTENT WITH THE "THE STANDARDS FOR SOIL EROSION AND SEDIMENT
CONTROL IN NEW JERSEY".
7. SEDIMENT BARRIERS APPROVED FOR USE SHALL INCLUDE TEMPORARY SILT FENCE AND TEMPORARY EROSION CHECKS USING SEED FREE STRAW BALES OR OTHER APPROVED MATERIALS CONSTRUCTED
AS PER THE CONSTRUCTION DRAWINGS AND SPECIFICATION FOR EROSION AND SEDIMENTATION
CONTROLS. HAY BALES SHALL NOT BE USED TO PREVENT SPREAD OF INVASIVE SPECIES.
8. INSTALL THE CONSTRUCTION ENTRANCE AT THE BEGINNING OF CONSTRUCTION ACTIVITIES AND
MAINTAIN THROUGH DURATION OF CONSTRUCTION.
UTILITIES
1. THE LOCATIONS, SIZES, AND TYPES OF EXISTING UTILITIES ARE SHOWN AS AN APPROXIMATE REPRESENTATION ONLY. THE UTILITY INFORMATION SHOWN DOES NOT GUARANTEE THE ACTUAL EXISTENCE, SERVICEABILITY, OR OTHER DATA CONCERNING THE UTILITIES, NOR DOES IT GUARANTEE AGAINST THE POSSIBILITY THAT ADDITIONAL UTILITIES MAY BE PRESENT THAT ARE NOT SHOWN ON THE PLANS. PRIOR TO ORDERING MATERIALS AND BEGINNING CONSTRUCTION, VERIFY AND DETERMINE THE EXACT LOCATIONS, SIZES, AND ELEVATIONS OF THE POINTS OF CONNECTIONS TO EXISTING UTILITIES AND, CONFIRM THAT THERE ARE NO INTERFERENCES WITH EXISTING UTILITIES AND THE PROPOSED UTILITY ROUTES, INCLUDING ROUTES WITHIN
THE PUBLIC RIGHTS OF WAY.
2. WHERE AN EXISTING UTILITY IS FOUND TO CONFLICT WITH THE PROPOSED WORK, OR EXISTING CONDITIONS DIFFER FROM THOSE SHOWN SUCH THAT THE WORK CANNOT BE COMPLETED AS INTENDED, THE LOCATION, ELEVATION, AND SIZE OF THE UTILITY SHALL BE ACCURATELY DETERMINED WITHOUT DELAY, AND THE INFORMATION FURNISHED IN WRITING TO THE CONTRACTING OFFICER (CO) FOR THE RESOLUTION OF THE CONFLICT. FAILURE TO NOTIFY PRIOR TO PERFORMING ADDITIONAL WORK RELEASES GOVERNMENT FROM OBLIGATIONS FOR ADDITIONAL PAYMENTS WHICH OTHERWISE MAY BE WARRANTED TO RESOLVE THE
CONFLICT.
3. SET RIMS, AND INVERTS OF SEWERS AND DITCHES IN ACCORDANCE WITH ELEVATIONS ON THE SITE PLANS.
4. RIM ELEVATIONS FOR SEWER MANHOLES AND OTHER SUCH ITEMS, ARE APPROXIMATE AND SHALL BE
SET/RESET AS FOLLOWS:
A. PAVEMENTS AND CONCRETE SURFACES: FLUSH
B. ALL SURFACES ALONG ACCESSIBLE ROUTES: FLUSH
C. LANDSCAPE, LOAM AND SEED, AND OTHER EARTH SURFACE AREAS: ONE INCH ABOVE SURROUNDING
AREA AND TAPER EARTH TO THE RIM ELEVATION.
5. COORDINATE WITH ELECTRICAL CONTRACTOR AND FURNISH EXCAVATION, INSTALLATION, AND BACKFILL OF ELECTRICAL FURNISHED SITEWORK RELATED ITEMS SUCH AS PULL BOXES, CONDUITS, DUCT BANKS, LIGHT POLE BASES, AND CONCRETE PADS. FURNISH CONCRETE ENCASEMENT OF DUCT BANKS IF REQUIRED AND AS
INDICATED ON THE DRAWINGS.
EXISTING CONDITIONS INFORMATION
1. EXISTING INFORMATION IS BASED ON GIS FILES PROVIDED BY THE NATIONAL PARK SERVICE.
LAYOUT AND MATERIALS
1. DIMENSIONS ARE FROM THE FACE OF CURB, FACE OF BUILDING, FACE OF WALL, AND CENTER LINE OF
PAVEMENT MARKINGS, UNLESS OTHERWISE NOTED.
2. PRIOR TO START OF CONSTRUCTION, VERIFY EXISTING PAVEMENT ELEVATIONS AT INTERFACE WITH PROPOSED
PAVEMENTS, AND EXISTING GROUND ELEVATIONS ADJACENT TO MANHOLES TO ASSURE PROPER
TRANSITIONS BETWEEN EXISTING AND PROPOSED FACILITIES.
DEMOLITION
1. REMOVE AND DISPOSE OF EXISTING MANMADE SURFACE FEATURES WITHIN THE LIMIT OF WORK INCLUDING STRUCTURES, PAVEMENTS, SLABS, CURBING, FENCES, ETC. UNLESS INDICATED OTHERWISE ON THE DRAWINGS.
2. EXISTING UTILITIES SHALL BE TERMINATED, UNLESS OTHERWISE NOTED, IN CONFORMANCE WITH LOCAL, STATE AND INDIVIDUAL UTILITY COMPANY STANDARD SPECIFICATIONS AND DETAILS.
3. CONTRACTOR SHALL DISPOSE OF DEMOLITION DEBRIS OUTSIDE THE PARK IN ACCORDANCE WITH APPLICABLE
FEDERAL, STATE AND LOCAL REGULATIONS, ORDINANCES AND STATUTES.
4. CONTRACTOR SHALL PREPARE A SPECIFICATION FOR ABANDONED UTILITY POLE DISPOSAL FOR NPS REVIEW/APPROVAL. CONTRACTOR SHALL DISPOSE OF CREOSOTE-CONTAINING POLES OUTSIDE THE PARK IN
ACCORDANCE WITH APPLICABLE STATE, FEDERAL AND LOCAL REGULATION.
G 1.
2- N
O T
E S
.D W
G
ABBREVIATIONS
AC ASBESTOS CONCRETE
BLVD BOULEVARD
BOT BOTTOM
CCTV CLOSED-CIRCUIT TELEVISION
CI CAST IRON
CO SANITARY CLEANOUT
CONC CONCRETE
DI DUCTILE IRON
E EASTING
ELEC ELECTRIC/ELECTRICAL
EL/ELEV ELEVATION
EP EDGE OF PAVEMENT
EX EXISTING
FL FLOW LINE
INV INVERT
IPM INTEGRATED PEST MANAGEMENT
LF LINEAR FEET
MH MANHOLE
MUT MULTI USE TRAIL
N NORTHING
NPS NATIONAL PARK SERVICE
OHW OVERHEAD WIRE
PR/PROP PROPOSED
PVC POLYVINYL CHLORIDE
SAN SANITARY
SAHO SANDY HOOK
TC TOP OF CURB
TYP TYPICAL
WSE WATER SURFACE ELEVATION
WTP WATER TREATMENT PLANT
PROJECT LOCATION
MAINTENANCE YARD TO BE AVAILABLE FOR
WELL DRILLING SPOILS AND GRAVEL REMOVED
FROM TEMPORARY ACCESS DRIVES REQUIRED
TO DEMOLISH EXISTING WELLS. CONTRACTOR
SHALL COORDINATE EXACT LOCATIONS AND
ACCESS WITH CONTRACTING OFFICER.
APPROXIMATELY 2.85
MILES (ONE-WAY)
BETWEEN WELL #6 SITE TO
SPOIL DISPOSAL AREA
C1.3
AERATION BUILDING
ABANDONED WELL #4
TO BE DECOMMISSIONED
WELL #5A
GENERATOR
BUILDING
WELL #5A 400,000 GAL. UG
STORAGE TANK
SAND SHED
CAMP SITE ROAD
RANDOLPH DRIVE
HARTSHORNE
DRIVE
SANDY HOOK
MULTI-USE TRAIL
ABANDONED
DEWATERING WELL #3
TO BE DECOMMISSIONED
C1.2 C1.1
ACCESS VIA MUT IS
PROHIBITED.
CONTRACTOR TO AVOID
ANY DISTURPTION TO
USERS OF ACTIVE MUT
SANDY HOOK WATER
TREATMENT PLANT
PROPOSED CLEARING
TIE INTO EX. CHAIN
LINK FENCE
TIE INTO EX. CHAIN
LINK FENCE
WELL #6 BUILDING (SEE
ARCHITECTURAL PLANS FOR
FOUNDATION INFORMATION)
WELL #5A BUILDING
WELL #5 (AUTOMATIC TRANSFER SWITCH) SEE
ELECTRICAL PLANS FOR ADDITIONAL INFORMATION
EXISTING GENERATOR
AND FUEL TANK TO BE
REMOVED
(SEE ELECTRICAL PLANS)
EX. TRANSFORMER
TO REMAIN
CONNECT NEW 8" DI
TO WELL #5A OUTLET
(BELOW GRADE)
MATCHLINE SHEET C1.2
6" CONCRETE
BOLLARD (TYP.)
8' CHAIN LINK FENCE
8' WIDE MOW STRIP
CONCRETE
SLAB
UGE TO WELL #6
PR. 8" DI WL
PR. 8" DI
WL
4' PEDESTRIAN
ACCESS GATE
18' ROLLING
CANTILEVER GATE
18' WIDE ASPHALT
ACCESS DRIVE TIE INTO EXISTING
8" AC WATER MAIN
COMMUNICATION LINE
FROM WELL #6 TO WTP
CUT, FLOW FILL, CAP
AND ABANDON 8" AC PIPE
TWO 3" CONCRETE ENCASED
SCH-80 PVC CONDUITS WITH
FIBER OPTIC CABLE FROM
WELL #6 BUILDING TO WTP
EXISTING 8" AC
WATER MAIN
CONCRETE
SLAB (TYP.)
C2.1
C2.1
C2.1
C2.1
C2.1
C2.1
GV&VB
(TYP.)C2.2
C2.2
C2.1
C2.2
FIVE CONTROL
CONDUITS
(1"Ø MIN.)
CONCRETE SPLASH PAD
AND RIPRAP APRON
REMOVE RTU AND BATTERY
PANELS AND DELIVER TO
THE GOVERNMENT
STABILIZED
CONSTRUCTION
ENTRANCE
C3.1
TREE PROTECTION
(SEE NOTE 1)C3.1
GENERATOR AND BURIED
PROPANE FUEL TANK,
SEE ELECTRICAL PLANS
TEMPORARY CHAIN LINK
FENCE WITH PRIVACY SLATS
TO PROVIDE SCREENING
DURING CONSTRUCTION
CONSTRUCTION ACCESS
VIA MULTI-USE-PATH IS
PROHIBITED
TWO METAL WINDOWS (37"X37") AT WELL #5
ARE TO BE REMOVED AND REPLACED IN KIND
LIMITS OF
CONSTRUCTION
LIMITS OF
CONSTRUCTION
FINAL SCHEMATIC DESIGN DOCUMENTS
1. CONTRACTOR SHALL PROTECT EXISTING TREES TO REMAIN PER SECTION
9 (TREE PROTECTION DURING CONSTRUCTION) OF THE STANDARD FOR
SOIL EROSION AND SEDIMENT CONTROL (SSESC) IN NEW JERSEY, LATEST
EDITION.
2. ANY DISTURBED AREA NOT RECEIVING IMPERVIOUS COVER SHALL
RECEIVE 4" OF TOPSOIL AND SEED PER SECTION 4 (PERMANENT
VEGETATIVE COVER FOR SOIL STABILIZATION) OF SSESC.
3. CONTRACTOR SHALL PREPARE AND SUBMIT WATER MAIN THRUST
CALCULATIONS AND INCLUDE THRUST BLOCK DESIGN DETAILS FOR
CONTRACTING OFFICER'S REVIEW/APPROVAL.
4. DESIGN BUILD CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND
INSTALLATION OF ALL ELECTRICAL AND CONTROL CONDUIT AND WIRING
SYSTEM.
5. STAGING AREA INCLUDING CONTRACTOR TRAILERS TO BE LOCATED
WITHIN LIMITS OF CONSTRUCTION.
Notes
EXISTING 6" CAST IRON WATERLINE
EXISTING 10" AC
TO DISTRIBUTION
EXISTING 8" AC TO
AERATION TANK
EXISTING 8" CAST IRON WATERLINE
EXISTING 10" AC FINISHED
WATER FEED TO POST
EXISTING WATER
TREATMENT PLANT
(WTP)
EXISTING 8" AC TO
AERATION TANK
TWO 3" CONCRETE ENCASED
SCH-80 PVC CONDUITS WITH
FIBER OPTIC CABLE FROM
WELL #6 BUILDING TO WTP
RANDOLPH ROAD
MATCHLINE SHEET C1.2
MATCHLINE SHEET C1.1
MATCHLINE SHEET C1.3
MATCHLINE SHEET C1.2
LIMITS OF CONSTRUCTION LIMITS OF
CONSTRUCTION
REMOVE 16' OF EXISTING
CHAIN LINK FENCE AND
REPLACE WITH DOUBLE 8'
WIDE CHAIN LINK GATE
FINAL SCHEMATIC DESIGN DOCUMENTS
1. PLACE THE EXCAVATED TRENCH MATERIAL UPSLOPE OF THE TRENCH. IF
NECESSARY TO PLACE MATERIAL DOWNSLOPE, INSTALL SILT FENCE
DOWN SLOPE PRIOR TO EXCAVATING THE TRENCH PER SECTION 23
(SEDIMENT BARRIERS) OF THE STANDARD FOR SOIL EROSION AND
SEDIMENT CONTROL (SSRSC) IN NEW JERSEY, LATEST EDITION.
2. ANY DISTURBED AREA NOT RECEIVING IMPERVIOUS COVER SHALL
RECEIVE 4" OF TOPSOIL AND SEED PER SECTION 4 (PERMANENT
VEGETATIVE COVER FOR SOIL STABILIZATION) OF SSRSC.
3. DESIGN BUILD CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND
INSTALLATION OF ALL ELECTRICAL AND CONTROL CONDUIT AND
WIRING SYSTEM.
Notes
EXISTING ABANDONED WELL HOUSE
(APPROXIMATELY 21'L X 11'W X 10'H)
TO BE DEMOLISHED, WALLS ARE 17"
THICK REINFORCED CONCRETE
WIDEN EXISTING PEDESTRIAN
PATH FROM WTP TO WELL #4
TO 14' WIDE ACCESS ROAD
INSTALL 14' WIDE ACCESS
ROAD WITH LOG WETLAND
MATTING FOR DEMOLITION
OPERATIONS
SEE NOTE 3
MATCHLINE SHEET C1.2
DECOMMISSION
EXISTING WELL #4 PER
NJDEP REGULATIONS
APPROXIMATE LOCATION OF
ABANDONED WELL #3,
DECOMMISSION EXISTING WELL
PER NJDEP REGULATIONS
EXISTING
SAND SHED
C1.3
SILT FENCE
C3.1
LIMITS OF CONSTRUCTION
REMOVE 16' OF EXISTING
CHAIN LINK FENCE AND
REPLACE WITH DOUBLE 8'
WIDE CHAIN LINK GATE
FINAL SCHEMATIC DESIGN DOCUMENTS
1. ALL DISTURBED AREAS NOT RECEIVING PAVEMENT SHALL BE FINE
GRADED AND RECEIVE 4" OF TOPSOIL AND PERMANENT SEEDING
PER PARK APPROVED SEED MIX.
2. CONTRACTOR SHALL RESTORE VEGETATION TO PRE-EXISTING
CONDITION.
3. CONTRACTOR SHALL REMOVE TWO POWER POLES ADJACENT TO
WELL #4 WITH HAND TOOLS ONLY. EXACT LOCATIONS OF THE
POWER POLES ARE TO BE CONFIRMED IN THE FIELD.
4. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION REGARDING
WELL DECOMMISSIONING MEETING NJDEP REQUIREMENTS.
Notes
DEFINITION:
A LOG CONSTRUCTION/WETLAND MAT IS A PORTABLE FABRICATION
USUALLY OF BOARDS OR TIMBERS HELD TOGETHER BY BOLTS OR CABLE
TO PROVIDE TEMPORARY PROTECTION OF GROUND TO BE TEMPORARILY
IMPACTED DURING CONSTRUCTION.
LOCATION:
LOG CONSTRUCTION/WETLAND MATTING SHALL BE USED DURING
CONSTRUCTION FOR ACCESS AND STAGING AREAS AS SHOWN ON THE
SITE PLANS.
SPECIFICATIONS:
1. MATS SHALL BE PLACED END TO END TO FORM A CONTINUOUS SPAN
FOR THE ENTIRE LENGTH OF THE AREA TO BE PROTECTED.
2. MATS CAN BE USED AS SUBSTITUTE FOR OR IN CONJUNCTION WITH
STONE, GRAVEL, WOOD CHIPS, CULVERTS, AND OTHER STABILIZING
MATERIAL AT AREAS DESIGNATED.
3. MATS SHALL BE INSPECTED FREQUENTLY AND MAINTAINED OR
REPLACED AS NECESSARY TO ENSURE THEIR PROPER FUNCTION.
4. ADDITIONAL MATTING MAY BE REQUIRED BY E&S INSPECTOR AND/OR
THE CONTRACTING OFFICER.
INDICATES TRAVEL
DIRECTION
Section
Elevation
Note:
SOIL EROSION & SEDIMENT CONTROL NOTES
(FREEHOLD SOIL CONSERVATION DISTRICT)
1. THE FREEHOLD SOIL CONSERVATION DISTRICT SHALL BE NOTIFIED FORTY-EIGHT (48) HOURS IN
ADVANCE OF ANY SOIL DISTURBING ACTIVITY.
2. ALL SOIL EROSION AND SEDIMENT CONTROL PRACTICES ARE TO BE INSTALLED PRIOR TO SOIL DISTURBANCE, OR IN THEIR PROPER SEQUENCE, AND MAINTAINED UNTIL PERMANENT PROTECTION IS
ESTABLISHED.
3. ANY CHANGES TO THE CERTIFIED SOIL EROSION AND SEDIMENT CONTROL PLANS WILL REQUIRE THE SUBMISSION OF REVISED SOIL EROSION AND SEDIMENT CONTROL PLANS TO THE DISTRICT FOR
RE-CERTIFICATION. THE REVISED PLANS MUST MEET ALL CURRENT STATE SOIL EROSION AND
SEDIMENT CONTROL STANDARDS.
4. N.J.S.A 4:24-39 ET. SEQ. REQUIRES THAT NO CERTIFICATES OF OCCUPANCY BE ISSUED BEFORE THE DISTRICT DETERMINES THAT A PROJECT OR PORTION THEREOF IS IN FULL COMPLIANCE WITH THE CERTIFIED PLAN AND STANDARDS FOR SOIL EROSION AND SEDIMENT CONTROL IN NEW JERSEY AND A REPORT OF COMPLIANCE HAS BEEN ISSUED. UPON WRITTEN REQUEST FROM THE APPLICANT, THE
DISTRICT MAY ISSUE A REPORT OF COMPLIANCE WITH CONDITIONS ON A LOT-BY-LOT OR
SECTION-BY-SECTION BASIS, PROVIDED THAT THE PROJECT OR PORTION THEREOF IS IN SATISFACTORY
COMPLIANCE WITH THE SEQUENCE OF DEVELOPMENT AND TEMPORARY MEASURES FOR SOIL
EROSION AND SEDIMENT CONTROL HAVE BEEN IMPLEMENTED, INCLUDING PROVISIONS FOR
STABILIZATION AND SITE WORK.
5. ANY DISTURBED AREAS THAT WILL BE LEFT EXPOSED MORE THAN SIXTY (60) DAYS, AND NOT SUBJECT TO CONSTRUCTION TRAFFIC, WILL IMMEDIATELY RECEIVE A TEMPORARY SEEDING. IF THE SEASON PREVENTS THE ESTABLISHMENT OF TEMPORARY COVER, THE DISTURBED AREAS WILL BE MULCHED WITH SEED FREE STRAW, OR EQUIVALENT MATERIAL, AT A RATE OF 2 TO 2 ½ TONS PER ACRE, ACCORDING TO THE STANDARD FOR STABILIZATION WITH MULCH ONLY. SEED MIX AND SEED FREE
STRAW TO BE APPROVED BY NPS PRIOR TO INSTALLATION.
6. IMMEDIATELY FOLLOWING INITIAL DISTURBANCE OR ROUGH GRADING, ALL CRITICAL AREAS SUBJECT TO EROSION (I.E. SOIL STOCKPILES, STEEP SLOPES AND ROADWAY EMBANKMENTS) WILL RECEIVE TEMPORARY SEEDING IN COMBINATION WITH SEED-FREE STRAW MULCH OR A SUITABLE EQUIVALENT, AND A MULCH ANCHOR, IN ACCORDANCE WITH STATE STANDARDS.
7. A SUB-BASE COURSE WILL BE APPLIED IMMEDIATELY FOLLOWING ROUGH GRADING AND
INSTALLATION OF IMPROVEMENTS TO STABILIZE STREETS, ROADS, DRIVEWAYS, AND PARKING AREAS.
IN AREAS WHERE NO UTILITIES ARE PRESENT, THE SUB-BASE SHALL BE INSTALLED WITHIN FIFTEEN (15)
DAYS OF THE PRELIMINARY GRADING.
8. THE STANDARD FOR STABILIZED CONSTRUCTION ACCESS REQUIRES THE INSTALLATION OF A PAD OF CLEAN CRUSHED STONE AT POINTS WHERE TRAFFIC WILL BE ACCESSING THE CONSTRUCTION SITE.
AFTER INTERIOR ROADWAYS ARE PAVED, INDIVIDUAL LOTS REQUIRE A STABILIZED CONSTRUCTION ACCESS CONSISTING OF ONE INCH TO TWO INCH (1” - 2”) STONE FOR A MINIMUM LENGTH OF TEN FEET (10') EQUAL TO THE LOT ENTRANCE WIDTH. ALL OTHER ACCESS POINTS SHALL BE BLOCKED OFF.
9. ALL SOIL WASHED, DROPPED, SPILLED, OR TRACKED OUTSIDE THE LIMIT OF DISTURBANCE OR ONTO
PUBLIC RIGHT-OF-WAYS WILL BE REMOVED IMMEDIATELY.
10. PERMANENT VEGETATION IS TO BE SEEDED OR SODDED ON ALL EXPOSED AREAS WITHIN TEN (10)
DAYS AFTER FINAL GRADING.
11. AT THE TIME THAT SITE PREPARATION FOR PERMANENT VEGETATIVE STABILIZATION IS GOING TO BE
ACCOMPLISHED, ANY SOIL THAT WILL NOT PROVIDE A SUITABLE ENVIRONMENT TO SUPPORT
ADEQUATE VEGETATIVE GROUND COVER SHALL BE REMOVED OR TREATED IN SUCH A WAY THAT IT WILL PERMANENTLY ADJUST THE SOIL CONDITIONS AND RENDER IT SUITABLE FOR VEGETATIVE
GROUND COVER. IF THE REMOVAL OR TREATMENT OF THE SOIL WILL NOT PROVIDE SUITABLE
CONDITIONS, NON-VEGETATIVE MEANS OF PERMANENT GROUND STABILIZATION WILL HAVE TO BE
EMPLOYED.
12. IN ACCORDANCE WITH THE STANDARD FOR MANAGEMENT OF HIGH ACID PRODUCING SOILS, ANY SOIL HAVING A PH OF 4 OR LESS OR CONTAINING IRON SULFIDES SHALL BE ULTIMATELY PLACED OR BURIED WITH LIMESTONE APPLIED AT THE RATE OF 10 TONS/ACRE, (OR 450 LBS/1,000 SQ FT OF SURFACE AREA) AND COVERED WITH A MINIMUM OF 12” OF SETTLED SOIL WITH A PH OF 5 OR MORE, OR 24” WHERE TREES OR SHRUBS ARE TO BE PLANTED. SOIL AMENDMENTS MAY NOT BE USED
WITHOUT NATIONAL PARK SERVICE APPROVAL.
13. CONDUIT OUTLET PROTECTION MUST BE INSTALLED AT ALL REQUIRED OUTFALLS PRIOR TO THE
DRAINAGE SYSTEM BECOMING OPERATIONAL.
14. UNFILTERED DEWATERING IS NOT PERMITTED. NECESSARY PRECAUTIONS MUST BE TAKEN DURING
ALL DEWATERING OPERATIONS TO MINIMIZE SEDIMENT TRANSFER. ANY DEWATERING METHODS
USED MUST BE IN ACCORDANCE WITH THE STANDARD FOR DEWATERING.
15. SHOULD THE CONTROL OF DUST AT THE SITE BE NECESSARY, THE SITE WILL BE SPRINKLED UNTIL THE SURFACE IS WET, TEMPORARY VEGETATIVE COVER SHALL BE ESTABLISHED OR MULCH SHALL BE
APPLIED AS REQUIRED BY THE STANDARD FOR DUST CONTROL.
16. STOCKPILE AND STAGING LOCATIONS ESTABLISHED IN THE FIELD SHALL BE PLACED WITHIN THE LIMIT OF DISTURBANCE ACCORDING TO THE CERTIFIED PLAN. STAGING AND STOCKPILES NOT LOCATED WITHIN THE LIMIT OF DISTURBANCE WILL REQUIRE CERTIFICATION OF A REVISED SOIL EROSION AND SEDIMENT CONTROL PLAN. CERTIFICATION OF A NEW SOIL EROSION AND SEDIMENT CONTROL PLAN MAY BE REQUIRED FOR THESE ACTIVITIES IF AN AREA GREATER THAN 5,000 SQUARE FEET IS
DISTURBED.
17. ALL SOIL STOCKPILES ARE TO BE TEMPORARILY STABILIZED IN ACCORDANCE WITH SOIL EROSION AND
SEDIMENT CONTROL NOTE #6.
18. THE PROPERTY OWNER SHALL BE RESPONSIBLE FOR ANY EROSION OR SEDIMENTATION THAT MAY
OCCUR BELOW STORMWATER OUTFALLS OR OFFSITE AS A RESULT OF CONSTRUCTION OF THE
PROJECT.
| Sheets and Views |
| COV |
| VIEW |
File details come from the government source that posted it. Updated .