B09_Attach_19_GATE_Well_PreProposal_Conf_0002.ppt

PPT presentation 5 MB Posted

Attached to
GATE 225953 - Rehab Well No. 4 Sandy Hook NJ
Solicitation number
140P2022R0044
Issued by

About this file

This pre-proposal conference presentation outlines the requirements for a design-build contract to replace Well No. 4 at Sandy Hook, New Jersey. The project scope includes decommissioning existing wells, drilling a new well, electrical and mechanical system installations, ductile iron piping improvements, site work including fencing and building construction. The period of performance is 225 days with an estimated price range between $1-5 million.

The solicitation is a two-phase small business set-aside competition conducted under FAR 36.3. Phase 1 proposals are due July 1st and will be evaluated on experience, key personnel, safety, and past performance. Up to five firms will be invited to submit phase 2 proposals including price. The National Park Service intends to award a firm-fixed price contract to the best value proposal based on tradeoffs between technical and price factors. Questions are due by June 24th to the National Park Service contracting office.

View the file

Other files

File Type Posted
B09_Attach_21_Request_for_Information_DRAFT_(1)_0004.pdf PDF
Sol_140P2022R0044_Amd_0004.pdf PDF
B09_Attach_24__Sheet_C1_1_Revision_0003.pdf PDF
B09_Amend_03_RFIs_0003.pdf PDF
B09_Attach_25_Cert_of_Vaccination_Form_Revised_0003.pdf PDF
Sol_140P2022R0044_Amd_0003.pdf PDF
B09_Attach_21_Request_for_Information_DRAFT_0003.docx DOCX document
B09_Attach_21_Request_for_Information_DRAFT_0002.docx DOCX document
B09_Attach_20_Pre-Proposal_Conf__Attendee_List_0002.docx DOCX document
Sol_140P2022R0044_Amd_0002.pdf PDF
B09_Attach_23_Project_Experience_Form_0002.docx DOCX document
B09_Attach_22_Schematic_Design_Plans_Revision_0002.pdf PDF
B09_Amend_02_Attachments_0002.pdf PDF
B09_Amend_01_PreProposal_Conf_0001.pdf PDF
Sol_140P2022R0044_Amd_0001.pdf PDF
B08_Attach_3_Vaccination_Certification_Notification_.pdf PDF
B08_Attach_4_Certification_of_Vaccination_Form.pdf PDF
B08_RFP_140P2022R0044.pdf PDF
B08_Attach_10_Schematic_Design_Tech_Requirements.pdf PDF
B08_Attach_16_NPS_Constructability_Checklist_DRAFT.xlsx XLSX spreadsheet
B08_Attach_8_Discussions_Permitting_Agencies.pdf PDF
B08_Attach_2_Davis_Bacon.pdf PDF
B08_Attach_13_Existing_Photos.pdf PDF
B08_Attach_6_Geologic_Survey___Drilling_Approach.pdf PDF
B08_Attach_9_Schematic_Design_Plans.pdf PDF
Sol_140P2022R0044.pdf PDF
B08_Attach_17_PPQ.docx DOCX document
B08_Attach_14_Existing_System_Drawings.pdf PDF
B08_Attach_18_LmtOnSubconRpt.xlsx XLSX spreadsheet
B08_Attach_15_Well_5A_Raw_Water_Test_Report.pdf PDF
B08_Attach_1_SOS.pdf PDF
B08_Attach_7_Existing_Permit_Authorizations.pdf PDF
B08_Attach_5_Basis_of_Design.pdf PDF
B08_Attach_11_Hazardous_Materials_Survey.pdf PDF
B08_Attach_12_Geotechnical_Report.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-proposal Conference June 13, 2022 Replace Well No. 4 at Sandy Hook

GATE 225953

Solicitation Number 140P2022R0044

Request for Proposals No.1443N5010070901

AGENDA

Introductions
Today’s Goal
Project Scope
Design-Build Process
Solicitation Review – Phase 1
Thank you for attending – Questions?

INTRODUCTIONS

Name
Company

TODAY’S GOAL

Provide Offerors an opportunity to gain a better understanding, ask questions, interface, and receive clarity from the GATE 225953 team; Park, Technical, and Contracting.

Encourage questions and clarifications at any time.

You must submit questions in writing for RFI’s to be incorporated into the contract via a solicitation amendment. It is the Offeror’s responsibility to take notes and submit questions by the deadline.

Questions are due to the CS/CO by June 24, 2022, at 12pm ET.
Jennifer_Braaten@nps.gov and Kevin_Lommer@nps.gov

PROJECT SCOPE

(Check Specs for complete requirements) Project goal is to properly decommission existing wells not in use and provide a redundant source of drinking water for the inhabitants and visitors of Sandy Hook and potable water during emergencies.

Complete design, apply and secure permits

Decommission Well #3 and #4

Drill Well #6

Associated Electrical requirements: new electrical panel, automatic transfer switch, main service disconnect, and control, and SCADA system improvements.

Associated Mechanical requirements: installation of a multi-stage vertical turbine pump, discharge piping, blow-off valve, and meter.

Ductile Iron improvements: installation of buried ductile iron mechanical joint piping to connect the well to the existing raw water transmission main network to the water treatment plant building.

New emergency generator and fuel tank

Site work: provide secured fenced area enclosing the new facility, removal of well #4 building, parking lot, and access road. Restore existing site after demo.

Construct Well #6 Building and access drive.

DESIGN-BUILD

Two-Step process (FAR 36.3)
Phase 1 – everyone may submit. Only Technical proposals, no price.
NPS conducts qualifications review and narrows the field. Phase 1 is evaluated on Phase 1 criteria. Up to 5 prime vendors will be invited to submit for Phase 2.
Phase 2 – By invitation only. Anyone not in the top 5 will be notified.
NPS evaluation for award will be based on phase 2 evaluation factors only.
NPS intends to issue 1 award to 1 firm.

SOLICITATION REVIEW

Estimated price range: between $1 and $5M
Period of Performance 225 days
Total Small business set-aside competition
One Firm-Fixed-Price Contract will be awarded
Source selection will be made using Best Value/Tradeoffs
Offer guarantee for 90 days
Email submission only; no hard copies
NAICS code: 237110 - Water and Sewer Line and Related Structures Construction $39.5M

PROPOSAL INSTRUCTIONS

PHASE 1

Section L Instructions begins on page 45
Phase 1 proposals due to CS/CO on or before:
July 1, 2022, 1200 ET
Jennifer_Braaten@nps.gov and Kevin_Lommer@nps.gov
Create one volume (break apart PDFs if file size is over 25M)
Make sure you verify receipt
Pay attention to detailed requirements
State the obvious

PHASE 1 Submission

SF1442 - block 19 & 20 - Amendment Acknowledgement only and signature. Do NOT include price. – Form provided
Factor 1: Project Experience – form provided
Factor 2: Key Personnel
Factor 3: Safety
Factor 4: Past Performance – form provided

Technical Factors are in descending order of importance.

Factor 4, past performance, is less important than factors 1-3, when combined.

Factor 1: Project Experience

5 relevant projects completed in the last 10 years

Teaming Experience: Describe your experience as a prime contractor working with the proposed team (key personnel and key trade subcontractors). Prime contractor experience is experience as a general contractor managing multiple subcontractors on projects you self-performed at least 30% of the cost of the contract, excluding materials.

Water Well Drilling Experience: Describe experience in water well drilling projects you completed on-time and within budget that are similar in scope, magnitude, and complexity to this solicitation.

Water Well Decommissioning Experience: Describe experience in water well decommissioning/abandoning projects you completed on-time and within budget that are similar in scope, magnitude, and complexity to this solicitation.

Design Experience: Describe design experience of projects completed on-time and within budget that are similar in scope, magnitude, and complexity to this solicitation.

Factor 1: Project Experience

5 relevant projects completed in the last 10 years

Key Trades: Describe experience and capability for the following Key Trades identified in Section H of this solicitation and listed below. Indicate whether or not you have previously worked with these firms on previous projects. All firms proposed as Key Trades are subject to substitution requirements contained in this solicitation.
Well drilling
Electrical
Designer of Record
Reference Key Trade clause in Section H.
Subject to substitution requirements
Proposed substitutes should have comparable qualifications
Substitutions subject to approval by Government

Factor 1: Project Experience - Evaluation

FACTOR 1 – PROJECT EXPERIENCE: Project experience demonstrating (1) capability to successfully complete relevant projects of similar scope and magnitude to this solicitation; (2) strong technical knowledge and skill required for this solicitation; and (3) effective management, problem solving, communication, coordination, and organization present lower levels of risk and will be more favorably rated. Those not demonstrating these attributes present higher levels of risk and will be less favorably rated.

The same projects evaluated for experience under this factor shall also be evaluated for Past Performance (Factor 4). Projects determined more relevant under this factor will be given more weight in the Past Performance evaluation.

Projects citing past experience with the New Jersey Department of Environmental Protection will be more favorably rated.

Projects citing coastal water well drilling will be more favorably rated.

Projects citing prior teaming with the proposed team will be more favorably rated.

Factor 2: Key Personnel Experience

Submit resumes for key personnel as identified in Section H of this solicitation and listed below. All personnel proposed are subject to substitution requirements contained in this solicitation. There is no preprinted form for this submittal.
Project Manager
On-site Superintendent
On-site Quality Control Specialist
On-site Safety Specialist
Designer of Record (New Jersey License)

Factor 2: Key Personnel Experience - Evaluation

Key Personnel experience demonstrating (1) capability in same or similar key personnel positions on successful relevant projects of similar scope and magnitude to this solicitation; (2) strong technical knowledge and skill required for this solicitation; and (3) effective problem solving, communication, coordination, and organization present lower levels of risk and will be more favorably rated. Those not demonstrating these attributes present higher levels of risk and will be less favorably rated.

Personnel who demonstrate experience with Federal Government processes and requirements will be more favorably rated.

Personnel who demonstrate experience with the prime contractor will be more favorably rated.

Factor 3: Safety

Submit a copy of OSHA 300A logs for the previous three calendar years.

Submit a copy of Experience Modification Rate (EMR) for the previous three calendar years provided by your insurance company.

Factor 3: Safety Evaluation

Fewer documented OSHA 300A incidents and lower EMR rates will be more favorably rated. Information not demonstrating these qualities and/or higher OHSA incidents and EMR rates will be less favorably rated.

Factor 4: Past Performance

Submit Past Performance information for the same projects submitted under Project Experience (Factor 1) using the Past Performance Questionnaire. Information may be regarding the offeror's firm and/or its proposed subcontractors performing key trades and other construction activities. Subcontractor past performance will only be considered if it correlates to the work the subcontractor will be performing on this requirement. If available, offerors may submit a CPARS evaluation report in lieu of the Past Performance Questionnaire.

Submittal process for the Past Performance Questionnaire is as follows:
Complete Sections I and II only of the attached Past Performance Questionnaire and forward to your client reference. The reference shall be someone who was substantially involved with the project and can provide a complete, objective assessment of your performance. Direct them to complete and submit the survey to the address and point of contact in paragraph B above by the due date and time for proposal receipt.

Factor 4: Past Performance - Evaluation

Past performance demonstrating higher levels of success and quality on more relevant projects similar in scope and magnitude to this solicitation present lower levels of risk and will be more favorably rated. Projects that are more relevant to the requirements of this solicitation will be given more weight in the overall past performance rating. Experience ratings (Factor 1) will be considered in determining relevancy for projects submitted under this factor. If an offeror has no past performance on similar work relevant to this solicitation, they will be evaluated neither favorably nor unfavorably.

Past performance on contracts with the Federal Government, other public agencies, or private organizations will be considered. All submitted references may not be contacted. Sources other than submitted references may be contacted.

During proposal evaluations, exchanges between the Government and offerors may occur to clarify the relevance of past performance information and/or address adverse past performance information which an offeror has not yet had an opportunity to respond to.

Submit Past Performance for the project submitted in Factor 1 – project experience.

REMINDER

Questions are due to the CS/CO by June 24, 2022, at 12p ET.

Phase 1 proposals due to CS/CO on or before July 1, 2022, at 12p ET.

Jennifer_Braaten@nps.gov and Kevin_Lommer@nps.gov

Solicitation and project documents are only changed with a formal amendment.

Direct all inquiries to contracting until contract award. All inquiries will be redirected to contracting.

QUESTIONS?

Thank you for your time and interest in this project!

File details come from the government source that posted it. Updated .