B09_Attach_21_Request_for_Information_DRAFT_0002.docx

DOCX document 35 KB Posted

Attached to
GATE 225953 - Rehab Well No. 4 Sandy Hook NJ
Solicitation number
140P2022R0044
Issued by

About this file

This document contains questions and answers regarding Request for Information solicitation number 140P2022R0044 from the National Park Service for rehabilitation of Well Number 4 at Sandy Hook, New Jersey. The solicitation involves a two-phase selection process, with the first phase being a shortlisting of offerors based on qualifications. Key details include that a virtual pre-proposal conference will be held, with an anticipated on-site visit occurring after shortlisting for phase two. Resumes should be submitted for project manager, superintendent, on-site quality control specialist, on-site safety specialist, and director of recovery as identified in Section H and Section L, factor 2. Additionally, the full set of 24 schematic design plans has been made available in Attachment 9 after an offeror noted only 10 of 22 drawings were previously provided.

View the file

Other files

File Type Posted
B09_Attach_21_Request_for_Information_DRAFT_(1)_0004.pdf PDF
Sol_140P2022R0044_Amd_0004.pdf PDF
B09_Attach_24__Sheet_C1_1_Revision_0003.pdf PDF
B09_Amend_03_RFIs_0003.pdf PDF
B09_Attach_25_Cert_of_Vaccination_Form_Revised_0003.pdf PDF
Sol_140P2022R0044_Amd_0003.pdf PDF
B09_Attach_21_Request_for_Information_DRAFT_0003.docx DOCX document
B09_Attach_20_Pre-Proposal_Conf__Attendee_List_0002.docx DOCX document
Sol_140P2022R0044_Amd_0002.pdf PDF
B09_Attach_19_GATE_Well_PreProposal_Conf_0002.ppt PPT presentation
B09_Attach_23_Project_Experience_Form_0002.docx DOCX document
B09_Attach_22_Schematic_Design_Plans_Revision_0002.pdf PDF
B09_Amend_02_Attachments_0002.pdf PDF
B09_Amend_01_PreProposal_Conf_0001.pdf PDF
Sol_140P2022R0044_Amd_0001.pdf PDF
B08_Attach_3_Vaccination_Certification_Notification_.pdf PDF
B08_Attach_4_Certification_of_Vaccination_Form.pdf PDF
B08_RFP_140P2022R0044.pdf PDF
B08_Attach_10_Schematic_Design_Tech_Requirements.pdf PDF
B08_Attach_16_NPS_Constructability_Checklist_DRAFT.xlsx XLSX spreadsheet
B08_Attach_8_Discussions_Permitting_Agencies.pdf PDF
B08_Attach_2_Davis_Bacon.pdf PDF
B08_Attach_13_Existing_Photos.pdf PDF
B08_Attach_6_Geologic_Survey___Drilling_Approach.pdf PDF
B08_Attach_9_Schematic_Design_Plans.pdf PDF
Sol_140P2022R0044.pdf PDF
B08_Attach_17_PPQ.docx DOCX document
B08_Attach_14_Existing_System_Drawings.pdf PDF
B08_Attach_18_LmtOnSubconRpt.xlsx XLSX spreadsheet
B08_Attach_15_Well_5A_Raw_Water_Test_Report.pdf PDF
B08_Attach_1_SOS.pdf PDF
B08_Attach_7_Existing_Permit_Authorizations.pdf PDF
B08_Attach_5_Basis_of_Design.pdf PDF
B08_Attach_11_Hazardous_Materials_Survey.pdf PDF
B08_Attach_12_Geotechnical_Report.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Information

RFP 140P2022R0044

GATE Well No. 4 June 13, 2022

Attendee
Email
1.
I would like to schedule a site visit to this location 1st week in June. Can you advise who I should coordinate with?
A virtual pre-proposal conference is scheduled to discuss solicitation requirements. After the short list has been made for Phase 2, we are anticipating an on-site visit.
2.
I downloaded the Sandy Hook project. I went through the package and could not find the bid sheet/checklist for submittal. Are you able to direct me to the correct part for this information?
Please refer to the Instructions section of the solicitation, which is Section L. That starts on page 40. You’ll want to pay special attention to pages 46-48 and 50-51 as it relates to detailed criteria for Phase 1. For Phase 1, do not submit any pricing information.
3.
Is it permissible to dual hat the on-site QC and Safety position?
Under review
4.
In Section H of the RFP The Key personnel are listed as the following:

PM, Job-site Superintendent, QC Manager, Safety Manager and DoR .

In Factor 2 Key Personnel on page 47 of 52 it states to Submit resumes for key personnel as identified in Section H of this solicitation and listed below, PM, Superintendent, On-site QC Specialist, On-site Safety Specialist and DoR.

Please confirm if for the QC and Safety Positions that you want resumes for the QC and Safety Managers not the On-site specialists.

Key Personnel have been revised in Section H and in Section L, Factor 2, so that they match; as follows:

5.
The set of drawings that were provided with this Solicitation only contains ten drawings (Sheets #1 – 10). However, the Drawing Index on Sheet #1 of 22 includes 22 drawings, and the numbering of the drawings also indicates that there are 22 drawings in the set of drawings. It would be appreciated if the missing drawings were made available to the Bidders as soon as possible.
Attachment 9_Schematic Design Plans has been revised to include the full set; 24 pages.