B08__A22_PreBid_Site_Visit_Overview_and_Field_Review.pdf
PDF 16 MB Posted
- Attached to
- CRIP MC Checks and Lateral 73 Construction Federal contract opportunity
- Solicitation number
- 140A1626R0014
About this file
This document is a pre-bid meeting presentation for the CRIP Main Canal Check Structures project, Solicitation 140A1626R0005, held on January 28, 2026. The presentation summarizes project scope, administrative procedures, work requirements, and site conditions across four bundled infrastructure projects.
The project involves rehabilitation and replacement of irrigation check structures on the Colorado River Indian Tribe (CRIT) water system. The base bid (CLIN 5) covers Lateral 73-36 Check 1 Replacement, with two bid additives: Bid Additive 1 includes MC 420 Radial Gate Design (CLIN 2), MC 420 Check Replacement (CLIN 3), and MC 420 Electrical Transmission and Distribution Modifications (CLIN 4); Bid Additive 2 covers MC 185 & MC 270 Check Rehabilitation (CLIN 1). All questions must be submitted in writing using the Q&A form, with verbal Q&A being non-binding. Prospective bidders must contact the TERO Director (Theo De La Rosa, theo.delarosa@crit-nsn.gov, 928-669-1380) regarding tribal employment requirements. The project spans 2026-2028, with critical work windows tied to annual January dry-up periods when CRIP draws down the Main Canal for maintenance. MC 185 and MC 270 require radial gate replacement and structural repairs during a two-week dry-up in January 2027 and 2028. MC 420 requires canal realignment and complete check replacement over multiple phases, with electrical transmission line realignment. Lateral 73-36 Check 1, the base bid, requires constructing a temporary bypass and check in 2026, activating the bypass during October 2026 drawdown, and installing permanent headworks and check during the January 2027 two-week dry-up. All sites have defined construction limits, environmental restrictions, and irrigation operation constraints. Bidders must review Sections L and M of the solicitation for detailed proposal procedures and evaluation criteria. Estimated magnitude construction cost is provided on SAM.gov.
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CRIP MAIN
CANAL CHECK
STRUCTURES
Solicitation: 140A1626R0005
Pre-Bid Meeting
01/28/2026
These slides summarize the pre-bid meeting discussions for the subject solicitation.
AGENDA
8:30 to 10:00 Project Overview by BIA/DOWL
Introductions
Administrative Procedures (by BIA CO)
Project Overview (by DOWL)
General Q&A
10:00 to 1:00 On-site Field Review
MC185 and MC270 sites (~60 min. total)
MC420 site (~60 min. total)
Lat. 73-36 site (~60 min. total)
1:00 to 2:00 End of Meeting and Additional Q&A
Jeff Olsson (DOWL) briefly outlined the agenda for the pre-proposal meeting. Slides 1 through 19 of this presentation were presented during the “project overview” portion of the meeting. Subsequent slides were briefly discussed on-site at each of the project sites.
TRIBAL EMPLOYMENT RIGHTS OFFICE (TERO)
TERO Director Theo De La Rosa Email: theo.delarosa@crit-nsn.gov Phone: (928) 669-1380 Alt.: (928) 669-1390
Address: 26600 Mohave Road Parker, AZ 85344 https://crit-nsn.gov/crittero/
The TERO Director was not in attendance at the meeting. Interested parties are encouraged to contact the TERO Office for more information on requirements that apply to this project and to individual contractors/subcontractors.
ADMINISTRATIVE PROCEDURES &
BIDDING PROCESS
Sections L and M present the bid/proposal procedures
Bid addenda process
Procedures for questions
• Verbal Q&A is non-binding
• Use the Q&A form in the solicitation
• BIA responses shortly after due date(s)
Solicitation deadline indicated on SAM.gov
Disclaimers
• Dry-up
• Schedules
BIA presented this brief overview of the administrative procedures specific to this solicitation.
• All questions MUST be submitted in writing and on the Q&A form. All verbal Q&A is non-binding.
• Prospective bidders should review Sections L and M in particular for more detailed information on project-specification proposal information and how BIA will review these proposals.
• Anyone can submit questions through the proper channels and on the proper form.
• The word “dry-up” is used to refer to the annual period each January during which BIA draws down the canals for maintenance. “Dry” is perhaps a misnomer in that most of the canals are not truly dry during this period; there is no active flow, but some retain standing water and saturated soil conditions.
• Schedules noted herein are informational, intended to convey the project team’s expectations regarding how the work would/could be sequenced and to illustrate sequencing the Engineer expects would be used to complete the work.
ADMINISTRATIVE PROCEDURES &
BIDDING PROCESS
This is a rebid of a Spring 2025 project under the solicitation number 140A1624R0015
The previous solicitation was an Indian Small Business Economic Enterprise (ISBEE) Set-Aside
Not awarded due to pricing exceeding the available funding
Rebidding as an open solicitation
Earlier Q&A is still available on SAM.gov
Estimated magnitude construction cost for the project is provided on SAM.gov
This project is a rebid of the solicitation that bid last fall. This slide summarizes reasons the project was not awarded and is being rebid.
PROJECT OVERVIEW
CLIN 1: MC 185 & MC 270 Check Rehabilitation
CLIN 2: MC 420 Radial Gate Design
CLIN 3: MC 420 Check Replacement
CLIN 4: MC 420 Electrical Transmission and Distribution Modifications
CLIN 5: Lat. 73-36 Check 1 Replacement
Main Canal Check 185
Main Canal Check 270
Lateral 73-36 Check 1
Main Canal Check 420
This slide shows the four projects that have been bundled together by BIA for bidding and construction purposes:
• MC185 and MC270 – These sites will be rehabilitated on their current footprint and as such no permanent ROW modifications are required. CRIT approved a resolution in
2023 granting a temporary construction easement (TCE) to facilitate construction of these features.
• MC420 – This site is in worse condition than the two upstream sites and has the least remaining service life; replacement (i.e., not rehabilitation) is required for this site.
Replacement is not feasible within the current footprint, and ROW modifications are required to facilitate construction on a new alignment adjacent the existing. ROW actions are complete.
• Lateral 73-36 Check 1 – This is a re-bid of an earlier solicitation by BIA. This had previously been considered an emergency repair. No permanent ROW needs at this site. A TCE was previously approved by CRIT through a Tribal resolution.
PRICING SCHEDULE STRUCTURE
Base Bid CLIN 5: Lat. 73-36 Check 1 Replacement
Bid Additive 1
CLIN 2: MC 420 Radial Gate Design
CLIN 3: MC 420 Check Replacement
CLIN 4: MC 420 Electrical Transmission and Distribution Modifications
Bid Additive 2 CLIN 1: MC 185 & MC 270 Check
Rehabilitation
Main Canal Check 185
Main Canal Check 270
Lateral 73-36 Check 1
Main Canal Check 420
• BIA would like to award the base bid and bid additives. The bid additives are included to allow BIA flexibility in awarding the contract.
• CLIN 2 includes the design of the MC420 radial gate. The fabrication and installation of this gate is included under CLIN 3.
B A
S E
B
ID
C
L
IN
L
A T.
-3
C H
E C
K R
E P
L A
C E
M E
N T
Existing Conditions Proposed Conditions
New Headworks
New Long-Crested Weir Check
Bank Improvements
Existing Check Structure with Integral Headworks
Cast-in-place Check
Precast Headgate
• This structure has been undermined several times and is in very poor condition.
• A new structure will be built slightly downstream of the current structure and a new headworks.
• A temporary check and bypass will be utilized to facilitate construction.
• We expect the bypass will be constructed in 2026 and activated in October during a period of low flow (CRIT/BIA may be able to accommodate a brief shutdown for the contractor to activate the bypass).
• The Lat. 73-36 check has a primary two-week dry-up period in Jan.
• A secondary one-week dry-up period occurs in Feb.
• We expect the headgate structure will be pre-cast and installed during the Jan. dry-up.
• The successful bidder will design and utilize their preferred cofferdam system.
• The plans include a design for the temporary check.
EXISTING FACILITY – CHECK 1
A S
E B
ID
C L
IN
L A
T.
-3
A
N T
IC
IP
A
T E
D W
O R
K S
E Q
U E
N C
E
Construct Temp. Check & Bypass Channel
Construct Permanent Check Structure
Construct Headworks and Resume Irrigation
1 2 3
New headworks constructed during dry-up
Activate bypass during October drawdown
The work sequence depicted on this slide differs slightly than that shown in the plans due to the changing schedule associated with rebidding. The Engineer believes this expected work sequence is a reasonable approach with a high likelihood of success. The Contractor may propose an alternate work sequence. Certain aspects of the work (e.g., cofferdam type, method, and timing) are the responsibility of the Contractor. Some aspects of the illustration were based on an alternate construction sequence, but the overall workflow is similar. The general expected workflow is:
• Phase 1: Construct the temporary bypass and check. Sheet pile walls isolates the construction of a bypass channel parallel to the 73-36 lateral. A bank raise upstream of the new check will be required. Some of the sheets are temporary and are intended to be removed when activating the bypass channel.
• Phase 2: The bypass is expected to be activated during the October 2026 drawdown in Sublateral 73-36. Water would then flow in the bypass while the new check is being constructed.
• The existing check and headworks demolition would also be completed at this time. Water would then flow in the bypass while the new check is being constructed.
• Phase 3: During the January 2026 dry-up (perhaps also including work during the February dry-up), the headworks would be replaced and the permanent check would be activated.
BASE BID – CLIN5
LAT. 73-36 KEY TAKEAWAYS
Activating bypass (Cofferdamming and CRIP Coordination)
Foundation dewatering (Isolate Seepage and Active Dewatering)
Demolish existing structure and install headworks (During 2-wk Period)
Bidders are encouraged to give significant attention to these items.
BID ADD. 1 – CLIN 2,3,&4
MC420 WORK RESTRICTIONS SUMMARY
Irrigation Restrictions and Dry-Up Schedule
Environmental Restrictions
Electrical Outage Window
Construction Limits
Construction Limits
Earthwork Borrow Area
Protect Culturally Significant Rock Outcrop
Protect Concrete Wasteway
• This site requires ROW modifications. CRIT and BIA have both approved the ROW authorizations for the project.
• Work restrictions are included in the specs.
• Clearing and grubbing has to be completed during a specific time-frame to avoid the bird breeding season – refer to the environmental specifications.
• There is an electrical outage window.
• The new electrical transmission lines can be activated during this window with a brief outage or activated “hot”.
• Preliminary pole foundations have been designed. Final foundation designs will be based on the Contractor’s shop drawings and pole reactions provided through submittals. This may necessitate the need for a foundation size adjustment. Refer to the pricing schedule which shows how size adjustments will be handled.
ID
A D
D
C L
IN
,3
M C
S
IT
E
O V
E R
V
IE
W Proposed Transmission Line Existing
Transmission Line
New Check Structure
Existing Check Structure Drain
Realignment
Canal Realignment
• The final cut/fill for the project is expected to be a net balance; however, not every construction phase will balance. For example, we expect there will be a shortage during Phase 1 construction; to accommodate this, the drawings identify a temporary borrow area. Final excavations during Phase 3 would then be needed to restore this borrow area to pre-disturbance conditions; however, note that the Phase 3 available fill is on the opposite side of the canal from the temporary borrow area.
ID
A D
D
C L
IN
,3
M
C
A N
T
IC
IP
A
T E
D W
O R
K S
E Q
U E
N C
E
Construct New Canal Alignment and Check Structure
Tie Into New Alignment During Dry-Up
Resume Irrigation and Remove Existing Canal1 2 3
• The transmission line will need to be realigned prior to canal work.
• Canal realignment will include the three phases detailed above.
BID ADD. 2 – CLIN1
MC185
KEY WORK ELEMENTS
Radial Gate Replacement
Radial Gate Hoist Equipment
Owner-Furnished Lateral Gates
Selective Demolition
Concrete and Steel Repairs
Walkways and Handrails
Instrumentation and Control Building
Safety Features, Fencing, Signage
Access Road Improvements
Stop Logs
• CRIP has a two-week (generally 14 calendar days) dry-up period in January of each year for routine O&M. Various activities (e.g., final gate measurements) will need to be performed by the successful proposer during this dry-up period. The canal will likely take a few days for the water level to draw down.
• DOWL has identified activities in the plans that could take place prior to the dry-up period. However, the called-out activities may not be inclusive and may be adjusted based on Contractor preference. It will be important to the successful performance of the contract to do as much as possible outside of the very limited dry-up window.
• Unless indicated otherwise through addendum, bidders should assume a two-week dry-up period for bidding purposes; however, BIA and CRIT are reviewing the potential for an extended dry-up to better accommodate this project. Bidders are encouraged to submit a question if they feel completion within the two-week dry-up is infeasible.
• The lateral gates at MC185 are owner-furnished and the actuators require modification (e.g., a motor swap); however, the successful bidder is not obligated to use the owner-furnished equipment.
• Field measurements of the radial gate and associated anchorage (which will be reused) will need to be taken by the successful proposer during the January dry-up period (expected Jan. 2027).
• The structure will need to be pressure-washed during the dry-up period to facilitate crack mapping.
• The successful bidder would need to coordinate with the CRIT building inspector prior to bringing the control building online.
• The radial gates are electrically actuated and automated. Multi-turn style actuators are not allowed for any of the radial gate hoist equipment of the project.
• The lateral slide gates are electrically actuated.
• A set of guides/rails will be installed at each MC site with one set of stop logs that can be used at all the sites. The bulkhead elements could be installed via crane if/when they are needed; these are not part of the
BIA’s typical/annual O&M.
BID ADD. 2– CLIN1
MC270
KEY WORK ELEMENTS
Radial Gate Replacement
Radial Gate Hoist Equipment
Contractor-Furnished Lateral Gates
Selective Demolition
Concrete and Steel Repairs
Walkways and Handrails
Instrumentation and Control Building
Safety Features, Fencing, Signage
Access Road Improvements
Stop Logs Shared With MC 185
Expected Work Sequence Shared with MC 185
• The elements of the MC270 site are very similar to the MC185 site. The main difference between the sites is that the lateral gates for MC270 are CONTRACTOR-furnished.
• Field measurements of the structure will need to be taken during the 2027 dry-up period for the gate design.
• The existing anchorage will be re-used.
• There is flexibility if the successful bidder wants to re-use the existing anchorage or cut it flush and extend the rods – refer to the drawings.
• Although Contractor’s detailed measurements are to be used for shop drawing development and final design, sufficient information is provided in the drawings for bidding purposes. The drawings document the overall gate bay width and require post-installed side rubbing plates and sill plate, providing suitable construction tolerance for fit-up.
• MC185 and MC270 will be completed during the same two-week dry-up period.
BID ADD. 2 – CLIN1
MC185/270 KEY CONSIDERATIONS
Annual January Main Canal dry-up (typically 2 weeks)
Contractor required to collect field measurements (expected during the January 2027 dry-up)
Radial gate: assemble and test hoist as a single assembly in shop, deliver to site prior to dry-up
Contractor should do as much as possible prior to irrigation dry-up
• Radial gate field measurements must be taken and submitted.
• The specs outline the requirements for substantial completion and commissioning at the close of the dry-up period. The gates need to be able to be operated manually and ready for programming.
• The Owner will be providing programming, which is expected to occur immediately after the dry-up period.
EXPECTED PROJECT SCHEDULE SUMMARY
202820272026
Q2Q1Q4Q3Q2Q1Q4Q3Q2Q1Event
Awards and Contracting
Lat. 73-36 Bypass and Check Construction
Lat 73-36 Headgate Replacement
MC 420 Electrical Transmission and Distribution
MC 420 Canal Realignment and New Check
MC 420 Gate Commissioning and Final Site Work
MC 185/270 Site Prep Work
MC 185/270 Radial Gate Replacement
MC 185/270 Final Site Work
Jan. 2027 MC Dry-up
Jan. 2028 MC Dry-up
Gate Measurements
Temp Check & Bypass Perm. Check
Gate Shop Dwgs. & Fab.
Pole Shop Dwgs. & Fab.
B as e B id B id A dd iti ve
B id
A dd
This schedule illustrated the general relationships between key activities, showing how we expect the work would be completed. The successful proposer may have alternate ideas; however, to be appropriate, any alternate work sequences or schedules need to consider the work restrictions (e.g., vegetation clearing windows, electrical outage periods, irrigation operations, and scheduled annual dry-up periods).
RECOMMENDED CONSTRUCTION
SCHEDULE MILESTONES
Base Bid o CLIN 5 - Lateral 73-36 o Temporary Bypass/Check ready to activate at the end of September 2026 o Headgate Substantial Completion by the end of the January 2027 MC dry-up period o Lat. 73-36 Check 1 Substantial Completion shortly after the January 2027 MC dry-up period
Bid Additive 1 o CLIN 3 - MC420 Check Replacement o Complete Phase 1 before the January 2028 MC dry-up o Construct Phase 2 during the January 2028 MC dry-up o Gate functional at the end of the January 2028 MC dry-up period o CLIN 4 - MC420 Electrical Transmission and Distribution Modifications o Perform clearing and grubbing activities and any electrical outages within the defined work restrictions o Elec. Transmission Realignment Substantial Completion: Preferred at the end of the electrical outage window (2/25/2027)
Bid Additive 2 o CLIN 1 - MC185 and MC270 Check Rehabilitation o Perform Contractor’s on-site measurements during the January 2027 dry-up period o Gates functional at the end of the January 2028 MC dry-up period o February 12, 2028: MC185 and MC270 Check Rehabilitation Substantial Completion
• The Engineer emphasized that these are “recommended” dates not “required” dates; prospective bidders may deviate from these dates if they feel it is beneficial to the overall project. However, if deviating from the recommended dates, bidders should outline the reasons for the deviations in their proposal narrative.
REMINDERS
Review Solicitation Sections L and M
Schedules shown in these slides are for illustration purposes only
Verbal Q&A is non-binding
All questions must be submitted in writing to the COR
Leaving from the parking lot to MC 185 Check site
• If you get separated from the group call:
Jeff Olsson
406-202-8436 (mobile)
Field logistics & Safety Reminder
M C
C
H E
C K
R E
H A
B
IL
IT
A
T
IO
N
Beginning of slides covered on-site at the MC185 site. Not all of these slides were reviewed in detail during the field review.
01/28/2026 CRIP MC Checks Field Review. Page 001 of 040
Radial Gate
Weir Wall
Lateral 19R Gate
Lateral 19L Gate
Overflow Wasteway
MC 185
SITE OVERVIEW
LATERAL 19L
01/28/2026 CRIP MC Checks Field Review. Page 002 of 040
MC 185 WORK RESTRICTIONS
Irrigation Restrictions and Dry-Up Schedule
Construction Limits
Environmental Restrictions
Construction Limits
Protect Pedestrian Bridge
Protect Concrete Wasteway
• The construction limits show the extent of the TCE approved by CRIT for the project. Work outside of these areas is not allowed.
01/28/2026 CRIP MC Checks Field Review. Page 003 of 040
MC 185 STRUCTURE MODIFICATIONS
Selective demolition
Structural platforms, walkways, railings
Concrete restoration
Concrete weir wall
Stainless steel stoplogs and bulkhead slots
Brief overview of key structure modifications.
01/28/2026 CRIP MC Checks Field Review. Page 004 of 040
MC 185 RADIAL GATE REPLACEMENT
Gate Hoist Assembly
1. Hoist base
2. Motor and gearing
3. Control panel
4. Cross shaft and wire rope drums
5. Grating and railings
Owner Witness Testing at fabrication shop
Erecting Engineer
Trunnion pins to fit existing anchor rods
01/28/2026 CRIP MC Checks Field Review. Page 005 of 040
MC 185 LATERAL GATE REPLACEMENTS
Owner-furnished stainless steel slide gates
Lateral 19L Headgate Lateral 19R Headgate
01/28/2026 CRIP MC Checks Field Review. Page 006 of 040
S
IT
E
I M
P R
O V
E M
E N
T S
Safety Cable & Ladders
Bollards
Fencing, Signage, & Gates
Road Resurfacing and Widening
All existing fences will be removed and replaced in their entirety.
01/28/2026 CRIP MC Checks Field Review. Page 007 of 040
I
N S
T R
U M
E N
TA
T
IO
N
N
D C
O N
T R
O L S
Staff Gages
Water Level Sensors
Stilling Wells
New Control Building
Gate Instrumentation
01/28/2026 CRIP MC Checks Field Review. Page 008 of 040
MC 185 ANTICIPATED WORK SEQUENCE
Phase 1: Prior to Main Canal Drawdown
Field Measurements (Jan. ‘27)
Selective Demolition
Radial Gate Procurement
Sensor Mounting and Installation
Control Building Installation
Staging and Preparation for Phase 2
All other work that can plausibly be completed before irrigation drawdown
Phase 2: During Main Canal Drawdown
Dewatering
Crack Mapping
Selective Demolition
Radial Gate and Lateral Gate Installation and Testing
Electrical Infrastructure
Structural Upgrades and Repairs
Safety Feature Installation
Concrete Weir Wall
Phase 3: After Main Canal Drawdown
Final Testing and Commissioning
Access Road Rehabilitation
Programming (by Owner) and Systems Integration
All Remaining Tasks
Site Rehabilitation and Demobilization
1 2 3
01/28/2026 CRIP MC Checks Field Review. Page 009 of 040
MC 185 ANTICIPATED TIMELINE
20282027
Q2Q1Q4Q3Q2Q1Event
Field Measurements
Radial Gate Procurement and Fabrication
Site Preparatory Work
Gate Installation and Structure Modifications
Gate Commissioning
Final Site Work and Cleanup
Planned two-week irrigation shutoff in the CRIP Main Canal January 2027 and January 2028
Jan. 2027 Dry-up
Jan. 2028 Dry-up
Phase 1: Prior to Main Canal Drawdown
Phase 2: During Main Canal Drawdown
Phase 3: After Main Canal Drawdown
01/28/2026 CRIP MC Checks Field Review. Page 010 of 040
RADIAL GATE PROCUREMENT FLOWCHART
Contractor Field Measurements (35 22 46-9)
Radial Gate Fabrication
Radial Gate Designer and Manufacturer Qualifications (35 22 46-1)
Radial Gate Approval Drawings and Data (35 22 46-2)
Wire Rope Prestressing Test Results (35 22 46-3)
Radial Gate Factory Acceptance Test Results (35 22 46-4)
Owner-witnessed Factory Acceptance Test Results (35 22 46-5)
Gate Handling and Installation Plan (35 22 46-6)
O&M Manuals and Post-Installation Documents (35 22 46-7 and 35 22 46-8)
Gate Hoist Assembly Fabrication
Ship Components to Site Gate Installation
Gate Commissioning and Testing
Training
Hoist Control Panel Product Data and Wiring Diagrams (40 63 13-1)
Hoist Control Panel Unwitnessed Factory Acceptance Test Results (40 63 13-2)
Hoist Control Panel Fabrication
Ship Panel to Hoist Assembly Shop
Owner’s Inspection of Materials
Notice of Award
Key Milestones
Radial Gate Submittals
Hoist Control Panel Submittals
LEGEND
FABRICATION SHOP(S)
PROJECT SITE
PANEL FACTORY
This flowchart illustrates project requirements. Emphasis on Contractor’s field measurements and Owner’s approval (e.g., gate hoist testing and gate inspection) of equipment.
Multi-turn actuators are not allowed—refer to the specific motor, gearing, etc. equipment indicated in the specifications. Programming will be by Owner after installation.
01/28/2026 CRIP MC Checks Field Review. Page 011 of 040
MC 185 KEY TAKEAWAYS
Radial gate fabrication and testing requirements
Identify elements of work that can be completed prior to irrigation dry-up
Incorporating owner- and contractor-furnished equipment
01/28/2026 CRIP MC Checks Field Review. Page 012 of 040
C
H E
C K
R E
H A
B
IL
IT
A
T
IO
N
Beginning of slides covered on-site at the MC270 site. Not all of these slides were reviewed in detail during the on-site meeting.
01/28/2026 CRIP MC Checks Field Review. Page 013 of 040
Radial Gate
Spillway
Lateral 27R Gate
Lateral 27L Gate
Overflow Wasteway
MC 270
SITE OVERVIEW
LATERAL 27R LATERAL 27L
3 4
01/28/2026 CRIP MC Checks Field Review. Page 014 of 040
MC 270 KEY
WORK ELEMENTS
Radial Gate Replacement
Selective Demolition
Concrete and Steel Repairs
Walkways and Handrails
Contractor-Furnished Lateral Gates
Instrumentation, and Control Building
Safety Features, Fencing, Signage
Access Road Improvements
Stop Logs Shared With MC 185
Expected Work Sequence Shared with MC 185
01/28/2026 CRIP MC Checks Field Review. Page 015 of 040
C
H E
C K
R E
P L A
C E
M E
N T
Beginning of slides covered on-site at the MC420 site. Not all of these slides were reviewed in detail during the on-site meeting.
01/28/2026 CRIP MC Checks Field Review. Page 016 of 040
Existing MC420 Check Structure
Existing Transmission Line
New Canal Alignment
MC420 Replacement Structure
Temporary Borrow Area
MC 420 SITE OVERVIEW
01/28/2026 CRIP MC Checks Field Review. Page 017 of 040
MC 420 WORK RESTRICTIONS
Dry-Up Schedule
Construction Limits
Environmental Restrictions
Construction Limits
Earthwork Borrow Area
Protect Concrete Wasteway
Protect Culturally Significant Rock Outcrop
01/28/2026 CRIP MC Checks Field Review. Page 018 of 040
E
X P
E C
T E
D W
O R
K S
E Q
U E
N C
E
Construct New Canal Alignment and Check Structure (2027)
Tie Into New Alignment During 2028 Dry-Up
Resume Irrigation and Remove Existing Canal1 2 3
01/28/2026 CRIP MC Checks Field Review. Page 019 of 040
MC 420 EXPECTED TIMELINE
202820272026
Q2Q1Q4Q3Q2Q1Q4Q3Q2Q1Event
Work Restrictions: Allowed Vegetative Clearing Window(s)
Work Restrictions: Allowed Transmission Outage Window
Electrical Pole Procurement and Fabrication
Construct Transmission and Distribution Revisions
Radial Gate Procurement and Fabrication
Construct Canal Realignment and New Check
Tie in Connection and Gate Commissioning
Final Site Work and Cleanup
Jan. 2028 Dry-up
CLIN 4
CLIN 2 and 3
01/28/2026 CRIP MC Checks Field Review. Page 020 of 040
F
IN
IS
H E
D S
IT
E
P L A
N Realigned Access Road
Concrete Canal Lining
Relocated Drain Ditch
New MC 420 Check Structure and Security Fencing
Canal Safety Features
Buried Drain Pipe
01/28/2026 CRIP MC Checks Field Review. Page 021 of 040
MC 420: DRAIN REALIGNMENT
01/28/2026 CRIP MC Checks Field Review. Page 022 of 040
R
E P
L A
C E
M E
N T
C H
E C
K S
T R
U C
T U
R E
01/28/2026 CRIP MC Checks Field Review. Page 023 of 040
MC 420 RADIAL GATE
Individual Contract Line Item
Gate Hoist Assembly
Owner-Witness Hoist Assembly Testing at Fabrication Shop
Owner’s Inspection of Radial Gate Before Shipping
Erecting Engineer and Commissioning
01/28/2026 CRIP MC Checks Field Review. Page 024 of 040
Sensors and electrical system for gate controls and flow measurement
Additional instrumentation and controls at Lateral 42L
Electrical system for gate controls not associated with transmission realignment
PLC programming by Owner
MC 420 CONTROLS AND
INSTRUMENTATION
Control Building
Hoist Control Panel
Existing Electrical Distribution Pole
Stilling Wells
01/28/2026 CRIP MC Checks Field Review. Page 025 of 040
MC 420 ELECTRICAL TRANSMISSION REALIGNMENT
Alignment
Work Sequencing
Foundation Payment Procedures
01/28/2026 CRIP MC Checks Field Review. Page 026 of 040
MC 420 KEY TAKEAWAYS
New Canal Alignment Construction
Radial Gate Commissioning Before Phase 3
Electrical Transmission Realignment
01/28/2026 CRIP MC Checks Field Review. Page 027 of 040
L
T E
R A
L
-3
C
H E
C K
R
P L A
C E
M E
N T
Beginning of slides covered on-site at the Lat. 73-36 site. Not all of these slides were reviewed in detail during the on-site meeting.
• Project Purpose: replacing infrastructure while minimizing interruptions in irrigation service.
• The new check will be an updated version of the existing long-crested weir, which maintains a relatively consistent upstream water level over a wide range of flow rates.
01/28/2026 CRIP MC Checks Field Review. Page 028 of 040
73-36 Check 1
73-36-7 Headworks
Temporary Bypass
Check 1 Replacement
LAT. 73-36 SITE
OVERVIEW
3 4
LA
TE
R A
L
-3
01/28/2026 CRIP MC Checks Field Review. Page 029 of 040
LAT. 73-36 BACKGROUND INFORMATION
01/28/2026 CRIP MC Checks Field Review. Page 030 of 040
LAT. 73-36 WORK RESTRICTIONS
Dry-Up Schedule
Construction Limits
Environmental Restrictions
Construction Limits
01/28/2026 CRIP MC Checks Field Review. Page 031 of 040
EXISTING FACILITY – CHECK 1
L A
T E
R A
L
-3
E
X P
E C
T E
D W
O R
K S
E Q
U E
N C
E
Construct Temp. Check & Bypass Channel
Construct Permanent Check Structure
Construct Headworks and Resume Irrigation
1 2 3
Activate bypass during Lat. 73-36 October drawdown
01/28/2026 CRIP MC Checks Field Review. Page 032 of 040
LAT. 73-36 EXPECTED TIMELINE
20272026
Q2Q1Q4Q3Q2Q1Event
Construct Temporary Check and Bypass
Fabricate Headgate and Precast Elements
Demolish Existing Check and Install Headgate
Install Cofferdams
Construct Permanent Check Structure
Final Site Grading and Cleanup
Annual two-week irrigation shutoff in Main Canal and Sublateral 73-36 January of each year
Additional one-week Lateral 73 shutdown in February of each year
Limited drawdown / low flow in Sublateral 73-36 early October
Exact shutdown dates vary by year
Jan. 2027 Dry-up
01/28/2026 CRIP MC Checks Field Review. Page 033 of 040
T
M P
O R
A R
Y C
H E
C K
C O
N S
T R
U C
T
IO
N
A Typical Section Bypass Channel
A
The borrow source for the temporary bypass fill is the adjacent farm field.
01/28/2026 CRIP MC Checks Field Review. Page 034 of 040
TEMPORARY CHECK CONSTRUCTION
Sheet Pile 1
Sheet Pile 2
Sheet Pile 3
A brief discussion on the design intent of the temporary check and bypass. Sheet Pile 1 and Sheet Pile 3 will be removed to activate the bypass channel. Sheet pile 2 is the temporary weir wall check that will stay in place for the duration that the bypass is active. The Contractor could propose an alternate sheet pile or bypass channel configuration.
01/28/2026 CRIP MC Checks Field Review. Page 035 of 040
TEMPORARY CHECK CONSTRUCTION
Sheet Pile 1 Sheet Pile 2
Sheet Pile 2
Sheet Pile 2 manages the upstream water level after the bypass channel is activated. The Contractor can decide how to achieve the specified elevation and length (e.g., overdriving or cutting the sheet pile).
01/28/2026 CRIP MC Checks Field Review. Page 036 of 040
73-36 CHECK 1 CONSTRUCTION
The replacement check is a relatively simple concrete structure, primarily consisting of flatwork and vertical walls with a downstream riprap apron. The Contractor will blend in the canal side slopes with the existing canal.
01/28/2026 CRIP MC Checks Field Review. Page 037 of 040
D
M O
E X
IS
T
IN
G
C H
E C
K
A N
D C
O N
S T
R U
C T
N E
W H
E A
D W
O R
K S
An expected excavation plan is shown on the left and the final grading plan is shown on the right. During the 2-week dry-up, the Contractor will demolish the existing structure and install the pipe, precast headwall, and precast outlet wall. The actual excavation approach will be the Contractor’s decision. Implicit to the design is the idea that the structure can be demolished and the new facility installed during the 2-week drawdown. Bidders are encouraged to review this sequence carefully when preparing their bids.
01/28/2026 CRIP MC Checks Field Review. Page 038 of 040
73-36-7 HEADWORKS CONSTRUCTION
Precast Headworks Fabricated in Three Pieces
B C
A
Embedded Wall Thimble
To improve constructability and allow for installation during the 2-week drawdown, Owner and Engineer selected a precast arrangement for the headwall. The headwall consists of three main precast elements and a concrete cutoff wall. Bidders attention was called to the wall thimble required for the headgate – this will take some coordination. Early development of gate shop drawings and precast design by Contractor and their suppliers is encouraged. The wall thimble is an embedded element requiring coordinated shop drawings and delivery of the wall thimble to the precast manufacturer. The outlet wall (not pictured in this presentation) is a similar precast element without a wall thimble.
01/28/2026 CRIP MC Checks Field Review. Page 039 of 040
LAT. 73-36 CHECK 1 KEY TAKEAWAYS
Activating bypass (Cofferdamming and CRIP Coordination)
Foundation dewatering (Isolate Seepage and Active Dewatering)
Demolish existing structure and install headworks (During 2-wk Period)
01/28/2026 CRIP MC Checks Field Review. Page 040 of 040