B08__A10_Drawings_MC420_IFC.pdf

PDF 22 MB Posted

Attached to
CRIP MC Checks and Lateral 73 Construction Federal contract opportunity
Solicitation number
140A1626R0014
Issued by
Department of the Interior Bureau of Indian Affairs Central Office

About this file

Summary: Colorado River Irrigation Project MC420 Check Replacement Construction Documents

This is a comprehensive set of construction design documents for the MC420 Check Replacement project on the Colorado River Irrigation Project, located in La Paz County, Arizona. The project involves replacing an existing irrigation check structure with a new concrete check structure designed to manage water flow in the Main Canal and associated lateral systems. The design is prepared by DOWL engineering firm for the Bureau of Indian Affairs Office of Trust Services Division of Water and Power, with documents issued for construction in March 2025. The project includes detailed civil, structural, electrical, and instrumentation plans spanning site layout, phasing strategies, concrete construction specifications, steel reinforcement details, drainage and canal reconstruction, fencing and security features, control building design, and complete electrical and control systems infrastructure.

The construction execution involves three phased activities designed to maintain canal operations throughout construction. Phase 1 includes check structure excavation and foundation preparation with simultaneous drain construction; Phase 2 covers canal reconstruction and structural testing; Phase 3 completes finishing, grading, and removal of temporary construction features. Key structural components include a 92-foot-wide base slab, concrete walls with integrated radial gate installation provisions, stilling wells for water level measurement, concrete canal lining with specified joint details, and ancillary features including safety ladders, cable systems, and 6-foot security fencing. The electrical and instrumentation systems incorporate redundant pressure transducers for upstream and downstream water level monitoring, gate position sensors, flow metering equipment, a programmable logic controller (PLC) with operator interface terminal, and networked control capabilities. Specifications reference ASCE 7-22 wind loads (105 mph), ACI 318-19 concrete standards, AISC 360-22 structural steel requirements, NAVD88 vertical datum, and Arizona State Plane coordinates (West Zone 203). The project includes detailed cost and material schedules, equipment grounding specifications, and comprehensive construction notes addressing sequencing constraints, dewatering requirements, and quality assurance protocols.

View the file

Other files for this federal contract opportunity

Other files attached to CRIP MC Checks and Lateral 73 Construction, newest first.
File Type Posted
B08_Q_A_Log_1_Apr_2026_0001.xlsx XLSX spreadsheet
B08__A05_Specifications_MC420_IFC-REV_1_Apr_2026_0001.pdf PDF
Sol_140A1626R0014_Amd_0001.pdf PDF
B08__A01_Pricing_Schedule-REV_1_Apr_2026_0001.pdf PDF
B08_Solicitation_140A1626R0014__Sections_D-M-REV_1_Apr_2026_0001.pdf PDF
B08__A23_Solicitation_Questions_and_Answers_Log.xlsx XLSX spreadsheet
B08__A03_Statement_of_Work_Lateral_73.pdf PDF
B08__A14_Historic_Drawings_MC420.pdf PDF
Sol_140A1626R0014.pdf PDF
B08__A02_Statement_of_Work_Main_Canal_Checks.pdf PDF
B08__A17_Geotechnical_Data_Report_Lateral_73.pdf PDF
B08__A15_Historic_Drawings_Owner_Furnished_Gates.pdf PDF
B08__A08_Drawings_MC185_IFC.pdf PDF
B08__A13_Historic_Drawings_MC270.pdf PDF
B08__A04_Specifications_MC185_270_IFC.pdf PDF
B08__A21_DOL_Wage_Rates_AZ20260007_and_AZ20260052.pdf PDF
B08__A09_Drawings_MC270_IFC.pdf PDF
B08__A24_SF-24_Bid_Bond_Form.pdf PDF
B08__A25_SF-25_Performance_Bond_Form.pdf PDF
B08__A01_Pricing_Schedule.pdf PDF
B08__A20_Groundwater_Monitoring_Report_MC185_MC270_MC420.pdf PDF
B08__A06_Specifications_M420_Electrical_Transmission.pdf PDF
B08__A07_Specifications_Lateral_73_IFC.pdf PDF
B08__A12_Drawings_Lateral_73_IFC.pdf PDF
B08__A18_Asbestos_Assessment_Survey_MC185_MC270_MC420.pdf PDF
B08__A16_Geotechnical_Data_Report_MC185_MC270_MC420.pdf PDF
B08__A22_PreBid_Site_Visit_Overview_and_Field_Review.pdf PDF
B08__A26_SF-25A_Payment_Bond_Form.pdf PDF
B08__A19_Asbestos_Assessment_Survey_Lateral_73.pdf PDF
B08__A05_Specifications_MC420_IFC.pdf PDF
B08__A11_Drawings_MC420_Electrical_Transmission.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PARKER

AVI

SUQUILLA

AIRPORT

CALIFORNIA

ARIZONA

C O

L O R A D O R I V E R

POSTON

COLORADO RIVER IRRIGATION PROJECT

MC420 CHECK REPLACEMENT

LA PAZ COUNTY, ARIZONA

TO QUARTZSITE, AZ

ARIZONA

PROJECT

VICINITY

PROJECT

LOCATION

LAT:34°4'12.20" N

LONG:114°19'31.48" W

G01

DOWL

Engineer of Record Jeffrey K. Olsson, P.E. 72432

Approved:

DOWL

Structural Engineer of Record Matt Mettler, P.E. 61334

Approved:

TO LAKE HAVASU

CITY, AZTO VIDAL JUNCTION, CA

FLAGSTAFF

PHOENIX

406-656-6399

222 N. 32nd Street, #700 Billings, Montana 59101

WWW.DOWL.COM

PREPARED FOR:

PREPARED BY:

BUREAU OF INDIAN AFFAIRS

OFFICE OF TRUST SERVICES

DIVISION OF WATER AND POWER

MC420

PARKER

THIS PLAN SET IS INTENDED TO BE VIEWED AND PLOTTED IN COLOR

DO NOT PLOT IN BLACK AND WHITE

ISSUED FOR

CONSTRUCTION

MARCH 2025

03-21-2025

03-21-2025

G02

SH

EE

T

IN

D

EX

, S

YM

BO

LS

AB

BR

EV

IA

TI

O N

S

G

EN

ER

AL

N O

TE

S

SYMBOLS

ABBREVIATIONS

GENERAL NOTES

N S7

"DETAIL ALPHANUMERIC"

"SHEET NUMBER"

A S7

PLAN VIEW

"SECTION OR DETAIL NUMBER"

"VIEW TYPE"

2 2 4 10 scale feet

0 6 8

"SHEET NUMBER"

"GRAPHIC SCALE"

FOUNDATION PLAN

A S7

"ELEVATION ALPHANUMERIC"

"SHEET NUMBER"

N S7

"SECTION ALPHANUMERIC"

"SHEET NUMBER"

EL. = 1000.00'

T.O.F.

"ELEVATION VALUE"

"LEVEL NAME"

SHEET SYMBOL IDENTIFICATION

"DOWL NORTH ARROW"

"VIEW NAME"

EXISTING FEATURES

DESIGN FEATURES

6-

6-

N . 3

2n d

St re et

Bi llin gs , M on ta na

W W W .D O W L .C O M

C R

IP

M

C

C

H

EC

K R

EP

LA

C

EM

EN

T

CONSTRUCTION LIMIT

POINT TABLE

6-

6-

N . 3

2n d

St re et

Bi llin gs , M on ta na

W W

W .D

O W

L .C

O M

C R

IP

M

C

C

H

EC

K R

EP

LA

C

EM

EN

T

MC420 PLAN

EXISTING CONDITIONS

Lateral 42L

Main Canal

Main Canal

MC420 CHECK STRUCTURE COORDINATE SYSTEM AND DATUM

THE HORIZONTAL COORDINATE SYSTEM IS ARIZONA STATE PLANE - WEST ZONE 203

(NAD83-2011). HORIZONTAL UNITS ARE INTERNATIONAL FEET (IFT). THE VERTICAL DATUM IS

NAVD88 AND ELEVATIONS WERE DERIVED BY GNSS OBSERVATIONS USING GEOID 18.

VERTICAL UNITS ARE U.S. SURVEY FEET (FT). MAPPING AND SURVEY WERE PERFORMED

CONCURRENTLY IN JANUARY 2022 AND AUGUST 2022.

MC420 CHECK STRUCTURE SURVEY CONTROL DATA

Control Point Northing Easting Elevation Description

CP-3 1,117,146.95 525,647.79 348.98 Set 2" Alum. Cap

CP-4 1,117,495.24 525,677.00 348.98 Set 2" Alum. Cap

CP-5 1,117,402.96 525,730.68 355.85 Found Brass Cap in Concrete

G03

EX

IS

TI

N

G C

O N

D

IT

IO

N

S, S

U R

VE

Y

C O

N

TR

O L

C

O N

ST

R

U C

TI

O

N L

IM

IT

S

MONITORING WELL INFORMATION

BORING GROUND WATER ENCOUNTERED

MW 420-1 18.5' BGS

MW 420-2 14.5' BGS

B 420-3 19.5' BGS

B 420-4 20.5' BGS

NOTE: GROUNDWATER DEPTHS NOTED WERE OBSERVED

DURING DRILLING AND FIELD OBSERVATIONS WHICH

OCCURRED AUGUST 22-23, 2022. ACTUAL GROUNDWATER

CONDITIONS AT THE TIME OF CONSTRUCTION MAY VARY FROM

THAT SHOWN.

6-

6-

N . 3

2n d

St re et

Bi llin gs , M on ta na

W W

W .D

O W

L .C

O M

C R

IP

M

C

C

H

EC

K R

EP

LA

C

EM

EN

T

MC420 PLAN

PHASE 1 CONSTRUCTION

Lateral 42L

Main Canal

Main Canal

G04

PH

AS

E

C O

N

ST

R U

C

TI

O N

S

EQ

U

EN

C

IN

G P

LA

N

6-

N . 3

2n d

St re et

Bi llin gs , M on ta na

W W

W .D

O W

L .C

O M

C R

IP

M

C

C

H

EC

K R

EP

LA

C

EM

EN

T

MC420 PLAN

PHASE 2 CONSTRUCTION

Lateral 42L

Main Canal

Main Canal G05

PH

AS

E

C O

N

ST

R U

C

TI

O N

S

EQ

U

EN

C

IN

G P

6-

N . 3

2n d

St re et

Bi llin gs , M on ta na

W W

W .D

O W

L .C

O M

C R

IP

M

C

C

H

EC

K R

EP

LA

C

EM

EN

T

MC420 PLAN

PHASE 3 CONSTRUCTION

Lateral 42L

Main Canal

Main Canal G06

PH

AS

E

C O

N

ST

R U

C

TI

O N

S

EQ

U

EN

C

IN

G P

6-

N . 3

2n d

St re et

Bi llin gs , M on ta na

W W

W .D

O W

L .C

O M

C R

IP

M

C

C

H

EC

K R

EP

LA

C

EM

EN

T

MC420 PLAN

DEMOLITION PLAN

Lateral 42L

Main Canal

Main Canal G07

O

VE

R

AL

L

SE

LE

C

TI

VE

D

EM

O

LI

TI

O

N P

LA

N

D#

D#

D3

D4 TYP.

D2 TYP.

D1 SEE NOTE 3

D3

D2 TYP.

DEMOLITION LEGEND

D7

D6

D6

D5

D6

D6 D8

A A

G07

DETAIL

PIPE OUTLET SELECTIVE DEMO

PLAN SECTION A-A

D5

MAIN CANAL CENTERLINE REALIGNMENT DATA

D

D

6-

6-

N . 3

2n d

St re et

Bi llin gs , M on ta na

W W

W .D

O W

L .C

O M

C R

IP

M

C

C

H

EC

K R

EP

LA

C

EM

EN

T

C01

O

VE

R

AL

L

FI

N

IS

H

ED

S

IT

E

PL

AN

MC420 PLAN

OVERALL FINISHED SITE PLAN

Lateral 42L

Main Canal

SIGNAGE SCHEDULE

Number Sign or Plaque MUTCD sign designation

1 DIP W8-2

2 OBJECT MARKER RIGHT OM3-R

3 NO TRESPASSING See Sheet D04

4 NO SWIMMING See Sheet D04

Note: Contractor to locate signage according to MUTCD guidelines.

MC420 Earthwork Quantities

Sequence Unclassified Material Classified Material Total Description Cut Fill Fill Net Volume

Phase 1

Check Excavation 3775 3 0 3772 Drain Excavation 5908 1755 0 4153 Canal Excavation 7396 16411 0 -9015

Staging Area Excavation 2150 0 0 2150 Imported Bedding Material 0 0 199 -199

Structural Fill 0 0 353 -353

Phase 2 Canal Excavation 5915 6439 0 -524 Imported Bedding Material 0 0 274 -274

Phase 3 Final Grading 10475 8323 0 2152

Surface Course Aggregate 0 0 1831 -1831 Note 1 All quantities provided are informational only, and for the Contractor's benefit for earthwork quantities estimation purposes.

Note 2 The quantities included in the table are loose volumes, and do not account for shrink, swell, moisture content or compaction and are unfactored.

Note 3 The volumes provided in the Table above are taken relative to a stripped surface, assuming 6" of topsoil/material is removed from Existing ground.

EG

.6

EG

.7

EG

.6

EG

.6

EG

.4

EG

.8

EG

.5

EG

.5

EG

.6

EG

.6

EG

.7

EG

.7

EG

.8

EG

.7

EG

.8

EG

.8

EG

.8

EG

.9

EG

.9

EG

.8

EG

.3

EG

.3

EG

.7

EG

.3

EG

.8

EG

.7

EG

.8

EG

.3

EG

.9

EG

.4

EG

.1

EG

.1

DRAIN CENTERLINE ALIGNMENT

D

D

A C02

TYPICAL SECTION

DRAIN AND ROADWAY

6-

6-

N . 3

2n d

St re et

Bi llin gs , M on ta na

W W

W .D

O W

L .C

O M

C R

IP

M

C

C

H

EC

K R

EP

LA

C

EM

EN

T

DRAIN PLAN

PHASE 1

Main C anal

Main Canal

DRAIN PROFILE

PHASE 1

C02

D R

AI

N

A N

D R

O

AD

W

AY

R

EC

O N

ST

R

U C

TI

O

N P

LA

N

A C02

C03

SECTION

CHECK STRUCTURE EXCAVATION

AND FOUNDATION PREPARATION

EXCAVATION GRADING POINT TABLE

6-

6-

N . 3

2n d

St re et

Bi llin gs , M on ta na

W W

W .D

O W

L .C

O M

C R

IP

M

C

C

H

EC

K R

EP

LA

C

EM

EN

T

EXCAVATION PLAN

CHECK STRUCTURE

FINISHED GRADING PLAN

CHECK STRUCTURE

A C03

A C03

C03

M C

C H

EC

K

ST

R

U C

TU

R

E

EX

C

AV

AT

IO

N P

EG

.3

EG

.3

EG

.6

EG

.9

EG

.7

EG

.7

EG

.4

EG

.2

EG

.5

EG

.7

EG

.0

EG

.7

EG

.1

EG

.2

EG

.9

EG

.6

EG

.3

EG

.2

EG

.0

EG

.8

EG

.0

EG

.0

EG

.1

EG

.9

EG

.4

EG

.0

EG

.9

EG

.9

EG

.9

PHASED CANAL RECONSTRUCTION

TYPICAL SECTION

D01

D01

6-

6-

N . 3

2n d

St re et

Bi llin gs , M on ta na

W W

W .D

O W

L .C

O M

C R

IP

M

C

C

H

EC

K R

EP

LA

C

EM

EN

T

MAIN CANAL PLAN

PHASE 1

Main C anal

Main Canal

MAIN CANAL PROFILE

PHASE 1

C04

M

AI

N C

AN

AL

P

LA

N A

N D

P R

O

FI

LE

D01

SECTION

CONCRETE CANAL LINING

D01

SECTIONS

LINING JOINTS AT STRUCTURE

D01

D01

D01

SECTION AT SLOPE PAVING

SECTION AT BASE SLAB

D01

DETAIL

CONTRACTION JOINT

D01

DETAIL

CONSTRUCTION / EXPANSION JOINT

D01

DETAIL

CANAL LINING JOINT TO EXISTING

PARTIAL PLAN

CANAL LINING JOINT DETAIL

6-

6-

N . 3

2n d

St re et

Bi llin gs , M on ta na

W W

W .D

O W

L .C

O M

C R

IP

M

C

C

H

EC

K R

EP

LA

C

EM

EN

T

D01

C

AN

AL

L

IN

ER

D

ET

AI

LS

SECTION TABLE

h BEGIN STA. END STA.

14'-9" BOP 418+28.80

13'-0" 418+28.80 423+40 14'-9" 423+40 424+00 13'-0" 424+92 431+10.46

14'-9" 431+10.46 EOP

D02

SECTION

TYPICAL STILLING WELL

PLAN

TYPICAL STILLING WELL

D02

B D02

SECTION

CANAL LINER EXTENSION

AT STILLING WELLS AND

LADDER LOCATIONS

D02

DETAIL

STILLING WELL ACCESS TUBE

A A

A-A

A D02

B D02

6-

6-

N . 3

2n d

St re et

Bi llin gs , M on ta na

W W

W .D

O W

L .C

O M

C R

IP

M

C

C

H

EC

K R

EP

LA

C

EM

EN

T

D02

ST

IL

LI

N

G W

EL

L

D

ET

AI

LS

STILLING WELL DATA TABLE

STATION DESCRIPTION ELEV. A ELEV. B ELEV. C

423+25 UPSTREAM 342.04 342.04 359.04

426+92 DOWNSTREAM 341.97 341.97 358.97

D03

DETAIL

SAFETY CABLE

D03

D03

DETAIL

SAFETY CABLE BOLLARD

D03

DETAIL

CABLE FITTINGS ATTACHMENT

SAFETY LADDER

SECTION

LADDER RUNG

SECTION A-A

D03

INSTALLATION DETAIL

SECTION

A

A 40 6-

6-

N . 3

2n d

St re et

Bi llin gs , M on ta na

W W

W .D

O W

L .C

O M

C R

IP

M

C

C

H

EC

K R

EP

LA

C

EM

EN

T

SAFETY FEATURES PLAN

MC420 CHECK

D03

SA

FE

TY

D

ET

AI

LS

SAFETY LADDER DATA TABLE

STATION OFFSET L X Y

418+21 LT & RT 16'-9" 5'-3" 9

423+49.5 LEFT 16'-9" 5'-3" 9

423+62 RIGHT 16'-9" 5'-3" 9

431+45 LT & RT 23'-9" 12'-3" 13

D04

D05

A D04

ELEVATION

FENCE PANEL AT WING WALLS

D05

D05

B D04

ELEVATION

ACCESS GATE

D05

NO

U.S. GOVT.

PROPERTY

TRESPASSING

6-

6-

N . 3

2n d

St re et

Bi llin gs , M on ta na

W W

W .D

O W

L .C

O M

C R

IP

M

C

C

H

EC

K R

EP

LA

C

EM

EN

T

FENCING PLAN

MC420 CHECK

D04

SE

C

U R

IT

Y

FE

N

C E

AN

D

G

AT

E D

ET

AI

LS

ELEVATION

PLAN

D05

DETAIL

FENCE POST BASE PLATE ON CONCRETE WALL

D05

DETAIL

GATE DROP ROD RECEPTACLE

IN CONCRETE ENCASEMENT

D05

DETAIL

FENCE POST (CAST-IN-PLACE)

U.S. GOVT.

PROPERTY

TRESPASSING

D05

DETAIL

NO TRESPASSING SIGN

NO

D05

DETAIL

BOLLARD

D05

DETAIL

PIPE BEDDING

D05

ELEVATION

FENCE PANEL AT WING WALLS

D05

DETAIL

NO SWIMMING SIGN

6-

6-

N . 3

2n d

St re et

Bi llin gs , M on ta na

W W

W .D

O W

L .C

O M

C R

IP

M

C

C

H

EC

K R

EP

LA

C

EM

EN

T

D05

SE

C

U R

IT

Y

FE

N

C E

AN

D

G

AT

E D

ET

AI

LS

REAR ELEVATION (SOUTH)

CONTROL BUILDING (NTS)

FRONT ELEVATION (NORTH)

CONTROL BUILDING (NTS)

SIDE ELEVATION (WEST)

CONTROL BUILDING (NTS)

FLOOR PLAN

CONTROL BUILDING (NTS)

FOUNDATION PLAN

CONTROL BUILDING (NTS)

6-

6-

N . 3

2n d

St re et

Bi llin gs , M on ta na

W W

W .D

O W

L .C

O M

C R

IP

M

C

C

H

EC

K R

EP

LA

C

EM

EN

T

D06

C O

N

TR

O L

BU

IL

D

IN

G

CONTROL BUILDING LOCATION

MC420 CHECK

NOTE: SEE STRUCTURAL SHEET S-11 FOR FOUNDATION AND STRUCTURAL DETAILS.

6-

N . 3

2n d

St re et

Bi llin gs , M on ta na

W W

W .D

O W

L .C

O M

C R

IP

M

C

C

H

EC

K R

EP

LA

C

EM

EN

T

PHASE 1 CONSTRUCTION

PHASE 2 CONSTRUCTION

PHASE 3 CONSTRUCTION

EXISTING GROUND

LEGEND

XS1

C R

O

SS

S

EC

TI

O

N S

ST

A.

+0

TO

S

TA

. 4

+0

CANAL RECONSTRUCTION

TYPICAL SECTION

CANAL RECONSTRUCTION PHASES

TYPICAL SECTION

6-

N . 3

2n d

St re et

Bi llin gs , M on ta na

W W W .D O W L .C O M

C R

IP

M

C

C

H

EC

K R

EP

LA

C

EM

EN

T

PHASE 1 CONSTRUCTION

PHASE 2 CONSTRUCTION

PHASE 3 CONSTRUCTION

EXISTING GROUND

LEGEND

XS2

C R

O

SS

S

EC

TI

O

N S

ST

A.

+0

TO

S

TA

. 4

+0

6-

N . 3

2n d

St re et

Bi llin gs , M on ta na

W W W .D O W L .C O M

C R

IP

M

C

C

H

EC

K R

EP

LA

C

EM

EN

T

PHASE 1 CONSTRUCTION

PHASE 2 CONSTRUCTION

PHASE 3 CONSTRUCTION

EXISTING GROUND

LEGEND

XS3

C R

O

SS

S

EC

TI

O

N S

ST

A.

+0

TO

S

TA

. 4

+0

MATTHEW J.

METTLER

LANOISSEF

O R P

D E

R E

T

SI

G E

R ) L

A R

U T

C U

R T

S

RE

EN

IG

NE

NA U . S

. A

.AR I ZO

CIFI

T

R

E C .

O

N

ETA

E D 0 3

5D

A T E

S I G N

61334

R E V

IS

IO

N S

R E V

D A T E

D E S C R

IP

TI

O N

B Y

-6

-6

N n d S tr e e t

B ill in g s M o n ta n a

W W

W .D

O W

L .C

O M

PROJECT

DATE

SHEET

DOWL 2025c

P L O T

D A T E

U S E R

1/

IS

S U E D

FO

R

C O N S

TR

U C

TI

O N

B W

R d

\M R

-S

T -C

V -1

-0

.r v t

/2

/2

:2

:4

P M

S01

S T

R U

C T

U R

A L G

E N

E R

A L

N O

T E

S

MARCH 2025

4626.12494.01

C R

IP

M

C

C

H E

C K

R E

P L

A C

E M

E N

T

M G

O L D

B E

R G

STRUCTURAL GENERAL NOTES:

1. GENERAL REQUIREMENTS

DESIGN AND ALL MATERIALS, FABRICATION, INSPECTIONS, TESTING AND

CONSTRUCTION TO COMPLY WITH THESE GENERAL NOTES AND PROJECT

SPECIFICATIONS AND STANDARDS.

2. GOVERNING CODES AND SPECIFICATIONS

a. MINIMUM DESIGN LOADS AND OTHER ASSOCIATED CRITERIA FOR BUILDINGS AND

OTHER STRUCTURES, ASCE 7-22

b. BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE, ACI 318-19(22)

c. CODE REQUIREMENTS FOR ENVIRONMENTAL ENGINEERING CONCRETE

STRUCTURES, ACI 350-20

d. SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, AISC 360-22

3. DESIGN LOADS

a. DEAD LOADS

i. EQUIPMENT WEIGHT(S) AS CERTIFIED BY THE MANUFACTURER.

ii. SELF WEIGHT OF PERMANENT COMPONENTS

b. LIVE LOADS

i. STEEL GRATED ACCESS AREAS, WALKWAYS AND STAIRS- - - - - 100 PSF

ii. CONCENTRATED LOADS ON STEEL GRATED AREAS - - - - - - - - - - 500 LBS

iii. RADIAL GATE HOIST PLATFORMS - - - - - - - - - - - - - - - - - - - - - - - - 150 PSF

iv. CONCENTRATED LOADS ON RADIAL GATE HOIST PLATFORMS 2,000 LBS

c. SNOW LOAD CRITERIA

i. NONE

d. WIND LOAD CRITERIA

i. WIND SPEED (3-SEC GUST, ULTIMATE) - - - - - - - - - - - - - - - - - - - - 105 MPH

ii. RISK CATEGORY - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - -- - - - II

iii. EXPOSURE CATEGORY - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - C

iv. TOPOGRAPHIC FACTOR, Kzt - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1.00

e. SEISMIC LOAD CRITERIA

i. MAPPED SPECTRAL RESPONSE SS - - - - - - - - - - - - - - - - - - - - - - - 0.20

ii. MAPPED SPECTRAL RESPONSE S1 - - - - - - - - - - - - - - - - - - - - - - -- 0.12

iii. PROJECT SITE CLASS - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - E

iv. SPECTRAL RESPONSE COEFFICIENT SDS - - - - - - - - - - - - - - - - - - - 0.32

v. SPECTRAL RESPONSE COEFFICIENT SD1 - - - - - - - - - - - - - - - - - - - 0.34

vi. IMPORTANCE FACTOR - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1.00

vii. SEISMIC DESIGN CATEGORY - - - - - - - - - - - - - - - - - - - - - - - - - - - - D

viii. ANALYSIS PROCEDURE, EQUIVALENT LATERAL FORCE

4. CONSTRUCTION PHASE STABILITY

a. STRUCTURE STABILITY REQUIRES THAT ALL MEMBERS AND CONNECTIONS ARE

COMPLETE PER THESE DRAWINGS. THE CONSTRUCTOR IS RESPONSIBLE FOR

PROVIDING TEMPORARY BRACING, SHORING OR OTHER SUPPLEMENTAL

SUPPORTS DURING CONSTRUCTION TO ENSURE STABILITY UNTIL COMPLETION.

b. THE CONSTRUCTOR IS ALSO RESPONSIBLE FOR PROVIDING TEMPORARY

SUPPLEMENTAL SUPPORTS DURING CONSTRUCTION, AS NECESSARY, TO

PROTECT THE STRUCTURES FROM OVERLOAD IF CONSTRUCTION PHASE LOADS

EXCEED THE DESIGN LOADS OUTLINED ABOVE.

5. FOUNDATIONS & BURIED WALLS

a. GEOTECHNICAL REFERENCE: CRIP MAIN CANAL GEOTECHNICAL REPORT BY

DOWL - DATED NOVEMBER, 2022.

b. FOUNDATION DESIGN CRITERIA

i. FROST DEPTH, NONE

ii. NET ALLOWABLE SOIL BEARING PRESSURE, MAT SLAB - - - - - - - 2,000 PSF

iii. SUBGRADE MODULUS, k - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 125 PCI

iv. NET ALLOWABLE SOIL BEARING PRESSURE, RETAINING WALL FOOTINGS - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2,500 PSF

v. LATERAL SOIL PRESSURE (EQUIV FLUID), ACTIVE - - - - - - -- - - - - - 40 PCF

vi. LATERAL SOIL PRESSURE (EQUIV FLUID), AT-REST - - - - - -- - - - - - 60 PCF

vii. LATERAL SOIL PRESSURE (EQUIV FLUID), PASSIVE - - - - - - - - - - - 390 PCF

viii. DESIGN WATER TABLE SURFACE BELOW WALL TOP - - - - - - - - - - - 7.5 FT

ADD HYDROSTATIC PRESSURE BELOW THIS LEVEL

ix. LATERAL SOIL PRESSURE (EQUIV FLUID), ACTIVE BELOW WATERTABLE -- - - - - - - - - - - - - - - - - - - - - - - - - - - - 85 PCF

x. LATERAL SOIL PRESSURE (EQUIV FLUID), PASSIVE BELOW WATERTABLE - - - - - - - - - - - - - - - - - - - - - - - - - - - - 260 PCF

xi. COEFFICIENT OF FRICTION - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.45

xii. LATERAL LIVE LOAD SURCHARGE COEFF - - - - - - - - - - - - - - - - - - - - 0.32

c. EXCAVATION

i. LOCATE UNDERGROUND UTILITIES BY SURFACE SCANNING OR CAREFUL

EXPLORATION BEFORE STRUCTURE EXCAVATION.

ii. EXCAVATION METHODS, SLOPES AND SHORING ARE THE CONSTRUCTOR'S

RESPONSIBILITY TO DESIGN AND INSTALL AND MUST BE IN COMPLIANCE

WITH OSHA 29 CFR 1926 BASED ON SITE SPECIFIC SOIL TYPE "C".

iii. EXCAVATION SURFACE BARRIERS FOR PERSONS, EQUIPMENT AND SURFACE

WATER ARE THE CONSTRUCTOR'S RESPONSIBILITY.

iv. EXCAVATION PERMITS MAY BE REQUIRED.

d. SUBGRADE

i. COMPACT OR PROOF ROLL NATIVE SOIL SUBGRADE SURFACE IN

ACCORDANCE WITH PROJECT SPECIFICATIONS AND AS DIRECTED BY THE

GEOTECHNICAL REPRESENTATIVE.

ii. FOOTINGS / MAT SLABS SHALL BEAR ON COMPACTED STRUCTURAL FILL ON

A GEOTEXTILE STABILIZATION FABRIC OVER SUBGRAGE SOILS APPROVED

BY THE GEOTECHNICAL REPRESENTATIVE. COMPACT STRUCTURAL FILL TO

98% DENSITY IN ACCORDANCE WITH ASTM D698.

e. BACKFILL

i. MOISTURE CONDITION, PLACE AND COMPACT APPROVED BACKFILL

MATERIALS IN ACCORDANCE WITH PROJECT SPECIFICATIONS AFTER

CONCRETE HAS GAINED DESIGN STRENGTH.

ii. PLACE AND COMPACT BACKFILL ON WALLS BURIED BOTH SIDES IN EQUAL

LIFTS ON EACH SIDE OF WALL. UNBALANCED LIFT SURFACES MUST NOT

EXCEED 1.5 FEET.

6. CONCRETE

a. MATERIALS AND CONSTRUCTION TO CONFORM TO THE AMERICAN CONCRETE

INSTITUTE SPECIFICATIONS FOR STRUCTURAL CONCRETE (AC1 301), BUILDING CODE

REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318) AND SPECIFICATION FOR

CURING CONCRETE (ACI 308.1).

b. DETAILING, FABRICATION AND PLACEMENT OF REINFORCEMENT TO CONFORM TO

DETAILS AND DETAILING OF CONCRETE REINFORCEMENT (ACI 315)

c. MATERIALS

i. PORTLAND CEMENT - - - - - - - - - - - - - - - - - - - - - - - - - - - ASTM C150 TYPE V

OR ASTM C595 TYPE IP OR IS

ii. FLY ASH - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ASTM C618 TYPE C OR F

iii. NORMAL WEIGHT AGGREGATES - - - - - - - - - - - - - - - - - ASTM C33 CLASS 3S OR 4M

iv. AIR-ENTRAINING ADMIXTURE - - - - - - - - - - - - - - - - - - - - ASTM C260

v. WATER-REDUCING ADMIXTURE - - - - - - - - - - - - - - - - - - ASTM C494

vi. WATER - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - POTABLE OR ASTM C1602

vii. REINFORCING BARS - - - - - - - - - - -- - - - - - - - - - - - - - - - - ASTM A615, GRADE 60

UN-COATED

viii. WELDED WIRE REINFORCING-DEFORMED (WWR) - - - - ASTM A1064, GRADE 70

UN-COATED

ix. POST-INSTALLED ANCHOR OR REBAR DOWEL ADHESIVE

HILTI HIT-HY-200 V3 OR HIT-RE 500 V3

d. ALL BENT REINFORCING BARS TO BE SHOP FABRICATED. REBENDING OR WELDING OF

REINFORCEMENT IS NOT PERMITTED UNLESS AUTHORIZED BY ENGINEER. END HOOKS

IN REINFORCING BARS, SHOWN ON THE DRAWINGS BUT NOT DIMENSIONED, TO

CONFORM TO ACI 318 STANDARDS.

e. REDI-MIXED CONCRETE - SEE SCHEDULE SHEET S02

f. CONCRETE MATERIALS & ACCESSORIES - SEE SCHEDULE SHEET S02

g. CONCRETE COVER OVER REBAR REINFORCEMENT TO BE 2" CLEAR, EXCEPT 3" CLEAR

FOR CONCRETE PLACED AGAINST SOIL.

h. LAP REINFORCING BARS PER THE REINFORCING BAR LAP SCHEDULE - SEE SCHEDULE

SHEET S02

i. STAGGER ADJACENT REINFORCEMENT LAP SPLICES IN WALLS 24" MINIMUM.

j. ADJUST REBAR SPACING OR POSITION NOMINALLY AS REQUIRED TO CLEAR EMBEDDED

ITEMS SUCH AS ANCHORAGES.

k. PROVIDE REBAR SUPPORTS TO PROPERLY SECURE AND SUPPORT REINFORCING IN

ACCORDANCE WITH CRSI UNLESS SHOWN/INDICATED OTHERWISE. PROVIDE #4

STANDEES AT 4 FT MAX TO SUPPORT TOP REINFORCEMENT MATS IN BASE SLABS AND

FOOTINGS, AND #4 CROSSTIES AT 6 FT MAX EACH WAY TO SECURE DOUBLE WALL

CURTAINS.

l. DOWELS, PIPE SLEEVES AND OTHER INSTALLED MATERIALS AND ACCESSORIES MUST

BE HELD SECURELY IN POSITION DURING CONCRETE PLACEMENT.

m. REINFORCING BARS AND ACCESSORIES MUST NOT BE IN CONTACT WITH ANY SLEEVE, PIPE FLANGE OR METAL PART EMBEDDED IN CONCRETE. PROVIDE 2" CLEARANCE IN

ALL CASES UNLESS OTHERWISE INDICATED. NO EMBEDDED ITEM MAY BE SUSPENDED

FROM, SUPPORTED BY, OR BRACED IN PLACE FROM REINFORCEMENT.

n. LOCATE CONSTRUCTION JOINTS WHERE SHOWN ON THE DRAWINGS OR AS

AUTHORIZED THE ENGINEER. SLABS AND BEAMS MAY NOT HAVE JOINTS IN A

HORIZONTAL PLANE.

o. THOROUGHLY CLEAN BY SANDBLASTING ALL CONSTRUCTION JOINT SURFACES PRIOR

TO ADJACENT CONCRETE PLACEMENT.

p. BEGIN SPACING OF BARS WHICH PARALLEL CONSTRUCTION JOINTS 3" CLEAR EACH

SIDE OF JOINT.

q. UNLESS OTHERWISE SHOWN, PLACE 2 - #5 (1 EACH FACE) WITH 2'-6" PROJECTIONS

AROUND ALL OPENINGS IN CONCRETE WALLS OR SLABS.

r. PROVIDE AN ADDITIONAL 120 LINEAL FEET OF #6 REINFORCING BARS FOR USE AS

DIRECTED DURING CONSTRUCTION.

s. CHAMFER ALL EXPOSED CONCRETE EDGES 3/4" UNLESS OTHERWISE INDICATED.

7. WATER STOP & JOINT SEALANT

a. PVC WATERSTOPS MANUFACTURED FROM VIRGIN MATERIALS AND IN COMPLIANCE

WITH CORPS OF ENGINEERS STANDARD CRD-C 572-74 RIBBED CENTER BULB UNLESS

INDICATED OTHERWISE. HEAT WELD WATERSTOP JOINTS AND INTERSECTIONS. USE

OF HOG RINGS AND TIE WIRE TO MAINTAIN POSITION AND TAUT CONDITION DURING

CONCRETE PLACEMENT IS REQUIRED.

b. HYDROPHILIC WATERSTOPS COMPRISED OF BENTONITE CLAY AND BUTYL RUBBER IN COMPLIANCE WITH ASTM D6. SIZE IS 3/4 INCH x 1 INCH UNLESS INDICATED OTHERWISE.

APPLICATION OF A PRIMER ADHESIVE WITH INSTALLATION IS REQUIRED.

c. SEE CONCRETE MATERIALS AND ACCESSORIES FOR JOINT SEALANT.

8. STRUCTURAL STEEL

a. STRUCTURAL STEEL MATERIALS AND CONSTRUCTION SHALL CONFORM TO THE

AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC) SPECIFICATION FOR THE

DESIGN, FABRICATION AND ERECTION OF STRUCTURAL STEEL BUILDINGS.

b. MATERIAL

i. STRUCTURAL STEEL W-SHAPES - - - - - - - - - - - - - - - - - - - - - - - - - - -

ii. PLATES, BARS, ANGLES AND C SHAPES - - - - - - - - - - - - - - - - - - - - - -

iii. BAR GRATING - - - - - - - - - - - - - - - - - - - - - - - - - -

iv. STEEL PIPE RAILING - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

v. HIGH-STRENGTH BOLTS - - - - - - - - - - - - - - - - - - - - - -

vi. ANCHOR RODS - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

vii. POST-INSTALLED ANCHOR RODS - ADHESIVE SET

HILTI HAS-R STAINLESS STEEL - - - - - - - - - - - - - - - - - - - - - - - - - - -

viii. HEADED ANCHOR STUDS (HAS) - - - - - - - - - - - - - - - - - - - - -

c. ALL STRUCTURAL STEEL BOLTED CONNECTIONS SHALL BE FULLY PRE-TENSIONED

A325 - N BOLTS WITH STANDARD HOLES UNLESS OTHERWISE NOTED.

d. ALL WELDING SHALL CONFORM TO AMERICAN WELDING SOCIETY STRUCTURAL

WELDING CODE - STEEL (AWS D1.1) AND SHALL BE PERFORMED BY WELDERS

QUALIFIED BY THE APPROPRIATE AWS TEST FOR THE WELDING PERFORMED.

e. ALL CARBON STEEL ASSEMBLIES, INCLUDING GRATING AND ANCHOR RODS, SHALL BE HOT-DIP GALVANIZED AFTER FABRICATION IN ACCORDANCE WITH

ASTM A123.

f. STEEL GRATING TYPE 19-W-4 WITH 1 1/4" x 3/16" BEARING BARS UNLESS

INDICATED OTHERWISE. BAND ALL PERIMETER ENDS AND PENETRATIONS.

g. FASTEN BAR GRATING TO SUPPORTING STEEL BEAMS WITH GRATING

STANDARD CLIPS AND FASTENERS SUCH AS MCNICHOLS TYPE GFSS-1,

SSGC, GN OR APPROVED ALTERNATE.

9. EQUIPMENT INSTALLATION

a. ALL OPENINGS AND ANCHOR ARRANGEMENTS SHOWN SHALL BE VERIFIED, AND

ALL STRUCTURAL DIMENSIONS AND DETAILS PERTAINING TO EQUIPMENT

INSTALLATION SHALL BE COORDINATED BY THE CONTRACTOR BASED ON THE

ACTUAL EQUIPMENT FURNISHED.

ALT -ALTERNATE

ANC -ANCHOR

BB -BACK TO BACK

BLDG -BUILDING

BM -BEAM

BRG -BEARING

BOPL -BOTTOM OF BASE PLATE

BOT -BOTTOM

BTWN -BETWEEN

CIP -CAST IN PLACE

CL -CENTERLINE

CLR -CLEAR

CLSM -CONTROLLED LOW

STRENGTH MATERIAL

CMU -CONCRETE MASONRY UNIT

COL -COLUMN

CONC -CONCRETE

CONN -CONNECTION

CONT -CONTINUOUS

COORD -COORDINATE

CNTRD -CENTERED

CNJT -CONTRACTION JOINT

CSJT -CONSTRUCTION JOINT

CY -CUBIC YARD

DBA -DEFORMED BAR ANCHOR

DIA OR (/) -DIAMETER

DIAG -DIAGONAL

DIM -DIMENSION

DIST -DISTANCE

DWG -DRAWING

DWL -DOWEL

E -EAST

EA -EACH

EF -EACH FACE

EL -ELEVATION

EPS -EXPANDED POLYSTYRENE

EQL -EQUAL

EXST -EXISTING

EXP -EXPANSION

EXT -EXTERIOR

FDN -FOUNDATION

FF -FRONT FACE

FLG -FLANGE

FT -FOOT

FTG -FOOTING

FRMG -FRAMING

FS -FAR SIDE

STRUCTURAL ABBREVIATIONS

GA -GAGE (OR GAUGE)

GALV -GALVANIZED

GL -GLULAM

GB -GRADE BEAM

GVW -GROSS VEHICLE WEIGHT

HAS -HEADED ANCHOR STUD

HORZ -HORIZONTAL

HT -HEIGHT

IN -INCH

INFO -INFORMATION

INT -INTERIOR

ISJT -ISOLATION JOINT

JT -JOINT

KIP -1,000 LBS

KSF -KIP PER SQUARE FOOT

KSI -KIP PER SQUARE INCH

LAT -LATERAL

LBS -POUND(S)

LDGR -LEDGER

LLH -LONG LEG HORIZONTAL

LLV -LONG LEG VERTICAL

LOC -LOCATION

LONG -LONGITUDINAL

LP -LOW POINT

MATL -MATERIAL

MAX -MAXIMUM

MCJ -MASONRY CONTROL JOINT

MFR -MANUFACTURER

MIN -MINIMUM

MISC -MISCELLANEOUS

N -NORTH

NO. OR # -NUMBER

NOM -NOMINAL

NS -NEAR SIDE

NTS -NOT TO SCALE

OC -ON CENTER

OD -OUTSIDE DIAMETER

OPNG -OPENING

OPP -OPPOSITE

PL -PLATE

PROJ -PROJECTION

PSF -POUNDS PER SQUARE FOOT

PSI -POUNDS PER SQUARE INCH

QTY -QUANTITY

R -RADIUS

REF -REFERENCE (REFER TO)

REINF -REINFORCEMENT

REQD -REQUIRED

RF -REAR FACE

S -SOUTH

SHT -SHEET

SIM -SIMILAR

SPA -SPACE OR SPACES

SPEC -SPECIFICATIONS

SQ -SQUARE

STD -STANDARD

STIF -STIFFENER

STL -STEEL

STIR -STIRRUP

STRUCT -STRUCTURAL

SYM -SYMMETRICAL

T&B -TOP AND BOTTOM

THK -THICKNESS

TOC -TOP OF CONCRETE

TOF -TOP OF FOOTING

TOG -TOP OF GRATING

TOPL -TOP OF PLATE

TOS -TOP OF STEEL

TOW -TOP OF WALL

TRANS -TRANSVERSE

TYP -TYPICAL

UNO -UNLESS NOTED OTHERWISE

VERT -VERTICAL

W -WEST

W/ -WITH

W/O -WITHOUT

WP -WORK POINT

WT -WEIGHT

WWR -WELDED WIRE FABRIC

ASTM A992

ASTM A36

ANSI MBG STEEL, TYPE 19-W-4

ASTM A53, GRADE B

ASTM F3125, GRADE A325

ASTM F1554, GRADE 55

AISI 304 / 316

ASTM A108, TYPE B

LANOISSEF

O R P

D E

R E

T

SI

G E

R ) L

A R

U T

C U

R T

S

RE

EN

IG

NE

NA U . S

. A

.AR I ZO

CIFI

T

R

E C .

O

N

ETA

E D 0 3

5D

A T E

S I G N

61334

R E V

IS

IO

N S

R E V

D A T E

D E S C R

IP

TI

O N

B Y

-6

-6

N n d S tr e e t

B ill in g s M o n ta n a

W W

W .D

O W

L .C

O M

PROJECT

DATE

SHEET

DOWL 2025c

P L O T

D A T E

U S E R

1/

IS

S U E D

FO

R

C O N S

TR

U C

TI

O N

B W

R d

\M R

-S

T -C

V -1

-0

.r v t

/2

/2

:2

:4

P M

S02

S T

R U

C T

U R

A L

M A

T E

R

IA

L S

I

N S

P E

C T

IO

N

S C

H E

D U

L E

S

MARCH 2025

4626.12494.01

C R

IP

M

C

C

H E

C K

R E

P L

A C

E M

E N

T

M G

O L D

B E

R G

SCHEDULE NOTES:

1. NOT ALL PROJECT MATERIALS ARE SUMMARIZED HERE. SEE PROJECT SPECIFICATIONS FOR COMPLETE MATERIAL & INSTALLATION REQUIREMENTS INCLUDING PRE-APPROVED PRODUCTS FOR SELECTED JOINT TREATMENT

ITEMS.

REBAR LAP SCHEDULE NOTES:

1. TENSION LAP LENGTHS ARE SHOWN CLASS B MINIMUMS FOR CAST-IN-PLACE CONCRETE FOR CRITERIA INDICATED.

2. LENGTHS BASED ON GRADE 60 UN-COATED DEFORMED BARS WITH CONCRETE COMPRESSIVE STRENGTH f'c = 4,000 PSI MINIMUM; 2" CONCRETE COVER; AND MINIMUM C-C BAR SPACING ~4" FOR BAR SIZE TO #6 AND ~6" FOR LARGER

SIZES.

3. TOP BAR LAPS ARE HORIZONTAL LAPS WHERE MORE THAN 12" OF FRESH CONCRETE IS PLACED BELOW THE BAR.

4. BAR HOOK GEOMETRY IN ACCORDANCE WITH ACI 318 CHAPTER 25.

5. HEADED TERMINATORS ARE MECHANICAL DEVICES IN ACCORDANCE WITH ACI 318 CHAPTER 25.

6. SEE STRUCTURAL GENERAL NOTES AND PLANS FOR RESTRICTIONS ON LAP LOCATIONS, IF ANY.

LANOISSEF

O R P

D E

R E

T

SI

G E

R ) L

A R

U T

C U

R T

S

RE

EN

IG

NE

NA U . S

. A

.AR I ZO

CIFI

T

R

E C .

O

N

ETA

E D 0 3

5D

A T E

S I G N

61334

R E V

IS

IO

N S

R E V

D A T E

D E S C R

IP

TI

O N

B Y

-6

-6

N n d S tr e e t

B ill in g s M o n ta n a

W W W .D O W L .C O M

PROJECT

DATE

SHEET

DOWL 2025c

P L O T

D A T E

U S E R

1/

IS

S U E D

FO

R

C O N S

TR

U C

TI

O N

B W

R d

\M

R

-S T

-1

-0

-M C

.r v t

/2

/2

:2

:2

P M

S03

C H

E C

K S

T R

U C

T U

R E

I S

O M

E T

R

IC

V

IE

W S

MARCH 2025

4626.12494.01

C R

IP

M

C

C

H E

C K

R E

P L

A C

E M

E N

T

M G

O L D

B E

R G

ISOMETRIC

S03

FULL VIEW - inlet

FLOW

WEIR WALL

EACH SIDE

BASE SLAB

ELECTRICAL ENCLOSURE PAD

ISOMETRIC

S03

FULL VIEW - outlet

FLOW

RADIAL GATE BAY

WEIR BAY,

EACH SIDE

STEEL RAILING, TYP

WEIR WALL EACH SIDE

WEIR BAY EACH SIDE

STEEL RAILING, TYP

BASE SLAB

RADIAL GATE BAY

ELECTRICAL

ENCLOSURE PAD

NOTES:

1. ISOMETRIC VIEWS OF THE STRUCTURE ARE INTENDED TO

PROVIDE AN OVERALL GRAPHIC OF ARRANGEMENT AND

KEY ELEMENTS - SOME FEATURES DETAILED IN THE

PROJECT PLANS AND SPECIFICATIONS ARE NOT SHOWN

HERE.

ELECTRICAL ENCLOSURE, RADIAL GATE, AND GATE HOIST

EQUIPMENT ARE NOT SHOWN.

2. GROUND SURFACES ARE NOT SHOWN. CANAL INVERT IS

TOP OF BASE SLAB, CANAL BANK NEAR WALL TOP.

CONC CANAL

LINING TRANSITION

CONC CANAL

LINING TRANSITION

CONC CANAL

LINING, SEE CIVIL

CONC CANAL

LINING, SEE CIVIL

B

B

C

C

1 1

4 4

3 3

D

D

5 5

7 7

28' - 6" 35' - 0" 28' - 6"

92' - 0"

SEE CIVIL SHT C03 FOR

LAYOUT CONTROL

POINTS

A S07

B

S07

TOC EL.= 342.00'

TOC EL.= 342.00'

C S

J T

C N

J T

1' - 9"

1' - 0" 3' - 9" 25' - 0 3/8" ±

BASE SLAB

34' - 5 3/8" 25' - 0 3/8" ± 3' - 9" 1' - 0"

1' - 3"

1' - 9"

6 6

2 2

98.5°

/4

/4

/4

/4

171.5°

3 5/16" 3 5/16"

98.5°

171.5°

W E

IR

B

A Y

W E

IR

B

A Y

BASE SLAB (LEVEL)

CONC WALLS, SEE SHEET S05

℄ SILL PL

TBD

16' - 9"

GATE SILL

PLATE EMBED

R A

D

IA

L G

A T

E B

A Y

(S

Y M

S08

S08

S08

S08

CANAL LINING EDGE

TREATMENT, SEE SHEET S05

AND DETAIL 4/S08, TYP

C

S08

S10

TRANSVERSE REINF

LONGITUDINAL REINF

(2) #6 X 10'-0" DIAG, TOP & BOT-

PLACE INSIDE COMMON MATS

(4) LOC

S08

ADD #8 X 15'-0" @ 12" TRANSVERSE

TO TOP REINF MAT THIS AREA.

CENTER ADD BAR LENGTH ON GRID 4

(SEE SHT S09)

MATTHEW J.

METTLER

LANOISSEF

O R P

D E

R E

T

SI

G E

R ) L

A R

U T

C U

R T

S

RE

EN

IG

NE

NA U . S

. A

.AR I ZO

CIFI

T

R

E C .

O

N

ETA

E D 0 3

5D

A T E

S I G N

61334

R E V

IS

IO

N S

R E V

D A T E

D E S C R

IP

TI

O N

B Y

-6

-6

N n d S tr e e t

B ill in g s M o n ta n a

W W W .D O W L .C O M

PROJECT

DATE

SHEET

DOWL 2025c

P L O T

D A T E

U S E R

1/

IS

S U E D

FO

R

C O N S

TR

U C

TI

O N

B W

R d

\M

R

-S T

-1

-0

-M C

.r v t

/2

/2

:2

:2

P M

S04

C O

N C

R E

T E

P L A

N

B A

S E

S L

A B

E L

MARCH 2025

4626.12494.01

C R

IP

M

C

C

H E

C K

R E

P L

A C

E M

E N

T

M G

O L D

B E

R G

PLAN VIEW

S04

BASE SLAB ELEVATION

scale feet

0 155 10

3/16" = 1' - 0"

NOTES:

1. SEE SHEET S01 FOR GENERAL STRUCTURAL NOTES.

2. SEE SHEET S02 FOR STRUCTURAL MATERIALS AND

INSPECTION SCHEDULES.

3. SEE CIVIL SHEETS FOR STRUCTURE LOCATION ON

PROJECT SITE, EARTH WORK DETAILS, AND CONCRETE

CANAL LINING.

4. DEWATERING MAY BE REQUIRED FOR SUBGRADE

PREPARATION AND BASE SLAB PLACEMENT ACTIVITIES.

FLOW

TBD = "TO BE DETERMINED" AS COORDINATED WITH

GATE FABRICATION DRAWINGS

B

B

C

C

1 1

4 4

3 3

D

D

5 5

7 7

SEE CIVIL FOR LAYOUT

CONTROL POINTS

TOW EL.= 357.50'

TOW EL.= 357.50'

TOW EL.= 357.50'

TOW EL.= 357.50'

TOW EL.= 357.50'

TOW EL.= 352.83'

TOW EL.= 352.83'

TOW EL.= 357.50'

TOC EL.= 357.50'

TOC EL.= 358.79'

28' - 6" 35' - 0" 28' - 6"

G A

T E

B A

Y

9' - 8"

A S07

B S07

C S08

S10

G

S09

SYM

F S09

E S09

S11

CONCRETE PAD FOR

ELEC ENCLOSURE; SEE

SHT D06 FOR LOCATION

' - 6

6 6

2 2

S11

S11

WEIR WALL

C A

N A

L B

O T

T O

M

WEIR WALL

(S

Y M

98.5°

CONC WALLS

BASE SLAB

92' - 0"

CONC HOIST

PLATFORM

EL.= 358.79'

106.4°

CONC WALKWAY

CANAL LINING

TRANSITION

C A

N A

L B

O T

T O

M

EACH SIDE

21' - 6"

STOP LOG

NOTCH, TYP

S10

S10

G S09

SYM

LAYOUT

NOSE

REINF

S10

S10

S11

G S09

SYM

G

S09

SYM

F S09

E S09

S11

S11

S11

OPP

2' - 0"

℄ NOTCH

℄ NOTCH

S11

2' - 9"

REAR FACE WALL

(SOIL SIDE)

FRONT FACE WALL

(CANAL SIDE)

S11

S11

GATE ANCHORAGE (NOTE 5)

GATE ANCHORAGE (NOTE 5)

CONCRETE STEP TO

MATCH PLATFORM

WIDTH, (3) RISERS @ 7"

TYP

2' - 0" 26' - 6" 4' - 0" 4' - 6" 19' - 0" 4' - 6" 3' - 0" 26' - 6"

2' - 0"

CANAL LINING TRANSITION,

SEE DETAIL 4/S08

NOTES:

1. SEE SHEET S01 FOR GENERAL STRUCTURAL NOTES.

2. SEE SHEET S02 FOR STRUCTURAL MATERIALS AND

INSPECTION SCHEDULES.

3. SEE CIVIL SHEETS FOR STRUCTURE LOCATION ON

PROJECT SITE, EARTH WORK DETAILS, AND CONCRETE

CANAL LINING.

4. SEE SHEET S04 FOR STRUCTURE SLAB PLAN.

5. DETAIL 4/S11 DEFINES THE FULL HEIGHT IN-WALL

REINFORCING CAGE AND THE BLOCK-OUT (OR CORED

HOLE AFTER CONCRETE PLACEMENT) FOR THE RADIAL

GATE ANCHORAGE SHEAR LUG. THE LOCATION OF THESE

ELEMENTS MUST BE VERIFIED WITH RADIAL GATE MFG

DRAWINGS.

6. SEE SHEET S06 FOR STEEL RAILING.

CNJT - SEE DETAIL 3/S08

CSJT - SEE DETAIL 2/S08

LEGEND:

MATTHEW J.

METTLER

LANOISSEF

O R P

D E

R E

T

SI

G E

R ) L

A R

U T

C U

R T

S

RE

EN

IG

NE

NA U . S

. A

.AR I ZO

CIFI

T

R

E C .

O

N

ETA

E D 0 3

5D

A T E

S I G N

61334

R E V

IS

IO

N S

R E V

D A T E

D E S C R

IP

TI

O N

B Y

-6

-6

N n d S tr e e t

B ill in g s M o n ta n a

W W W .D O W L .C O M

PROJECT

DATE

SHEET

DOWL 2025c

P L O T

D A T E

U S E R

1/

IS

S U E D

FO

R

C O N S

TR

U C

TI

O N

B W

R d

\M

R

-S T

-1

-0

-M C

.r v t

/2

/2

:2

:3

P M

S05

C O

N C

R E

T E

P L A

N

W A

L L T

O P

E L

MARCH 2025

4626.12494.01

C R

IP

M

C

C

H E

C K

R E

P L

A C

E M

E N

T

M G

O L D

B E

R G

PLAN VIEW

S05

WALL TOP PLAN - CONCRETE 1

scale feet

0 155 10

3/16" = 1' - 0"

FLOW

GATE SIDE

PL EMBED

B

B

C

C

1 1

4 4

3 3

D

D

5 5

7 7

C S08

A S07

B S07

6 6

2 2

ELECTRICAL

ENCLOSURE

92' - 0"

28' - 6" 35' - 0" 28' - 6"

CONC WALLS BASE SLAB

STEEL RAILING; SEE

DETAIL 1/S12, TYP

R A

D

IA

L G

A T

E B

A Y

R

A D

IA

L G

A T

E

℄ HOIST SHAFT

℄ ARM PIN

℄ ARM ANCHORAGE

TBD

10' - 0"

TBD

16' - 2"

TBD

1' - 8"

TBD

6 1/2" GATE FACE

RADIAL

GATE

FACE

CONC WALKWAYCONC HOIST

PLATFORM

SEE FENCING DETAIL ON SHT

D04 FOR WALL RETURN

CLOSURES

R A

D

IA

L G

A T

E A

N D

H O

IS

T

E Q

U

IP

M E

N T

(S E

E N

O T

E

RADIAL GATE HOIST EQUIP,

STEEL ACCESS PLATFORM

& RAILING AT HOIST EQUIP

SUPPLIED BY GATE MFG

CONCRETE STEPS AT

PLATFORM END, TYP;

EXTEND RAILING TO

STEP NOSE

MATTHEW J.

METTLER

LANOISSEF

O R P

D E

R E

T

SI

G E

R ) L

A R

U T

C U

R T

S

RE

EN

IG

NE

NA U . S

. A

.AR I ZO

CIFI

T

R

E C .

O

N

ETA

E D 0 3

5D

A T E

S I G N

61334

R E V

IS

IO

N S

R E V

D A T E

D E S C R

IP

TI

O N

B Y

-6

-6

N n d S tr e e t

B ill in g s M o n ta n a

W W W .D O W L .C O M

PROJECT

DATE

SHEET

DOWL 2025c

P L O T

D A T E

U S E R

1/

IS

S U E D

FO

R

C O N S

TR

U C

TI

O N

B W

R d

\M

R

-S T

-1

-0

-M C

.r v t

/2

/2

:2

:3

P M

S06

S T

E E

L

G A

T E

E Q

U

IP

P L A

N

W A

L L

T O

P E

L

MARCH 2025

4626.12494.01

C R

IP

M

C

C

H E

C K

R E

P L

A C

E M

E N

T

M G

O L D

B E

R G

PLAN VIEW

S06

WALL TOP PLAN - STEEL & GATE

EQUIPMENT 1

scale feet

0 155 10

3/16" = 1' - 0"

NOTES:

1. SEE SHEET S01 FOR GENERAL STRUCTURAL

NOTES.

2. SEE SHEET S02 FOR STRUCTURAL MATERIALS

AND INSPECTION SCHEDULES.

3. SEE CIVIL FOR SITE FENCING.

4. DIMENSIONAL INFORMATION RELATED TO THE

RADIAL GATE AND GATE EQUIPMENT SHOWN

IS FOR DESIGN PURPOSES ONLY. LAYOUT

MUST BE VERIFIED AND ADJUSTED AS

REQUIRED TO MATCH GATE MFG

CONSTRUCTION DRAWINGS AND DETAILS.

CHECK CONSTRUCTION RELATED CLOUDED

DIMENSIONS ARE ON HOLD UNTIL VERIFIED.

RADIAL GATE ARM AND HOIST EQUIPMENT

ANCHOR RODS ARE SCHEDULED TO BE POST-

INSTALLED. SEE GATE MFG DETAILS FOR

SPEC, SIZE, AND ARRANGEMENT.

5. STEEL RAILING TYPE AND LIMITS ARE

REPRESENTED HERE. POST LOCATIONS MAY

VARY AS DEEMED MOST EFFICIENT BY THE

RAILING FABRICATOR PROVIDED MAXIMUM

DESIGN SPACING IS NOT EXCEEDED.

FLOW

TBD = "TO BE DETERMINED" AS COORDINATED

WITH GATE FABRICATION DRAWINGS

TOC

EL.=342.00'

TOC

EL.=357.50'

14 357

6 2

IMPROVED SUBGRADE,

SEE DETAIL 1/S08

/2

51' - 0"

10' - 9" 2' - 0" 10' - 0" 2' - 6"

GATE BAY

18' - 6" 2' - 6" 10' - 0" 2' - 0" 10' - 9"

69' - 0"

GRADE

BASE SLAB

CONC WALLS

STEEL RAILING

RADIAL GATE

TOC

EL.=358.79'

PLATFORM

TOC

EL.=342.00'

TOC

EL.=357.50'

EL.=352.83'

WEIR TOW

6 2

12' - 9" 43' - 6" 12' - 9"

IMPROVED SUBGRADE,

SEE DETAIL 1/S08

BASE SLAB

CONC WALLS

WEIR WALLS

WEIR WEIR

GRADE

STEEL RAILING

MATTHEW J.

METTLER

LANOISSEF

O R P

D E

R E

T

SI

G E

R ) L

A R

U T

C U

R T

S

RE

EN

IG

NE

NA U . S

. A

.AR I ZO

CIFI

T

R

E C .

O

N

ETA

E D 0 3

5D

A T E

S I G N

61334

R E V

IS

IO

N S

R E V

D A T E

D E S C R

IP

TI

O N

B Y

-6

-6

N n d S tr e e t

B ill in g s M o n ta n a

W W W .D O W L .C O M

PROJECT

DATE

SHEET

DOWL 2025c

P L O T

D A T E

U S E R

1/

IS

S U E D

FO

R

C O N S

TR

U C

TI

O N

B W

R d

\M

R

-S T

-1

-0

-M C

.r v t

/2

/2

:2

:3

P M

S07

C O

N C

R E

T E

S E

C T

IO

N

S

MARCH 2025

4626.12494.01

C R

IP

M

C

C

H E

C K

R E

P L

A C

E M

E N

T

M G

O L D

B E

R G scale feet

0 155 10

3/16" = 1' - 0" scale feet

0 155 10

3/16" = 1' - 0"

SECTION

S07

A

THROUGH RADIAL GATE BAY

SECTION

S07

B

THROUGH WEIRS BAYS

TOC

EL.=357.50'

A B C D

A

S07

B

S07

28' - 6" 35' - 0" 28' - 6"

℄ STOP LOG NOTCH

(SEE PLAN FOR LOCS)

℄ STOP LOG NOTCH

(SEE PLAN FOR LOCS)

92' - 0"

1' - 3"

EL.= 354.50'

CL PIN

℄ GATE ARM

PIN

S11

WEIR

IMPROVED SUBGRADE,

SEE DETAIL 1/S08

S10

GATE SILL

PL EMBED

GATE ANC

TBD

BASE SLAB

CONC WALLS

STEEL RAILINGS08

TOC

EL.=358.79'

/2

GATE HOIST

EQUIP - TBD

GATE ANCHORAGE (NOTE 5, SHT S05)

RADIAL

GATE

GATE SLIDE PL EMBED PER

DETAIL 1 / S10, SEE RADIAL GATE

MFG DRAWINGS FOR LAYOUT

3/8" x 6" CENTER BULB

PVC WATERSTOP

BOND BREAKER,

30# BITUMINOUS

FELT - CUT AT

WATERSTOP

1 1/2" X 2'-0" SMOOTH ROUND

EPOXY COATED DOWEL @ 12",

GREASE ONE END

℄ CONSTRUCTION JT

E Q

L E

Q L

C L R

C L R

TYP

3" CLR

TOP LONGITUDINAL REINF

WITH 90° X 1'-6" END HOOK

TOC

IMPROVED SUBGRADE,

SEE

B

S10

/1 S08

℄ CONTRACTION JT

IMPROVED SUBGRADE,

SEE

3/8" X 6" CENTER

BULB PVC

WATERSTOP

INITIAL SAWCUT OR TOOL 1 1/2" DEEP

(AFTER FINISHING), FINAL SAWCUT

1/2" X 3/4" DEEP (AFTER AT LEAST 14

DAYS CURE) THEN CLEAN AND ADD

1/2" SEALANT OVER BOND BREAKER

FIELD CUT ALTERNATE

LONGITUDINAL BARS 3" CLEAR

OF JOINT, TOP & BOT

2" PVC CRACK INITIATOR

TOC

C

/1 S08

TOC

FINISH TOLERANCE

± 0.04'

1'-6" IMPORTED STRUCTURAL FILL

CLASS 4 PER ADOT ROAD & BRIDGE

SPEC 303-2. MOISTURE CONDITION

WITHIN 4% OF OPTIMUM AND COMPACT

TO 98% DENSITY PER ASTM D698

GEOTEXTILE STABILIZATION FABRIC

PER ADOT ROAD & BRIDGE SPEC

1014-10. PLACE TAUT, WRINKLE FREE

WITH 12" MINIMUM LAPS.

CONC BASE SLAB

NOTE: STRUCTURAL FILL MUST EXTEND AT LEAST 1'-6" BEYOND ALL BASE SLAB

EDGES. THE GEOTEXTILE MUST COVER STRUCTURAL FILL PLAN LIMITS PLUS

AN EXTRA OF TWO FEET WRAPPED UP THE EXCAVATION PERIMETER.

PREPARED SUBGRADE:

SCARIFY 12", MOISTURE CONDITION WITHIN

4% OF OPTIMUM AND COMPACT TO 95%

DENSITY PER ASTM D698. SOFT SPOTS, IF

ANY, MUST BE REMOVED AND REPLACED

TO ACHIEVE UNIFORM DENSITY.

1' - 0"

TOC

EL. = 342.00'

6" CONCRETE CANAL LINING,

REINF WITH WWR 6X6-D8/D8;

ADD (2) 3" BARS AT EDGE

SAWCUT 1 1/4" DEEP

AT TRANSITION EDGE

BASE SLAB

CHIP BASE SLAB 1 1/4" DEEP TO

RECEIVE CANAL LINING, 1/4" MIN

SURFACE ROUGHNESS. CLEAN

AND APPLY BONDING AGENT

#3 EPOXY GROUTED

DOWELS @ 12" OC; EMBED

6" INTO BASE SLAB

8"

18"

124.0°

/2

MIN

1' - 0"

EL. = 342.00'

TOC

A

D

EPOXY OR ZINC COATED DOWEL ⅊ 1/4" X 4 1/2" SQ @ 18"

SPACING, WITH SLIP SLEEVE ON CANAL LINING SIDE -

PLACE DOWELS IN BASE SLAB OVER EXTENT OF

INTERFACE WITH CANAL LINING BOTTOM

CHECK STR

BASE SLAB

PLATE DOWEL,

PLAN VIEW

JOINT

CONC CANAL LINING, SEE SHT D01

FOR THICKNESS & REINF

CLSM UNDER SLOPING CANAL

LINING WITHIN STRUCTURE LIMITS

6" CONC CANAL LINING

TOC

EL.=342.00'

TOC

EL.=357.50'

B

EL.=352.83'

WEIR TOW

1' - 3"

SEALANT JOINT, FULL

GATE WALL HT

CAST ARMORED NOSE

OVER WEIR WALL ON 1/2"

PREFORMED JT FILLER

ARMORED NOSE EMBED:

L5X5X3/8" X 4'-4 3/4" WITH

(2) #5X2'-6" DEFORMED

BAR ANCHORS @ 9"

STOP LOG NOTCH

SEQUENCE 2SEQUENCE 1

WALL CONSTRUCTION

JOINT

MATTHEW J.

METTLER

LANOISSEF

O R P

D E

R E

T

SI

G E

R ) L

A R

U T

C U

R T

S

RE

EN

IG

NE

NA U . S

. A

.AR I ZO

CIFI

T

R

E C .

O

N

ETA

E D 0 3

5D

A T E

S I G N

61334

R E V

IS

IO

N S

R E V

D A T E

D E S C R

IP

TI

O N

B Y

-6

-6

N n d S tr e e t

B ill in g s M o n ta n a

W W W .D O W L .C O M

PROJECT

DATE

SHEET

DOWL 2025c

P L O T

D A T E

U S E R

1/

IS

S U E D

FO

R

C O N S

TR

U C

TI

O N

B W

R d

\M

R

-S T

-1

-0

-M C

.r v t

/2

/2

:2

:3

P M

S08

C O

N C

R E

T E

S E

C T

IO

N

S

MARCH 2025

4626.12494.01

C R

IP

M

C

C

H E

C K

R E

P L

A C

E M

E N

T

M G

O L D

B E

R

G LONGITUDINAL SECTION

S08

C

THROUGH GATE BAY 1

scale feet

0 155 10

3/16" = 1' - 0"

DETAIL

S08

BASE SLAB, CONSTRUCTION JOINT

DETAIL

S08

BASE SLAB, CONTRACTION JOINT

DETAIL

S08

IMPROVED SUBGRADE

1 1 2 scale feet

0 76543

3/8" = 1' - 0"

DETAIL

S08

CANAL LINING TRANSITION EDGE

TREATMENT

0 2 scale feet1 1/2"=1'-0"

DETAIL

S08

CANAL LINING DOWEL 0 2

scale feet1 1/2"=1'-0"

DETAIL

S08

CANAL LINING TRANSITION 0 2

scale feet1 1/2"=1'-0"

NOTES:

1. RADIAL GATE EQUIPMENT IS SCHEMATICALLY SHOWN.

SECTION

S08

WEIR TO GATE BAY WALL TRANSITION

TOC

EL.=357.50'

2' - 0"

GRADE

#6 @ 12" BASE DOWEL, FF

#8 @ 8" BASE

DOWEL, RF

#7 @ 8" VERT, RF

#6 @ 12" VERT, FF

#6 @ 12" HORZ, EF WITH

6" SPA AT WALL TOP

#6 @ 12" LONGITUDINAL,

TOP & BOT

#8 @ 12" TRANSVERSE, TOP

#7 @ 8" TRANSVERSE, BOT

EACH SIDE - IN SAME PLANE

AS #7 FULL WIDTH AT EDGE

#7 @ 12" TRANSVERSE,

BOT (FULL WIDTH)

1'-6"

1'-6"

HYDROPHILIC

WATERSTOP

ROUGHEN CONSTR

JT 1/4" AMPLITUDE

BASE SLAB

3/4" CHAMFER ALL

EXPOSED EDGES

DAMPROOFING

BELOW GRADE

(2) #6 AT PERIMETER

W/ CORNER BARS

#6 @ 24" BENT BAR AT

PERIMETER EDGES

1'-6"

(6) #4 CROSSTIES @ 12"

HORZ SPA (TOP ROW

ONLY) AT PLATFORM

BEARING LOCATIONS

8'-8"

TOC

EL.=342.00'

TOC

EL.=357.50'

2' - 6"

BASE SLAB

#8 @ 12" BASE DOWEL, EF

#8 @ 12" VERT, EF

#6 @ 9" HORZ, EF WITH

4 1/2" SPA AT WALL TOP

#6 @ 12" LONGITUDINAL,

TOP & BOT

#8 @ 12" TRANSVERSE, TOP

#7 @ 12" TRANSVERSE, BOT

1'-6"

℄ GATE PIN & ANC

(SEE NOTE #4, SHEET S06)

EL.= 354.50'

HYDROPHILIC

WATERSTOP

ROUGHEN CONSTR

JT 1/4" AMPLITUDE

3/4" CHAMFER ALL

EXPOSED EDGES

(6) #4 CROSSTIES @ 12"

HORZ SPA (TOP ROW

ONLY) AT PLATFORM

BEARING LOCATIONS

TBD

SEE DETAIL 4 / S11 FOR

ADDED REINF AT RADIAL

GATE ANCHORAGE

/4 S11

TOC

EL.=342.00'

A

EL.=352.83'

WEIR TOW

1' - 6"

BASE SLAB

#7 @ 12" BASE DOWEL, EF

#6 @ 12" VERT, EF

#5 @ 12" HORZ, EF WITH

6" SPA AT WALL TOP

#6 @ 12" LONGITUDINAL,

TOP & BOT

#8 @ 12" TRANSVERSE, TOP

#7 @ 12" TRANSVERSE,

BOT PLUS #7 @ 8" EDGES

1'-6"

"HYDROPHILIC

WATERSTOP

ROUGHEN CONSTR

JT 1/4" AMPLITUDE

(2) #6 AT PERIMETER

W/ CORNER BARS

#6 @ 24" BENT BAR AT

PERIMETER EDGES

1'-6"

1/2" PREFORMED JOINT FILLER,

HOLD DOWN 1/2" FOR JOINT

SEALANT

4" CONC CANAL LINING, THICKEN

TO 6 1/2" AT WALL FACE, ADD (2)

#3 BARS AT EDGE

DAMPROOFING

BELOW GRADE

3/4" CHAMFER, ALL

EXPOSED EDGES

6" CONC CANAL LINING, THICKEN

TO 8" AT WALL FACE,

REINF WITH WWR 6X6-D8/D8;

ADD (2) #3 BARS AT EDGE

1/2" PREFORMED JOINT

FILLER, HOLD DOWN 1/2"

FOR JOINT SEALANT

WEIR WALL AT CANAL

TRANSITION SHOWING

SLOPED CANAL LINING,

SAME WALL REINF AS

SECTION G

CLSM UNDER SLOPING CANAL

LINING WITHIN STRUCTURE LIMITS

MATTHEW J.

METTLER

LANOISSEF

O R P

D E

R E

T

SI

G E

R ) L

A R

U T

C U

R T

S

RE

EN

IG

NE

NA U . S

. A

.AR I ZO

CIFI

T

R

E C .

O

N

ETA

E D 0 3

5D

A T E

S I G N

61334

R E V

IS

IO

N S

R E V

D A T E

D E S C R

IP

TI

O N

B Y

-6

-6

N n d S tr e e t

B ill in g s M o n ta n a

W W W .D O W L .C O M

PROJECT

DATE

SHEET

DOWL 2025c

P L O T

D A T E

U S E R

1/

IS

S U E D

FO

R

C O N S

TR

U C

TI

O N

B W

R d

\M

R

-S T

-1

-0

-M C

.r v t

/2

/2

:2

:3

P M

S09

C O

N C

R E

T E

D E

T A

IL

S

MARCH 2025

4626.12494.01

C R

IP

M

C

C

H E

C K

R E

P L

A C

E M

E N

T

M G

O L D

B E

R G

1 1 2 scale feet

0 3

3/4" = 1' - 0"

SECTION

S09

E

EXTERIOR WALL

SECTION

S09

F

INTERIOR/GATE WALL 1 1 2

scale feet

0 3

3/4" = 1' - 0"

SECTION

S09

G

WEIR WALL 1 1 2

scale feet

0 3

3/4" = 1' - 0"

NOTES:

1. SEE SHEET S01 FOR GENERAL STRUCTURAL NOTES.

2. SEE SHEET S02 FOR STRUCTURAL MATERIALS AND

INSPECTION SCHEDULES.

C

3 5

CONC GATE BAY

WALL

℄ NOTCHSTEEL EMBED & REINF

DETAIL, SEE 8/S10

OPP

DOWEL SIMILAR

TO DETAIL 8 OF

THIS SHEET

VERT REINF, (3) EF

NEAR WALL END

VERT REINF, ADD

(1) CENTERED ON

WALL END

#5 CLOSED TIE AT

WALL END,

MATCH HORZ

REINF SPACING

B

1' - 3"

T Y

P

C L R

S10

℄ CONSTR JT

(BELOW)

(2) VERT, EF

FULL HT GATE

BAY WALL

(3) #7 VERT IN

WALL NOSE

#5 PAIR @ 9" IN

WALL NOSE

STEEL EMBED

SEE DETAIL

CAST WALL PORTION WITH

ARMORED NOSE ABOVE

WEIR WALL ON 1/2"

PREFORMED JT FILLER

(HORZ), RAKE BACK 1/2"

DEEP FOR JOINT SEALANT

L5X5X3/8X4'-4 3/4" NOSE

ARMOR (GALV) WITH (2)

#5 X 2'-6" DEFORMED

BAR ANCHORS @ 9"

VERT REINF

HORZ REINF WITH 90° X 1'-6"

END HOOK, HOLD 2" CLR OF

STEEL EMBED

#6 X 6'-0" @ 9" HORZ, EF, HOLD

2" CLR OF STEEL EMBED

(ABOVE WEIR WALL ONLY)

22"

9"

16"

5/16 2

TYP

3 5

OPP

/8 S10

1/2"

N O

T C

H /4

-1/4", +0"

1 1/4"

M

IN

/8

S E

A L A

N T

/2

M

IN

BOND BREAKER, 30#

BITUMINOUS FELTCONSTR JT

EXPOSED CONC FACE

JOINT SEALER OVER

BOND BREAKER

B

HORZ REINF W/ 135°

END HOOK, EXTEND

2'-6" MIN PAST WALL

ANGLE POINT

℄ CONSTR JT

HYDROPHILIC WATERSTOP

EA SIDE DOWEL

SEQUENCE 1 SEQUENCE 2

#5 CROSSTIE, MATCH

HORZ REINF SPACING

BOND BREAKER, 30#

BITUMINOUS FELT OVER

HT OF WEIR WALL

1 1/2" X 2'-0" SMOOTH

BAR DOWEL @ 12",

GREASE ONE END

HORZ REINF WITH

135° END HOOK

SEALANT EA

FACE & WALL

TOP

STEEL EMBED &

REINF DETAIL -

SEE

CONC GATE

BAY WALL

/8 S10

S10

1' - 3"

#5 CLOSED TIE AT

WALL END, MATCH

HORZ REINF SPA

OPP

LOCATE PER PLAN

TOP, BOTTOM, AND ALTERNATE

HORZ BARS ROWS CONTINUOUS

THROUGH JOINT; FIELD CUT OTHER

HORZ BARS 3" CLEAR OF JOINT

3/4" CHAMFER WITH 1/8" ROOT

WIDTH SAWN OR FORMED

EACH FACE (TYP.)

3/8" x 6" CENTER BULB

PVC WATERSTOP SHRINKAGE CRACK

/2

R O

O T

B

1' - 11 1/4" 1' - 3"

163.6°

SEQUENCE 1

FULL HEIGHT

SEQUENCE 2

FULL HEIGHT

OPP

EL.= 352.83' TOW

EL.= 357.50' TOW

WEIR WALL

GATE WALL

ARMORED NOSE EMBED

CAST WALL NOSE ABOVE

WEIR WALL WITH

SEQUENCE 2, PLACE 1/2"

PREFORMED JT FILLER

ON HORZ SURFACE

WALL CSJT FROM BASE SLAB TO

WEIR WALL TOP, SEALANT JOINT

ONLY CONTINUES FROM WEIR WALL

TOP TO GATE WALL TOP

℄ (SYM) FORM NARROWER THAN FINISHED

WIDTH & SAWCUT TO FINISHED EDGE

3/8" x 6" (MIN) ALL-THREAD, SS 304/316 ADHESIVE SET ANCHOR

@ 16" SPA - STAGGER SPACING SIDE TO SIDE EXCEPT PLACE AN

ADJACENT PAIR WITHIN 6" OF PLATE ENDS. PROVIDE DOUBLE

NUTS & FLAT WASHERS EA ANCHOR FOR PLATE LEVELING

ANCHOR TAB, SEE DETAIL 3 / S10

ROUGHEN CONC SURFACE

1/4" AMPLITUDE, CLEAN AND

APPLY BONDING AGENT

CEMENTITIOUS GROUT FILL, EXTEND W/ 3/8"

AGGREGATE - PLACE FROM ONE SIDE ONLY TO AVOID

ENTRAPPED AIR. REINFORCE GROUT W/ (3) #3 REBAR

RADIAL GATE SEAL PLATE

(SILL OR SIDE) (NOTE 3)

CONC SURFACE

1/8 2

TYP

4" PL WIDTH 4"

1 1/2" 1 1/2"

/2

E M

B E

D

M

IN

M

IN

C O

V E

R

/2

PL WIDTH + 8"

BLOCK-OUT=

M

IN

/2

B L O

C K

-O U

T

/3 S10

RADIAL GATE SEAL PLATE

LOCATION THK WIDTH MATERIAL

SILL 3/8" 9" STAINLESS 304/316

SIDES 3/8" 9" STAINLESS 304/316

PROVIDE 90° X 1'-6" HOOK ON

ALL REBAR INTERCEPTED BY

BLOCK-OUT, TYP

MATCH SIZE AND SPACING OF INTERCEPTED

REBAR BELOW BLOCK-OUT, EXTEND PAST

BLOCK-OUT 2'-6" MIN EA WAY, TYP

1"

CONSTRUCTION NOTES:

1. REMOVE FORM TIES: SNAP-OFF WITH WATERPROOFING WASHER, 1 1/2"

BACK BREAK DIMENSION AND CONE TYPE. POWER BRUSH REMAINING HOLE

CLEAN AND BLOW OUT WITH COMPRESSED AIR. TAPER TIES ARE NOT

ALLOWED.

2. IF GREASE/OIL RESIDUE IS LEFT ON CONCRETE, HYDROBLAST OR

SANDBLASTING MAY BE REQUIRED.

3. APPLY 2-PART EPOXY BOND COAT TO TIE HOLES IMMEDIATELY PRIOR TO

DRY PACKING.

4. DRY PACK HOLES WITH NON-SHRINK GROUT.

CONC WALL

2 32 3

VARIES

4" 4"

#4 CROSS TIES @ 4' - 0"

OC EACH DIRECTION.

WRAP INNER LAYER OF

REINFORCEMENT UNO

CLR

WIRE TIE BOTH

CURTAINS OF MAIN

REINF TOGETHER AND

WRAP INNER REINF

WITH SPACER TIE

SPACER CROSS TIE

CLR

WIRE TIE SPACER TIE TO

OUTER CURTAIN OF REINF

AT EACH INTERSECTION

PROVIDE TIE WIDTH SO HOOK

IS IN LINE WITH OUTSIDE MAT

OF REINFORCEMENT

HOOKING INNER CURTAIN

FLARE

1 1/2"

TOW

U P

FLARE WIDTH OPENING AT

WALL TOP - FILL CORNERS

AS REQUIRED AND GRIND

SMOOTH

EMBED TOP FLARE DETAIL

DIM "A"D

IM

B

EQL EQL

+ 6"

~TOP LAP

T Y

P

C L R

TYP

2 1/2"

NOTCH SIZE

DIM "A"

DIM "B"

12"

5 1/2"

℄ NOTCH (SEE PLAN FOR LOC)

STEEL EMBED SS304/316:

BENT PL 3/8" X FULL WALL HT

WITH (2) 5/8" X 5" HAS @ 12"

(SEE TOP FLARE DETAIL)

HORZ REINF WITH 90° X 1'-6"

END HOOK, HOLD 2" CLR OF

STEEL EMBED

CONC WALL

VERT REINF

MATCH HORZ REINF SIZE

& SPACING, HOLD 2" CLR

OF STEEL EMBED

90° X 1'-6" END HOOK

AT WALL ENDS

DIM "A"

VERIFY WITH

BULKHEAD SUPPLY

℄ HOLE

1 1/4" 1 3/4"

/4

/4

MIN

1/8"

LEG FASTENED TO

RADIAL GATE SEAL PLATE

ANCHOR TAB,

SS 304/316 MATERIAL

ANCHOR HOLE SIZE =

ANC DIA + 3/16"

MATTHEW J.

METTLER

LANOISSEF

O R P

D E

R E

T

SI

G E

R ) L

A R

U T

C U

R T

S

RE

EN

IG

NE

NA U . S

. A

.AR I ZO

CIFI

T

R

E C .

O

N

ETA

E D 0 3

5D

A T E

S I G N

61334

R E V

IS

IO

N S

R E V

D A T E

D E S C R

IP

TI

O N

B Y

-6

-6

N n d S tr e e t

B ill in g s M o n ta n a

W W W .D O W L .C O M

PROJECT

DATE

SHEET

DOWL 2025c

P L O T

D A T E

U S E R

1/

IS

S U E D

FO

R

C O N S

TR

U C

TI

O N

B W

R d

\M

R

-S T

-1

-0

-M C

.r v t

/2

/2

:2

:3

P M

S10

C O

N C

R E

T E

D E

T A

IL

S

MARCH 2025

4626.12494.01

C R

IP

M

C

C

H E

C K

R E

P L

A C

E M

E N

T

M G

O L D

B E

R G

DETAIL

S10

WALL END REINFORCING

DETAIL

S10

NOSE ARMOR AND REINFORCING

1 1 2 scale feet

0 3

3/4" = 1' - 0"

1 1 2 scale feet

0 3

3/4" = 1' - 0"

DETAIL

S10

JOINT TREATMENT

DETAIL

S10

WALL CONSTR JOINT & REINFORCING

DETAIL

S10

CONCRETE WALL CONTRACTION JOINT

1 1 2 scale feet

0 3

3/4" = 1' - 0"

1 0 1 2 scale feet1" = 1' - 0"

DETAIL

S10

WEIR WALL - GATE WALL TRANSITION

DETAIL

S10

RADIAL GATE SEAL PLATE

DETAIL

S10

WALL TIE HOLE TREATMENT

DETAIL

S10

WALL DOUBLE REINF CURTAIN

SPACERS

NOTES:

1. SEE SHEET S01 FOR GENERAL STRUCTURAL NOTES.

2. SEE SHEET S02 FOR STRUCTURAL MATERIALS AND INSPECTION SCHEDULES.

3. USE FABRICATED SEAL PLATE WITH ANCHOR TABS AS TEMPLATE FOR

ANCHOR HOLE LOCATIONS.

1 1 2 scale feet

0 3

3/4" = 1' - 0"

DETAIL

S10

STOP LOG NOTCH

0 2 scale feet1 1/2"=1'-0"

DETAIL

S10

ANCHOR TAB

TOC

3/4" CHAMFER, ALL EDGES NEW CONC ELECTRICAL

PAD, REDI-MIXED

CONCRETE 'CLASS B'.

COARSE BROOM FINISH

#5 @ 12", EA WAY,

TOP & BOT

#5 @ 12", EA WAY,

TOP & BOT

ANCHOR ROD

(SEE NOTE 1A)

NOTE:

1A. SIZE AND LOCATION OF ANCHOR RODS IS THE RESPONSIBILITY OF THE

BUILDING MFG.

INSTALL ALL THREAD, "HDG" ADHESIVE SET ANCHOR RODS WITH SLOPED

WASHER AND NUT. ANCHOR PROJECTION = 2 1/2" MIN.

ANCHOR EMBED = 6" FOR 5/8" DIA OR 7 1/2" FOR 3/4" DIA.

COMPACTED SUBGRADE

GRADE

EL.= 357.50'

C L R

6" DOUBLE 3/4" CHAMFER

DRIP GROOVE

COARSE BROOM FINISH3/4" CHAMFER,

TYP

#6 @ 12" LONG BARS, TOP

#4 @ 12" TRANS WITH 90°

END HOOK, TOP & BOT

#6 @ 6" LONG BARS WITH

90° END HOOK, BOT

(RAILING NOT SHOWN, SEE STEEL PLAN)

TOC

EL.=358.79'

PLATFORM

C L R

C L R

A

D (CORNER ONLY, NO WEIR WALL)

HORZ REINF WITH

END HOOKS

EXTERIOR CONC WALL

HYDROPHILIC WATERSTOP

ROUGHEN CONSTR JT,

1/4" AMPLITUDE

CONC WEIR WALL

VERT REINF, TYP

HORZ REINF, EXTEND

THROUGH JT

DOWEL, MATCH HORZ

REINF SIZE & SPACING -

EMBED LENGTH = TOP

BAR LAP MIN

C

O N

S T

R J

T

S E

Q U

E N

C E

S

E Q

U E

N C

E

HORZ REINF WITH

END HOOKS

L A

P

T O

P B

A R

A

VERT REINF, TYP

HORZ REINF WITH

STD END HOOKS

CONC WEIR WALL

CORNER BAR, MATCH

HORZ REINF SIZE AND

SPACING - PROVIDE "TOP

BAR" LAP MINIMUM

C L R

DIA

8"

EQL EQL

D E

E P

R A

D

IA

L G

A T

E B

A Y

CONC GATE BAY WALL ~ 1' - 3" ~ 1' - 3"

℄ GATE ARM CONN BRACKET

℄ GATE ARM PIN

CONC BLOCKOUT FOR

GROUTED SHEAR LUG (NOTE 3);

SEE SECTION C / S08 FOR

LOCATION

#5 CLOSED TIE, MATCH HORZ

REINF SPA - PLACE ABOVE

AND BELOW BLOCKOUT 1" CLR

VERT REINF, EF

HORZ REINF, EF

VERT REINF, (4) EF

CENTERED ON GATE ARM

CONNECTION BRACKET

COORDINATE DETAIL

WITH GATE MFG

OPP

32"

26" (SEE NOTE 2)

PVC TUBES FOR

GROUT FILL & AIR

RELEASE

TOC

EL.=358.79' = 1'-10"

(2) T @ 11"

(3

R

GRADE

#6 x 2'-0" ADHESIVE SET

DOWEL @ 6" (PLACE BTWN

TRANS BOT BARS), EMBED 10"

2" PVC DOWEL SLEEVE, FILL WITH SAND

AND CAP WITH 2" CEMENTITIOUS GROUT

PLUG AFTER PLATFORM INSTALL

C L R

#5 ADHESIVE SET DOWEL @ 12",

EMBED 6" IN CONC WALL.

(6) #5 X 4'-0" TRANSVERSE

CONC STEPS WITH ANTI-SLIP

NOSE EMBED & COARSE

BROOM FINISH, TYP

1' - 0" 1' - 0"

CONC PLATFORM, SEE

DETAIL 7 / S11 (NOTE 1)

1/2" X 1'-6" X 4'-6" ELASTOMERIC

PAD, FIELD CUT HOLES TO

MATCH DOWELS

(RAILING NOT SHOWN)

EXTERIOR CONC WALL,

SEE SECTION E / S09

/7 S11

/E S09

#5 ADHESIVE SET DOWEL @ 12",

EMBED 8" IN CONC WALL WITH

(6) #5 X 4'-0" TRANSVERSE

1"

1/2" PREFORMED JT FILLER

TOC

EL.=357.50'

TOC

EL.=358.79'

#6 x 2'-0" ADHESIVE SET

DOWEL @ 6" (PLACE BTWN

TRANS BOT BARS), EMBED 10"

2" PVC DOWEL SLEEVE, FILL

WITH CEMENTITIOUS GROUT

AFTER PLATFORM INSTALL

1/2" X 0'-11" X 4'-6"

ELASTOMERIC PAD, FIELD CUT

HOLES TO MATCH DOWELS

CONC PLATFORM, SEE

DETAIL 7/S11 (NOTE 1)

(RAILING NOT SHOWN)

INTERIOR CONC WALL,

SEE SECTION F / S09/F S09

8" 1' - 2" 8"

/2

/2

1/2" JOINT SEALANT OVER

CLOSED BACKER ROD

B

1' - 3"

SEALANT EA

FACE & WALL

TOP

S10

OPP

℄ CONSTR JT

EXTERIOR CONC WALL

HORZ REINF W/ 135° END

HOOK, EXTEND 2'-6" MIN

PAST WALL ANGLE POINT

HYDROPHILIC WATERSTOP

#5 CROSSTIE, MATCH

HORZ REINF SPACING

BOND BREAKER, 30# BITUMINOUS

FELT OVER HT OF WALL

1 1/2" x 2'-0" SMOOTH ROUND

EPOXY COATED DOWEL @ 12",

GREASE ONE END

HORZ REINF WITH

135° END HOOK STEEL EMBED & REINF

DETAIL - SEE 8/S10

#5 CLOSED TIE, MATCH HORZ

REINF SPA

MATTHEW J.

METTLER

LANOISSEF

O R P

D E

R E

T

SI

G E

R ) L

A R

U T

C U

R T

S

RE

EN

IG

NE

NA U . S

. A

.AR I ZO

CIFI

T

R

E C .

O

N

ETA

E D 0 3

5D

A T E

S I G N

61334

R E V

IS

IO

N S

R E V

D A T E

D E S C R

IP

TI

O N

B Y

-6

-6

N n d S tr e e t

B ill in g s M o n ta n a

W W W .D O W L .C O M

PROJECT

DATE

SHEET

DOWL 2025c

P L O T

D A T E

U S E R

1/

IS

S U E D

FO

R

C O N S

TR

U C

TI

O N

B W

R d

\M

R

-S T

-1

-0

-M C

.r v t

/2

/2

:2

:3

P M

S11

C O

N C

R E

T E

D E

T A

IL

S

MARCH 2025

4626.12494.01

C R

IP

M

C

C

H E

C K

R E

P L

A C

E M

E N

T

M G

O L D

B E

R G

DETAIL

S11

ELECTRICAL ENCLOSURE 1 1 2

scale feet

0 3

3/4" = 1' - 0"

DETAIL

S11

PLATFORM SECTION

1 1 2 scale feet

0 3

3/4" = 1' - 0"

DETAIL

S11

WALL CONSTR JOINT & REINFORCING 1 1 2

scale feet

0 3

3/4" = 1' - 0"

DETAIL

S11

WALL CORNER REINFORCING 1 1 2

scale feet

0 3

3/4" = 1' - 0"

DETAIL

S11

GATE ARM ANCHORAGE

1 1 2 scale feet

0 3

3/4" = 1' - 0"

SECTION

S11

WALKWAY - PLATFORM EXT WALL

BEARING

SECTION

S11

WALKWAY - PLATFORM INT WALL

BEARING

1 1 2 scale feet

0 3

3/4" = 1' - 0"

1 1 2 scale feet

0 3

3/4" = 1' - 0"

1 1 2 scale feet

0 3

3/4" = 1' - 0"

DETAIL

S11

EXT WALL CONSTR JOINT &

REINFORCING

NOTES:

1. CONSTRUCTION SEQUENCE REQUIREMENT.

SITE OR PRECAST CONCRETE PLATFORMS MAY NOT BE INSTALLED

UNTIL CHECK STRUCTURE BACKFILL IS COMPLETE.

2. NOMINALLY ADJUST REINFORCING SPACING/POSITION AT THE GATE

ARM ANCHORAGE LOCATION SHOWN IN DETAIL 4/S11 TO CLEAR

POST-INSTALLED ANCHOR RODS AS DETAILED ON THE RADIAL GATE

MFG CONSTRUCTION DRAWINGS.

3. CONCRETE BLOCKOUT FOR GATE ARM ANCHORAGE MAY BE CORE

DRILLED AT CONTRACTOR'S PREFERENCE. COORDINATE LOCATION

WITH THE RADIAL GATE MFG CONSTRUCTION DRAWINGS.

ELEVATION

1 1/2" DIA. SCHEDULE

40 GALVANIZED

RAILING, TYP

TOP OF CONCRETE

TOE PLATE 1/4" x 4" x CONTINUOUSA A

(2) 3/4" x 10" ALL-THREAD

"HDG" ADHESIVE ANCHORS

3/4"

1 1/2" DIA. SCHEDULE 40

GALVANIZED RAILING

1/4" PLATE 2"X2"

3/4" DIA. HOLE

3/8" STAINLESS STEEL

GUARD CHAIN

STAINLESS STEEL

SPRING SNAP

3/16R 3/4"

SECTION A-A

1 1/2" DIA SCHEDULE 40

GALVANIZED RAILING

POST, TYP

1/2" BASE PL ROUND

CORNERS, 1/2" R

(2) 15/16" HOLES

TOE PLATE

RAILING NOTES:

1. MAXIMUM POST SPACING = 7'-6"

2. MINIMUM CL POST TO END OF

CONCRETE WALL DIM = 11"

1 1/4" 7 1/2"

1 1/4"

1/4

10"

M

IN3

NEAREST

CONC EDGE

MATTHEW J.

METTLER

LANOISSEF

O R P

D E

R E

T

SI

G E

R ) L

A R

U T

C U

R T

S

RE

EN

IG

NE

NA U . S

. A

.AR I ZO

CIFI

T

R

E C .

O

N

ETA

E D 0 3

5D

A T E

S I G N

61334

R E V

IS

IO

N S

R E V

D A T E

D E S C R

IP

TI

O N

B Y

-6

-6

N n d S tr e e t

B ill in g s M o n ta n a

W W

W .D

O W

L .C

O M

PROJECT

DATE

SHEET

DOWL 2025c

P L O T

D A T E

U S E R

1/

IS

S U E D

FO

R

C O N S

TR

U C

TI

O N

B W

R d

\M

R

-S T

-1

-0

-M C

.r v t

/2

/2

:2

:3

P M

S12

S T

E E

L A

N D

E Q

U

IP

M E

N T

A N

C H

O R

D E

T A

IL

S

MARCH 2025

4626.12494.01

C R

IP

M

C

C

H E

C K

R E

P L

A C

E M

E N

T

M G

O L D

B E

R

G SECTION

S12

RAILING DETAIL - TOP MOUNT

SECTION

S12

GUARD CHAIN CONNECTION

R eg is te re d

Professional Engineer (E lectrical)

C E

RTIFICATE N

O

76396

BRADLEY

BAILEY

Date SignedARIZONA, U.S.A.

EXPIRES 9-30-2025

03/13/2025 is te re d

Professional Engineer (E lectrical)

C E

RTIFICATE N

O

76396

BRADLEY

BAILEY

Date SignedARIZONA, U.S.A.

is te re d

Professional Engineer (E lectrical)

C E

RTIFICATE N

O

76396

BRADLEY

BAILEY

Date SignedARIZONA, U.S.A.

is te re d

Professional Engineer (E lectrical)

C E

RTIFICATE N

O

76396

BRADLEY

BAILEY

Date SignedARIZONA, U.S.A.

TABLE 1. TAG SYMBOL LEGEND

LOCATION AND

ACCESSIBILITY

PLC TAGS

ALARMS

DISCRETE

HARDWARE

FIELD

IN / ON RTU PANEL

RTU PANEL REAR

IN / ON

SECONDARY

PANEL

SECONDARY

PANEL REAR

PLC

PROGRAMMING

XX

XX

XX

XX

XX

XX

XX

TAG - SEE TABLE 2 & 3

REDUNDANT/GROUPED DEVICE

NUMBER, OR

"?" FOR PRIMARY SENSOR, OR

"B" FOR BOTH REDUNDANT

SENSORS

ID NUMBER

TYP1

HOA

DETAILS - SEE TABLE 4

DETAILS - SEE TABLE 4

TAG DETAILS - SEE TABLE 1 FOR TYPES

XX

TAG - SEE TABLE 2 & 3

ID NUMBER

TABLE 2. GENERAL TAG LEGEND (ISA 5.1:2009)

LETTER FIRST LETTER SECOND LETTER THIRD/FOURTH

LETTER

A ALARM ALARM

C CONTROL

D DOOR DIFFERENCE /

DIFFERENTIAL

F FLOW

G GENERATOR GAUGE

H HAND

I

INDICATION

(DISPLAY)

INDICATION

(DISPLAY)

L LEVEL LOW

P PRESSURE

S SPEED /

FREQUENCY SWITCH

T TRANSMITTER

V VALVE

Z POSITION

TABLE 3. SPECIAL TAG

LEGEND

TAG NAME DESCRIPTION

CAM CAMERA

FG1 GATE 1 FLOW

FG2 GATE 2 FLOW

OIT

OPERATOR

INTERFACE

TERMINAL

PLC

PROGRAMMABLE

LOGIC

CONTROLLER

S VANDALISM DOOR

SWITCH

OTHER SYMBOLS

NORMALLY CLOSED SOLENOID VALVE

RADIO AND ANTENNA

PANEL MOUNT ALARM INDICATOR LIGHT

M ACTUATOR MOTOR

PLC AUTO LOGIC INTERLOCK#

SW…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .