B.08.02.09.04 LFSH SOW Section 011010_Att4_10 48 60_Ballistic Specifications.pdf

PDF 42 KB Posted

Attached to
Range Improvements, Slunj, Croatia
Solicitation number
W912GB21R0018
Issued by

About this file

This federal contract opportunity solicitation seeks design-build construction services for three range improvement projects at the Eugen Kvaternik Training Area in Slunj, Croatia. The US Army Corps of Engineers Europe District plans to award a single contract to convert an existing tank platoon qualification range into a machine gun range for weapons up to 50 caliber, convert an existing structure into a shoot house with ballistic fortifications, and clear and grade an area to place an unreinforced concrete rapid runway repair training pad. Interested vendors must pre-register for any virtual pre-proposal conference by the Friday or Monday before the scheduled June 28th site visit. The solicitation number is W912GB21R0018 and the agency is the Department of the Army European Command.

View the file

Other files

File Type Posted
B.08.03 Amendment 0003 W912GB21R0018.pdf PDF
B.08.02.07 MPMG SOW Section 011010 - Amended 2021.06.17.pdf PDF
B.08.02.09.02 LFSH SOW Section 011010_Att2_Concept Drawings - Amended 2021.06.17.pdf PDF
B.08.02.07 MPMG SOW Section 011010 - Amended 2021.06.17.pdf PDF
B.08.02.09 LFSH SOW Section 011010 - Amended 2021.06.17.pdf PDF
B.08.03 Amendment 0002 RFP W912GB21R0018.pdf PDF
B.07.01 2021.06.11 - W912GB21R0018 PPC Slides.pdf PDF
B.08.03 Amendment 0001 RFP W912GB21R0018.pdf PDF
B.07.01 7ATC Range Improvements, Slunj, Croatia Site, Visit Roster - 2021.06.08.pdf PDF
B.08.02.07.09 MPMG SOW Section 011010_Att 9_MPMG Narrative Description Mar2017.pdf PDF
B.08.02.09.03 LFSH SOW Section 011010_Att3_Structural Calculations.pdf PDF
B.08.02.07.03 MPMG SOW Section 011010_Att 3_Structural Calculations.pdf PDF
B.08.02.09.06 LFSH SOW Section 011010_Att6_UFC 04 179 02_Small Arms Range.pdf PDF
B.08.02.07.04 MPMG SOW Section 011010_Att 4_MPMG Description.pdf PDF
B.08.02.07.02 MPMG SOW Section 011010_Att 2_Concept Site Plan.pdf PDF
B.08.02.09.07 LFSH SOW Section 011010_Att7_Shoothouse Standard Design Guide.pdf PDF
B.08.02.07.08 MPMG SOW Section 011010_Att 8_MAT Detail.pdf PDF
B.08.02.07.01 MPMG SOW Section 011010_Att 1_Location Map.pdf PDF
B.08.02.07.10 MPMG SOW Section 011010_Att 10_TC 25-8.pdf PDF
B.08.02.04 Attachment 4_BLA Template.docx DOCX document
B.08.02.09.01 LFSH SOW Section 011010_Att1_Location Map.pdf PDF
B.08.02.09.02 LFSH SOW Section 011010_Att2_Conceptual Drawings.pdf PDF
B.08.02.07 MPMG SOW Section 011010.pdf PDF
B.08.02.06 Specifications Binder Slunj Rg Imprv 2021.05.04.pdf PDF
B.08.02.08.02 RRR SOW Section 011010_Att2_Conceptual Plan.pdf PDF
B.08.02.10 RFP Attch Site Visit Registration Form v2.xlsx XLSX spreadsheet
B.08.02.09 LFSH SOW Section 011010_011010.pdf PDF
B.08.02.01 Attachment 1_Past Performance Info Sheet.pdf PDF
B.08.02.09.05 LFSH SOW Section 011010_Att5_05 12 00_Metals.pdf PDF
B.08.02.03 Attachment 3_Letter of Commitment Sample.docx DOCX document
B.08.02.07.07 MPMG SOW Section 011010_Att 7_SAT Detail.pdf PDF
B.08.02.07.05 MPMG SOW Section 011010_Att 5_Firing Position.pdf PDF
B.08.02.08 RRR SOW Section 011010.pdf PDF
B.08.02.02 Attachment 2_PPQ.pdf PDF
B.08.02.07.06 MPMG SOW Section 011010_Att 6_SIT.pdf PDF
B.08.02 RFP W912GB21R0018 Range Improvements, Slunj, Croatia.pdf PDF
B.08.02.08.01 RRR SOW Section 011010_Att1_Location Map.pdf PDF
B.08.02.05 Attachment 5_BLG Template.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 10 48 60

BALLISTIC RUBBER

08/09

PART 1 GENERAL

1.1 DEFINITIONS

Not Used.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

NAME (ACRONYM)

ASTM C67-09 (2009) Standard Test Methods for Sampling and Testing Brick and Structural Clay Tile

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

List of subcontractors contacts and references; G

1. List of no less than five (5) projects of a similar scope, include client contacts for reference.

List of installer qualifications; G

1. Certified by manufacturer in writing.

2. On site technical support.

SD-02 Shop Drawings

Shop Drawings; G, AE

Shop Drawings must be provided indicating location, size and manner of fastening, including all items related to Structural Steel 05 12 00 Section.

SD-03 Product Data

Product Data; G

SD-06 Test Reports

Test Reports; G

SECTION 10 48 60 Page 1

1. Studies and/or tests indicating round defeating performance.

2. Studies and/or tests indicating lead encapsulation.

3. US Army Research Test Summary Report of Penetration and Richochet Evaluation for the specific system to be used.

Alternate evaluation procedures may be submitted upon approval of the contracting office.

4. NRC test results.

SD-08 Manufacturer's Instructions

Material Product, Instructions, Warranty and Maintenance Data; G

1. Manufacturer product cut sheets.

2. Installation instructions.

3. Warranty statement and terms.

4. Maintenance, lead abatement, recycling and replacement data.

PART 2 PRODUCTS

2.1 MATERIALS

Materials shall conform to the following requirements.

2.1.1 Ballistic Rubber General Requirements

All proposed Material Product, Instructions, Warranty and Maintenance Data for the ballistic rubber material must comply with the following general criteria:

1. Ballistic material shall be a non-ricochet, non-splatter, round defeating, bullet encapsulating ballistic rubber.

2. Ballistic material must have been formally tested by an approved agency or facility for penetration and ricochet values.

3. Ballistic material used must have a history of a minimum of 10 successful installations.

4. Ballistic material shall have self-healing properties up to round saturation guidelines.

5. Ballistic rubber material must be a cold pressed product with a maximum density of 48 lbs. per cubic foot.

6. Ballistic materials must accept a latex base acrylic paint finish on their surface if required.

7. No Vulcanized or heat treated rubber will be acceptable for this application.

8. Ballistic materials, if required to meet fire resistant criteria, must have passed the Underwriters Laboratories UL 94 Horizontal Flammability Test.

9. Ballistic material must be usable in both protected and unprotected environments and provide for UV protection if used unprotected.

10. Ballistic materials must be modular, dimensionally stable, recyclable and replaceable by end user maintenance personnel.

11. Ballistic materials shall have no air or sand/rock filled gaps as part of the bullet capturing system. Surface material must be bonded directly to steel panel substrate.

12. Ballistic materials shall have a minimum of a one-year warranty on manufacturing defects.

2.1.2 Surface Product Composition

Product Data of the ballistic rubber materials shall be a mixture of modified, high density composite rubber based particles, Kevlar and titanium particles, and bonding agents, molded under high pressure to form

SECTION 10 48 60 Page 2 dimensionally stable ballistic panels and blocks. Ballistic rubber material is to be free of large cracks, tears, holes or any defects which will impair performance. all ballistic rubber material will be free of metal debris. Minor cracks and chipping as a result of manufacture, shipping and handling are normal and are not considered grounds for rejection.

Weight and/or Density of ballistic rubber material shall be a maximum 48 pounds per cubic foot.

Dimensional Tolerance: 1/4" length and width, 1/4" depth.

2.1.3 Round Defeating Substrate

Refer to Structural Steel Section 05 12 00 for AR 500 steel plate substrate requirements.

2.1.4 Support Systems

Metal and mechanical support systems for anchoring and compression (where required) of products.

2.2 PRODUCT DESCRIPTION

A. Ballistic Rubber Encapsulating System component

1. UV inhibitor for exterior (unprotected) units.

2.3 PRODUCT PERFORMANCE

2.3.1 Ballistic Rubber System

1. List of installer qualifications. Must show product is successfully installed in a minimum of ten (10 existing military installations as the main bullet stopping/absorbing wall system.

2. US Army study (Picatinney Arsenal) showing no penetration of system with specific use of 7.62mm (M80 Ball) and 5.56mm (M855 Ball).

3. US Army study (Picatinney Arsenal) showing ballistic rubber material and AR Steel substrate component capable of minimal ricochet at limited incidence of angle with specific use of 7.62mm (M80 Ball), 5.56mm (M855 Ball, M193 Ball) from M14 rifle, M16A2 and M16A1 rifle and the M4A1 Carbine.

4. Encapsulates standard, armor piercing and non-armor piercing, handgun and frangible rounds with appropriate armor backing.

5. Ballistic rubber surface shall be self-healing.

6. Ballistic Rubber shall pass the environmental durability freeze-thaw test in accordance with Section 8 of ASTM C67-09. Results for Weight Loss shall be less than 0.5%.

7. Ballistic rubber material shall provide a one year warranty from manufacturing defects.

8. Ballistic rubber material test reports shall be approved through the Research and Development Unit for Materials/Equipment for the US Army, Combat Applications Group, Fort Bragg, NC.

SECTION 10 48 60 Page 3

PART 3 EXECUTION

3.1 GENERAL INSTALLATION REQUIREMENTS

List of subcontractors contacts and references of no less than five (5) projects of a similar scope, include client contacts for reference.

Install items at locations indicated, according to the manufacturer's instructions. Shop Drawings must be provided indicating location, size and manner of fastening, including all items related to Structural Steel 05 12 00 Section. The Contract shall verify all measurements and shall take all field measurements necessary before fabrication. Exposed fastenings shall be compatible materials, shall generally match in color and finish, and shall harmonize with the material to which fastenings are applied. Materials and parts necessary to complete each item, even though such work is not definitely shown or specified, shall be included. Poor matching of holes for fasteners shall be cause for rejection of work.

Fastenings shall be concealed where practicable.

-- End of Section --