This solicitation document describes three range improvement projects to be completed under a single design-build construction contract for the U.S. Army Corps of Engineers Europe District. The projects include converting an existing tank qualification range to a machine gun range at 4509'22.6"N 1527'57.9"E, converting an existing structure to a live fire shoot house with ballistic fortifications at 4501'35.5"N 1534'02.0"E, and clearing and grading an area to place an unreinforced 50m x 50m concrete pad for rapid runway repair training at 4507'48.1"N 1526'39.4"E. Offerors may participate in an in-person or virtual pre-proposal conference for additional details. The contract will be awarded to a single contractor responsible for 100% design and construction of all three range improvement projects located at the Eugen Kvaternik Training Area in Slunj, Croatia in support of the 7th ATC.

View the file

Other files

File Type Posted
B.08.03 Amendment 0003 W912GB21R0018.pdf PDF
B.08.02.07 MPMG SOW Section 011010 - Amended 2021.06.17.pdf PDF
B.08.02.09.02 LFSH SOW Section 011010_Att2_Concept Drawings - Amended 2021.06.17.pdf PDF
B.08.02.07 MPMG SOW Section 011010 - Amended 2021.06.17.pdf PDF
B.08.02.09 LFSH SOW Section 011010 - Amended 2021.06.17.pdf PDF
B.08.03 Amendment 0002 RFP W912GB21R0018.pdf PDF
B.07.01 2021.06.11 - W912GB21R0018 PPC Slides.pdf PDF
B.08.03 Amendment 0001 RFP W912GB21R0018.pdf PDF
B.07.01 7ATC Range Improvements, Slunj, Croatia Site, Visit Roster - 2021.06.08.pdf PDF
B.08.02.07.09 MPMG SOW Section 011010_Att 9_MPMG Narrative Description Mar2017.pdf PDF
B.08.02.09.03 LFSH SOW Section 011010_Att3_Structural Calculations.pdf PDF
B.08.02.07.03 MPMG SOW Section 011010_Att 3_Structural Calculations.pdf PDF
B.08.02.09.06 LFSH SOW Section 011010_Att6_UFC 04 179 02_Small Arms Range.pdf PDF
B.08.02.07.04 MPMG SOW Section 011010_Att 4_MPMG Description.pdf PDF
B.08.02.09.04 LFSH SOW Section 011010_Att4_10 48 60_Ballistic Specifications.pdf PDF
B.08.02.07.02 MPMG SOW Section 011010_Att 2_Concept Site Plan.pdf PDF
B.08.02.09.07 LFSH SOW Section 011010_Att7_Shoothouse Standard Design Guide.pdf PDF
B.08.02.07.01 MPMG SOW Section 011010_Att 1_Location Map.pdf PDF
B.08.02.07.10 MPMG SOW Section 011010_Att 10_TC 25-8.pdf PDF
B.08.02.04 Attachment 4_BLA Template.docx DOCX document
B.08.02.09.01 LFSH SOW Section 011010_Att1_Location Map.pdf PDF
B.08.02.09.02 LFSH SOW Section 011010_Att2_Conceptual Drawings.pdf PDF
B.08.02.07 MPMG SOW Section 011010.pdf PDF
B.08.02.06 Specifications Binder Slunj Rg Imprv 2021.05.04.pdf PDF
B.08.02.08.02 RRR SOW Section 011010_Att2_Conceptual Plan.pdf PDF
B.08.02.10 RFP Attch Site Visit Registration Form v2.xlsx XLSX spreadsheet
B.08.02.09 LFSH SOW Section 011010_011010.pdf PDF
B.08.02.01 Attachment 1_Past Performance Info Sheet.pdf PDF
B.08.02.09.05 LFSH SOW Section 011010_Att5_05 12 00_Metals.pdf PDF
B.08.02.03 Attachment 3_Letter of Commitment Sample.docx DOCX document
B.08.02.07.07 MPMG SOW Section 011010_Att 7_SAT Detail.pdf PDF
B.08.02.07.05 MPMG SOW Section 011010_Att 5_Firing Position.pdf PDF
B.08.02.08 RRR SOW Section 011010.pdf PDF
B.08.02.02 Attachment 2_PPQ.pdf PDF
B.08.02.07.06 MPMG SOW Section 011010_Att 6_SIT.pdf PDF
B.08.02 RFP W912GB21R0018 Range Improvements, Slunj, Croatia.pdf PDF
B.08.02.08.01 RRR SOW Section 011010_Att1_Location Map.pdf PDF
B.08.02.05 Attachment 5_BLG Template.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RANGE AND TRAINING LAND PROGRAM – MANDATORY CENTER OF EXPERTISE

U.S. ARMY ENGINEERING AND SUPPORT CENTER, HUNTSVILLE

HUNTSVILLE, ALABAMA

256-895-1534

EMAIL RTLP

Moving Armor Target

(MAT)

BUILDING STRONG® 1

M o v in g A rm o r T a rg e t– A u g u s t2

R T L P

-M C

X R a n g e

D e s ig n G u id e

General

The Moving Armor Target (MAT) presents moving and stationary vehicle target silhouettes, including friendly and foe targets; heavy, medium, and light armor vehicles; technical trucks, etc.

It can support vehicle, dismounted, and aerial gunnery training. The standard MAT track is 350m

(1,148ft) long. Coordinate non-standard MAT lengths with TCM-Range and the RTLP-MCX.

The Entry Control Point station of the Convoy Live Fire Range (CLF) uses a 225m (738ft) long serpentine moving target (ECPMT).

The MAT has space behind the berm for electrical equipment, including an optional electrical power center. The MAT target, provided by OPA, consists of a track, carrier, target lifter, battle effects simulator, and charging station. The “home” end of the MAT is the location of the electrical equipment and charging station. In most cases, place the home end closest to the engagement point for better protection. However, also consider training scenarios and the location of power. Refer to the standard Civil and Electrical detail drawings for additional details.

Range designers should refer to the Inspection Checklists provided in the RDG to ensure that all required items are included.

Civil/Siting

This section covers the Civil Engineering and Siting issues unique to this type of emplacement for all types of ranges. The sections below address the standard MAT; a separate paragraph at the end of the document addresses the ECPMT. Refer to the specific range section of the RDG for siting issues specific to a particular range.

MAT Emplacement

The MAT emplacement includes a track bed, target protection berm, berm retaining wall, electrical equipment, and service road. The minimum horizontal curve allowed on a MAT is

152m (500ft). The MAT target carrier is required to be able to traverse a 10% grade. However, whenever possible limit the grade to 3% with a maximum of 5% to allow for use in adverse weather conditions. The last 40m (131ft) at each end must have a slope of less than 1%. A 3-meter area is provided at the home end for placing electrical equipment. See Civil Details in the

Appendix of this document.

Drainage

Ensuring proper drainage is critical in the design and construction of target emplacements. Even though the electrical and target equipment is designed for outdoor installation, many of the issues with range targetry can be avoided with proper emplacement drainage. MAT berms are large structures that can affect drainage patterns causing damage in heavy rain events. Avoid placing the MAT across significant drainage features. The ground should slope away from the emplacement whenever possible; add swales as necessary to ensure positive drainage. Ensure proper compaction under the emplacement to avoid differential settlement. Drainage is especially critical on newly constructed ranges before vegetation is fully established.

BUILDING STRONG® 2

o v in g A rm o r T a rg e t– A u g u s t2

L P

-M C

X R a n g e

D e s ig n G u

Target Clearance

No obstruction may be present which interferes with travel of the target along the entire length either in the up or down position. Provide a minimum of 5.2m (17ft) clear space, in addition to the service road, from the face of the emplacement wall along the entire length of the MAT.

Configuration

The Civil Details and Electrical Details in the Appendix of this document show the standard

MAT emplacement configuration. The emplacement design supports the ballistic characteristics of armor, low-hover helicopters and anti-armor systems. The emplacement does not provide protection from helicopter running and diving fire.

Wall Height

The front wall and berm must be high enough to protect the targetry equipment while still allowing target visibility from the firing position. The standard wall height is 1.53m (5ft), 1.83m

(6ft) for aerial gunnery, measured from the top of the aggregate pavement. The height has been coordinated within the program as the minimum that hides both the electrical equipment and the targetry based on a relatively flat angle of fire from the shooter to the target, generally +/- 2 degrees.

Angle of Fire

The angle of fire (AOF) from the gun barrel to the target is a critical parameter on a range that affects the functionality in a number of ways. Certain range and weapon types have a limit on the allowable angle of fire, e.g. a Known Distance range limits the AOF to +/- 2 degrees. Refer to the installation trainers, applicable training manuals, and the RDG section for specific range types for additional information and guidance. In addition, the amount of the target that is visible to shooters can affect the ability to qualify, e.g. it is harder to qualify on a MRF when only half of the target is visible. Finally, rounds can hit and damage targetry and electrical equipment on higher angles of fire.

The standard MAT emplacement with a 60-inch front wall and a 2-percent slope on the berm provides adequate protection for AOF of +/- two degrees. Greater angles require special design consideration. Higher negative angles may require increasing the front wall height, adjusting the slope of the berm to match the AOF, or some other method. Theoretically, the minimum wall height hides the electrical equipment, including the target arms and clamps, up to a -10o AOF, higher with the aviation wall height. In situations with a positive AOF, greater than 2 degrees, the berm itself begins to hide the target. Adjustments to the berm slope may be necessary.

On ranges where target engagement is from multiple points, the designer must coordinate closely with the installation and the targetry provider to determine the correct front wall height. The emplacement protection is also critical for aviation gunnery.

Wall Design

Typical retaining walls are designed using concrete gravity block or wood timbers and steel piles. Walls designed so that the top section is replaceable in case of damage are typical. Filter fabric is normally required. The design of the MAT walls must take in consideration the stability

BUILDING STRONG® 3

o v in g A rm o r T a rg e t– A u g u s t2

L P

-M C

X R a n g e

D e s ig n G u of the wall, including site-specific geotechnical conditions. The design must include overturning, sliding, and settling.

Berm Criteria

The Target Protection Design Curves in the RDG provide the recommended thickness for emplacement protective berms. The berm must protect the emplacement from all anticipated directions of fire. The berm should be thickest in the expected direction of fire. Use thinner berms to protect the emplacement from occasional directions of fire and ricochets.

Determine the berm thicknesses based on projectile type, soil compaction, and the in-place soil density. However, the designer must also coordinate with the range trainer or user to determine the appropriate berm thickness for each target, since individual target siting may dictate added target protection. For example, when SIT emplacements is in front of or behind a MAT or SAT, the emplacements will need to be designed to withstand the largest weapon system that will engage that group of targets. At a minimum, berm widths will be at least 4 feet to facilitate ease of maintenance.

Historical experience shows that, under normal usage, well-compacted berms, designed with the recommended widths require maintenance on 6-month cycles. Heavily used ranges and individual targets often require increased berm thicknesses.

Direction of Fire

The direction of fire (DOF) is the horizontal angle to the target. The standard MAT berm configuration provides protection for DOF up to 45 degrees from perpendicular. Where angles of fire are less than that, the berm extension can be reduced, similar the SAT. Delete the berm extension entirely on an end from which the MAT is not engaged. The standard berm will protect the electronics and mechanism from errant rounds and ricochets to much higher DOF, up 90 degrees.

BUILDING STRONG® 4

o v in g A rm o r T a rg e t– A u g u s t2

L P

-M C

X R a n g e

D e s ig n G u

Service Road/Track Bed

The area behind the berm includes a 5.2m (17ft) wide area for the MAT track, lifter, and silhouette and a 3m (10ft) wide service road. Design the track bed and service road for local conditions per the site-specific geotechnical report. Typically, the top 300mm (1ft) of the subgrade is compacted as specified in ASTM D1557, Method D, 90-percent laboratory maximum dry density for cohesive soils and 95-percent laboratory maximum dry density for cohesionless soils. Slope the top of the subgrade away from the protective wall in order to facilitate drainage. Place an additional 150mm (6in) aggregate pavement above the subgrade; use filter fabric when required. The final subgrade and aggregate pavement should not show deviations greater than 13mm (1/2in) when tested with a 3.7m (12ft) straightedge after compaction. The targetry equipment contractor is responsible for all construction above aggregate subgrade including anchoring for the specific targetry system.

REPRESENTATIVE MAT PHOTOS

Electrical/Communications

This section discusses electrical/communication considerations unique to this specific emplacement type. Downrange power, communication, transformers, trenching requirements, etc., are discussed in the Downrange Distribution Section of this document. Electrical interface for the ECPMT is different from the standard MAT; refer to the separate paragraph below.

BUILDING STRONG® 5

o v in g A rm o r T a rg e t– A u g u s t2

L P

-M C

X R a n g e

D e s ig n G u

Target Emplacement Wall Configuration

Refer to Emplacement Elevation Drawings for a typical target emplacement wall configuration.

The electrical equipment required in each MAT emplacement are the 1) Load Center (LC), 2)

Target Power Receptacle (TPR), 3) Auxiliary Power Receptacle, 4) GFCI Maintenance

Receptacle (MR), 5) and the data enclosure, along with the associated wiring and conduits which are not detailed in this document. The load center contains the secondary branch circuits and provides feed-through capability to the load center in the next adjoining target emplacement. All boxes and receptacles on the front wall of the emplacement should be mounted no higher than two inches from the top of the emplacement wall; this protects the boxes and receptacles from low rounds that might skim the top of the emplacement wall. A detailed drawing of the electrical equipment requirements for SIT emplacements is provided in the Appendix of this design guide.

REPRESENTATIVE MAT ELEVATION DRAWING (NOT TO SCALE)

Routing

All conduits and/or cables should enter and exit from the side or rear of the emplacement. This cable routing helps to minimize damage to the cables from range operations and maintenance crews performing berm repair.

Grounding

Grounding is required for safety at each downrange emplacement or equipment location. A

19mm (3/4in) by 3,050mm (10ft) copper-clad steel ground rod will be driven to a depth of

305mm (1ft) below finished grade at each emplacement or equipment location. The MTDP/TDP and LC equipment will be connected to the emplacement’s single ground rod with a #6 AWG bare copper conductor and exothermically welded connections. All data cable armor or shields must be bonded to the ground bar in the TDP. The design will leave a 3048mm (15ft) coil of

#1/0 AWG bare copper that will be used to ground the MAT track. If a counterpoise is installed for a transformer or power center in the MAT emplacement, the target ground rod shall be bonded to the counterpoise.

BUILDING STRONG® 6

o v in g A rm o r T a rg e t– A u g u s t2

L P

-M C

X R a n g e

D e s ig n G u

Surge Suppression

Provide surge protective devices (SPD) in the load center of all target emplacements. The surge suppression for the data communication cables will be provided by the target vendor during the installation of targets.

Conduit and Cable Fittings

All penetrations into the MTDP or TDP must be made with fittings approved for use with a

NEMA 4, 4X or 6P enclosure. Non-compliance with this requirement will result in equipment failure. Sheet ED-01 in the Range Design Guide illustrates the preferred sealing method. Foam filled conduits are not acceptable. The MAT load center only requires a NEMA

3R rated enclosure. Provide fittings approved for use with a NEMA 3R enclosure for connection to the load center.

Target Outlets

Target Power Receptacles and Auxiliary Power Receptacles must be equipped with a waterproof enclosure approved for use with the power plug inserted and unattended, according to NEC

406.8(B) (2). The emplacement outlet configurations are shown in the Table below:

TARGET POWER

RECEPTACLE

AUXILIARY

POWER

RECEPTACLE

FIBER OPTIC

CABLE

CONNECTORS

CATEGORY 5E OR

BETTER CABLE

CONNECTORS

NEMA L14-20R NEMA L5-20R Type “SC” MALE, RJ45

MAT EMPLACEMENT TARGET INTERFACE SPECIFICS

TARGET POWER RECEPTACLE (TPR) – AUXILIARY RECEPTACLE (AR)

BUILDING STRONG® 7

o v in g A rm o r T a rg e t– A u g u s t2

L P

-M C

X R a n g e

D e s ig n G u

EMPLACEMENT

TYPE

POWER

FEED TYPE

PEAK STATIC

LOAD

DESIGN

LOAD

MAT with Thermal

Blanket

120/240VAC

Single Phase

3.8kVA during system charging.

100VA

3.8kVA

Total Design Load 3.8kVA

MAT EMPLACEMENT POWER TABLE

Standard Target Interface

All targets operate at 240 V. Power is supplied to the target through a 120/240V cord and plug connection. The target emplacement shall be provided with a standard 120/240V receptacle that is supplied power through a circuit breaker that is located inside the target emplacement. An auxiliary 120 V outlet is provided in the target emplacement for additional devices or training aids that may be added to the target mechanism. Thermal blankets are the most common devices that are added to the target mechanisms that utilize this power outlet. The specific components used to supply power to the target mechanisms installed inside each target emplacement is fully defined in the remaining sections.

Target and training device communication is accomplished by equipment installed inside the data enclosure located in each target emplacement. All networking equipment will be provided with the target mechanism when the target mechanism is purchased. The target mechanisms are normally purchased with Other Appropriations-Army (OPA) funded target installation contracts.

The range data infrastructure should be installed with data cables to the target emplacement and these cables should be properly terminated inside the target emplacement data enclosures. These data enclosures are referred to as either a Target Data Panel (TDP) or a Master Target Data Panel

(MTDP), and they are fully defined in other sections of this document. The target mechanism installer will interface with the data cables inside these enclosures during the installation of the targets. The schematic below provides an overview of the wiring responsibilities inside the data enclosures.

BUILDING STRONG® 8

o v in g A rm o r T a rg e t– A u g u s t2

L P

-M C

X R a n g e

D e s ig n G u

MTDP DATA WIRING SCHEMATIC

The Master Target Data Panel (MTDP), or the Target Data Panel (TDP) must be rated NEMA 4, 4X, or 6P depending on environmental conditions (refer to Conduit and Cable Fittings section below for connections). The MTDP/TDP contains the electronics for local target operation, including data cable splicing and terminations. Data cabling shall enter and exit the data panels through approved cable seal fittings (refer to Conduit and Cable Fittings below). All fiber optic cabling will be terminated with SC type connectors, and the network cables will be terminated with CAT 5e or better rated RJ45 connectors. The MTDP and TDP provides space for Other

Appropriations-Army (OPA) funded equipment which may include the fiber optic jumpers, switch/media converter, target data outlet, and network cables. The OPA equipment is installed by others and not the MILCON contractor. The designer must ensure the dimensions of the data panel are consistent with those dimensions stated on the detail plans for the MTDP and TDP equipment. A 120v AC power outlet is provided in the TDP for “Use by Others”. The TDP and the GFCI maintenance receptacle may utilize the same power circuit, but the TDP equipment must be wired ahead of the maintenance to ensure no nuisance tripping occurs. Reference the

Electrical and Civil Details in the directory of the Range Design Guide for more information pertaining to the MTDP, TDP and their mounting requirements.

Target Data Connection

All automated targets are connected to the data cable infrastructure through copper patch cables provided by the target vendor. The interface point between the facility infrastructure and the target installation occurs through the faceplate in the weatherproof outlet box installed immediately adjacent to the MTDP or TDP enclosure. The target vendor will penetrate the

BUILDING STRONG® 9

o v in g A rm o r T a rg e t– A u g u s t2

L P

-M C

X R a n g e

D e s ig n G u faceplate on the outlet box and install a weatherproof coupling mechanism that mates with the patch cord provided with their targets.

TARGET DATA CONNECTION

Environmental Limits

The temperature and humidity limits for electronic equipment are as follows:

Outdoor:

Non-operating and operating temperature: -34°C (-30°F) to 60°C (140°F).

Humidity: 5% to 95% RH (non-condensing).

Entry Control Point Moving Target (ECPMT)

The ECPMT, or Serpentine Mover, has a different electrical interface than the standard MAT. It requires a 30 amp 120/240 circuit with a L14-30R receptacle for the ECPMT charging station.

The charging station is placed behind a protective berm at the downrange end of the track. Refer to the Convoy Live Fire Range detail drawings for additional details.

The ECPMT is used to simulate a vehicle entering an access control point. The vehicle has SIT targets inside to simulate occupants and a hit sensor to simulate an engine disabling shot. The track and mechanism are protected using concrete walls and berms. A line of sight analysis must be done to ensure that the track and mechanism are protected from all firing positions while the target is visible along the entire length. A berm and retaining wall is placed at the far end of the track to protect the electrical tie-in and charging station. The track has a nominal radius of 7.62m

(25ft) and a sweep of 26 degrees.

BUILDING STRONG® 10

o v in g A rm o r T a rg e t– A u g u s t2

L P

-M C

X R a n g e

D e s ig n G u

REPRESENTATIVE ECPMT PHOTOS

%PRODUCTION DATA 1%

SHEET ID

®of Engineers

US Army Corps

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

P R

O J E

C T N

U M

B E

R

H U

N T S

V

IL

L E

A L A

B A

M A

E N

G

IN

E E

R

IN

G

S

U P P

O R

T

C

E N

T E

R

U S

A R

M Y

C

O R P

O F

E

N G

IN

E E

R S

A U

G U

S T

R A

N G

E A

N D T

R A

IN

IN

G L

A N

D P

R O

G R

A M

S T

A N

D A

R D D

E S

IG

N M

A N

U A

L

GRAPHIC SCALES:

02 2 4

SCALE: 1" = 2'

10010

SCALE: 1" = 10'

SCALE: 1" = 2'

PLAN

SECTION

TOE OF BERM

COMPACTED SUBGRADE

(ENTIRE FOOTPRINT OF EMPLACEMENT)

GRANULAR DRAINAGE MATERIAL

305mm [1'-0"]

FILL

COMPACTED

FILTER FABRIC

1530mm [5'-0"] FOR TANK GUNNERY

1829mm [6'-0"] FOR AERIAL GUNNERY

(SEE DESIGNER NOTE 2)

FRONT WALL

HORIZONTAL AND

VERTICAL CONTROL

POINT (B)

[2'-6"]

762mm

2% SLOPE

76mm

[3"]

DIRECTION

OF FIRE

A

MAT-01 MAT-01

COMPACTED SUBGRADE (ENTIRE FOOTPRINT OF EMPLACEMENT)

GRANULAR DRAINAGE MATERIAL

FILTER FABRIC

2% SLOPE

305mm [1'-0"]

NOTES:

8230mm [27'-0"]

TOE OF BERM

S T

A .0

(TYP.)

SLOPE

3:1

END OF WALL

S L

O P

E

HORIZONTAL AND

VERTICAL CONTROL

POINT (B)

m m

M

IN

TARGET SERVICE ROAD

MAT-01 MAT-01

A

D

IR

E C

T

IO

N O

F F

IR

E

(SEE DESIGNER NOTE 4) S

L

O P

E

FRONT WALL

FRONT WALL

m m

[3 0' R

.9 m

4877mm

[16'-0"]

SERVICE ROAD

TARGET

18.59m [61'-0"]

.0 m

[3 ' R m m

MAT-02

B

MAT-01

TARGET SERVICE ROAD

POINT (A)

VERTICAL CONTROL

HORIZONTAL AND

S T

A m m

[1

TARGET SERVICE ROAD

C

MAT-02MAT-01

TOE OF BERM

MAT-01

M O

V

IN

G A

R M

O R

T A

R G

E T E

M P

L A

C E

M E

N T

AND NOTES TO DESIGNER.

1. SEE MAT-02 FOR GENERAL NOTES

MOVING ARMOR TARGET EMPLACEMENT

DESIGNER NOTE 4)

VARIES (SEE

BERM THICKNESS

NOTES 4)

VARIES (SEE DESIGNER

BERM EXTENSIONNOTES 4)

VARIES (SEE DESIGNER

BERM EXTENSION

BERM THICKNESS VARIES

ELECTRICAL EQUIPMENT (HOME END)

3m [10'-0"] CLEAR SPACE FOR

350m [1,150'-0"]

%PRODUCTION DATA 1%

SHEET ID

®of Engineers

US Army Corps

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

P R

O J E

C T N

U M

B E

R

H U

N T S

V

IL

L E

A L A

B A

M A

E N

G

IN

E E

R

IN

G

U P P

O R

T

C

E N

T E

R

U S

A R

M Y

C

O R P

O F

E

N G

IN

E E

R S

A U

G U

S T

R A

N G

E A

N D T

R A

IN

IN

G L

A N

D P

R O

G R

A M

S T

A N

D A

R D D

E S

IG

N M

A N

U A

L

8.

7.

6.

5.

4.

3.

2.

1.

ENGAGEMENT POINT.

TRANSFORMER TO BE LOCATED AT THE END OF MAT CLOSEST TO

MAT.

0+00.00 IS ALWAYS LOCATED ON THE TRANSFORMER END OF THE

HORIZONTAL CONTROL POINT (A) IS LOCATED AT STA. 0+00.00. STA.

UNITS FOR INSTANCE, 1372mm [4'-6"] UNLESS OTERWISE INDICATED.

ALL DIMENSIONS ARE INDICATED AS FOLLOWS: METRIC [ENGLISH]

EXISTING GRADE.

SLOPE END WALLS AT A 3:1 SLOPE TO A POINT 305mm [12"] ABOVE THE

VISIBILITY.

SURROUNDINGS. GROUND COVER SHALL NOT REDUCE TARGET

REVEGETATED OR RESURFACED CONSISTENT WITH THE NATURAL

AREAS DISTURBED BY CONSTRUCTION ACTIVITIES SHALL BE

SHALL EXTEND THE FULL HEIGHT OF THE WALL.

FILTER FABRIC SHALL BE INSTALLED BEHIND THE WALLS. FABRIC

ALL REINFORCING STEEL SHALL BE PER ASTM A615, GRADE 60.

28 MPa (4000PSI) IN 28 DAYS.

CONCRETE SHALL DEVELOP A MINIMUM COMPRESSIVE STRENGTH OF

GENERAL NOTES:

FRONT WALL ELEVATION

GRAPHIC SCALE:

PRECAST WALL SLOPED

END BLOCK

PRECAST WALL BLOCK

-STACK USING STAGGERED BOND

E N

D O

F W

A L L

HORIZONTAL AND

VERTICAL CONTROL

POINT (B)

S T

A .0

350m [1,150'-0"]

POINT (A)

VERTICAL CONTROL

HORIZONTAL AND

S T

A .0

E N

D O

F W

A L L

PRECAST WALL SLOPED

END BLOCK

PRECAST WALL BLOCKS

-STACK USING STAGGERED BOND

MAT-01 MAT-02

B

4' 8'0 2'

SCALE:1/4"=1'

EQUIPMENT (HOME END) AT THE END CLOSEST TO THE DIRECTION OF FIRE.

MIRROR THE MAT EMPLACEMENTS AS REQUIRED TO KEEP ELECTRICAL

AND/OR VERTICAL CURVES.

USE A MINIMUM CURVE RADIUS OF 150 METERS (500 FEET) FOR HORIZONTAL

PERCENT SLOPE MAXIMUM.

PERCENT. THE LAST 40 METERS (130 FEET) ON EACH END MUST BE FLAT; 1

TRAVEL. LIMIT SLOPES TO 3 PERCENT WHERE POSSIBLE WITH A MAXIMUM OF 5

MAT EMPLACEMENTS MAY BE SLOPED ALONG THE DIRECTION OF TARGET

WALL FOR TARGET MOVEMENT/LAYDOWN.

REQUIRES A MINIMUM OF 9 METERS (30’) CLEAR SPACE BEHIND THE FRONT

THE MAT ELECTRICAL EQUIPMENT AND TARGET RAIL/LIFTER/SILHOUETTE

SITE-SPECIFIC GEOTECHNICAL REPORT.

THE 3:1 BERM SLOPES SHOWN ARE TYPICAL; ADJUST BASED ON A

THE DESIGN MUST INCLUDE POSITIVE DRAINAGE AWAY FROM THE TARGET.

FOR THE REQUIRED BERM THICKNESS AND BERM EXTENSION REQUIREMENTS.

REFER TO THE TARGET EMPLACEMENT PROTECTION SECTION OF THE RDG

THE TOP 300MM (1’) MUST BE REPLACEABLE.

CAST-IN-PLACE/PRE-CAST CONCRETE, OR THE GRAVITY BLOCK WALL SHOWN.

GEOTECHNICAL REPORT. RETAINING WALLS MAY BE TREATED TIMBERS,

RETAINING WALLS REQUIRE LOCATION SPECIFIC DESIGN BASED ON THE

GREATER ANGLES OF FIRE.

ANGLE OF FIRE. COORDINATE WITH THE INSTALLATION AND THE RTLP-MCX FOR

THE TARGET LIFTER INCLUDING THE TARGET ARMS UP TO A 10 DEGREE DOWN

ELECTRICAL EQUIPMENT FOR AN ANGLE OF FIRE OF +/- 2 DEGREES AND HIDES

FOR AERIAL GUNNERY, PROVIDES FULL PROTECTION FOR THE TARGETRY AND

THE MINIMUM FRONT WALL HEIGHT OF 1.530 METERS (5’-0”), 1.83 METERS (6’-0”)

ADDITIONAL INFORMATION AND REQUIREMENTS.

REFER TO THE MOVING ARMOR TARGETS WRITE-UP IN THE RDG FOR

DESIGNER NOTES

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

M O

V

IN

G A

R M

O R

T A

R G

E T E

M P

L A

C E

M E

N T

MAT-02

(HOME END)

ELECTRICAL EQUIPMENT

3m [10'-0"] CLEAR SPACE FOR

(SEE DESIGNER NOTES 4)

BERM EXTENSION VARIES

(SEE DESIGNER NOTES 4)

BERM EXTENSION VARIES

NOT TO SCALE

File details come from the government source that posted it. Updated .