This vendor price sheet details pricing for regulatory drydocking services for Training Ship Freedom Star. The vendor offers pricing for general service requirements including surveys, inspections, waste removal, and certifications. Pricing is also provided for drydocking work items such as hull blasting and coating, thickness gauging, propeller cleaning and inspection, tank examinations, anchor and thruster maintenance, and engine and generator inspections. Optional work items include wet lay berthing, supplemental labor and materials. The total proposed price for required work items 0114 and 0128 is $80,000. The Maritime Administration seeks these drydocking services through solicitation number 6933A222Q000025 for regulatory drydocking of Training Ship Freedom Star in fiscal year 2023.

View the file

Other files

File Type Posted
TSFS 2020 Anchor Chain Gauging.pdf PDF
Bow Thruster Maintenance - Final Service Report.pdf PDF
TSFS Tankages 2022.pdf PDF
Answers to questions submitted by various vendors.pdf PDF
Bow Thruster 1.pdf PDF
Bow Thruster Maintenance Report.pdf PDF
Bow Thruster 2.pdf PDF
Freedom Star 6-3-2020 Soundings.pdf PDF
Amdmt 0004 TSFS 6933A222Q000025.pdf PDF
2020 Rudder and Skeg Inspection and Pintle Clearances.pdf PDF
TSFS 6933A222Q000025 Amndmt 0003.pdf PDF
4 Questions and Answers TSFS 2023 DD.pdf PDF
Finding Detail Report - 229.2.pdf PDF
2020 Item 207 Ultrasonic Thickness Gauging - Final.pdf PDF
Rudder Anodes Pic 2.pdf PDF
Rudder Anodes Pic.pdf PDF
Windward 22 Gauging TS FREEDOM STAR.pdf PDF
2021 Corrosion Guaging Report.pdf PDF
Finding Detail Report - 230.2.pdf PDF
Freedom Star VALVE SURVEY FORM for Marad 9-8-22qt.xlsx XLSX spreadsheet
New WO Valves Quote.pdf PDF
MVFS Mooring Analysis.pdf PDF
2020 xx Zinc Anodes Locations.pdf PDF
1547 4420 Rev 3 Bow Thruster Arr.pdf PDF
Switchboard DWG 19159-1 19159-2 19159 3 19159 4 DWG 19157 1 19157 2 19157 3 19157 4.pdf PDF
TSFS 6933A222Q000025 Amdmt 00002.pdf PDF
Hurricane Preparedness and Heavy Weather Mooring Plan.pdf PDF
Item 201 DRY DOCK SHIP.pdf PDF
Stern Thruster 2768WG D 32HJP SECTIONAL ARRANGEMENET.pdf PDF
1547 4419 Rev 1 Stern Thruster Compt Machy Arr.pdf PDF
1427 802 Rev TV FREEDOM STAR General Arrangements and Profile.pdf PDF
KINGS POINTER Tank Tables 15 Oct 13.pdf PDF
3 Questions and Answers TSFS 2023 DD.pdf PDF
1780 2550 Stern Thruster AD.pdf PDF
2 Questions and Answers TSFS 2023 DD.pdf PDF
Freedom Star NEW ITEM 205 SEA VALVES.pdf PDF
Tank Plan ST Locations.pdf PDF
1 Questions and Answers TSFS 2023 DD.pdf PDF
1547 2515 Rev 6 Transverse Bhds.pdf PDF
1547 2510 Rev 7 Long l Struct Sections.pdf PDF
Amdmt 0001 TSFS 6933A222Q000025.pdf PDF
TSFS FY22 DD combined synopsis solicitation.pdf PDF
Siemens-Allis Switchgear Parts Ordering Guide Type LA-600A.pdf PDF
August 2022 RRF Coatings Guidelines.xls XLS spreadsheet
1547-4705_Rudder Details.pdf PDF
Shell Expansion Drawing.pdf PDF
TSFS 2023 DD SOW Rev3.docx DOCX document
2018 Bow Thruster Maintenance - Final Service Report.pdf PDF
1547-1420 Docking Plan.pdf PDF
MA-57_Drydock_Report.pdf PDF
Show 40 more

Latest 50 of 71 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vendor quote sheet

VENDOR PRICE SHEET
T.V. KINGS POINTER - ABS SPECIAL PERIODICAL SURVEYS DRYDOCKINGTS FREEDOM STAR REGULATORY DRYDOCKING
ITEMDESCRIPTION OF SERVICESQuanityUnitUnit PriceTotalColumn1
0100SECTION 100: GENERAL SERVICES REQUIREMENTSNSP
0101APPLICABILITY OF RULES AND REGULATIONNSP
0102ACCURACY OF INFORMATIONNSP
0103SECURITY- 0
0104FIRE PROTECTION AND SAFETY- 0
0105OFFICE AND ADMINISTRATIVE SERVICES- 0
0106WHARFAGE- 0
0107SURVEYS AND INSPECTIONSNSP
0108ON-SITE CONTRACTOR'S REPRESENTATIVENSP
0109DOCUMENTATION OF OPENINGS, BLANKS AND PLUGS- 0
0110ALLOWANCE FOR SCRAP MATERIALNSP
0111MAINTAIN SHIP'S LIGHTING- 0
0112HAZARDOUS MATERIALS IDENTIFICATION AND DISPOSAL- 0- 0
0113USE OF SHIP'S PARTS AND EQUIPMENTNSP
0114PROVIDE SHORE POWERkWh- 0Install meter and connect/disconect
0115DISABLE CO2 AND HALON SYSTEMS.- 0
0116MAINTAINING SHIP'S CLEANLINESS- 0
0117MAINTAIN CLEAN BILGES AND DRAIN WELLS- 0Included in item #120
0118PROTECTIVE FLOOR COVERING- 0
0119SURFACE PREPARATION AND PAINTING/COATING GUIDELINENSP
0120SAFE FOR ENTRY AND SAFE FOR HOT WORK CERTIFICATES- 0
0121PRODUCTION REPORTING- 0No charge
0122CRANE SERVICE- 0
0123STAGING- 0
0124OIL BOOM- 0
0125WELDING / BRAZING PROCEDURESNSP
0126SOUNDINGS- 0
0127SANITARY SYSTEM- 0
0128WASTE WATER AND OILS- 0Set up break down
0129PORTABLE TOILETS/TEMPORARY FACILITIES- 0
0130COMPRESSED AIR- 0
0200SECTION 200: DRYDOCKING REQUIREMENTS- 0
0201DRY DOCK SHIP- 0
0202TAILSHAFT EXAMINATION and CPP ASSEMBLIES REMOVAL AND EXAMINATION- 0
0203RUDDER and SKEG INSPECTION and PINTLE CLEARANCES- 0
0204SEA CHESTS- 0
0205SEA VALVES- 0
0206BLASTING & COATING OF HULL- 0
0207ULTRASONIC THICKNESS GAUGINGS- 0
0208PROPELLER CLEANING, INSPECTION AND COATING- 0
0209INTERNAL STRUCTURAL EXAMS AND TESTING OF FUEL TANKS.- 0
0210INTERNAL STRUCTURAL EXAMS OF BALLAST, VOIDS, COFFERDAMS, and POTABLE & WASH WATER TANKS.- 0
0211ANCHOR CHAINS & LOCKERS- 0
0212ZINC ANODES- 0
0213BOW THRUSTER MAINTENANCE- 0
0214STERN THRUSTER MAINTENANCE- 0
0215TRANSDUCER VOID; BLAST and COAT- 0
0216Hull Repairs, Replace Steel in #3 port SWB and CL Flume- 0
0217CRITICAL GUAGES, CALIBRATE- 0
0218MAIN ENGINES; 5 YEAR INSPECTIONS- 0
0219PORT and STARBOARD GENERATOR GOVERNORS; OVERHAUL- 0
0220MAIN SWITCHBOARD; CLEAN, INSPECT and REPAIR- 0
- 0
0300SECTION 300: OPTIONAL AND UNIT PRICED ITEMS- 0
0301OPTION - PROVIDE WET LAY BERTH$1,050.00- 0- 0
0302OPTION - SUPPLEMENTAL LABOR1500HRS- 0
0303OPTION - SUPPLEMENTAL MATERIAL80,000.00
0304OPTION - SUPPLEMENTAL STEEL
304aKTR Provide A Quote for Estimated 1,000 lbs of Flat Steel1000LB- 0
304bKTR Provide A Quote for Estimated 1,000 lbs of Rolled Steel1000LB- 0
304cKTR provide a quotation to prep and re-weld external hull weld seams, of an estimated length of 100 feet of weld.100FT- 0
0305OPTION - AUDIO GAUGINGS ADDITIONAL (Est. 1000 Readings)1000EA- 0
- 0- 0
SUBTOTAL80,000.00
Price for Work Item 0114
Price for Work Item 0128
TOTAL80,000.00