1547 2515 Rev 6 Transverse Bhds.pdf

PDF 4 MB Posted

Attached to
TRAINING SHIP FREEDOM STAR (TSFS) FY23 REGULATORY DRY DOCKING
Solicitation number
6933A222Q000025
Issued by

About this file

This document contains a federal contract solicitation for regulatory dry docking services for a training ship as well as an associated technical file. The solicitation was issued by the U.S. Department of Transportation Maritime Administration in Norfolk, Virginia to solicit industrial support for the regulatory dry docking of the Training Ship Freedom Star in accordance with the provided Statement of Work. The technical file appears to include specifications for modifications to be made to the ship including the insertion of openings and holes in plates, addition of stiffeners, and insertion of new sewage tank forward bulkheads on both sides.

View the file

Other files

File Type Posted
TSFS 2020 Anchor Chain Gauging.pdf PDF
Bow Thruster Maintenance - Final Service Report.pdf PDF
TSFS Tankages 2022.pdf PDF
Answers to questions submitted by various vendors.pdf PDF
Bow Thruster 1.pdf PDF
Bow Thruster Maintenance Report.pdf PDF
Bow Thruster 2.pdf PDF
Freedom Star 6-3-2020 Soundings.pdf PDF
Amdmt 0004 TSFS 6933A222Q000025.pdf PDF
2020 Rudder and Skeg Inspection and Pintle Clearances.pdf PDF
TSFS 6933A222Q000025 Amndmt 0003.pdf PDF
4 Questions and Answers TSFS 2023 DD.pdf PDF
Finding Detail Report - 229.2.pdf PDF
2020 Item 207 Ultrasonic Thickness Gauging - Final.pdf PDF
Rudder Anodes Pic 2.pdf PDF
Rudder Anodes Pic.pdf PDF
Windward 22 Gauging TS FREEDOM STAR.pdf PDF
2021 Corrosion Guaging Report.pdf PDF
Finding Detail Report - 230.2.pdf PDF
Freedom Star VALVE SURVEY FORM for Marad 9-8-22qt.xlsx XLSX spreadsheet
New WO Valves Quote.pdf PDF
MVFS Mooring Analysis.pdf PDF
2020 xx Zinc Anodes Locations.pdf PDF
1547 4420 Rev 3 Bow Thruster Arr.pdf PDF
Switchboard DWG 19159-1 19159-2 19159 3 19159 4 DWG 19157 1 19157 2 19157 3 19157 4.pdf PDF
TSFS 6933A222Q000025 Amdmt 00002.pdf PDF
Hurricane Preparedness and Heavy Weather Mooring Plan.pdf PDF
Item 201 DRY DOCK SHIP.pdf PDF
Stern Thruster 2768WG D 32HJP SECTIONAL ARRANGEMENET.pdf PDF
1547 4419 Rev 1 Stern Thruster Compt Machy Arr.pdf PDF
1427 802 Rev TV FREEDOM STAR General Arrangements and Profile.pdf PDF
KINGS POINTER Tank Tables 15 Oct 13.pdf PDF
3 Questions and Answers TSFS 2023 DD.pdf PDF
1780 2550 Stern Thruster AD.pdf PDF
2 Questions and Answers TSFS 2023 DD.pdf PDF
Freedom Star NEW ITEM 205 SEA VALVES.pdf PDF
Tank Plan ST Locations.pdf PDF
1 Questions and Answers TSFS 2023 DD.pdf PDF
1547 2510 Rev 7 Long l Struct Sections.pdf PDF
Amdmt 0001 TSFS 6933A222Q000025.pdf PDF
TSFS FY22 DD combined synopsis solicitation.pdf PDF
Siemens-Allis Switchgear Parts Ordering Guide Type LA-600A.pdf PDF
August 2022 RRF Coatings Guidelines.xls XLS spreadsheet
1547-4705_Rudder Details.pdf PDF
Shell Expansion Drawing.pdf PDF
TSFS 2023 DD SOW Rev3.docx DOCX document
2018 Bow Thruster Maintenance - Final Service Report.pdf PDF
1547-1420 Docking Plan.pdf PDF
MA-57_Drydock_Report.pdf PDF
Gen Breakers Exterior.pdf PDF
Show 40 more

Latest 50 of 71 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSERT OPENINGS

" PLT

INSERT RAT HOLES

TOP & BOTTOM

" PLT

ADD FACE PLT 3x1/4"FB TO

EACH VERT STIFF

NEW SEWAGE TK

FWD BHD, P&S

BHD INSERTED

AS PART OF REEFER

SPACE MODS

2A

3D

1. MADE NTB FR 41 WT OUTBOARD OF 8ft

LONG'L AS NEW SEWAGE TANK FWD BHD P&S

2. INSERTED FRAME 12 REEFER SPACE BHD

DOOR OPENING.

BECI

JULY

'13

INSERT OPENINGS

" PLT

INSERT RAT HOLES

TOP & BOTTOM

" PLT

ADD FACE PLT 3x1/4"FB TO

EACH VERT STIFF

NEW SEWAGE TK

FWD BHD, P&S