Attachment P2_Sub_Cost_Breakout.xlsx

XLSX spreadsheet 45 KB Posted

Attached to
Draft RFP: Aircraft Instrumentation Division (AID) Follow On
Solicitation number
N0042124R0081
Issued by

About this file

The file is a detailed Excel-based SubContractor Cost Breakout spreadsheet for a federal contract opportunity with the Naval Air Warfare Center Aircraft Division. The spreadsheet provides comprehensive instructions for subcontractors to document labor costs, requiring detailed entries for each employee including employment status, labor category, full-time/part-time designation, work location, and rates across five performance periods (base year and four option years). Contractors must populate the spreadsheet with employee names, labor categories, hourly rates, and calculate total labor costs, indirect costs, and fixed fees, with specific formatting requirements such as using two decimal places for dollar figures and maintaining unlocked cells with intact formulas.

The related federal contract opportunity is a draft Request for Proposal (RFP) for the Aircraft Instrumentation Division (AID) Follow On solicitation (N0042124R0081), seeking technical, engineering, supply, administrative, program analysis/management, and facility contractor support services. The opportunity is issued by the Department of the Navy's Naval Air Systems Command, with questions to be submitted to Contract Specialist Shannon Summers by 2:00 PM Eastern Time on 06 June 2025. The draft RFP is available on the Procurement Integrated Enterprise Environment (PIEE) platform, and interested contractors should review the detailed solicitation for full requirements and submission guidelines.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

SubContractors Instructions for Cost Spreadsheet (LOE) tab:
1Enter Prime offeror name into cell C3 and Subcontractor name into cell C4
2Enter all subcontractor current employee or Contingent hire names in Column C (starting at row 9), If proposed employee is prospective leave blank. If necessary, insert additional rows or delete blank rows, but ensure integrity of formulas.
3Select the employment status (Current, Contingent or Prospective) in Column D.
4Select the subcontractor labor category for the employee in Column E (starting at row 9). Labor categories having more than one position shall be listed with a separate row for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
5Only one worksheet shall be prepared for the entire period of performance.
6All cells shall be unprotected and unlocked, with formulas intact to show mathematical operations.
7All dollar figures shall be carried out no further than two decimal places. Use the rounding function.
8In column F, identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time.
9In column G, the Offeror shall insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in the Government Spaces. Regarless of the location, pricing will be in accordance with the Section L instructions to Offerors.
10Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert separately and apply accordingly.
11Insert the fixed fee rate applied to its cost.

Cost Spreadsheet (LOE)

COST SUMMARY SPREADSHEET

Prime Offeror Name:
Subcontractor Name:
BaseOption Year 1Option Year 2Option Year 3Option Year 4Total
PositionCost ElementsEmployment StatusLabor CategoryF/PSiteRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountHoursAmount
Subcontractor Labor Cost
Subcontractor Direct Labor
1Employee Name 1SelectSelect0000000
2Employee Name 2SelectSelect0000000
3Etc.SelectSelect0000000
4Etc.SelectSelect0000000
5Etc.SelectSelect0000000
6Etc.SelectSelect0000000
7Etc.SelectSelect0000000
8Etc.SelectSelect0000000
9Etc.SelectSelect0000000
10Etc.SelectSelect0000000
11Etc.SelectSelect0000000
12Etc.SelectSelect0000000
13Etc.SelectSelect0000000
14Etc.SelectSelect0000000
15Etc.SelectSelect0000000
16Etc.SelectSelect0000000
17Etc.SelectSelect0000000
18Etc.SelectSelect0000000
19Etc.SelectSelect0000000
20Etc.SelectSelect0000000
21Etc.SelectSelect0000000
22Etc.SelectSelect0000000
23Etc.SelectSelect0000000
24Etc.SelectSelect0000000
25Etc.SelectSelect0000000
26Etc.SelectSelect0000000
27Etc.SelectSelect0000000
28Etc.SelectSelect0000000
29Etc.SelectSelect0000000
30Etc.SelectSelect0000000
31Etc.SelectSelect0000000
32Etc.SelectSelect0000000
33Etc.SelectSelect0000000
34Etc.SelectSelect0000000
35Etc.SelectSelect0000000
36Etc.SelectSelect0000000
37Etc.SelectSelect0000000
38Etc.SelectSelect0000000
39Etc.SelectSelect0000000
40Etc.SelectSelect0000000
41Etc.SelectSelect0000000
42Etc.SelectSelect0000000
43Etc.SelectSelect0000000
44Etc.SelectSelect0000000
45Etc.SelectSelect0000000
46Etc.SelectSelect0000000
47Etc.SelectSelect0000000
48Etc.SelectSelect0000000
49Etc.SelectSelect0000000
50Etc.SelectSelect0000000
Total Direct Labor Cost0000000
Subcontractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost000000
Total Direct and Indirect Labor cost000000
COM
Total Subcontractor Labor Cost000000

Total Subcontractor Labor Cost 0 0 0 0 0 0

Fixed Fee
Subcontractor Fee000000

Total Labor Cost Plus Fixed Fee (CPFF) 0 0 0 0 0 0

Employment Status Data Field
Select
Current
Contingent
Prospective
Labor Category Data Field
Select
Administrative Assistant , Journeyman
Computer Scientist , Journeyman
Configuration Manager , Journeyman
Configuration Manager , Senior
Engineer, Instrumentation , Senior
Engineer , Junior
Engineer , Journeyman
Engineer , Senior
Engineer, Structural , Journeyman
General Technician I
General Technician II
General Technician II - OT
Graphic Designer , Journeyman
Aerospace Engineering, Instrumentation and Operations Technician I
Aerospace Engineering, Instrumentation and Operations Technician I - OT
Aerospace Engineering, Instrumentation and Operations Technician II
Aerospace Engineering, Instrumentation and Operations Technician II- OT
Aerospace Engineering, Instrumentation and Operations Technician III
Aerospace Engineering, Instrumentation and Operations Technician IV
Aerospace Machinist Technician I
Aerospace Machinist Technician II
Aerospace Machinist Technician III
Aerospace Sheet Metal Technician I
Aerospace Sheet Metal Technician I - OT
Aerospace Sheet Metal Technician II
Aerospace Sheet Metal Technician III
Aerospace Sheet Metal Technician IV
Aerospace Structures Technician I
Aerospace Structures Technician II
Aerospace Structures Technician III
Aerospace Structures Technician IV
Laborer
Management Analyst , Journeyman
Material Coordinator
Mechanical Drafter II
Mechanical Drafter III
Mechanical Drafter IV
Program Manager , Senior
Project Analyst , Journeyman
Safety / QA Specialist , Junior
Safety / QA Specialist , Journeyman
Supply Tech

Page &P &F

KTR: (name) Source Selection Information - See: FAR 2.101 and 3.104 RFP:

Instructions Fully Burdened Instructions to Subcontractors Contractors for completing Attachment P6 Annual Fully Burdened Labor

RFP # N00421-24-R-0081

COLUMN/AREACOLUMN HEADINGDESCRIPTION OF DATA UNDER THIS COLUMN HEADING
BProposed Labor CategoryEnter the Proposed Labor Category as entered in the Cost Spreadsheet (LOE) Tab column E.
CPosition DesignatorFor each individual Contractor employee proposed, the contractor shall enter the corresponding Position Number as found on the Cost Spreadsheet (LOE) Tab column B.
D-HProposed Annual Fully-Burdened Labor per Labor Catergory, per Labor Individual DesignatorEnter the Annual Fully-Burdened Labor proposed for the applicable performance period (e.g. Base or Year_#) for personnel associated with the Proposed Labor Category and Individual Designator. Enter numbers only, in U.S. Dollar format $###.## rounded to the nearest cent. Annual Fully-Burdened Labor shall include fringe, overhead, G&A, and fee on total cost, but should not include Fully-Burdened Other Direct Costs (ODCs) such as Materials, Travel, and Cost of Money costs. Annual Fully-Burdened Labor shall be the Fully-Burdened Labor Rate times the amount of hours proposed for the applicable performance period.

Fully Burdened Labor Rates

Proposed Labor CategoryPosition DesignatorProposed Annual Fully-Burdened Labor
Year 1Year 2Year 3Year 4Year 5

File details come from the government source that posted it. Updated .