Attachment L-6 - Cost Price Workbook Final.xlsx
XLSX spreadsheet 423 KB Posted
- Solicitation number
- 693KA7-25-R-00001
About this file
This document is a Cost Price Workbook template for a federal contract opportunity. It contains detailed pricing information for various contract line items (CLINs) across the base period and two option periods. The CLINs cover a range of products and services including program management, system development and testing, training, site survey and preparation, spares and consumables, and travel/other direct costs.
The pricing is structured as firm-fixed-price (FFP), cost-plus-fixed-fee (CPFF), and time-and-materials (T&M) CLINs. The workbook provides instructions for offerors to input pricing details in the blue-shaded cells. The total estimated cost and price for the base period, Option Period 1, and Option Period 2 are also calculated. This cost price workbook is associated with Solicitation Number 693KA7-25-R-00001 for the Surface Movement Radar, Model 4 Replacement for the Airport Surface Detection Equipment Model 3 Surface Movement Radar (ASDE-3 SMR) requirement issued by the Department of Transportation Federal Aviation Administration Enroute Terminal Contracts.
View the file
Other files
Show 40 more
Latest 50 of 61 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary INSTRUCTIONS TO OFFEROR: Fill in only blue-shaded cells
OFFEROR NAME:
BASE PERIOD TOTAL COST AND PRICE $ - 0
OPTION PERIOD 1 TOTAL COST AND PRICE $ - 0
OPTION PERIOD 2 TOTAL COST AND PRICE $ - 0
TOTAL CONTRACT COST AND PRICE $ - 0
&"Times New Roman,Bold"&12PART I - SECTION B &USUPPLIES OR SERVICES AND PRICE/COSTS &"Times New Roman,Bold"&12DTFAWA-XX-R-XXXXX
&"Times New Roman,Bold"&12 PAGE B-&P
Base Period INSTRUCTIONS TO OFFEROR: Fill in only blue-shaded cells
OFFEROR NAME:
Base Period
| Base Period FFP | CLIN | Supplies/Services | Qty* | Units | CLIN Type | Unit Price | Total Price |
| 0001 | Program Management | 1 | EA | FFP | $ - 0 | ||
| 0006a | In-Plant Development Test System | 1 | EA | FFP | $ - 0 | ||
| 0006b | Program Support Facility (PSF) System | 1 | EA | FFP | $ - 0 | ||
| 0006c | Academy System | 1 | EA | FFP | $ - 0 | ||
| 0006d | Key Site Systems | 3 | EA | FFP | $ - 0 | ||
| 0006e | Depot Support System | 1 | EA | FFP | $ - 0 | ||
| 0007a | Integrated Logistics Support Program Management | 1 | EA | FFP | $ - 0 | ||
| 0007c | Site Spares & Site Consumables | 5 | EA | FFP | $ - 0 | ||
| 0007d | ICDLS/Depot Spares Lay-In | 1 | EA | FFP | $ - 0 | ||
| 0007e | Support and Test Equipment | 6 | EA | FFP | $ - 0 | ||
| 0007f | Technical Data | 1 | EA | FFP | $ - 0 | ||
| 0008a | Training Development - System Familiarization | 1 | EA | FFP | $ - 0 | ||
| 0008b | Training Development - Second Level Engineering | 1 | EA | FFP | $ - 0 | ||
| 0008c | Training Development - Depot | 1 | EA | FFP | $ - 0 | ||
| 0008d | Training Development - Technical Operations | 1 | EA | FFP | $ - 0 | ||
| 0008e | Training Conduct and Materials - System Familiarization | 4 | EA | FFP | $ - 0 | ||
| 0008f | Training Conduct and Materials - Second Level Engineering | 4 | EA | FFP | $ - 0 | ||
| 0008h | Training Conduct and Materials - Technical Operations | 4 | EA | FFP | $ - 0 | ||
| 0012a | Site Survey and Report | 5 | EA | FFP | $ - 0 | ||
| 0012b | Site Preparation | 5 | EA | FFP | $ - 0 | ||
| 0014 Option | Additional Maintenance Terminals | 6 | EA | FFP | $ - 0 |
Base Period Total FFP $ - 0
| Base Period CPFF | CLIN | Supplies/Services | Qty* | Units | CLIN Type | Estimated Cost | Total Cost | Fixed Fee | Total Estimated Cost Plus Fixed Fee |
| 0002 | System Engineering | 1 | EA | CPFF | $ - 0 | $ - 0 | |||
| 0003 | System Design/Software (SW) Development | 1 | EA | CPFF | $ - 0 | $ - 0 | |||
| 0004 | System Test and Evaluation | 1 | EA | CPFF | $ - 0 | $ - 0 | |||
| 0005 | First Article Production Acceptance Test and System Support | 1 | EA | CPFF | $ - 0 | $ - 0 | |||
| 0010 | Information System Security | 1 | EA | CPFF | $ - 0 | $ - 0 | |||
| 0012c | Installation, Checkout, Optimization and Acceptance –Not-To-Exceed 5 systems** | 5 | EA | CPFF | $ - 0 | $ - 0 |
Base Period Total CPFF $ - 0
| Base Period T&M | CLIN | Supplies/Services | Qty* | Units | CLIN Type | Total Not-to-Exceed Ceiling |
| 0007b | Interim Contractor Depot Level Support (ICDLS) | 1 | EA | T&M | ||
| 0009 | Engineering Services | 1 | EA | T&M |
Base Period Total T&M $ - 0
| Base Period CR | CLIN | Supplies/Services | Qty* | Units | CLIN Type | Total Cost Estimate |
| 0011 | Travel/ODCs | 1 | EA | CR |
Base Period Total CR $ - 0
TOTAL BASE PERIOD COST AND PRICE $ - 0
| Notes: | * Quantities are presented for cost/price evaluation purposes only. |
| ** This CLIN is to be priced by Quantity (Qty) of individual not-to-exceed (NTE) systems. |
Option Period 1 INSTRUCTIONS TO OFFEROR: Fill in only blue-shaded cells
OFFEROR NAME:
Option Period 1
| Option Period 1 FFP | CLIN | Supplies/Services | Qty* | Units | CLIN Type | Unit Price | Total Price |
| 1001 | Program Management | 1 | EA | FFP | $ - 0 | $ - 0 | |
| 1007a | Integrated Logistics Support Program Management | 1 | EA | FFP | $ - 0 | $ - 0 | |
| 1008f Option | Training Conduct and Materials - Second Level Engineering | 4 | EA | FFP | $ - 0 | $ - 0 | |
| 1008g | Training Conduct and Materials - Depot | 1 | EA | FFP | $ - 0 | $ - 0 | |
| 1012a | Site Survey and Report | 27 | EA | FFP | $ - 0 | $ - 0 | |
| 1012b | Site Preparation | 27 | EA | FFP | $ - 0 | $ - 0 | |
| 1013 Option | First Article - System Refurbishment | 2 | EA | FFP | $ - 0 | $ - 0 | |
| 1014 Option | Additional Maintenance Terminals | 27 | EA | FFP | $ - 0 | $ - 0 | |
| 1015 | Production Systems | 27 | EA | FFP | $ - 0 | $ - 0 |
Option Period 1 Total FFP $ - 0
| Option Period 1 CPFF | CLIN | Supplies/Services | Qty* | Units | CLIN Type | Estimated Cost | Total Cost | Fixed Fee | Total Estimated Cost Plus Fixed Fee |
| 1002 | System Engineering | 1 | EA | CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 1010 | Information System Security | 1 | EA | CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 1012c | Installation, Checkout, Optimization and Acceptance –Not-To-Exceed 27 systems** | 27 | EA | CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Option Period 1 Total CPFF $ - 0
| Option Period 1 T&M | CLIN | Supplies/Services | Qty* | Units | CLIN Type | Total Not-to-Exceed Ceiling |
| 1007b | Interim Contractor Depot Level Support (ICDLS) | 1 | EA | T&M | $ - 0 | |
| 1009 | Engineering Services | 1 | EA | T&M | $ - 0 |
Option Period 1 Total T&M $ - 0
| Option Period 1 CR | CLIN | Supplies/Services | Qty* | Units | CLIN Type | Total Cost Estimate |
| 1011 | Travel/ODCs | 1 | EA | CR | $ - 0 |
Option Period 1 Total CR $ - 0
TOTAL OPTION PERIOD 1 COST AND PRICE $ - 0
| Notes: | * Quantities are presented for cost/price evaluation purposes only. |
| ** This CLIN is to be priced by Quantity (Qty) of individual not-to-exceed (NTE) systems. |
Option Period 2 INSTRUCTIONS TO OFFEROR: Fill in only blue-shaded cells
OFFEROR NAME:
Option Period 2
| Option Period 2 FFP | CLIN | Supplies/Services | Qty* | Units | CLIN Type | Unit Price | Total Price |
| 2001 | Program Management | 1 | EA | FFP | $ - 0 | $ - 0 | |
| 2007a | Integrated Logistics Support Program Management | 1 | EA | FFP | $ - 0 | $ - 0 | |
| 2012a | Site Survey and Report | 19 | EA | FFP | $ - 0 | $ - 0 | |
| 2012b | Site Preparation | 19 | EA | FFP | $ - 0 | $ - 0 | |
| 2013 Option | First Article - System Refurbishment | 2 | EA | FFP | $ - 0 | $ - 0 | |
| 2014 Option | Additional Maintenance Terminals | 19 | EA | FFP | $ - 0 | $ - 0 | |
| 2015 | Production Systems | 19 | EA | FFP | $ - 0 | $ - 0 |
Option Period 2 Total FFP $ - 0
| Option Period 2 CPFF | CLIN | Supplies/Services | Qty* | Units | CLIN Type | Estimated Cost | Total Cost | Fixed Fee | Total Estimated Cost Plus Fixed Fee |
| 2002 | System Engineering | 1 | EA | CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 2010 | Information System Security | 1 | EA | CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 2012c | Installation, Checkout, Optimization and Acceptance –Not-To-Exceed 19 systems** | 19 | EA | CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Option Period 2 Total CPFF $ - 0
| Option Period 2 T&M | CLIN | Supplies/Services | Qty* | Units | CLIN Type | Total Not-to-Exceed Ceiling |
| 2009 | Engineering Services | 1 | EA | T&M | $ - 0 |
Option Period 2 Total T&M $ - 0
| Option Period 1 CR | CLIN | Supplies/Services | Qty* | Units | CLIN Type | Total Cost Estimate |
| 2011 | Travel/ODCs | 1 | EA | CR | $ - 0 |
Option Period 2 Total CR $ - 0
TOTAL OPTION PERIOD 2 COST AND PRICE $ - 0
| Notes: | * Quantities are presented for cost/price evaluation purposes only. |
| ** This CLIN is to be priced by Quantity (Qty) of individual not-to-exceed (NTE) systems. |
File details come from the government source that posted it. Updated .