Attachment-L-6-Cost Price Workbook Amendment 2.xlsx
XLSX spreadsheet 424 KB Posted
- Solicitation number
- 693KA7-25-R-00001
About this file
This is a pricing workbook template (Cost Price Workbook) for offerors to submit pricing for a Surface Movement Radar Model 4 replacement project for the FAA's Airport Surface Detection Equipment Model 3 Surface Movement Radar (ASDE-3 SMR). The workbook is structured with separate tabs for the base period and two option periods, requiring pricing across multiple Contract Line Item Numbers (CLINs) with different pricing types including Firm-Fixed-Price (FFP), Cost-Plus-Fixed-Fee (CPFF), Time & Materials (T&M), and Cost Reimbursement (CR).
The CLINs cover various elements including program management, system engineering, software development, testing, training, site surveys, installation, logistics support, and production systems. The base period includes development test systems and initial deployments, while Option Period 1 covers 27 production systems and Option Period 2 covers 19 production systems. Each period requires detailed pricing for components such as site spares, support equipment, depot support, and information system security. All quantities listed are noted as being for evaluation purposes only.
View the file
Other files
Show 40 more
Latest 50 of 61 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary INSTRUCTIONS TO OFFEROR: Fill in only blue-shaded cells
OFFEROR NAME:
BASE PERIOD TOTAL COST AND PRICE $ - 0
OPTION PERIOD 1 TOTAL COST AND PRICE $ - 0
OPTION PERIOD 2 TOTAL COST AND PRICE $ - 0
TOTAL CONTRACT COST AND PRICE $ - 0
&"Times New Roman,Bold"&12PART I - SECTION B &USUPPLIES OR SERVICES AND PRICE/COSTS &"Times New Roman,Bold"&12DTFAWA-XX-R-XXXXX
&"Times New Roman,Bold"&12 PAGE B-&P
Base Period INSTRUCTIONS TO OFFEROR: Fill in only blue-shaded cells
OFFEROR NAME:
Base Period
| Base Period FFP | CLIN | Supplies/Services | Qty* | Units | CLIN Type | Unit Price | Total Price |
| 0001 | Program Management | 1 | EA | FFP | $ - 0 | $ - 0 | |
| 0006a | In-Plant Development Test System | 1 | EA | FFP | $ - 0 | $ - 0 | |
| 0006b | Program Support Facility (PSF) System | 1 | EA | FFP | $ - 0 | $ - 0 | |
| 0006c | Academy System | 1 | EA | FFP | $ - 0 | $ - 0 | |
| 0006d | Key Site Systems | 3 | EA | FFP | $ - 0 | $ - 0 | |
| 0006e | Depot Support System | 1 | EA | FFP | $ - 0 | $ - 0 | |
| 0007a | Integrated Logistics Support Program Management | 1 | EA | FFP | $ - 0 | $ - 0 | |
| 0007f | Technical Data | 1 | EA | FFP | $ - 0 | $ - 0 | |
| 0008a | Training Development - System Familiarization | 1 | EA | FFP | $ - 0 | $ - 0 | |
| 0008b | Training Development - Second Level Engineering | 1 | EA | FFP | $ - 0 | $ - 0 | |
| 0008c | Training Development - Depot | 1 | EA | FFP | $ - 0 | $ - 0 | |
| 0008d | Training Development - Technical Operations | 1 | EA | FFP | $ - 0 | $ - 0 | |
| 0008e | Training Conduct and Materials - System Familiarization | 4 | EA | FFP | $ - 0 | $ - 0 | |
| 0008f | Training Conduct and Materials - Second Level Engineering | 4 | EA | FFP | $ - 0 | $ - 0 | |
| 0008h | Training Conduct and Materials - Technical Operations | 4 | EA | FFP | $ - 0 | $ - 0 | |
| 0012a | Site Survey and Report | 6 | EA | FFP | $ - 0 | $ - 0 | |
| 0014 Option | Additional Maintenance Terminals | 6 | EA | FFP | $ - 0 | $ - 0 |
Base Period Total FFP $ - 0
| Base Period CPFF | CLIN | Supplies/Services | Qty* | Units | CLIN Type | Unit Cost | Total Cost | Fixed Fee | Total Cost Plus Fixed Fee |
| 0002 | System Engineering | 1 | EA | CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0003 | System Design/Software (SW) Development | 1 | EA | CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0004 | System Test and Evaluation | 1 | EA | CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0005 | First Article Production Acceptance Test and System Support | 1 | EA | CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0007c | Site Spares & Site Consumables | 5 | EA | CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0007d | ICDLS/Depot Spares Lay-In | 5 | EA | CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0007e | Support and Test Equipment | 6 | EA | CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0007g | Unique Support and Test Equipment - PSF | 1 | EA | CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0007h | Unique Support and Test Equipment - Depot | 1 | EA | CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0010 | Information System Security | 1 | EA | CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0012b | Site Preparation | 6 | EA | CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0012c | Installation, Checkout, Optimization and Acceptance | 6 | EA | CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Base Period Total CPFF $ - 0
| Base Period T&M | CLIN | Supplies/Services | Qty* | Units | CLIN Type | Total T&M Price |
| 0007b | Interim Contractor Depot Level Support (ICDLS) | 1 | EA | T&M | $ - 0 | |
| 0009 | Engineering Services | 1 | EA | T&M | $ - 0 |
Base Period Total T&M $ - 0
| Base Period CR | CLIN | Supplies/Services | Qty* | Units | CLIN Type | Total Cost |
| 0011 | Travel/ODCs | 1 | EA | CR | $ - 0 |
Base Period Total CR $ - 0
TOTAL BASE PERIOD COST AND PRICE $ - 0
Notes: * Quantities are presented for cost/price evaluation purposes only.
Option Period 1 INSTRUCTIONS TO OFFEROR: Fill in only blue-shaded cells
OFFEROR NAME:
Option Period 1
| Option Period 1 FFP | CLIN | Supplies/Services | Qty* | Units | CLIN Type | Unit Price | Total Price |
| 1001 | Program Management | 1 | EA | FFP | $ - 0 | $ - 0 | |
| 1007a | Integrated Logistics Support Program Management | 1 | EA | FFP | $ - 0 | $ - 0 | |
| 1008f Option | Training Conduct and Materials - Second Level Engineering | 4 | EA | FFP | $ - 0 | $ - 0 | |
| 1008g | Training Conduct and Materials - Depot | 1 | EA | FFP | $ - 0 | $ - 0 | |
| 1012a | Site Survey and Report | 27 | EA | FFP | $ - 0 | $ - 0 | |
| 1013 Option | First Article - System Refurbishment | 2 | EA | FFP | $ - 0 | $ - 0 | |
| 1014 Option | Additional Maintenance Terminals | 27 | EA | FFP | $ - 0 | $ - 0 | |
| 1015 | Production Systems | 27 | EA | FFP | $ - 0 | $ - 0 |
Option Period 1 Total FFP $ - 0
| Option Period 1 CPFF | CLIN | Supplies/Services | Qty* | Units | CLIN Type | Unit Cost | Total Cost | Fixed Fee | Total Cost Plus Fixed Fee |
| 1002 | System Engineering | 1 | EA | CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 1007c | Site Spares & Site Consumables | 27 | EA | CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 1007d | Depot Spares Lay-In | 1 | EA | CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 1007e | Support and Test Equipment | 27 | EA | CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 1010 | Information System Security | 1 | EA | CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 1012b | Site Preparation | 27 | EA | CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 1012c | Installation, Checkout, Optimization and Acceptance | 27 | EA | CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Option Period 1 Total CPFF $ - 0
| Option Period 1 T&M | CLIN | Supplies/Services | Qty* | Units | CLIN Type | Total T&M Price |
| 1007b | Interim Contractor Depot Level Support (ICDLS) | 1 | EA | T&M | $ - 0 | |
| 1009 | Engineering Services | 1 | EA | T&M | $ - 0 |
Option Period 1 Total T&M $ - 0
| Option Period 1 CR | CLIN | Supplies/Services | Qty* | Units | CLIN Type | Total Travel Cost |
| 1011 | Travel/ODCs | 1 | EA | CR | $ - 0 |
Option Period 1 Total CR $ - 0
TOTAL OPTION PERIOD 1 COST AND PRICE $ - 0
Notes: * Quantities are presented for cost/price evaluation purposes only.
Option Period 2 INSTRUCTIONS TO OFFEROR: Fill in only blue-shaded cells
OFFEROR NAME:
Option Period 2
| Option Period 2 FFP | CLIN | Supplies/Services | Qty* | Units | CLIN Type | Unit Price | Total Price |
| 2001 | Program Management | 1 | EA | FFP | $ - 0 | $ - 0 | |
| 2007a | Integrated Logistics Support Program Management | 1 | EA | FFP | $ - 0 | $ - 0 | |
| 2012a | Site Survey and Report | 19 | EA | FFP | $ - 0 | $ - 0 | |
| 2013 Option | First Article - System Refurbishment | 2 | EA | FFP | $ - 0 | $ - 0 | |
| 2014 Option | Additional Maintenance Terminals | 19 | EA | FFP | $ - 0 | $ - 0 | |
| 2015 | Production Systems | 19 | EA | FFP | $ - 0 | $ - 0 |
Option Period 2 Total FFP $ - 0
| Option Period 2 CPFF | CLIN | Supplies/Services | Qty* | Units | CLIN Type | Unit Cost | Total Cost | Fixed Fee | Total Cost Plus Fixed Fee |
| 2002 | System Engineering | 1 | EA | CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 2007c | Site Spares & Site Consumables | 19 | EA | CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 2007d | Depot Spares Lay-In | 1 | EA | CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 2007e | Support and Test Equipment | 19 | EA | CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 2010 | Information System Security | 1 | EA | CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 2012b | Site Preparation | 19 | EA | CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 2012c | Installation, Checkout, Optimization and Acceptance | 19 | EA | CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Option Period 2 Total CPFF $ - 0
| Option Period 2 T&M | CLIN | Supplies/Services | Qty* | Units | CLIN Type | Total T&M Price |
| 2009 | Engineering Services | 1 | EA | T&M | $ - 0 |
Option Period 2 Total T&M $ - 0
| Option Period 1 CR | CLIN | Supplies/Services | Qty* | Units | CLIN Type | Total Travel Cost |
| 2011 | Travel/ODCs | 1 | EA | CR | $ - 0 |
Option Period 2 Total CR $ - 0
TOTAL OPTION PERIOD 2 COST AND PRICE $ - 0
Notes: * Quantities are presented for cost/price evaluation purposes only.
File details come from the government source that posted it. Updated .