Attachment J.22,TE 4.5 Other Equip PM Task Codes.xlsx

XLSX spreadsheet 66 KB Posted

Attached to
Distribution and Warehousing Services at DLA Distribution Bartstow, CA Federal contract opportunity
Solicitation number
SP3300-21-R-5008
Issued by
Defense Logistics Agency Distribution

About this file

This document contains a federal contract opportunity notice for distribution and warehousing services at DLA Distribution Barstow, California. The scope of work includes management, personnel, supervision, materials, equipment, transportation and other items and services to meet requirements. The requirement is for an indefinite delivery indefinite quantity contract with a five year period of performance from July 2022 to June 2027 including a three month transition period. The incumbent contractor is Technica, LLC. The contract will be solicited as a 100% 8(a) set-aside. The NAICS code is 493110 with a $30 million size standard. The pre-proposal teleconference will be held on September 1, 2021. Interested parties should contact the acquisition specialist or contracting officer for any questions.

View the file

Other files for this federal contract opportunity

Other files attached to Distribution and Warehousing Services at DLA Distribution Bartstow, CA, newest first.
File Type Posted
Amendment 0004 Questions.docx DOCX document
SF-30 SP3300-21-R-5008 Amendment 0004.pdf PDF
RFP SP3300-21-R-5008 Sections B - M 9.29.21.pdf PDF
SF-30 SP3300-21-R-5008 Amendment 0003.pdf PDF
DLA Barstow_SP3300-21-R-5008_Questions_09.29.2021.docx DOCX document
Attachment J.38 Staffing Matrix Amendment 003.xlsx XLSX spreadsheet
Attachment J.11 CDRLs.zip ZIP file
SF-30 SP3300-21-R-5008 Amendment 0002.pdf PDF
Attachment J.39, Training Plan.xlsx XLSX spreadsheet
RFP SP3300-21-R-5008 Sections B - M 9.21.21.pdf PDF
SP330021R5008_ Questions Responses 9.21.21.docx DOCX document
Attachment J.1 Performance Work Statement Amend 002.docx DOCX document
Attachment J.32 TE 4.6 Contractor Furnished Equipment.doc DOC document
Attachment J.38 Staffing Matrix Amendment 002.xlsx XLSX spreadsheet
SF-30 SP3300-21-R-5008 Amendment 0001 2 of 2.pdf PDF
DLA Barstow SP330021R5008_ Questions Responses.docx DOCX document
Attachment J.32, Contractor Furnished Equipment.doc DOC document
Attachment J.17 TE 3.3 Government Data Systems.docx DOCX document
Attachment J.38 Staffing Matrix Amendment 001.xlsx XLSX spreadsheet
Attachment J.1 Performance Work Statement.docx DOCX document
CDRL A006 - Quality Control Plan with Attachments.pdf PDF
Attachment J.3 - Technica CBA - DLA Barstow FE.pdf PDF
RFP SP3300-21-R-5008 Sections B - M.pdf PDF
Attachment J.1 Performance Work Statement.docx DOCX document
Attachment J.2.docx DOCX document
Attachment J.11 CDRLs.pdf PDF
Attachment J.13 TE 1.2 CAC_Procedures (2021 Version).docx DOCX document
Attachment J.13, TE 1.2 CAC Procedures.docx DOCX document
Attachment J.14 TE 2.1 Definitions, Acronyms, and Abbreviations.docx DOCX document
Attachment J.28 TE 5.2 Projected Workload DDBC April 2021 updated.docx DOCX document
Attachment J.22, TE 4.1 Contractor Training.docx DOCX document
Attachment J.12 TE 1.1 Contractor Personnel Security.docx DOCX document
Attachment J.15 TE 3.1 GF-6 21.docx DOCX document
Attachment J.26 TE 5.0 APLs.doc DOC document
Attachment J.27 TE 5.1 DDBC Historical Workload.docx DOCX document
Attachment J.32, DDBC Proposed Productive Hours UPDATE.xlsx XLSX spreadsheet
Attachment J.4 Wage Determination.pdf PDF
DDBC Preproposal Teleconference .docx DOCX document
Attachment J.5 DD254 DDBC SP3300-21-R-5008.pdf PDF
Attachment J.16 TE 3.2 Government Training.docx DOCX document
Attachment J.24,TE 4.3 MHE PM Task Codes.xlsx XLSX spreadsheet
Attachment J.19 TE 3.5 GE - Misc.xls XLS spreadsheet
Attachment J.37 TE 6.1 Government Forms.docx DOCX document
Attachment J.38 Staffing Matrix 7 July.xlsx XLSX spreadsheet
Attachment J.41, Limitation on Subcontracting Report.xls XLS spreadsheet
SF33 SP330021R5008.pdf PDF
Attachment J.6 CLIN X006 Labor Rate Table.xlsx XLSX spreadsheet
Attachment J.17 TE 3.3 Government Data Systems.docx DOCX document
Attachment J.25,TE 5.2 Projected Workload DDBC for final RFP.docx DOCX document
Attachment J.29 TE 5.4 Transshipment of Hazardous Assets.rtf RTF text file
Show all 50

Distribution and Warehousing Services at DLA Distribution Bartstow, CA has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Other Equip PM Task Codes

DOCK Leveler - PM Schedule
Required Preventive Maintenance based on the type of equipmentEst Hrs to Complete Each Type of PM Action
Equipment TypePM TypeTask CodePM Task Description
DOCK Leveler (EJON: BZ2002, BZ2003, BZ2004, BZ2005)Annual1008lube all grease zerks/oil all swivel points0.3
Annual2147check grating,frame & decking0.1
Annual3010complete operation check0.1
Annual3301safety inspection0.1
Annual4118make necessary adjustments0.3
Annual4407clean equipment0.3
LABELING Machine Packages - PM Schedule
Required Preventive Maintenance based on the type of equipmentEst Hrs to Complete Each Type of PM Action
Equipment TypePM TypeTask CodePM Task Description
LABELING Machine Packages (EJON: YW2050)Annual1300service as needed2
LIFT Table - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionEst Hrs to Complete Each Type of PM Action
LIFT Table (EJON: BW5200,BW5201)Annual1003oil/grease as necessary0.4
Semi-Annual1300Service as needed2
Annual3301safety inspection0.1
PLATFORM Maint. Telescope - PM Schedule
Required Preventive Maintenance based on the type of equipmentEst Hrs to Complete Each Type of PM Action
Equipment TypePM TypeTask CodePM Task Description
PLATFORM Maint. Telescope, Electric (EJON: PL0001, PL4488)90-Quarterly2244hydraulic system0.2
90-Quarterly3301safety inspection0.1
90-Quarterly4405battery,clean & service1.2
Annual1003oil/grease as necessary0.4
Annual2238brakes, check0.3
Annual3307clean,steam/vaccum0.8
Annual4002load test3
SCOOTER 3 or 4 Wheel Gas & Electric - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionEst Hrs to Complete Each Type of PM Action
SCOOTER 3 or 4 Wheel Gas (EJON: BA8530)Annual & Semi-annual1103Lubrication,chassis,etc.0.2
Annual & Semi-annual1112Check all fluid levels0.5
Annual & Semi-annual1132Tire pressure & condition0.2
Annual & Semi-annual2277Check & service air cleaner0.2
Annual & Semi-annual3306Safety inspection0.2
Annual & Semi-annual4416Battery service0.2
Annual1114Wheel bearing, steering1
Annual1121Engine oil & filter change0.5
Annual2271Tune engine0.5
Annual2272Check,clean,adjust,brakes0.5
Annual2272Brakes,ck,clean,adjust0.5
Annual4449Clean0.5
SCOOTER 3 or 4 Wheel Electric (EJON: BF1530, BF7225, BF2226, BF7227, BF7228, BF7229, BF1530, 0Y2963, BF4592, BF6070, BF6071)Semi-annual3301Safety inspection0.1
Semi-annual4038Clean equipment1
Semi-annual1110Check lights, tires & horn0.5
Semi-annual1120Wheel bearings, steering0.1
Semi-annual1125Lubrication chassis, etc.1.5
Semi-annual1999Check front hub levels check rear if needed3
Semi-annual2003Check motor brushes0.5
Semi-annual2251Brakes, check, clean, adjust2
Semi-annual4403Battery, fluid, charge, clean0.8
Semi-annual4529Check chassis ground1.2
Semi-annual1036Check suspension, shocks, structure1
Semi-annual2279Check wheels1
SHRINK Wrap Machine - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionEst Hrs to Complete Each Type of PM Action
SHRINK Wrap Machine, Spiral (EJON: BX1507, BX3372, BX3373, BX3374, BX9810)Annual & Semi-annual1063Lube and adjust chain0.5
Annual & Semi-annual3010Complete operation check0.2
STRAPPER Dispensing - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionEst Hrs to Complete Each Type of PM Action
STRAPPER Dispensing (EJON: YX2026)Annual & Semi-annual2090Check burnt frayed wires0.2
Annual & Semi-annual3008Inspect for oil/hydraulic/air leaks0.1
Annual & Semi-annual3010Complete operation check0.2
Annual & Semi-annual3306Safety inspection0.2
SWEEPER Warehouse Riding - PM Schedule
Required Preventive Maintenance based on the type of equipmentEst Hrs to Complete Each Type of PM Action
Equipment TypePM TypeTask CodePM Task Description
SWEEPER Warehouse Riding LPG (EJON: BC3375, BC3376)Quarterly1101Change engine oil & filter1
Quarterly4536Clean service batteries1.3
Quarterly1127Lubrication, chassis etc.0.8
Quarterly1105Check all belts0.3
Quarterly2205Check blow off radiator0.2
Quarterly2212Check hoses (LPG)0.5
Quarterly3308Clean, steam/vaccum1
Quarterly3314Clean hopper0.3
Quarterly3306Safety inspection0.5
Quarterly1110Check lights, tires & horn0.5
Quarterly1102Fluid levels, antifreeze0.2
WAREHOUSE Equipment, Miscellaneous - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionEst Hrs to Complete Each Type of PM Action
Cooler - Portable Evaporative Air (EJON: BX5138, BX0114,BX0914, BX1278, BX1507, BX1671, BX1705, BX1724, BX2615, BX3363, BX3365, BX4315, BX5806, BX5808, BX5812, BX5902, BX6912, BX7012)Annual1017Grease/oil motors0.2
Annual1999Service-prevent deterioration1
Annual2076Check fan and motor0.1
Annual2077Check suction hoses0.1
Annual4010Clean equipment0.3
WOODWOKING Equipment - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionEst Hrs to Complete Each Type of PM Action
JOINTER Woodworking (EJON: BX2115)Annual & Semi-annual3010Complete operation check0.2
Annual & Semi-annual3306Safety inspection0.2
Annual & Semi-annual4010Clean equipment0.3
SAW Band Woodworking (EJON: BX5251, BX0631)Annual & Semi-annual1003Oil/grease as necessary0.4
Annual & Semi-annual3010Complete operation check0.2
Annual & Semi-annual3306Safety inspection0.2
Annual & Semi-annual4010Clean equipment0.3
SAW Circular Rip Wood (EJON: BX0001, BX5248, BX5249)Annual & Semi-annual1003Oil/grease as necessary0.4
Annual & Semi-annual3010Complete operation check0.2
Annual & Semi-annual3306Safety inspection0.2
Annual & Semi-annual4010Clean equipment0.3
SAW Circular Tilt/table (EJON: BX5245, BX5246)Annual & Semi-annual1003Oil/grease as necessary0.4
Annual & Semi-annual3010Complete operation check0.4
Annual & Semi-annual3306Safety inspection0.2
Annual & Semi-annual4010Clean equipment0.4
SAW Circular Woodworking (EJON: BX5244, BX5247, BX5250, BX5299)Annual & Semi-annual1003Oil/grease as necessary0.4
Annual & Semi-annual3010Complete operation check0.2
Annual & Semi-annual3306Safety inspection0.2
Annual & Semi-annual4010Clean equipment0.3
SAW Radial Woodworking (EJON: BX5243)Annual & Semi-annual1003Oil/grease as necessary0.4
Annual & Semi-annual3010Complete operation check0.2
Annual & Semi-annual3306Safety inspection0.2
Annual & Semi-annual4010Clean equipment0.3
SURFACER Woodworking (EJON: BX5252)Annual & Semi-annual1002Lube flange bearings0.1
Annual & Semi-annual2245Gear boxes0.1
Annual & Semi-annual3006Inspect for safety hazard0.1
Annual & Semi-annual4010Clean equipment0.3
Neighborhood Electric Vehicle (NEV) - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionEst Hrs to Complete Each Type of PM Action
Neighborhood Electric Vehicle, (EJON: BA5348, BA7349)Semi-annual4403Battery, fluid, charge, clean0.8
Semi-annual2003Check motor brushes0.5
Semi-annual3301Safety inspection0.1
Semi-annual2251Brakes, check, clean, adjust2
Semi-annual2279Check wheels1
Semi-annual1999Check front hub levels check rear if needed3
Semi-annual1125Lubrication chassis, etc.1.5
Semi-annual1036Check suspension, shocks, structure1
Semi-annual1110Check lights, tires & horn0.5
Semi-annual1120Wheel bearings, steering0.1
Semi-annual4038Clean equipment1
Semi-annual4529Check chassis ground1.2
Scooter Stand-up Solo 2 or 3 wheels, Electric - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionEst Hrs to Complete Each Type of PM Action
Scooter, Stand-up, Solo, Electric (EJON: BA8316, BA8318, BA8319)Semi-annual1036Check suspension, shocks, structure1
Semi-annual4529Check chassis ground1.2
Semi-annual1999Check front hub levels check rear if needed3
Semi-annual2279Check wheels1
Semi-annual2261Brakes, check, clean, adjust1
Semi-annual3301Safety inspection0.1
Semi-annual4038Clean equipment1
Semi-annual4404Battery service0.5
Semi-annual2003Check motor brushes0.5
Semi-annual1127Lubrication, chassis etc.0.8
Semi-annual1120Wheel bearings, steering0.1
Semi-annual1110Check lights, tires & horn0.5
Low Speed Vehicle - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionEst Hrs to Complete Each Type of PM Action
Low Speed Vehicle, Electric (EJON: BA5350)Semi-annual4403Battery ,fluid, charge, clean0.8
Semi-annual3301safety check0.1
Semi-annual2251Brakes, check, clean adjust2
Semi-annual1125lubrication chassis, ect0.8
Winding Machine, Wire/Rope - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionEst Hrs to Complete Each Type of PM Action
Winding Machine, Wire/Rope Electric (EJON: BR6488)Annual1140lubrication0.3
DUST Collector - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionEst Hrs to Complete Each Type of PM Action
DUST Collector Centralized (EJON: BX0226)semi-annual1113check chains and anchors0.5
semi-annual1123lubrication, chassis etc1.5
Front End Loader, Diesel - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionEst Hrs to Complete Each Type of PM Action
Front End Loader, Diesel (EJON: BF5332)quarterly1101engine oil and filter, change0.3
quarterly1105fluid levels/antifreeze, check0.1
quarterly1106lubrication: chassis, etc0.3
quarterly2010hour meter, check0.2
quarterly2051hydraulic fluid & filter, change1
quarterly2062brakes, check & adjust1
quarterly2040belts, check/adjust0.2
quarterly2007brake lining, check0.3
quarterly3301safety inspection0.1
quarterly3303clean, steam/vacuum0.3
quarterly3341safety inspection0.5
quarterly1130trans filter, change0.3
quarterly1145lubricate parking brake0.1
quarterly2209fuel filter, change0.1
quarterly2037blades, check0.2
quarterly2219hydraulic oil filter, change0.2
quarterly2067engine tuneup, gas/diesel0.5
quarterly2066engine tuneup0.9
quarterly2284lights, check0.1
quarterly3070instruments & controls0.2
quarterly4406battery, check0.1
quarterly4408test run unit0.1
quarterly4501reflectors/lights0.5
quarterly1187lube unit0.2
quarterly1300service as needed2
quarterly3041inspect overall appearance0.1
Passenger Van, gasoline - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionEst Hrs to Complete Each Type of PM Action
Passenger Van, gasoline (EJON/asset Number: 20149885)Semi-annual4541fuel filters2
Semi-annual1112ck all fluid levels0.5
Semi-annual1111ck hoses and fuel filter0.3
Semi-annual1132tire pressure0.1
Semi-annual2216check battery connectors0.1
Semi-annual4540change engine oil2

SP3300-16-R-5003

Attachment J.22 Technical Exhibit 4.5 Other Equip PM Task Codes

Dock Leveler

DOCK Leveler - PM Schedule
Required Preventive Maintenance based on the type of equipmentEst Hrs to Complete Each Type of PM Action
Equipment TypePM TypeTask CodePM Task Description
DOCK Leveler (EJON: BZ2002, BZ2003, BZ2004, BZ2005)Annual1008lube all grease zerks/oil all swivel points0.3
Annual2147check grating,frame & decking0.1
Annual3010complete operation check0.1
Annual3301safety inspection0.1
Annual4118make necessary adjustments0.3
Annual4407clean equipment0.3

Technical Exhibit 4.5 Other Equip PM Task Codes SP3300-11-R-0011

TE 4.4 Other Equip PM Task Codes &P of 1

Labeling Machine

LABELING Machine Packages - PM Schedule
Required Preventive Maintenance based on the type of equipmentEst Hrs to Complete Each Type of PM Action
Equipment TypePM TypeTask CodePM Task Description
LABELING Machine Packages (EJON: YW2050)Annual1300service as needed2

Other Equip PM Task Codes SP3300-11-R-0011

&P of 1

Lift Table

LIFT Table - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionEst Hrs to Complete Each Type of PM Action
LIFT Table (EJON: BW5200,BW5201)Annual1003oil/grease as necessary0.4
Semi-Annual1300Service as needed2
Annual3301safety inspection0.1

Technical Exhibit 4.5 Other Equip PM Task Codes SP3300-11-R-0011

&P of 1

Platform Maint Telescope

PLATFORM Maint. Telescope - PM Schedule
Required Preventive Maintenance based on the type of equipmentEst Hrs to Complete Each Type of PM Action
Equipment TypePM TypeTask CodePM Task Description
PLATFORM Maint. Telescope, Electric (EJON: PL0001, PL4488)90-Quarterly2244hydraulic system0.2
90-Quarterly3301safety inspection0.1
90-Quarterly4405battery,clean & service1.2
Annual1003oil/grease as necessary0.4
Annual2238brakes, check0.3
Annual3307clean,steam/vaccum0.8
Annual4002load test3

Other Equip PM Task Codes SP3300-11-R-0011

&P of 1

Scooter 3-4 whl Gas & Elect

SCOOTER 3 or 4 Wheel Gas & Electric - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionEst Hrs to Complete Each Type of PM Action
SCOOTER 3 or 4 Wheel Gas (EJON: BA8530)Annual & Semi-annual1103Lubrication,chassis,etc.0.2
Annual & Semi-annual1112Check all fluid levels0.5
Annual & Semi-annual1132Tire pressure & condition0.2
Annual & Semi-annual2277Check & service air cleaner0.2
Annual & Semi-annual3306Safety inspection0.2
Annual & Semi-annual4416Battery service0.2
Annual1114Wheel bearing, steering1
Annual1121Engine oil & filter change0.5
Annual2271Tune engine0.5
Annual2272Check,clean,adjust,brakes0.5
Annual2272Brakes,ck,clean,adjust0.5
Annual4449Clean0.5
SCOOTER 3 or 4 Wheel Electric (EJON: BF1530, BF7225, BF2226, BF7227, BF7228, BF7229, BF1530, 0Y2963, BF4592, BF6070, BF6071)Semi-annual3301Safety inspection0.1
Semi-annual4038Clean equipment1
Semi-annual1110Check lights, tires & horn0.5
Semi-annual1120Wheel bearings, steering0.1
Semi-annual1125Lubrication chassis, etc.1.5
Semi-annual1999Check front hub levels check rear if needed3
Semi-annual2003Check motor brushes0.5
Semi-annual2251Brakes, check, clean, adjust2
Semi-annual4403Battery, fluid, charge, clean0.8
Semi-annual4529Check chassis ground1.2
Semi-annual1036Check suspension, shocks, structure1
Semi-annual2279Check wheels1

Other Equip PM Task Codes SP3300-11-R-0011

&P of 1

Shrink Wrap Machine

SHRINK Wrap Machine - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionEst Hrs to Complete Each Type of PM Action
SHRINK Wrap Machine, Spiral (EJON: BX1507, BX3372, BX3373, BX3374, BX9810)Annual & Semi-annual1063Lube and adjust chain0.5
Annual & Semi-annual3010Complete operation check0.2

Technical Exhibit 4.5 Other Equip PM Task Codes SP3300-11-R-0011

&P of 1

Strapper

STRAPPER Dispensing - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionEst Hrs to Complete Each Type of PM Action
STRAPPER Dispensing (EJON: YX2026)Annual & Semi-annual2090Check burnt frayed wires0.2
Annual & Semi-annual3008Inspect for oil/hydraulic/air leaks0.1
Annual & Semi-annual3010Complete operation check0.2
Annual & Semi-annual3306Safety inspection0.2

Technical Exhibit 4.5 Other Equip PM Task Codes SP3300-11-R-0011

&P of 1

Sweeper Whse Riding

SWEEPER Warehouse Riding - PM Schedule
Required Preventive Maintenance based on the type of equipmentEst Hrs to Complete Each Type of PM Action
Equipment TypePM TypeTask CodePM Task Description
SWEEPER Warehouse Riding LPG (EJON: BC3375, BC3376)Quarterly1101Change engine oil & filter1
Quarterly4536Clean service batteries1.3
Quarterly1127Lubrication, chassis etc.0.8
Quarterly1105Check all belts0.3
Quarterly2205Check blow off radiator0.2
Quarterly2212Check hoses (LPG)0.5
Quarterly3308Clean, steam/vaccum1
Quarterly3314Clean hopper0.3
Quarterly3306Safety inspection0.5
Quarterly1110Check lights, tires & horn0.5
Quarterly1102Fluid levels, antifreeze0.2

Other Equip PM Task Codes SP3300-11-R-0011

&P of 1

Warehouse Equip Misc.

WAREHOUSE Equipment, Miscellaneous - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionEst Hrs to Complete Each Type of PM Action
Cooler - Portable Evaporative Air (EJON: BX5138, BX0114,BX0914, BX1278, BX1507, BX1671, BX1705, BX1724, BX2615, BX3363, BX3365, BX4315, BX5806, BX5808, BX5812, BX5902, BX6912, BX7012)Annual1017Grease/oil motors0.2
Annual1999Service-prevent deterioration1
Annual2076Check fan and motor0.1
Annual2077Check suction hoses0.1
Annual4010Clean equipment0.3

Other Equip PM Task Codes SP3300-11-R-0011

&P of 1

Woodworking Equip

WOODWOKING Equipment - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionEst Hrs to Complete Each Type of PM Action
JOINTER Woodworking (EJON: BX2115)Annual & Semi-annual3010Complete operation check0.2
Annual & Semi-annual3306Safety inspection0.2
Annual & Semi-annual4010Clean equipment0.3
SAW Band Woodworking (EJON: BX5251, BX0631)Annual & Semi-annual1003Oil/grease as necessary0.4
Annual & Semi-annual3010Complete operation check0.2
Annual & Semi-annual3306Safety inspection0.2
Annual & Semi-annual4010Clean equipment0.3
SAW Circular Rip Wood (EJON: BX0001, BX5248, BX5249)Annual & Semi-annual1003Oil/grease as necessary0.4
Annual & Semi-annual3010Complete operation check0.2
Annual & Semi-annual3306Safety inspection0.2
Annual & Semi-annual4010Clean equipment0.3
SAW Circular Tilt/table (EJON: BX5245, BX5246)Annual & Semi-annual1003Oil/grease as necessary0.4
Annual & Semi-annual3010Complete operation check0.4
Annual & Semi-annual3306Safety inspection0.2
Annual & Semi-annual4010Clean equipment0.4
SAW Circular Woodworking (EJON: BX5244, BX5247, BX5250, BX5299)Annual & Semi-annual1003Oil/grease as necessary0.4
Annual & Semi-annual3010Complete operation check0.2
Annual & Semi-annual3306Safety inspection0.2
Annual & Semi-annual4010Clean equipment0.3
SAW Radial Woodworking (EJON: BX5243)Annual & Semi-annual1003Oil/grease as necessary0.4
Annual & Semi-annual3010Complete operation check0.2
Annual & Semi-annual3306Safety inspection0.2
Annual & Semi-annual4010Clean equipment0.3
SURFACER Woodworking (EJON: BX5252)Annual & Semi-annual1002Lube flange bearings0.1
Annual & Semi-annual2245Gear boxes0.1
Annual & Semi-annual3006Inspect for safety hazard0.1
Annual & Semi-annual4010Clean equipment0.3

Other Equip PM Task Codes SP3300-11-R-0011

&P of 2

NEV

Neighborhood Electric Vehicle (NEV) - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionEst Hrs to Complete Each Type of PM Action
Neighborhood Electric Vehicle, (EJON: BA5348, BA7349)Semi-annual4403Battery, fluid, charge, clean0.8
Semi-annual2003Check motor brushes0.5
Semi-annual3301Safety inspection0.1
Semi-annual2251Brakes, check, clean, adjust2
Semi-annual2279Check wheels1
Semi-annual1999Check front hub levels check rear if needed3
Semi-annual1125Lubrication chassis, etc.1.5
Semi-annual1036Check suspension, shocks, structure1
Semi-annual1110Check lights, tires & horn0.5
Semi-annual1120Wheel bearings, steering0.1
Semi-annual4038Clean equipment1
Semi-annual4529Check chassis ground1.2

Technical Exhibit 4.5 Other Equip PM Task Codes SP3300-11-R-0011

&P of 1

Scooter, Stand-up, Solo

Scooter Stand-up Solo 2 or 3 wheels, Electric - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionEst Hrs to Complete Each Type of PM Action
Scooter, Stand-up, Solo, Electric (EJON: BA8316, BA8318, BA8319)Semi-annual1036Check suspension, shocks, structure1
Semi-annual4529Check chassis ground1.2
Semi-annual1999Check front hub levels check rear if needed3
Semi-annual2279Check wheels1
Semi-annual2261Brakes, check, clean, adjust1
Semi-annual3301Safety inspection0.1
Semi-annual4038Clean equipment1
Semi-annual4404Battery service0.5
Semi-annual2003Check motor brushes0.5
Semi-annual1127Lubrication, chassis etc.0.8
Semi-annual1120Wheel bearings, steering0.1
Semi-annual1110Check lights, tires & horn0.5

Technical Exhibit 4.5 Other Equip PM Task Codes SP3300-11-R-0011

&P of 1

Low Speed Vehicle

Low Speed Vehicle - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionEst Hrs to Complete Each Type of PM Action
Low Speed Vehicle, Electric (EJON: BA5350)Semi-annual4403Battery ,fluid, charge, clean0.8
Semi-annual3301safety check0.1
Semi-annual2251Brakes, check, clean adjust2
Semi-annual1125lubrication chassis, ect0.8

Other Equip PM Task Codes SP3300-11-R-0011

&P of 1

Winding Machine

Winding Machine, Wire/Rope - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionEst Hrs to Complete Each Type of PM Action
Winding Machine, Wire/Rope Electric (EJON: BR6488)Annual1140lubrication0.3

Other Equip PM Task Codes SP3300-11-R-0011

&P of 1

Dust Collector

DUST Collector - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionEst Hrs to Complete Each Type of PM Action
DUST Collector Centralized (EJON: BX0226)semi-annual1113check chains and anchors0.5
semi-annual1123lubrication, chassis etc1.5

Technical Exhibit 4.5 Other Equip PM Task Codes SP3300-11-R-0011

&P of 1

Front End Loader

Front End Loader, Diesel - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionEst Hrs to Complete Each Type of PM Action
Front End Loader, Diesel (EJON: BF5332)quarterly1101engine oil and filter, change0.3
quarterly1105fluid levels/antifreeze, check0.1
quarterly1106lubrication: chassis, etc0.3
quarterly2010hour meter, check0.2
quarterly2051hydraulic fluid & filter, change1
quarterly2062brakes, check & adjust1
quarterly2040belts, check/adjust0.2
quarterly2007brake lining, check0.3
quarterly3301safety inspection0.1
quarterly3303clean, steam/vacuum0.3
quarterly3341safety inspection0.5
quarterly1130trans filter, change0.3
quarterly1145lubricate parking brake0.1
quarterly2209fuel filter, change0.1
quarterly2037blades, check0.2
quarterly2219hydraulic oil filter, change0.2
quarterly2067engine tuneup, gas/diesel0.5
quarterly2066engine tuneup0.9
quarterly2284lights, check0.1
quarterly3070instruments & controls0.2
quarterly4406battery, check0.1
quarterly4408test run unit0.1
quarterly4501reflectors/lights0.5
quarterly1187lube unit0.2
quarterly1300service as needed2
quarterly3041inspect overall appearance0.1

Technical Exhibit 4.5 Other Equip PM Task Codes SP3300-11-R-0011

&P of 1

Passenger Van

Passenger Van, gasoline - PM Schedule
Required Preventive Maintenance based on the type of equipment
Equipment TypePM TypeTask CodePM Task DescriptionEst Hrs to Complete Each Type of PM Action
Passenger Van, gasoline (EJON/asset Number: 20149885)Semi-annual4541fuel filters2
Semi-annual1112ck all fluid levels0.5
Semi-annual1111ck hoses and fuel filter0.3
Semi-annual1132tire pressure0.1
Semi-annual2216check battery connectors0.1
Semi-annual4540change engine oil2

Other Equip PM Task Codes SP3300-11-R-0011

&P of 1

Sheet1

File details come from the government source that posted it. Updated .