About this file

This is a Design Coordination Key Decision Tracking Log for CSO (Combined Sewer Overflow) Facilities Improvements managed by the Great Lakes Water Authority (GLWA) for the Hazen-CDM Cross Coordination Project. The document outlines preliminary design recommendations and specifications for nine CSO facilities across Michigan, including St. Aubin SDF, Belle Isle RTB, Baby Creek SDF, Conner Creek RTB, Hubbell Southfield RTB, Leib CSO, Oakwood CSO, Puritan Fenkell RTB, and Seven Mile RTB. The log tracks 22 design decision items spanning multiple disciplines including screening technology, disinfection systems, chemical storage and handling, mixing systems, chlorination control strategies, odor control, electrical systems, architectural rehabilitation, and safety improvements. Key design specifications include Romag screen technology with rehabilitation of existing screens, FRP chemical storage tanks certified to RTP-1 standards, centrifugal sealless magnetic drive pumps, polyethylene piping with fused joints at certain facilities and PVC piping at others, Gas Masterrr induction mixers, and colorimetric TRC analyzers by Swan. The document was last revised on August 16, 2023, and references related technical memoranda and basis of design documents for coordination purposes.

The tracking log emphasizes standardization across facilities while accommodating site-specific variations. Design coordination notes indicate that specifications such as chemical piping materials and joint types have been evaluated during conceptual design phases and adjusted based on input from GLWA operations and maintenance staff preferences. Safety improvements across all nine CSOs include fall protection enhancements for ladders and hatches and replacement of lift cylinders with lift-assisted hatches on dewatering pump access plates. Architectural rehabilitation work is assigned to project code 2200061 for all facilities. Supporting coordination items include influent sampling requirements, screen flushing system specifications, and floor coating timing. The document references related technical materials and design basis documentation maintained in the CSO Control Program SharePoint repository, indicating ongoing design development and multi-disciplinary coordination among project teams.

View the file

Other files

File Type Posted
Attachment C2- CS-299_CSO_NA_Report_Vol_6_Appendices.pdf PDF
Attachment A2- Environmental Compliance and Permits Plan Form.xlsx XLSX spreadsheet
Attachment A3- GLWA PMP.docx DOCX document
Attachment B2 - Specification Section 01 78 40.A - OnBase Document Upload Template.XLS XLS spreadsheet
Attachment B4 - Spec Section 01 79 23 - Instruction of Operation and Maintenance Personnel.PDF PDF
Attachment A4 - GLWA CAD BIM Standards - Version 0.0.pdf PDF
2-Attachment No. 2 - REQ-0009198- Vendor Certifications Solicitation.pdf PDF
6-Attachment No. 6 - REQ-0009198 - Task Cost Matrix.xlsx XLSX spreadsheet
8-Attachment No. 7 - REQ-0009198 - Statement of Minimum Qualifications (2).docx DOCX document
Attachment B1 - Specification Section 01 78 40 - OnBase Digital Document Turnover.PDF PDF
Attachment B5 - GLWA Master Division 01 Specifications.zip ZIP file
Attachment A1- Professional Services and Construction Change Log.xlsx XLSX spreadsheet
4-Attachment No. 4 - REQ-0009198 - B.I.D. Requirements.pdf PDF
3-Attachment No. 3 - REQ-0009198 - Scope of Work.pdf PDF
1-Attachment No. 1 - REQ-0009198 - GLWA Engineering Design Services Contract Rev 4-1-2026.pdf PDF
Attachment B3 - Specification Section 01 33 30 Asset Turnover Feb 2024.PDF PDF
Attachment C1 - CS-299_CSO_NA_Report_Vol_2_Sect_04-14.pdf PDF
5-Attachment No. 5 - REQ-0009198 - Solicitation Subcontractor List.pdf PDF
9-REQ-0009198 - Solicitation Cover - Instructions to Vendors.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hazen-CDM Cross Coordination

Project:Design Services of CSO Facilities Improvements
Owner:Great Lakes Water Authority (GLWA)
Revised:8/16/23
GLWA CSO Facilities Design Coordination
Item No.DescriptionPreliminary RecommendationComments / Notes
St. Aubin SDF (STA)Leib CSOOakwood CSO
1Screen TechnologyRomag
(Rehab Existing)RomagNot part of scope (existing screens are perf. Plate technology)
2Chemical Storage TankFRP (RTP-1 Certified)FRP (RTP-1 Certified)FRP (RTP-1 Certified)
3Chemical Pump TechnologyCentrifugal seal less, magnetic drive pumpsCentrifugal seal less, magnetic drive pumpsCentrifugal seal less, magnetic drive pumps
4Feed pump discharge configuration (e.g. manifold loop like CON, BC) vs. dedicated pump per mixing chamber)Manifold loop with dedicated flow control valve stations to each mixing chamber*Manifold loop with dedicated flow control valve stations to each mixing chamber*Manifold loop with dedicated flow control valve stations dedicated to each storm pump.**Pressurized recirculation loop feeding flow control valves. Evaluated during conceptual design and during Jacobs CS-299 project.
5Chemical PipingPolyethylene:

*fused joint with flanged joints at equipment (i.e., no glued joints) *Chem Proline®pipe by Asahi/America or Equal

*Based on input from GLWA plumbers and products they've usedSch 80 PVC -
*flanged or glued joints onlySch 80 PVC -
*flanged or glued joints onlyFlanges joints at all equipment
6Chemical Valves, IsolationVented Ball Valves -

-Sch 80 PVC -True Union Joints Vented Ball Valves - -Sch 80 PVC -True Union Joints Vented Ball Valves - -Sch 80 PVC -True Union Joints

7Chemical Valves, Throttling/Flow ControlDiaphragm Valve or Globe ValveMaterials of construction will be chemically compatible with application.
8Chemical MixingInduction mixers -

*Gas Mastrrr Mixers (No Water Champ per GLWA).

*Explosion proof motors for hazardous areas *oil reservoirs to maintain seals during intermittent operation Induction mixers - *Gas Mastrrr Mixers (No Water Champ per GLWA).

*Explosion proof motors for hazardous areas

*oil reservoirs to maintain seals during intermittent operationInjection ring on discharge piping of each storm pump.At STA Hazen is evaluating the use of Gas Masterrr's NV type mixer for Prechlor location.
9Chlorination Control Strategy*Manual

*Flow Pacing with dose set point

*The primary disinfection control strategy operating mode will be TRC mode.Manual; Flow Pacing w/ dose set point; ICT with TRC feedback; Machine LearningManual; Flow Pacing w/ dose set point; ICT with TRC feedback; Machine Learning
10TRC AnalyzerColorimetric (Swan or equal)Colorimetric (Swan)Colorimetric (Swan)Recommendation based on GLWA's pilot experience and feedback from Macomb County's experience. Also amperometric style (Reagentless) can become saturated, resulting in control reliability issues.

&"-,Bold"&14EOWC Water Treatment and Supply Program Action Item Log &D

&P of &N

Draft All CSOs

GLWA CSO Facilities Design Coordination
Item No.DescriptionPreliminary RecommendationComments / Notes
Baby Creek SDF (BC)Belle Isle RTB (BLI)Conner Creek RTB (CON)Hubbell Southfield RTB (HS)Leib CSOOakwood CSOPuritan Fenkell RTB (PF)Seven Mile RTB (SM)St. Aubin SDF (STA)BC
Screening1Screen TechnologyRomagNot part of scope (existing screens are perf. Plate technology)Romag
(Rehab Existing)BLI
2Screen Clogging MitigationAdding spray bars on backside of screens to mitigate build up of solids in trough
Disinfection3Chemical Storage TankFRP (RTP-1 Certified)FRP (RTP-1 Certified)FRP (RTP-1 Certified)CON
4Chemical Pump TechnologyCentrifugal seal less, magnetic drive pumpsCentrifugal seal less, magnetic drive pumpsCentrifugal seal less, magnetic drive pumpsHS
5Feed pump discharge configuration (e.g. manifold loop like CON, BC) vs. dedicated pump per mixing chamber)Manifold loop with dedicated flow control valve stations to each mixing chamber*Manifold loop with dedicated flow control valve stations dedicated to each storm pump.*Manifold loop with dedicated flow control valve stations to each mixing chamber**Pressurized recirculation loop feeding flow control valves. Evaluated during conceptual design and during Jacobs CS-299 project.LEIB
6Chemical PipingSch 80 PVC -
*flanged or glued joints onlySch 80 PVC -
*flanged or glued joints onlyPolyethylene:

*fused joint with flanged joints at equipment (i.e., no glued joints) *Chem Proline®pipe by Asahi/America or Equal

*Based on input from GLWA plumbers and products they've usedNeed to update pipe type and joints. Recently GLWA O&M staff requested fused joint piping.OKW
7Chemical Valves, IsolationVented Ball Valves -

-Sch 80 PVC -True Union Joints Vented Ball Valves - -Sch 80 PVC -True Union Joints Vented Ball Valves - -Sch 80 PVC

-True Union Joints or flangedPF
8Chemical Valves, Throttling/Flow ControlDiaphragm ValvesMaterials of construction will be chemically compatible with application.SM
9Chemical MixingInduction mixers -

*Gas Mastrrr Mixers (No Water Champ per GLWA).

*Explosion proof motors for hazardous areas *oil reservoirs to maintain seals during intermittent operation Injection ring on discharge piping of each storm pump. Induction mixers - *Gas Mastrrr Mixers (No Water Champ per GLWA).

*Explosion proof motors for hazardous areas

*oil reservoirs to maintain seals during intermittent operationAt STA Hazen is evaluating the use of Gas Masterrr's NV type mixer for Prechlor location.STA
10Chlorination Control StrategyManual; Flow Pacing w/ dose set point; ICT with TRC feedback; Machine LearningManual; Flow Pacing w/ dose set point; ICT with TRC feedback; Machine Learning*Manual

*Flow Pacing with dose set point *The primary disinfection control strategy operating mode will be TRC mode.

11TRC AnalyzerColorimetric (Swan)Colorimetric (Swan)Colorimetric (Swan or equal)Recommendation based on GLWA's pilot experience and feedback from Macomb County's experience. Also amperometric style (Reagentless) can become saturated, resulting in control reliability issues.
12Automatic Filter System (upstream of TRC Analyzer)S.P. Kinney Model AP
13Chemical Unloading StationDoes GLWA have a preference such as a certain existing installation to mimic or certain parameters that they would like monitored and displayed on control panel and/or Ovation?
Odor Control14
Flushing & Dewatering15
HVAC16
Electrical17Will replace all buckets for MCCs
Site18
Architectural19Architectural Rehabilitation - address architectural deficiencies2200061 - Architectural Rehab2200061 - Architectural Rehab2200061 - Architectural Rehab2200061 - Architectural Rehab2200061 - Architectural Rehab2200061 - Architectural Rehab2200061 - Architectural Rehab2200061 - Architectural Rehab2200061 - Architectural Rehab2200061 - Architectural Rehab
Safety20Fall Protection2200061 - Fall protection for ladders, hatches, etc. (ALL 9 CSOs)
21Hatch Lift Assist2200061 - Replace lift cylinders for hatches or replaces hatches new (All 9 CSOs)Will upgrade plates over dewatering pumps to be lift assisted hatches
Supporting Infrastructure22

O&M Needs

GLWA CSO Facilities Design Coordination
Item No.DescriptionComments / Notes
Baby Creek SDF (BC)Belle Isle RTB (BLI)Conner Creek RTB (CON)Hubbell Southfield RTB (HS)Leib CSOOakwood CSOPuritan Fenkell RTB (PF)Seven Mile RTB (SM)St. Aubin SDF (STA)
Screening1Screen Technology
Disinfection2Chemical Storage Tank
3Chemical Pump Technology
4Feed pump discharge configuration (e.g. manifold loop like CON, BC) vs. dedicated pump per mixing chamber)
5Chemical Piping
6Chemical Valves, Isolation
7Chemical Valves, Throttling/Flow Control
8Chemical Mixing
9Chlorination Control Strategy
10TRC Analyzer
11Automatic Filter System (upstream of TRC Analyzer)
12Chemical Unloading Station
Odor Control
Flushing & Dewatering
HVAC
Electrical
Site
ArchitecturalArchitectural Rehabilitation - address architectural deficiencies
SafetyFall Protection
Hatch Lift Assist
Supporting Infrastructure

Add'l Coordination

Item No.DescriptionPreliminary Recommendation (if applicable)Comments / Notes
St. Aubin SDF (STA)Leib CSOOakwood CSO
Influent SamplingTSSMultiparameterMultiparemeter
Romag Screen FlushingPipe w/ orifice
Various Hatch workCoordinate timing & document updates
Various floor coatingsCoordinate timing & document updates

Key TMs

270010 - Leib/ OKW
No.NameLink
18Chlorine Dose Response Results and ICT ModelWastewater Engineering - TM-18 Chlorine Dose Response Results and ICT Model.pdf - All Documents (sharepoint.com)
270006 - STA
1AScrening Evaluation2200061 R-Task 2-001A-TM1A-STA Screen Eval_Draft.pdf
BODRBasis of Design2200061_GLWA_CSO Improvements_30% BODR.pdf

../../../../../../../Forms/AllItems.aspx?csf=1&web=1&e=4zYQPL&cid=435fda2f%2D5a28%2D47db%2Da69c%2D6fea789d36f2&FolderCTID=0x012000DD88D4A64B39D442B43B0EBC05FE878F&id=%2Fsites%2FCSOControlProgram%2FShared%20Documents%2FGeneral%2FWWE%2F001%20PROJ%2FCSO%2F%5FMULTI%2FCIP270004%20%2D%202101475%20%2D%20OKW%2C%20Leib%20Imp%2C%20CON%20%26%20BC%20CFD%20%28DES%29%2F06%20Deliverables%2FTask%20B%20%2D%20Concep%20DES%2FTMs%2FFinal%20TM%27s%2FTM%2D18%20Chlorine%20Dose%20Response%20Results%20and%20ICT%20Model%2Epdf&parent=%2Fsites%2FCSOControlProgram%2FShared%20Documents%2FGeneral%2FWWE%2F001%20PROJ%2FCSO%2F%5FMULTI%2FCIP270004%20%2D%202101475%20%2D%20OKW%2C%20Leib%20Imp%2C%20CON%20%26%20BC%20CFD%20%28DES%29%2F06%20Deliverables%2FTask%20B%20%2D%20Concep%20DES%2FTMs%2FFinal%20TM%27s../../../../../../../../../../../../../../../../:b:/s/CSOControlProgram/Ee97j6uv4m1Eqtn0k6Zu5DIB6KZTqMOb2fIYXRJQUYoYDA?e=dtBxCE../../../../../../../../../../../../../../../../:b:/s/CSOControlProgram/Eb-CJg6KVp9AoUsM8AoZZxsBXMCrFZ8ufORMQ3I6nUz3uw?e=YNjj1H image1.png

File details come from the government source that posted it. Updated .