Attachment A3- GLWA PMP.docx

DOCX document 26 KB Posted

Attached to
Site Improvements at St. Aubin, Belle Isle, and Baby Creek CSO Facilities
Solicitation number
REQ - 0009198
Issued by
Wayne County, Michigan

About this file

This attachment document references the Great Lakes Water Authority (GLWA) Program Management Plan (PMP), which serves as the foundational governance and operational framework for the Site Improvements project at St. Aubin, Belle Isle, and Baby Creek Combined Sewer Overflow (CSO) facilities in Michigan. The document itself is a pointer to the complete PMP version dated September 1, 2024 (CIP-PMP-Project-Management-Plan-9.1.2024.pdf), which contains detailed project management protocols, organizational structures, roles and responsibilities, and procedural guidelines for executing the multi-facility CSO improvement initiative. The project encompasses study, design, and construction assistance services across four sites: St. Aubin, Belle Isle, Baby Creek, and the St. Aubin Outfall facility, with the PMP serving as the controlling document for how these services will be managed and delivered throughout the project lifecycle.

The attachment itself does not contain specific information regarding pricing terms, bid due dates, site visit schedules, award timelines, funding sources, or contract duration. All such substantive project details are contained within the referenced Program Management Plan document (version 9.1.2024), which bidders and interested parties would need to consult directly for comprehensive information about contract requirements, administrative procedures, and project execution standards.

View the file

Other files

File Type Posted
Attachment C2- CS-299_CSO_NA_Report_Vol_6_Appendices.pdf PDF
Attachment A2- Environmental Compliance and Permits Plan Form.xlsx XLSX spreadsheet
Attachment B2 - Specification Section 01 78 40.A - OnBase Document Upload Template.XLS XLS spreadsheet
Attachment C3 - CSO Design Coordination_Key Decision Tracking Log.xlsx XLSX spreadsheet
Attachment B4 - Spec Section 01 79 23 - Instruction of Operation and Maintenance Personnel.PDF PDF
Attachment A4 - GLWA CAD BIM Standards - Version 0.0.pdf PDF
2-Attachment No. 2 - REQ-0009198- Vendor Certifications Solicitation.pdf PDF
6-Attachment No. 6 - REQ-0009198 - Task Cost Matrix.xlsx XLSX spreadsheet
8-Attachment No. 7 - REQ-0009198 - Statement of Minimum Qualifications (2).docx DOCX document
Attachment B1 - Specification Section 01 78 40 - OnBase Digital Document Turnover.PDF PDF
Attachment B5 - GLWA Master Division 01 Specifications.zip ZIP file
Attachment A1- Professional Services and Construction Change Log.xlsx XLSX spreadsheet
4-Attachment No. 4 - REQ-0009198 - B.I.D. Requirements.pdf PDF
3-Attachment No. 3 - REQ-0009198 - Scope of Work.pdf PDF
1-Attachment No. 1 - REQ-0009198 - GLWA Engineering Design Services Contract Rev 4-1-2026.pdf PDF
Attachment B3 - Specification Section 01 33 30 Asset Turnover Feb 2024.PDF PDF
Attachment C1 - CS-299_CSO_NA_Report_Vol_2_Sect_04-14.pdf PDF
5-Attachment No. 5 - REQ-0009198 - Solicitation Subcontractor List.pdf PDF
9-REQ-0009198 - Solicitation Cover - Instructions to Vendors.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment A.3

The current version of the GLWA Program Management Plan (PMP) may be found at: CIP-PMP-Project-Management-Plan-9.1.2024.pdf

File details come from the government source that posted it. Updated .