This is a Multi-Disciplinary Facilities Assessment document prepared by Jacobs Consultants Inc. for the Great Lakes Water Authority (GLWA) concerning nine combined sewer overflow (CSO) facilities in Michigan. The assessment encompasses comprehensive evaluations of CSO facilities including Baby Creek, Belle Isle, Connor Creek, Hubbell-Southfield, Leib, Oakwood, Puritan-Fenkell, Seven Mile, and St. Aubin. The document, updated as of May 20, 2022, provides detailed facility descriptions, capital improvement recommendations, and 20-year capital outlay plans organized across six volumes. The assessment addresses common facility needs including disinfection system improvements, electrical upgrades, instrumentation and control system enhancements, structural evaluations, building roof replacements, safety improvements, and maintenance work order reviews. Each facility section includes assessments of screening, disinfection, odor control, flushing and dewatering, HVAC systems, electrical systems, instrumentation and control systems, site conditions, architectural elements, safety, and supporting infrastructure.
The project employs a coordinated approach integrating Asset Management Planning through a Scheduled Replacement Plan, Performance-Based Planning via the Facilities Assessment, and 20-Year Capital Improvement and Capital Outlay Planning. Alternative evaluation methodologies utilize Net Present Value analysis and benefit ratio assessments to determine optimal solutions for facility needs. Capital cost estimating covers both Capital Improvement Project costs and Scheduled Replacement Plan asset replacement costs across multiple categories. The document establishes a repeatable, defendable process that meshes asset condition data with identified facility needs to prioritize investments while considering available budgets, resources, and regulatory compliance requirements. The assessment provides standardized recommendations for equipment replacement and facility enhancements to improve operations and maintenance efficiency, enhance operator safety, and ensure compliance with NPDES permit requirements for discharge to receiving water bodies.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FES0117211109DET
CS-299 CSO Facilities Assessment Volume 2 – Facilities Assessment
FINAL
April 9, 2021
Great Lakes Water Authority
Volume 2 – Multi-Disciplinary Facilities Assessment
May 2022
UPDATED FINAL
Volume 2 - Multi-Disciplinary Facilities Assessment ii
CS-299 CSO Facilities Assessment
Project No: C6A13300
Document Title: Volume 2 - Multi-Disciplinary Facilities Assessment
Revision: Updated Final
Date: May 20, 2022
Client Name: Great Lakes Water Authority
Project Manager: Bruce Allman / Allen Gelderloos
Jacobs Consultants Inc.
30800 Telegraph Road, Suite 4900
Bingham Farms, Michigan 48025-4710
United States
T +1.248.633.1440 www.jacobs.com
© Copyright 2021 Jacobs Consultants Inc.. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright.
Limitation: This document has been prepared on behalf of, and for the exclusive use of Jacobs’ client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this document by any third party.
Document history and status
Version Date Description
Draft August 21, 2020 Draft Multi-Disciplinary Needs Assessment
Draft 2 April 9, 2021 Draft 2 Multi-Disciplinary Facilities Assessment
Final November 24, 2021 Final Multi-Disciplinary Facilities Assessment
Updated Final May 20, 2022 Updated Final Multi-Disciplinary Facilities Assessment iv Acronyms and Abbreviations
Contents
Overall CS-299 Facilities Assessment Organization
Volume 1 – Project Introduction and Capital Improvement and Outlay Plans
Volume 2 – Multi-Disciplinary Facilities Assessment
Volume 3 – Asset Audit, Condition Assessment, FMEAs, and Schedule Replacement Plan
Volume 4 – Reporting
Volume 5 – CSO System 5-Year SRF Project Plan
Volume 6 – Appendices
Contents .............................................................................................................................................................................. iv
Acronyms and Abbreviations ...................................................................................................................................... xvii
4. Process Overview ............................................................................................................................................ 4-1
4.1 General Combined Sewer Overflow Facility Descriptions .............................................................. 4-1
4.2 Project Overview ............................................................................................................................................. 4-1
4.2.1 Asset Management Planning (Scheduled Replacement Plan) ................................... 4-4
4.2.2 Performance Based Planning (Facilities Assessment) .................................................... 4-4
4.2.3 20-Year Capital Improvement and Capital Outlay Planning........................................ 4-5
4.3 Purpose of Multi-Disciplinary Facilities Assessment........................................................................ 4-5
4.4 Approach for Multi-Disciplinary Facilities Assessment ................................................................... 4-5
4.5 Organization of Multi-Disciplinary Facilities Assessment .............................................................. 4-6
4.6 Coordination with Scheduled Replacement Plan .............................................................................. 4-6
4.7 Alternatives Evaluation Approach ........................................................................................................... 4-7
4.7.1 NPV/Benefit Ratio ......................................................................................................................... 4-8
4.7.2 Do Nothing Alternative ............................................................................................................... 4-8
4.7.3 Improvement Alternative ........................................................................................................... 4-9
4.8 Capital Improvement Plan and Capital Outlay Plan Approach .................................................... 4-9
4.8.1 Capital Improvement Plan Process Overview ..................................................................... 4-9
4.8.2 Capital Outlay Plan Process Overview ................................................................................ 4-10
4.9 Capital Cost Estimating Approach ........................................................................................................ 4-10
4.9.1 Capital Improvement Project Costs ..................................................................................... 4-10
4.9.2 Scheduled Replacement Plan Asset Replacement Costs ........................................... 4-12
5. Common Needs Among Multiple Facilities .............................................................................................. 5-1
5.1 Introduction ...................................................................................................................................................... 5-1
5.2 Disinfection ....................................................................................................................................................... 5-1
5.2.1 Overview and Review of Current Disinfection Performance ......................................... 5-1
5.2.2 Replace Chemical Feed System ............................................................................................... 5-5
5.2.3 Flow-Paced and TRC-Paced Automatic Chemical Feed .............................................. 5-15
5.2.4 Reduce Cost Associated with Large Quantity of Chemical Induction Mixers ...... 5-17
5.2.5 Total Chlorine Residual Reduction ...................................................................................... 5-27
Acronyms and Abbreviations v
5.3 Electrical ......................................................................................................................................................... 5-27
5.3.1 CSO-Wide Lighting Replacement Project ......................................................................... 5-27
5.3.2 Power Quality Monitoring ....................................................................................................... 5-28
5.4 Instrumentation and Control .................................................................................................................. 5-28
5.4.1 Introduction .................................................................................................................................. 5-28
5.4.2 Control System Improvements ............................................................................................. 5-28
5.4.3 Evaluation of Level Measurement Technology – Ultrasonic vs Radar Instruments
........................................................................................................................................................... 5-30
5.4.4 Evaluation of Open Channel Flowmeter Technologies ............................................... 5-31
5.4.5 Chemical Fill Station Level Indicators ................................................................................ 5-32
5.4.6 Evaluation of Valve Control Philosophy – Valve Network (PakScan) vs Hardwired
........................................................................................................................................................... 5-32
5.4.7 Fire Alarm System and Gas Monitoring Minimization ................................................. 5-33
5.4.8 Process Monitoring Cameras ................................................................................................. 5-34
5.4.9 Install Local Control Near Process Equipment ............................................................... 5-35
5.4.10 Automatic Transfer Switch and Generators Controls Upgrade ................................ 5-35
5.4.11 Study for Disabled Motor Moisture Detection Capabilities........................................ 5-36
5.5 Structural ........................................................................................................................................................ 5-36
5.6 Building Roofs .............................................................................................................................................. 5-36
5.7 Safety ............................................................................................................................................................... 5-36
5.7.1 CSO Facility Safety Inspection ............................................................................................... 5-36
5.7.2 Safety-Related Capital Improvement Projects for Each Facility .............................. 5-37
5.7.3 Fall Protection Improvements ............................................................................................... 5-37
5.8 Maintenance Work Order Review .......................................................................................................... 5-39
5.9 3D Modeling and As-Built Drawings ................................................................................................... 5-39
6. Baby Creek CSO Control Facility ................................................................................................................. 6-1
6.1 Facility Description and Future Capacity Considerations ............................................................... 6-1
6.1.1 General Facility Description ...................................................................................................... 6-1
6.1.2 Future Capacity Considerations ............................................................................................... 6-1
6.2 Facility Assessment ....................................................................................................................................... 6-1
6.2.1 Screening .......................................................................................................................................... 6-1
6.2.2 Disinfection ...................................................................................................................................... 6-9
6.2.3 Odor Control ................................................................................................................................. 6-17
6.2.4 Flushing and Dewatering......................................................................................................... 6-18
6.2.5 HVAC ............................................................................................................................................... 6-23
6.2.6 Electrical......................................................................................................................................... 6-28
6.2.7 I&C .................................................................................................................................................... 6-31
6.2.8 Site ................................................................................................................................................... 6-39
6.2.9 Architectural ................................................................................................................................. 6-46
6.2.10 Safety .............................................................................................................................................. 6-51
6.2.11 Supporting Infrastructure........................................................................................................ 6-53
6.2.12 Confirmation of Asset Replacement in Capital Planning ........................................... 6-58
6.3 Capital Planning for Baby Creek CSO Facility .................................................................................. 6-61
6.3.1 Summary of Capital Improvement Plan Projects ........................................................... 6-61 vi Acronyms and Abbreviations
6.3.2 Capital Improvement Project Bundling and Scheduling ............................................ 6-61
6.3.3 20-Year Capital Outlay Plan .................................................................................................. 6-63
7. Belle Isle CSO Control Facility ..................................................................................................................... 7-1
7.1 Existing Facility Description and Future Capacity Considerations .............................................. 7-1
7.1.1 General Facility Description ...................................................................................................... 7-1
7.1.2 Future Capacity Considerations ............................................................................................... 7-1
7.2 Facility Assessment ....................................................................................................................................... 7-1
7.2.1 Screening .......................................................................................................................................... 7-1
7.2.2 Disinfection ...................................................................................................................................... 7-7
7.2.3 Odor Control ................................................................................................................................. 7-14
7.2.4 Flushing and Dewatering......................................................................................................... 7-19
7.2.5 HVAC ............................................................................................................................................... 7-22
7.2.6 Electrical......................................................................................................................................... 7-31
7.2.7 I&C .................................................................................................................................................... 7-34
7.2.8 Site ................................................................................................................................................... 7-39
7.2.9 Architectural ................................................................................................................................. 7-42
7.2.10 Safety .............................................................................................................................................. 7-45
7.2.11 Supporting Infrastructure........................................................................................................ 7-47
7.2.12 Confirmation of Asset Replacement in Capital Planning ........................................... 7-47
7.3 Capital Planning for Belle Isle CSO Facility ....................................................................................... 7-50
7.3.1 Summary of Capital Improvement Plan Projects ........................................................... 7-50
7.3.2 Capital Improvement Project Bundling and Scheduling ............................................ 7-50
7.3.3 20-Year Capital Outlay Plan .................................................................................................. 7-52
8. Connor Creek CSO Control Facility ............................................................................................................. 8-1
8.1 Facility Description and Future Capacity Considerations ............................................................... 8-1
8.1.1 General Facility Description ...................................................................................................... 8-1
8.1.2 Future Capacity Considerations ............................................................................................... 8-1
8.2 Facility Assessment ....................................................................................................................................... 8-1
8.2.1 Screening .......................................................................................................................................... 8-1
8.2.2 Disinfection ...................................................................................................................................... 8-4
8.2.3 Odor Control ................................................................................................................................. 8-15
8.2.4 Flushing and Dewatering......................................................................................................... 8-18
8.2.5 HVAC ............................................................................................................................................... 8-26
8.2.6 Electrical......................................................................................................................................... 8-34
8.2.7 I&C .................................................................................................................................................... 8-37
8.2.8 Site ................................................................................................................................................... 8-44
8.2.9 Architectural ................................................................................................................................. 8-47
8.2.10 Safety .............................................................................................................................................. 8-50
8.2.11 Supporting Infrastructure........................................................................................................ 8-52
8.2.12 Confirmation of Asset Replacement in Capital Planning ........................................... 8-52
8.3 Capital Planning for Conner Creek CSO Facility .............................................................................. 8-55
8.3.1 Summary of Capital Improvement Plan Projects Alternatives ................................. 8-55
8.3.2 Capital Improvement Project Bundling and Scheduling ............................................ 8-55
8.3.3 20-Year Capital Outlay Plan .................................................................................................. 8-57
Acronyms and Abbreviations vii
9. Hubbell-Southfield CSO Control Facility .................................................................................................. 9-1
9.1 General Facility Description and Future Capacity Considerations .............................................. 9-1
9.1.1 General Facility Description ...................................................................................................... 9-1
9.1.2 Future Capacity Considerations ............................................................................................... 9-1
9.2 Facility Assessment ....................................................................................................................................... 9-1
9.2.1 Screening .......................................................................................................................................... 9-1
9.2.2 Disinfection ...................................................................................................................................... 9-6
9.2.3 Odor Control ................................................................................................................................. 9-14
9.2.4 Flushing and Dewatering......................................................................................................... 9-15
9.2.5 HVAC ............................................................................................................................................... 9-26
9.2.6 Electrical......................................................................................................................................... 9-29
9.2.7 I&C .................................................................................................................................................... 9-33
9.2.8 Site ................................................................................................................................................... 9-39
9.2.9 Architectural ................................................................................................................................. 9-45
9.2.10 Safety .............................................................................................................................................. 9-48
9.2.11 Supporting Infrastructure........................................................................................................ 9-50
9.2.12 Confirmation of Asset Replacement in Capital Planning ........................................... 9-52
9.3 Capital Planning for Hubbell-Southfield CSO Facility .................................................................. 9-55
9.3.1 Summary of Capital Improvement Plan Projects ........................................................... 9-55
9.3.2 Capital Improvement Project Bundling and Scheduling ............................................ 9-55
9.3.3 20-Year Capital Outlay Plan .................................................................................................. 9-57
10. Leib CSO Control Facility ........................................................................................................................... 10-1
10.1 General Facility Description and Future Capacity Considerations ........................................... 10-1
10.1.1 General Facility Description ................................................................................................... 10-1
10.1.2 Future Capacity Considerations ............................................................................................ 10-1
10.2 Facility Assessment .................................................................................................................................... 10-2
10.2.1 Screening ....................................................................................................................................... 10-2
10.2.2 Disinfection ................................................................................................................................... 10-6
10.2.3 Odor Control ...............................................................................................................................10-14
10.2.4 Flushing and Dewatering.......................................................................................................10-14
10.2.5 HVAC .............................................................................................................................................10-17
10.2.6 Electrical.......................................................................................................................................10-23
10.2.7 I&C ..................................................................................................................................................10-25
10.2.8 Site .................................................................................................................................................10-29
10.2.9 Architectural ...............................................................................................................................10-33
10.2.10 Safety ............................................................................................................................................10-36
10.2.11 Supporting Infrastructure......................................................................................................10-38
10.2.12 Confirmation of Asset Replacement in Capital Planning .........................................10-38
10.3 Capital Planning for Leib CSO Facility...............................................................................................10-41
10.3.1 Summary of Capital Improvement Plan Projects .........................................................10-41
10.3.2 Capital Improvement Project Bundling and Scheduling ..........................................10-41
10.3.3 20-Year Capital Outlay Plan ................................................................................................10-43
11. Oakwood CSO Control Facility .................................................................................................................. 11-1
11.1 General Facility Description and Future Capacity Considerations ........................................... 11-1 viii Acronyms and Abbreviations
11.1.1 General Facility Description ................................................................................................... 11-1
11.1.2 Northwest Interceptor Diversion to Oakwood CSO Facility........................................ 11-1
11.2 Facility Assessment .................................................................................................................................... 11-1
11.2.1 Screening ....................................................................................................................................... 11-1
11.2.2 Disinfection ................................................................................................................................... 11-6
11.2.3 Odor Control ...............................................................................................................................11-15
11.2.4 Flushing and Dewatering.......................................................................................................11-16
11.2.5 HVAC .............................................................................................................................................11-21
11.2.6 Electrical.......................................................................................................................................11-26
11.2.7 I&C ..................................................................................................................................................11-29
11.2.8 Site .................................................................................................................................................11-34
11.2.9 Architectural ...............................................................................................................................11-38
11.2.10 Safety ............................................................................................................................................11-41
11.2.11 Supporting Infrastructure......................................................................................................11-44
11.2.12 Storm Pump Station ................................................................................................................11-44
11.2.13 Sanitary Pump Station ............................................................................................................11-48
11.2.14 Confirmation of Asset Replacement in Capital Planning .........................................11-49
11.3 Capital Planning for Oakwood CSO Facility ....................................................................................11-54
11.3.1 Summary of Capital Improvement Plan Projects .........................................................11-54
11.3.2 Capital Improvement Project Bundling and Scheduling ..........................................11-54
11.3.3 20-Year Capital Outlay Plan ................................................................................................11-56
12. Puritan-Fenkell CSO Control Facility ...................................................................................................... 12-1
12.1 General Facility Description and Future Capacity Considerations ........................................... 12-1
12.1.1 General Facility Description ................................................................................................... 12-1
12.1.2 Modifications to Make Puritan-Fenkell Facility into a Capture-Only Facility (PF-
WWMP-1) ...................................................................................................................................... 12-1
12.2 Facility Assessment .................................................................................................................................... 12-1
12.2.1 Screening ....................................................................................................................................... 12-1
12.2.2 Disinfection ................................................................................................................................... 12-5
12.2.3 Odor Control ...............................................................................................................................12-11
12.2.4 Flushing and Dewatering.......................................................................................................12-11
12.2.5 HVAC .............................................................................................................................................12-18
12.2.6 Electrical.......................................................................................................................................12-24
12.2.7 I&C ..................................................................................................................................................12-27
12.2.8 Site .................................................................................................................................................12-32
12.2.9 Architectural ...............................................................................................................................12-37
12.2.10 Safety ............................................................................................................................................12-40
12.2.11 Supporting Infrastructure......................................................................................................12-42
12.2.12 Confirmation of Asset Replacement in Capital Planning .........................................12-42
12.3 Capital Planning for Puritan-Fenkell CSO Facility........................................................................12-45
12.3.1 Summary of Capital Improvement Plan Projects .........................................................12-45
12.3.2 Capital Improvement Project Bundling and Scheduling ..........................................12-45
12.3.3 20-Year Capital Outlay Plan ................................................................................................12-47
13. Seven Mile CSO Control Facility ............................................................................................................... 13-1
Acronyms and Abbreviations ix
13.1 General Facility Description and Future Capacity Considerations ........................................... 13-1
13.1.1 General Facility Description ................................................................................................... 13-1
13.1.2 Modifications to Make Seven Mile Facility into a Capture-Only Facility (SM-
WWPM-1) ...................................................................................................................................... 13-1
13.2 Facility Assessment .................................................................................................................................... 13-1
13.2.1 Screening ....................................................................................................................................... 13-1
13.2.2 Disinfection ................................................................................................................................... 13-1
13.2.3 Odor Control ................................................................................................................................. 13-2
13.2.4 Flushing and Dewatering......................................................................................................... 13-3
13.2.5 HVAC ............................................................................................................................................... 13-8
13.2.6 Electrical.......................................................................................................................................13-13
13.2.7 I&C ..................................................................................................................................................13-16
13.2.8 Site .................................................................................................................................................13-17
13.2.9 Architectural ...............................................................................................................................13-22
13.2.10 Safety ............................................................................................................................................13-27
13.2.11 Supporting Infrastructure......................................................................................................13-29
13.2.12 Confirmation of Asset Replacement in Capital Planning .........................................13-29
13.3 Capital Planning for Seven Mile CSO Facility .................................................................................13-32
13.3.1 Summary of Capital Improvement Plan Projects .........................................................13-32
13.3.2 Capital Improvement Project Bundling and Scheduling ..........................................13-32
13.3.3 20-Year Capital Outlay Plan ................................................................................................13-34
14. St. Aubin CSO Control Facility .................................................................................................................. 14-1
14.1 General Facility Description and Future Capacity Considerations ........................................... 14-1
14.1.1 General Facility Description ................................................................................................... 14-1
14.1.2 Future Capacity Considerations ............................................................................................ 14-1
14.2 Facility Assessment .................................................................................................................................... 14-1
14.2.1 Screening ....................................................................................................................................... 14-1
14.2.2 Disinfection ................................................................................................................................... 14-3
14.2.3 Odor Control ................................................................................................................................. 14-4
14.2.4 Flushing and Dewatering......................................................................................................... 14-6
14.2.5 HVAC .............................................................................................................................................14-10
14.2.6 Electrical.......................................................................................................................................14-12
14.2.7 I&C ..................................................................................................................................................14-15
14.2.8 Site .................................................................................................................................................14-19
14.2.9 Architectural ...............................................................................................................................14-22
14.2.10 Safety ............................................................................................................................................14-25
14.2.11 Supporting Infrastructure......................................................................................................14-27
14.2.12 Confirmation of Asset Replacement in Capital Planning .........................................14-27
14.3 Capital Planning for St. Aubin CSO Facility .....................................................................................14-30
14.3.1 Summary of Capital Improvement Plan Projects .........................................................14-30
14.3.2 Capital Improvement Project Bundling and Scheduling ..........................................14-30
14.3.3 20-Year Capital Outlay Plan ................................................................................................14-31 x Acronyms and Abbreviations
Tables
Table 4-1. Key Design Criteria and General Information for GLWA’s CSO Facilities............................................. 4-2 Table 4-2. Example of Facilities Assessment and SRP Interaction .............................................................................. 4-7 Table 4-3. Non-Economic Decision Criteria and Weights ............................................................................................... 4-8 Table 4-4. Cost Categories for Capital Cost Estimating ................................................................................................ 4-11 Table 4-5. Cost Categories for SRP Replacement Costs ............................................................................................... 4-12 Table 5-1. Overview of Disinfection Systems ....................................................................................................................... 5-2 Table 5-2. Hypochlorite Pump Summary .............................................................................................................................. 5-3 Table 5-3. Comparison of Original and Current Predicted CSO Facility Design Storm Peak Flow Rates (10-
Year, 1-Hour Flow Rates) ............................................................................................................................................................. 5-6 Table 5-4. Option 1 – Pump Sizing for Standardized Pump Distribution .............................................................. 5-13 Table 5-5. Option 2- Pump Sizing for Standardized Manifold Distribution Using Hose Pumps .................. 5-13 Table 5-6. Option 2- Pump Sizing for Standardized Manifold Distribution Using Magnetic Drive Centrifugal
Pumps ............................................................................................................................................................................................... 5-13 Table 5-7. Capital Costs for the Pump Distribution and Pump Type Options ...................................................... 5-14 Table 5-8. Review of Chemical Induction Mixer Work Orders by CSO Facility ..................................................... 5-18 Table 5-9. Cost Comparison Between Water Champ and Gas Mastrrr Induction Mixers ................................. 5-19 Table 5-10. Reduced Number of Induction Mixers Alternative Summary ............................................................ 5-21 Table 5-11. Vertical Shaft Mixer Alternative ..................................................................................................................... 5-25 Table 5-12. TRC Reduction Capital Cost Estimates From the WWMP ..................................................................... 5-27 Table 5-13. Existing and Proposed SCADA Control Systems at Each CSO Facility ............................................ 5-29 Table 5-14. Process Monitoring Camera Needs at Each CSO Facility ..................................................................... 5-34 Table 6-1. Overview of Existing Screening System at Baby Creek CSO facility....................................................... 6-2 Table 6-2. Peak Total Influent Flow and Screen Level Differential During Storm Events .................................. 6-3 Table 6-3. Alternative Evaluation for Replace Existing Screen Brushes (Project BC-SCR-1) ........................... 6-8 Table 6-4. Overview of Existing Disinfection System at Baby Creek CSO facility................................................... 6-9 Table 6-5. Alternative Evaluation for Replace Chemical Feed System (Project BC-DIS-1) ............................ 6-12 Table 6-6. Alternative Evaluation for Provide Flow-paced and TRC-paced Chemical Feed Control System
(Project BC-DIS-2) ....................................................................................................................................................................... 6-14 Table 6-7. Alternative Evaluation for Reduce Cost Associated with Large Quantity of Chemical Induction
Mixers (Project BC-DIS-3) ......................................................................................................................................................... 6-16 Table 6-8. Overview of Existing Flushing and Dewatering System at Baby Creek CSO facility ..................... 6-19 Table 6-9. Alternative Evaluation for Flushing System in Influent Area (Project BC-FD-1)........................... 6-22 Table 6-10. Major HVAC Equipment at Baby Creek CSO Facility .............................................................................. 6-23 Table 6-11. Baby Creek Original Indoor Basis of Design Performance Criteria Summary .............................. 6-24 Table 6-12. Baby Creek Original Outdoor Basis of Design Conditions ................................................................... 6-24 Table 6-13. Alternative Evaluation for Replace Chemical Room Unit Heaters and Ventilation System
(Project BC-HVAC-1) .................................................................................................................................................................. 6-27 Table 6-14. Major Electrical Equipment at Baby Creek................................................................................................. 6-28 Table 6-15. Alternative Evaluation for Electrical Improvements (Project BC-ELEC-1) .................................... 6-30 Table 6-16. Summary of Flow Meters and Level Sensors at Baby Creek CSO Facility ...................................... 6-31 Table 6-17. Alternative Evaluation for I&C Improvements (Project BC-I&C-1) .................................................. 6-36 Table 6-18. Alternative Evaluation for Control System Upgrade (Project BC-I&C-2) ...................................... 6-38 Table 6-19. Alternative Evaluation for Security Fencing (Project BC-SITE-1) ..................................................... 6-42 Table 6-20. Alternative Evaluation for Stop Log Storage (Project BC-SITE-2) ................................................... 6-45 Table 6-21. 60-Year Life-Cycle Cost Evaluation of Shingled vs. Metal Roof for Baby Creek Facility ......... 6-46 Table 6-22. Alternative Evaluation for Architectural Rehabilitation (Project BC-ARCH-1) ............................ 6-48 Table 6-23. Alternative Evaluation for Slope Chemical Room Floors and Add Coating (Project BC-ARCH-2)
............................................................................................................................................................................................................. 6-50 Table 6-24. Identification of Capital Improvements for Safety Issues .................................................................... 6-51 Table 6-25. Alternative Evaluation for Safety Improvements (Project BC-SAFE-1) ......................................... 6-52
Acronyms and Abbreviations xi
Table 6-26. Alternative Evaluation for Improve Mixer Removal System (Project BC-SUPP-1) .................... 6-55 Table 6-27. Alternative Evaluation for Overhead Crane Access for Dewatering Pump (Project BC-SUPP- 2)
............................................................................................................................................................................................................. 6-57 Table 6-28. Listing of Asset Condition Assessments for Baby Creek Facility ....................................................... 6-58 Table 6-29. Summary of Recommended Projects at Baby Creek CSO Facility .................................................... 6-61 Table 6-30. Capital Improvement Plan Projects for Baby Creek CSO Facility ...................................................... 6-62 Table 6-31. Information for Assets with Condition 1-4 in Capital Improvement Projects.............................. 6-63 Table 6-32. Information for Assets with Condition 5 in Capital Improvement Projects .................................. 6-63 Table 6-33. 20-Year Capital Outlay Plan for Baby Creek CSO Facility.................................................................... 6-64 Table 7-1. Overview of Existing Screening System at Belle Isle CSO Facility .......................................................... 7-1 Table 7-2. Alternative Evaluation for Screen Replacement (Project BLI-SCR-1) .................................................. 7-6 Table 7-3. Overview of Existing Disinfection System at Belle Isle CSO Facility ...................................................... 7-7 Table 7-4. Alternative Evaluation for Replace Chemical Feed System (Project BLI-DIS-1) .............................. 7-9 Table 7-5. Alternative Evaluation for Provide Flow-paced and TRC-paced Chemical Feed Control System
(Project BLI-DIS-2) ...................................................................................................................................................................... 7-11 Table 7-6. Alternative Evaluation for Replace Chemical Recirculation System (Project BLI-DIS-3) .......... 7-13 Table 7-7. Alternative Evaluation for Access to Odor Control Vessel (Project BLI-OC-1) .............................. 7-18 Table 7-8. Overview of Existing Flushing and Dewatering System at Belle Isle CSO Facility ......................... 7-19 Table 7-9. Alternative Evaluation for Flushing System in Mixing Channel (Project BLI-FD-1) ..................... 7-21 Table 7-10. Major HVAC Equipment at Belle Isle CSO Facility .................................................................................. 7-22 Table 7-11. Belle Isle Original Indoor Basis of Design Performance Criteria Summary .................................. 7-22 Table 7-12. Belle Isle Original Outdoor Basis of Design Conditions ........................................................................ 7-23 Table 7-13. Alternative Evaluation for HVAC Improvements (Project BLI-HVAC-1) ........................................ 7-30 Table 7-14. Major Electrical Equipment at Belle Isle ..................................................................................................... 7-31 Table 7-15. Alternative Evaluation for Electrical Improvements (Project BLI-ELEC-1) ................................... 7-33 Table 7-16. Summary of Flow Meters and Level Sensors at Belle Isle CSO Facility .......................................... 7-34 Table 7-17. Alternative Evaluation for I&C Improvements (Project BLI-I&C-1).................................................. 7-37 Table 7-18. Alternative Evaluation for Control System Upgrade (Project BLI-I&C-2) ..................................... 7-38 Table 7-19. Alternative Evaluation for Site Improvements (Project BLI-SITE-1) ............................................... 7-41 Table 7-20. 60-Year Life Cycle Cost Evaluation of Shingled vs. Metal Roof for Belle Isle Facility .............. 7-42 Table 7-21. Alternative Evaluation for Architectural Rehabilitation (Project BLI-ARCH-1) ........................... 7-44 Table 7-22. Identification of Capital Improvements for Safety Issues .................................................................... 7-45 Table 7-23. Alternative Evaluation for Safety Improvements (Project BLI-SAFE-1) ........................................ 7-46 Table 7-24. Listing of Asset Condition Assessments for Belle Isle Facility ........................................................... 7-47 Table 7-25. Summary of Recommended Projects at Belle Isle CSO Facility ........................................................ 7-50 Table 7-26. Capital Improvement Plan Projects for Belle Isle CSO Facility .......................................................... 7-51 Table 7-27. Information for Assets with Condition 1-4 in Capital Improvement Projects.............................. 7-52 Table 7-28. Information for Assets with Condition 5 in Capital Improvement Projects .................................. 7-52 Table 7-29. 20-Year Capital Outlay Plan for Belle Isle CSO Facility ........................................................................ 7-53 Table 8-1. Overview of Existing Screening System at Connor Creek CSO Facility ................................................. 8-1 Table 8-2. Overview of Existing Disinfection System at Connor Creek CSO Facility ............................................. 8-4 Table 8-3. Alternative Evaluation for Replace Chemical Feed System (Project CON-DIS-1) ........................... 8-7 Table 8-4. Alternative Evaluation for Provide Flow-paced and TRC-paced Chemical Feed Control System
(Project CON-DIS-2) ....................................................................................................................................................................... 8-9 Table 8-5. Alternative Evaluation for Reduce Cost Associated with Large Quantity of Chemical Induction
Mixers (Project CON-DIS-3) ...............................................