6-Attachment No. 6 - REQ-0009198 - Task Cost Matrix.xlsx
XLSX spreadsheet 60 KB Posted
- Solicitation number
- REQ - 0009198
- Issued by
- Wayne County, Michigan
About this file
This is a Task Cost Matrix for REQ-0009198, Site Improvements at St. Aubin, Belle Isle, and Baby Creek CSO Facilities, a Michigan state and local contract opportunity for study, design, and construction assistance services at multiple combined sewer overflow facilities. The request encompasses twelve distinct tasks spanning the complete project lifecycle: Task A (Project Management), Task B (Study Phase), Task C (30% Design), Task D (60% Design), Task E (90% Design), Task F (Permitting), Task G (Final Bid Documents), Task H (Bidding and Negotiation Services), Task I.1 (Construction Management), Task I.2 (Resident Project Representation), Task J (Asset Management Services), Task K (Document Turnover), and Task L (Systems Operations and Maintenance Training). Each task includes provisions for direct labor with estimated hours across ten position categories, indirect costs with overhead percentages, other direct costs including equipment and travel, and subconsultant/subcontractor labor.
The cost matrix structure allows bidders to propose labor rates and hours for each task, calculate overhead and indirect costs as percentages, identify additional direct costs, and apply contract mark-ups separately for direct labor, indirect labor, and subconsultant/subcontractor services to arrive at total task costs. The matrix format enables transparent cost breakdown and comparative evaluation across qualified proposers, with the flexibility to accommodate varying fee structures and project delivery approaches while maintaining cost visibility and control throughout the multiple phases of facility study, permitting, design advancement, and construction support services.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Task A
| Qualificaions Base Selection Task Order Cost Matrix (FSA_PRO_TPL_0005) | |||
| Req # and Title: | REQ-0009198 - Site Improvements at St. Aubin, Belle Iusle, and Baby Ceeek CSO Facilties | ||
| Task A - Project Management | |||
| Direct Labor | Estimated Hours | Cost | |
| 1 | |||
| 2 | |||
| 3 | |||
| 4 | |||
| 5 | |||
| 6 | |||
| 7 | |||
| 8 | |||
| 9 | |||
| 10 | |||
| Indirect Cost - Overhead | % | ||
| Other Direct Cost | |||
| Equipment | |||
| Travel | |||
| Other (list as needed) | |||
| Subtotal | |||
| Subconsultant/Subcontractors | Estimated Hours | ||
| 1 | |||
| 2 | |||
| Subtotal | |||
| Contract Mark-up for Services | |||
| Direct Labor | % | ||
| Indirect Labor | % | ||
| Subconsultant/Subcontractors | % | ||
| Subtotal Contract Mark-up for Services | |||
| Total Cost |
Task B
| Qualificaions Base Selection Task Order Cost Matrix | |||
| Req # and Title: | REQ-0009198 - Site Improvements at St. Aubin, Belle Iusle, and Baby Ceeek CSO Facilties | ||
| Task B - Study Phase | |||
| Direct Labor | Estimated Hours | Cost | |
| 1 | |||
| 2 | |||
| 3 | |||
| 4 | |||
| 5 | |||
| 6 | |||
| 7 | |||
| 8 | |||
| 9 | |||
| 10 | |||
| Indirect Cost - Overhead | % | ||
| Other Direct Cost | |||
| Equipment | |||
| Travel | |||
| Other (list as needed) | |||
| Subtotal | |||
| Subconsultant/Subcontractors | Estimated Hours | ||
| 1 | |||
| 2 | |||
| Subtotal | |||
| Contract Mark-up for Services | |||
| Direct Labor | % | ||
| Indirect Labor | % | ||
| Subconsultant/Subcontractors | % | ||
| Subtotal Contract Mark-up for Services | |||
| Total Cost |
Task C
| Qualificaions Base Selection Task Order Cost Matrix | |||
| Req # and Title: | REQ-0009198 - Site Improvements at St. Aubin, Belle Iusle, and Baby Ceeek CSO Facilties | ||
| Task C - 30% Design | |||
| Direct Labor | Estimated Hours | Cost | |
| 1 | |||
| 2 | |||
| 3 | |||
| 4 | |||
| 5 | |||
| 6 | |||
| 7 | |||
| 8 | |||
| 9 | |||
| 10 | |||
| Indirect Cost - Overhead | % | ||
| Other Direct Cost | |||
| Equipment | |||
| Travel | |||
| Other (list as needed) | |||
| Subtotal | |||
| Subconsultant/Subcontractors | Estimated Hours | ||
| 1 | |||
| 2 | |||
| Subtotal | |||
| Contract Mark-up for Services | |||
| Direct Labor | % | ||
| Indirect Labor | % | ||
| Subconsultant/Subcontractors | % | ||
| Subtotal Contract Mark-up for Services | |||
| Total Cost |
Task D
| Qualificaions Base Selection Task Order Cost Matrix | |||
| Contract # and Title: | REQ-0009198 - Site Improvements at St. Aubin, Belle Iusle, and Baby Ceeek CSO Facilties | ||
| Task D - 60% Design | |||
| Direct Labor | Estimated Hours | Cost | |
| 1 | |||
| 2 | |||
| 3 | |||
| 4 | |||
| 5 | |||
| 6 | |||
| 7 | |||
| 8 | |||
| 9 | |||
| 10 | |||
| Indirect Cost - Overhead | % | ||
| Other Direct Cost | |||
| Equipment | |||
| Travel | |||
| Other (list as needed) | |||
| Subtotal | |||
| Subconsultant/Subcontractors | Estimated Hours | ||
| 1 | |||
| 2 | |||
| Subtotal | |||
| Contract Mark-up for Services | |||
| Direct Labor | % | ||
| Indirect Labor | % | ||
| Subconsultant/Subcontractors | % | ||
| Subtotal Contract Mark-up for Services | |||
| Total Cost |
Task E
| Qualificaions Base Selection Task Order Cost Matrix | |||
| Contract # and Title: | REQ-0009198 - Site Improvements at St. Aubin, Belle Iusle, and Baby Ceeek CSO Facilties | ||
| Task E - 90% Design | |||
| Direct Labor | Estimated Hours | Cost | |
| 1 | |||
| 2 | |||
| 3 | |||
| 4 | |||
| 5 | |||
| 6 | |||
| 7 | |||
| 8 | |||
| 9 | |||
| 10 | |||
| Indirect Cost - Overhead | % | ||
| Other Direct Cost | |||
| Equipment | |||
| Travel | |||
| Other (list as needed) | |||
| Subtotal | |||
| Subconsultant/Subcontractors | Estimated Hours | ||
| 1 | |||
| 2 | |||
| Subtotal | |||
| Contract Mark-up for Services | |||
| Direct Labor | % | ||
| Indirect Labor | % | ||
| Subconsultant/Subcontractors | % | ||
| Subtotal Contract Mark-up for Services | |||
| Total Cost |
Task F
| Qualificaions Base Selection Task Order Cost Matrix | |||
| Contract # and Title: | REQ-0009198 - Site Improvements at St. Aubin, Belle Iusle, and Baby Ceeek CSO Facilties | ||
| Task F - Permitting | |||
| Direct Labor | Estimated Hours | Cost | |
| 1 | |||
| 2 | |||
| 3 | |||
| 4 | |||
| 5 | |||
| 6 | |||
| 7 | |||
| 8 | |||
| 9 | |||
| 10 | |||
| Indirect Cost - Overhead | % | ||
| Other Direct Cost | |||
| Equipment | |||
| Travel | |||
| Other (list as needed) | |||
| Subtotal | |||
| Subconsultant/Subcontractors | Estimated Hours | ||
| 1 | |||
| 2 | |||
| Subtotal | |||
| Contract Mark-up for Services | |||
| Direct Labor | % | ||
| Indirect Labor | % | ||
| Subconsultant/Subcontractors | % | ||
| Subtotal Contract Mark-up for Services | |||
| Total Cost |
Task G
| Qualificaions Base Selection Task Order Cost Matrix | |||
| Contract # and Title: | REQ-0009198 - Site Improvements at St. Aubin, Belle Iusle, and Baby Ceeek CSO Facilties | ||
| Task G - Final Bid Documents | |||
| Direct Labor | Estimated Hours | Cost | |
| 1 | |||
| 2 | |||
| 3 | |||
| 4 | |||
| 5 | |||
| 6 | |||
| 7 | |||
| 8 | |||
| 9 | |||
| 10 | |||
| Indirect Cost - Overhead | % | ||
| Other Direct Cost | |||
| Equipment | |||
| Travel | |||
| Other (list as needed) | |||
| Subtotal | |||
| Subconsultant/Subcontractors | Estimated Hours | ||
| 1 | |||
| 2 | |||
| Subtotal | |||
| Contract Mark-up for Services | |||
| Direct Labor | % | ||
| Indirect Labor | % | ||
| Subconsultant/Subcontractors | % | ||
| Subtotal Contract Mark-up for Services | |||
| Total Cost |
Task H
| Qualificaions Base Selection Task Order Cost Matrix | |||
| Contract # and Title: | REQ-0009198 - Site Improvements at St. Aubin, Belle Iusle, and Baby Ceeek CSO Facilties | ||
| Task H -Bidding and Negotiation Services | |||
| Direct Labor | Estimated Hours | Cost | |
| 1 | |||
| 2 | |||
| 3 | |||
| 4 | |||
| 5 | |||
| 6 | |||
| 7 | |||
| 8 | |||
| 9 | |||
| 10 | |||
| Indirect Cost - Overhead | % | ||
| Other Direct Cost | |||
| Equipment | |||
| Travel | |||
| Other (list as needed) | |||
| Subtotal | |||
| Subconsultant/Subcontractors | Estimated Hours | ||
| 1 | |||
| 2 | |||
| Subtotal | |||
| Contract Mark-up for Services | |||
| Direct Labor | % | ||
| Indirect Labor | % | ||
| Subconsultant/Subcontractors | % | ||
| Subtotal Contract Mark-up for Services | |||
| Total Cost |
Task I.1
| Qualificaions Base Selection Task Order Cost Matrix | |||
| Contract # and Title: | REQ-0009198 - Site Improvements at St. Aubin, Belle Iusle, and Baby Ceeek CSO Facilties | ||
| Task I.1- Construction Management | |||
| Direct Labor | Estimated Hours | Cost | |
| 1 | |||
| 2 | |||
| 3 | |||
| 4 | |||
| 5 | |||
| 6 | |||
| 7 | |||
| 8 | |||
| 9 | |||
| 10 | |||
| Indirect Cost - Overhead | % | ||
| Other Direct Cost | |||
| Equipment | |||
| Travel | |||
| Other (list as needed) | |||
| Subtotal | |||
| Subconsultant/Subcontractors | Estimated Hours | ||
| 1 | |||
| 2 | |||
| Subtotal | |||
| Contract Mark-up for Services | |||
| Direct Labor | % | ||
| Indirect Labor | % | ||
| Subconsultant/Subcontractors | % | ||
| Subtotal Contract Mark-up for Services | |||
| Total Cost |
Task I.2
| Qualificaions Base Selection Task Order Cost Matrix | |||
| Contract # and Title: | REQ-0009198 - Site Improvements at St. Aubin, Belle Iusle, and Baby Ceeek CSO Facilties | ||
| Task I.2- Resident Project Representation (all-inclusive blended rate) | |||
| Direct Labor | Estimated Hours | Cost | |
| 1 | |||
| 2 | |||
| 3 | |||
| 4 | |||
| 5 | |||
| 6 | |||
| 7 | |||
| 8 | |||
| 9 | |||
| 10 | |||
| Indirect Cost - Overhead | % | ||
| Other Direct Cost | |||
| Equipment | |||
| Travel | |||
| Other (list as needed) | |||
| Subtotal | |||
| Subconsultant/Subcontractors | Estimated Hours | ||
| 1 | |||
| 2 | |||
| Subtotal | |||
| Contract Mark-up for Services | |||
| Direct Labor | % | ||
| Indirect Labor | % | ||
| Subconsultant/Subcontractors | % | ||
| Subtotal Contract Mark-up for Services | |||
| Total Cost |
Task J
| Qualificaions Base Selection Task Order Cost Matrix | |||
| Contract # and Title: | REQ-0009198 - Site Improvements at St. Aubin, Belle Iusle, and Baby Ceeek CSO Facilties | ||
| Task J - Asset Management Services | |||
| Direct Labor | Estimated Hours | Cost | |
| 1 | |||
| 2 | |||
| 3 | |||
| 4 | |||
| 5 | |||
| 6 | |||
| 7 | |||
| 8 | |||
| 9 | |||
| 10 | |||
| Indirect Cost - Overhead | % | ||
| Other Direct Cost | |||
| Equipment | |||
| Travel | |||
| Other (list as needed) | |||
| Subtotal | |||
| Subconsultant/Subcontractors | Estimated Hours | ||
| 1 | |||
| 2 | |||
| Subtotal | |||
| Contract Mark-up for Services | |||
| Direct Labor | % | ||
| Indirect Labor | % | ||
| Subconsultant/Subcontractors | % | ||
| Subtotal Contract Mark-up for Services | |||
| Total Cost |
Task K
| Qualificaions Base Selection Task Order Cost Matrix | |||
| Contract # and Title: | REQ-0009198 - Site Improvements at St. Aubin, Belle Iusle, and Baby Ceeek CSO Facilties | ||
| Task K - Document Turnover | |||
| Direct Labor | Estimated Hours | Cost | |
| 1 | |||
| 2 | |||
| 3 | |||
| 4 | |||
| 5 | |||
| 6 | |||
| 7 | |||
| 8 | |||
| 9 | |||
| 10 | |||
| Indirect Cost - Overhead | % | ||
| Other Direct Cost | |||
| Equipment | |||
| Travel | |||
| Other (list as needed) | |||
| Subtotal | |||
| Subconsultant/Subcontractors | Estimated Hours | ||
| 1 | |||
| 2 | |||
| Subtotal | |||
| Contract Mark-up for Services | |||
| Direct Labor | % | ||
| Indirect Labor | % | ||
| Subconsultant/Subcontractors | % | ||
| Subtotal Contract Mark-up for Services | |||
| Total Cost |
Task L
| Qualificaions Base Selection Task Order Cost Matrix | |||
| Contract # and Title: | REQ-0009198 - Site Improvements at St. Aubin, Belle Iusle, and Baby Ceeek CSO Facilties | ||
| Task L - Systems O&M and Training | |||
| Direct Labor | Estimated Hours | Cost | |
| 1 | |||
| 2 | |||
| 3 | |||
| 4 | |||
| 5 | |||
| 6 | |||
| 7 | |||
| 8 | |||
| 9 | |||
| 10 | |||
| Indirect Cost - Overhead | % | ||
| Other Direct Cost | |||
| Equipment | |||
| Travel | |||
| Other (list as needed) | |||
| Subtotal | |||
| Subconsultant/Subcontractors | Estimated Hours | ||
| 1 | |||
| 2 | |||
| Subtotal | |||
| Contract Mark-up for Services | |||
| Direct Labor | % | ||
| Indirect Labor | % | ||
| Subconsultant/Subcontractors | % | ||
| Subtotal Contract Mark-up for Services | |||
| Total Cost |
File details come from the government source that posted it. Updated .