Attachment C2- CS-299_CSO_NA_Report_Vol_6_Appendices.pdf

PDF 539 MB Posted

Attached to
Site Improvements at St. Aubin, Belle Isle, and Baby Creek CSO Facilities
Solicitation number
REQ - 0009198
Issued by
Wayne County, Michigan

About this file

This document is an appendix report (Volume 6) prepared for the City of Detroit and related agencies regarding Combined Sewer Overflow (CSO) facilities improvement projects at St. Aubin, Belle Isle, Baby Creek, and St. Aubin Outfall sites in Michigan. The report supports study, design, and construction assistance services for these four CSO facilities. The project encompasses comprehensive site improvements and engineering support to address combined sewer overflow challenges at these Detroit-area locations. The appendices contained within this volume provide detailed technical data, analysis, and supporting documentation necessary for planning and executing the proposed facility upgrades and modifications. Specific response dates, due dates, site visit schedules, and bidders' conference information are not detailed within the scope of this appendix document itself, as it serves primarily as a supporting technical reference rather than a solicitation notice.

The appendix document functions as a technical support resource containing detailed engineering, environmental, and operational data related to the CSO facilities. As a supporting exhibit to the broader CSO-NA Report, this volume provides the analytical foundation and supplementary information required for consultants and contractors to understand existing conditions, infrastructure requirements, and project specifications. Pricing terms, contract award dates, contract duration, and renewal options would be specified in the primary contract solicitation documents rather than within these technical appendices. The document supports the overall project delivery for study, design, and construction assistance services, establishing the technical baseline and detailed requirements necessary for qualified firms to submit competitive proposals for these Michigan CSO facility improvement projects.

View the file

Other files

File Type Posted
Attachment A2- Environmental Compliance and Permits Plan Form.xlsx XLSX spreadsheet
Attachment A3- GLWA PMP.docx DOCX document
Attachment B2 - Specification Section 01 78 40.A - OnBase Document Upload Template.XLS XLS spreadsheet
Attachment C3 - CSO Design Coordination_Key Decision Tracking Log.xlsx XLSX spreadsheet
Attachment B4 - Spec Section 01 79 23 - Instruction of Operation and Maintenance Personnel.PDF PDF
Attachment A4 - GLWA CAD BIM Standards - Version 0.0.pdf PDF
2-Attachment No. 2 - REQ-0009198- Vendor Certifications Solicitation.pdf PDF
6-Attachment No. 6 - REQ-0009198 - Task Cost Matrix.xlsx XLSX spreadsheet
8-Attachment No. 7 - REQ-0009198 - Statement of Minimum Qualifications (2).docx DOCX document
Attachment B1 - Specification Section 01 78 40 - OnBase Digital Document Turnover.PDF PDF
Attachment B5 - GLWA Master Division 01 Specifications.zip ZIP file
Attachment A1- Professional Services and Construction Change Log.xlsx XLSX spreadsheet
4-Attachment No. 4 - REQ-0009198 - B.I.D. Requirements.pdf PDF
3-Attachment No. 3 - REQ-0009198 - Scope of Work.pdf PDF
1-Attachment No. 1 - REQ-0009198 - GLWA Engineering Design Services Contract Rev 4-1-2026.pdf PDF
Attachment B3 - Specification Section 01 33 30 Asset Turnover Feb 2024.PDF PDF
Attachment C1 - CS-299_CSO_NA_Report_Vol_2_Sect_04-14.pdf PDF
5-Attachment No. 5 - REQ-0009198 - Solicitation Subcontractor List.pdf PDF
9-REQ-0009198 - Solicitation Cover - Instructions to Vendors.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .