Attachment_B6_Hendley_ES_Radon_Report.pdf
PDF 173 KB Posted
- Solicitation number
- DCAM-26-CS-RFP-0011
- Issued by
- District of Columbia
About this file
This is a laboratory analysis report for radon testing conducted at Hendley Elementary School in Washington, DC by Air Chek, Inc., dated February 20, 2023. The District of Columbia Department of General Services issued a Request for Proposals for design-build services to modernize Hendley ES, located at 425 Chesapeake Street SE. The modernization project includes design and construction services for approximately 79,575 square feet of combined renovation and new construction to meet District of Columbia Public Schools Educational Specifications. The scope encompasses outdoor play and educational areas, a minimum U-8 size turf field, parking and loading facilities, new site fencing, and replacement of existing exterior site amenities in kind unless otherwise modified during the project. Exterior site improvements will be subject to change based on community engagement.
The radon testing was conducted from February 13-16, 2023, across 15 locations within Hendley ES, including classrooms, offices, cafeteria, health suite, kitchen office, and one blank control sample. Results ranged from less than 0.3 picocuries per liter (pCi/L) to 1.0 pCi/L, with most readings below 0.3 pCi/L. The cafeteria locations registered the highest readings at 0.9-1.0 pCi/L, while the G 14 Classroom measured 0.9 pCi/L. All radon measurements remained below the EPA action level of 4.0 pCi/L, indicating acceptable indoor air quality at the facility. This radon assessment appears to be a preliminary environmental baseline evaluation supporting the modernization project's design and planning phase.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
February 20, 2023 ** LABORATORY ANALYSIS REPORT **
Radon test result report for:
HENDLEY ELEMENTARY SCHOOL
MAIN
Kit # Room Id Started Ended pCi/L Analyzed 11292141 BLANK G 11 CLASSROOM 2023-02-13 @ 1:00 pm 2023-02-16 @ 11:00 am < 0.3 2023-02-20 11292137 CAFETERIA 2023-02-13 @ 1:00 pm 2023-02-16 @ 12:00 pm 0.9 ± 0.4 2023-02-20 11292140 CAFETERIA 2023-02-13 @ 1:00 pm 2023-02-16 @ 12:00 pm 1.0 ± 0.4 2023-02-20 11292133 DUPLICATE G 8 OFFICE 2023-02-13 @ 1:00 pm 2023-02-16 @ 11:00 am < 0.3 2023-02-20 11292142 G 09 CLASSROOM 2023-02-13 @ 1:00 pm 2023-02-16 @ 11:00 am < 0.3 2023-02-20 11292135 G 11 CLASSROOM 2023-02-13 @ 1:00 pm 2023-02-16 @ 11:00 am < 0.3 2023-02-20 11292167 G 13 CLASSROOM 2023-02-13 @ 1:00 pm 2023-02-16 @ 11:00 am < 0.3 2023-02-20 11292144 G 14 CLASSROOM 2023-02-13 @ 1:00 pm 2023-02-16 @ 12:00 pm 0.9 ± 0.3 2023-02-20 11292143 G 15 CLASSROOM 2023-02-13 @ 1:00 pm 2023-02-16 @ 12:00 pm < 0.3 2023-02-20 11292138 G 16 CLASSROOM 2023-02-13 @ 1:00 pm 2023-02-16 @ 12:00 pm < 0.3 2023-02-20 11292173 G 17 CLASSROOM 2023-02-13 @ 1:00 pm 2023-02-16 @ 12:00 pm < 0.3 2023-02-20 11292134 G 8 OFFICE 2023-02-13 @ 1:00 pm 2023-02-16 @ 11:00 am 0.7 ± 0.3 2023-02-20 11292139 HEALTH SUITE 2023-02-13 @ 1:00 pm 2023-02-16 @ 12:00 pm 0.8 ± 0.4 2023-02-20 11292147 KITCHEN OFFICE 2023-02-13 @ 1:00 pm 2023-02-16 @ 12:00 pm 0.7 ± 0.3 2023-02-20
Air Chek 1936 Butler Bridge Rd, Mills River, NC 28759-3892 Phone: (828) 684-0893 Fax: (828) 684-8498 report.21601.tmp.html
File details come from the government source that posted it. Updated .