This Facility Condition Assessment (FCA) report, prepared by Hayat Brown LLC for the District of Columbia Department of General Services (DGS) on behalf of the District of Columbia Public Schools (DCPS), provides a comprehensive evaluation of Hendley Elementary School located at 425 Chesapeake Street SE, Washington, DC. The assessment was conducted following ASTM E2018-08 standards and includes a complete visual, non-destructive evaluation of the 66,329 gross square foot facility originally constructed in 1959. The FCA identifies physical deficiencies, estimates remaining useful lives (RULs) for building components, and projects replacement costs across a ten-year planning horizon through 2026. The report documents immediate maintenance needs totaling $454,367, with building shell systems requiring $191,165 (42.1%), site work requiring $211,997 (46.7%), interiors requiring $18,180 (4.0%), services requiring $2,320 (0.5%), and general items requiring $30,705 (6.8%).
The current replacement value of Hendley Elementary School is estimated at $15,352,510, with a current year Facility Condition Index (FCI) of 2.95% based on deferred maintenance costs. The ten-year cumulative FCI is projected to reach 12.18% if identified needs are not addressed, with total capital needs of $1,870,664 anticipated over the study period. Major capital replacements are projected including superstructure replacement in 2026 ($888,809), parking lot paving in 2021 ($213,629), and pedestrian paving replacement in 2017 ($209,250). The assessment identifies significant deficiencies in exterior walls, masonry joints, windows, stairs, electrical systems, and site conditions including parking and playground surfaces. All cost estimates are stated in constant 2017 dollars and adjusted for the Washington DC area, based on industry-standard cost references including Whitestone Facility Maintenance and Repair Cost Library and RSMeans. The FCA data is stored in the iPlan Sustainable Facility Governance Solution platform and accessible via web-based dashboard for DGS planning and capital improvement programming.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FACILITY CONDITION
ASSESSMENT
© 2016 4tell™ Solutions, LP. All Rights Reserved.
4tell, iPlan (patent pending) Building Blocks, and Innovation for the Built Environment are trademarks of 4tell™ Solutions, LP.
Hendley Elementary School
425 CHESAPEAKE STREET SE
Washington, DC
January 9, 2018
Submitted by:
3715 Martin Luther King Jr. Avenue, SE
Washington, DC 20032
Submitted to:
Mr. Stephen A. Campbell
Senior Planner, Planning Office
Department of General Services – Construction Division
2000 14th Street NW, 5th Floor
Washington, DC 20009
Hayat Brown LLC Page 2 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
T A B L E O F C O N T E N T S
Table of Contents
Executive Summary
1.1 General Description
1.2 Scope of Work
1.3 Definitions
1.4 Limiting Conditions
1.5 Building Summary
1.6 Summary of Findings
1.7 Facility Condition Index
1.8 Building System Needs: Immediate
A SubStructure Systems
A10 Foundat ions
B Shell Systems
B10 SuperStructure B20 Exter ior Enclosure B30 Roof ing
C Interiors Systems
C10 Inter ior Construct ion C20 Sta irs C30 Inter ior F inishes
D Services Systems
D10 Conveying Systems D20 Plumbing
D30 HVAC
D40 Fi re Protect ion Systems D50 Electr ica l Systems
E Equipment & Furnishing Systems
E10 Equipment
G Building Sitework Systems
G20 Site Improvements
Appendices Appendix A: Expenditure Forecast Appendix B: Photographic Record Appendix C: Survey Information Resulting In Plant Adaptation Recommendations
0596.0
Hayat Brown LLC Page 3 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
E X E C U T I V E S U M M A R Y
1.1 GENERAL DESCRIPTION
Hayat Brown LLC was retained by the District of Columbia Department of General Services (DGS) to undertake Facility Condition Assessments (FCAs) for District of Columbia Public Schools (DCPS) facilities. The purpose of the FCAs are to inventory the elemental components in the buildings, identify key attributes of those components, determine estimated remaining useful lives (RULs) and replacement costs of those components for inclusion in DCPS’ 6-year capital plan. The FCA will also identify physical deficiencies needing immediate attention. The FCA data was collected by Hayat Brown LLC’s assessment teams into the iPlan™ Sustainable Facility Governance Solution (iPlan) platform and will function as the source for DGS’ development of a comprehensive repair, alteration, and improvement program for DCPS facilities. The FCA and analytical data will enable the District to plan, manage and analyze data utilizing a single platform. This will enhance the District's ability to develop short- , intermediate-, and long-term capital improvement strategies based on stakeholder needs and will provide for a cost-effective operation of the facility based upon the prioritization code for each identified element or component in the FCA. The iPlan platform calculated the RULs and estimated replacement costs, and generated this draft Facility Condition Assessment Report (FCA Report) for DGS review. The iPlan platform also allows the FCA data and the FCA Report to be accessible via a web-based dashboard.
Note: This report was issued in January 2018 and is based on current iPlan information which was the source of the 10 Year FCI projections provided in October 2017. The FCA reporting engine can only be run on current year assessments and because these assessments happened in a previous year, 2017 data would not normally be shown however this FCA Report content has been augmented with standard iPlan reports to include 2017 data.
1.2 SCOPE OF WORK
The FCAs were carried out by Hayat Brown LLC (Contractor) and included a complete and thorough visual, non-destructive assessment of each facility. The Contractor followed ASTM standards ("ASTM E2018-08") for conducting property condition assessments, as well as guidance from DGS regarding additional survey information and cost estimates for possible plant adaptations. The FCA Report summarizes the FCA process, which included the following:
• Review of existing documentation provided by the District and interviews with DCPS personnel regarding aspects of each facility.
• Physical assessment to include a limited non-intrusive visual assessment of the buildings and their components.
• Identify and categorize each major component for predictive maintenance, testing and/or inspection, preventative maintenance, emergency maintenance and/or routine maintenance needs.
• Based on provided templates surveyed elements included:
o Core and shell: These elements include superstructure, floors, bearing walls, columns, beams, and exterior envelope components.
o Interiors: These elements include interior finishes of floors, walls, ceilings, stairways, etc.
Hayat Brown LLC Page 4 of 142 Powered by iPlan™ © 4tell™ Solutions, LP o Building equipment and systems: These elements include HVAC systems, and electrical systems, fire protection systems, and conveyor systems.
o Fixed equipment and non-movable furnishings: These elements include fixed equipment such as kitchen equipment’s, audio equipment, public address systems, etc.
o Building site Improvements: These elements include paved surfaces, playground equipment, fencing, recreational elements, site lighting, general site drainage and landscaping.
• Evaluated additional elements based on questionnaires provided by DGS. These questionnaires were answered based on interviewing the facility staff and visual surveys:
o ADA accessibility: included questions relating to accessibility barriers of interior and exterior elements o Safety and security: included questions relating to safety and security of the facility such as fire protection systems o Access control: included questions relating to controlled access to the facility such intrusion detection systems and component hardware o Hazardous materials: included questions relating to the existence hazardous materials at each facility o LEED opportunities: included questions relating to existing components and improving LEED certification points o Additional space considerations: included additional questions relating to space allocation and the existence of special features
Hayat Brown LLC Page 5 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
1.3 DEFINITIONS
Facility Condition Assessment Report (FCA Report) - The work product resulting from completing a FCA is a FCA Report. The FCA Report incorporates the information obtained during the Walk-Through Site Assessment Survey, the Document Review, and Interviews to support the iPlan cost estimates for components at their RUL.
Document Reviews and Interviews - Includes document reviews, research, and interviews to augment the walk-through survey so as to assist the consultant's understanding of the subject property and identification of physical deficiencies.
Walk Through Site Assessment Survey - The walk-through survey identifies the subject property's elemental components, conditions, RULs, and replacement costs at RUL.
Costing - Costing is reported following the ASTM 2018-08 Guidelines Section 9, “Opinions of Costs to Remedy Physical Deficiencies. As such, they include general-scope opinions of costs to assist the user in developing a general understanding of the physical condition of the subject property. As outlined in ASTM 2018-08, the opinion of probable costs should only be construed as preliminary, order of magnitude budgets. Actual costs will vary based on design, quality of materials, field conditions and several other factors as outlined in ASTM 2018-08.
Generally, costing does not include project management, contingency, permits, hazardous material remediation (unless specifically stated on a case by case basis) and other overhead costs such as Architect and Engineering fees, profit, or other markups.
Replacement and repair costs herein are based on the two major North American Standards for facility cost estimating: Whitestone Facility Maintenance and Repair Cost Library (Costlabs); and RSMeans. Whitestone visualizes costing from a Facility Maintenance viewpoint while RSMeans approaches costing from a construction viewpoint. Using industry best practices, the relative strengths of each costing approach has been integrated into a unified costing guide for the condition assessment process. The quantities associated with each item have been estimated during a walk-through during the site assessment and do not represent exact measurements or quantities. Costs have been adjusted to the local Washington DC area and are stated in constant 2017 dollars. The cost guide has been utilized by the assessment team as a starting point for costing and supplemented by the assessors adjusting costs based upon experience and facility factors (such as installation design) to determine maintenance and replacement costs.
Physical Deficiencies - In defining good commercial and customary practice for conducting a baseline FCAs, the goal is to identify and communicate physical deficiencies to a user. The term physical deficiencies mean the presence of conspicuous defects or material deferred maintenance of a subject property's material systems, components, or equipment as observed during the assessor’s walk-through survey. This definition specifically excludes deficiencies that may be remedied with routine maintenance, miscellaneous minor repairs, normal operating maintenance, etc., and excludes conditions that generally do not present material physical deficiencies of the subject property.
Survey Information Resulting in Plant Adaptation Recommendations - These are methodical questions based upon defined industry or Owner standards resulting in a general costing amount that gives an Owner a cash expenditure to plan on within proformas.
Hayat Brown LLC Page 6 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
Life Cycle - There are various approaches for determining an elemental component’s service life such as a “modeling” approach where an industry standard expected useful life (EUL) is added to a component’s date of installation resulting in a modeled or calculated expectation of replacement for that item. The methodology used in Hayat Brown LLC’s reported value for the expected replacement of an elemental component is a field assessed opinion of remaining useful life (RUL). Observed RUL takes into account a field assessor’s observation of the elemental component along with other factors such as maintenance records or observed measurable parameters.
Planning Horizon – Since the life cycles of many elemental components exceed industry standard cash flow proformas, Hayat Brown LLC’s FCA Report only includes a timeframe of importance to an Owner’s immediate cash flow planning. In the case of this report, DGS requested a planning horizon window of 10 years. The Planning Horizon years and remaining useful lives (RULs) as defined in this report’s approach are summarized in the table below:
Planning Horizon Remaining Useful Life
(RUL)
Year 1 - “Immediate” or “Current” 0
Year 2 1
Year 3 2
Year 4 3
Year 5 4
Year 6 5
Year 7 6
Year 8 7
Year 9 8
Year 10 9
Hayat Brown LLC Page 7 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
1.4 L IMITING CONDITIONS
This report has been prepared for the exclusive and sole use of the Department of General Services. The report may not be relied upon by any other person or entity without the express written consent of Hayat Brown LLC.
Any reliance on this report by a third party, any decisions that a third party makes based on this report, or any use at all of this report by a third party is the responsibility of such third parties. Hayat Brown LLC accepts no responsibility for damages, if any, suffered by any third party as a result of decisions made, or actions taken, based on this report.
The assessment of the building/site components was performed using methods and procedures that are consistent with standard commercial and customary practice as outlined in ASTM Standard E 2018-08 for PCA assessments. As per this ASTM Standard, the assessment of the building/site components was based on a visual walk-through site visit, which captured the overall condition of the site at that specific point in time only.
No legal surveys, soil tests, environmental assessments, geotechnical assessments, detailed barrier-free compliance assessments, seismic assessments, detailed engineering calculations, or quantity surveying compilations have been made. No responsibility, therefore, is assumed concerning these matters. Hayat Brown LLC did not design nor construct the building(s) or related structures and therefore will not be held responsible for the impact of any design or construction defects, whether or not described in this report. No guarantee or warranty, expressed or implied, with respect to the property, building components, building systems, property systems, or any other physical aspect of the property is made.
The recommendations and cost estimates associated with these recommendations, as presented in this report, are based on walk-through non-invasive observations of the parts of the building which were readily accessible during our visual review. Conditions may exist that are not as per the general condition of the system being observed and reported in this report. Cost estimates presented in this report are also based on information received during interviews with operations and maintenance staff. In certain instances, Hayat Brown LLC has been required to assume that the information provided is accurate and cannot be held responsible for incorrect information received during the interview process. Should additional information become available with respect to the condition of the building and/or site elements, Hayat Brown LLC requests that this information be brought to our attention so that we may reassess the conclusions presented herein.
The cost estimates are intended for global budgeting purposes only. The scope of work and the actual costs of the work recommended can only be determined after a detailed examination of the site element in question, understanding of the site restrictions, understanding of the effects on the ongoing operations of the site/building, definition of the construction schedule, and preparation of tender documents. We expressly waive any responsibilities for the effects of any action taken as a result of these endeavors unless we are specifically advised of prior to, and participate in the action, at which time, our responsibility will be negotiated.
Our opinions and recommendations presented in our reports will be rendered in accordance with generally accepted professional standards and are not to be construed as a warranty or guarantee regarding existing or future physical conditions at the Site or regarding compliance of Site systems/components and procedures/operations with the various regulating codes, standards, regulations, ordinances, etc.
Hayat Brown LLC Page 8 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
1.5 BUILDING SUMMARY
Item Description
Project Name Hendley Elementary School
DCAM-17-NC-0058
Full Address 425 CHESAPEAKE STREET SE Washington, DC
Year Built 1959
Gross Building Area (SF) 66,329
Current Replacement Value $ 15,352,510
CRV/GSF ($/Sq Ft) $231.46 / Sq Ft
1.6 SUMMARY OF F INDINGS
This report represents summary-level findings for the Facility Condition Assessment. The deficiencies identified in this assessment can be combined with potential new construction requirements to develop an overall Long-Term Capital Needs Plan that can be the basis for a facility wide capital improvement funding strategy. Key findings from the Assessment include:
Key Finding Metric
Current Year Facility Condition Index
2.95%
Property Replacement Value (in Current Dollars)
$15,352,510
Current Year Capital Needs (included in FCI)
$452,967
Current Year Non-Capital Needs (not included in FCI)
$1,400
Year 0 to Year 10 Capital Needs $1,870,664
10 Year FCI 12.18%
Hayat Brown LLC Page 9 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
1.7 FACILITY CONDITION INDEX
The Facility Condition Index (FCI) gives an indication of a building’s or portfolio’s overall state of condition. It is a widely recognized metric for benchmarking in the real estate industry. By definition, THE FCI is defined as the ratio of Deferred Maintenance Cost to the Current Building Replacement Value (CRV) of the property.
This CRV is based on the building type from the online Whitestone Facility Maintenance and Repair Cost Library (Costlabs) as of 1 September 2017 (a national recognized publication used in thousands on condition assessments throughout the country). Typically, the FCI is calculated using only the current condition values, not taking into account the future needs identified in the life cycle evaluation or building enhancements or programmatic upgrades that may be identified in a scoping or design process.
Accounting principles indicate that a value of 65%, or the “rule of two-thirds”, be utilized for the FCI threshold for identifying potential replacement candidates. Once the current repair costs reach 65%, or roughly two-thirds of the full replacement value of the estimated cost to replace a facility, it may not be prudent to continue to fund repairs. In cases where aggressive facilities planning is expected to be necessary, this threshold may be adjusted to address more pressing need.
Hendley Elementary School Current Year FCI = 2.95%
The Chart below indicates the cumulative effects of the FCI ratio over the study period assuming the required funds and expenditures are NOT provided to address the identified works and deferred maintenance each year.
Hayat Brown LLC Page 10 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
Hendley Elementary School 59 Years Old
Estimated Replacement Value: $15,352,510
Cumulative FCI over the 10 Year Study Period
2017 2018 2019 2020 2021 2022 2023 2024 2025 2026
Deferred Maint.
(Carried Forward)
$0 $452,967 $455,163 $457,231 $504,265 $717,894 $717,894 $750,959 $766,656 $981,855
Current Year Cost (Anticipated)
$452,967 $2,196 $2,068 $47,034 $213,629 $0 $33,065 $15,697 $215,200 $888,809
Total Cost $452,967 $455,163 $457,231 $504,265 $717,894 $717,894 $750,959 $766,656 $981,855 $1,870,664
Funding Budgeted $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Total Deferred Maint.
$452,967 $455,163 $457,231 $504,265 $717,894 $717,894 $750,959 $766,656 $981,855 $1,870,664
FCI% 3.0% 3.0 % 3.0 % 3.3 % 4.7 % 4.7 % 4.9 % 5.0 % 6.4 % 12.2 %
Hayat Brown LLC Page 11 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
1.8 BUILDING SYSTEM NEEDS: IMMEDIATE
Building Systems Estimated Costs Percentage of Total Cost
B Shell $191,165 42.1%
C Interiors $18,180 4.0%
D Services $2,320 0.5%
G Building Sitework $211,997 46.7%
Z General $30,705 6.8%
Total $454,367 100.0%
Hayat Brown LLC Page 12 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
A S U B S T R U C T U R E S Y S T E M S
A10 FOUNDATIONS
A1011 Wall Foundations Standard Foundations
Condition Fair - Good
RUL 14
Plan Type Capital Replacement
Quantity 66329
Unit of Measure SF
Unit Cost $11.66
Hayat Brown LLC Page 13 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
A1031 Standard Slab on Grade Slabs On Grade
Condition Fair - Good
RUL 14
Plan Type Capital Replacement
Quantity 29000
Unit Cost $8.21
Hayat Brown LLC Page 14 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
B S H E L L S Y S T E M S
B10 SUPERSTRUCTURE
B10 SuperStructure SuperStructure
Condition Fair - Good
RUL 9
Plan Type Capital Replacement
Quantity 66329
Unit Cost $13.40
Type Component Description Plan Type Year Expenditures
B10 Replace SuperStructure Capital
Replacement 2026 $888,809
Hayat Brown LLC Page 15 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
B20 EXTERIOR ENCLOSURE
B2011 Exterior Wall Construction Exterior Walls
Condition Poor - Fair
RUL 16
Plan Type Capital Replacement
Quantity 25000
Unit of Measure Sq Ft
Unit Cost $37.86
Annex building Minor brick crack
Site wall Typical exterior wall
Hayat Brown LLC Page 16 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
Typical deteriorated sealant Site wall
Areaway wall Deteriorated louver
Covered louver Upper roof
Hayat Brown LLC Page 17 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
Exterior wall Deteriorated brick
Soffit Exterior wall
Cracked concrete Exterior guards
Hayat Brown LLC Page 18 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
B2011 Deteriorated masonry joints Deferred
Maintenance 2017 $110,400
B2011 Deteriorated sealant at coping, windows and doors Deferred
Maintenance 2017 $14,028
B2011 Repair concrete cracks Deferred
Maintenance 2017 $2,847
B2011 Repair stucco walls Deferred
Maintenance 2017 $1,820
B2011 Replace coping stone Deferred
Maintenance 2017 $1,508
B2011 Replace cracked brick Deferred
Maintenance 2017 $26,735
B2011 Replace deteriorated louver Deferred
Maintenance 2017 $1,750
B2011 Replace window guards Deferred
Maintenance 2017 $14,915
Hayat Brown LLC Page 19 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
B2021 Windows Exterior Windows
Condition Good
RUL 25
Plan Type Capital Replacement
Quantity 380
Unit of Measure Each
Unit Cost $835.27
Typical window Typical windows
B2021 Corrosion at window lintels Deferred
2017 $17,163
Hayat Brown LLC Page 20 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
B2032 Solid Exterior Doors Exterior Doors
Condition Fair - Good
RUL 70
Plan Type Capital Replacement
Quantity 20
Unit of Measure EA
Unit Cost $1,473.70
Exterior door Exterior door
Exterior door Exterior door
Hayat Brown LLC Page 21 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
B30 ROOFING
B3011 Roof Finishes Single-Ply Modified Bituminous/Thermoplastic Roof
Condition Good
RUL 15
Plan Type Capital Replacement
Quantity 29000
Unit of Measure Sq Ft
Unit Cost $7.09
General roof
Hayat Brown LLC Page 22 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
B3022 Roof Hatches Roof Hatch, Aluminum
Condition Good
RUL 45
Plan Type Capital Replacement
Quantity 1
Unit Cost $1,131.61
Hayat Brown LLC Page 23 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
C I N T E R I O R S S Y S T E M S
C10 INTERIOR CONSTRUCTION
C1021 Interior Doors Interior Wood Doors
Condition Fair - Good
RUL 35
Plan Type Capital Replacement
Quantity 150
Unit Cost $1,343.55
Typical deteriorated door Typical deteriorated door
Interior door
Hayat Brown LLC Page 24 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
C1021 Replace/repair Deteriorated wood doors Deferred
2017 $9,405
Hayat Brown LLC Page 25 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
C1021 Interior Doors Interior Metal Doors
Condition Fair - Good
RUL 23
Plan Type Capital Replacement
Quantity 5
Unit Cost $1,857.80
Interior door
C1021 Deteriorated metal door at kitchen Deferred
2017 $1,858
Hayat Brown LLC Page 26 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
C20 STAIRS
C2011 Regular Stairs Concrete filled metal pan stairs
Condition Fair - Good
RUL 20
Plan Type Capital Replacement
Quantity 2000
Unit Cost $35.88
Missing rails Deteriorated rubber nosing
Deteriorated rubber nosing
Hayat Brown LLC Page 27 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
C2011 Replace handrails end pieces Routine
Maint Minor Repairs
2017 $500
C2011 Replace rubber nosing Routine
Maint Minor Repairs
2017 $400
Hayat Brown LLC Page 28 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
C2011 Regular Stairs Exterior concrete stairs
Condition Fair - Good
RUL 2
Plan Type Capital Replacement
Quantity 700
Unit of Measure SF
Unit Cost $37.48
Comments Some stairs were recently replaced
Concrete at basement stairs Concrete stairs
Loose rail at stairs to basement Typical concrete stair
Hayat Brown LLC Page 29 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
Typical exterior stairs Typical concrete stairs
Deteriorated rail Cracked stairs and missing rails
C2011 Replace deteriorated rails Deferred
Maintenance 2017 $4,143
C2011 Replace/Repair concrete stairs Deferred
2017 $1,874
Hayat Brown LLC Page 30 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
C30 INTERIOR F INISHES
C3012 Wall Finishes to Interior Walls Gypsum Board Wall Finishes
Condition Good
RUL 35
Plan Type Capital Replacement
Quantity 130000
Unit Cost $2.50
Typical wall finishes
Hayat Brown LLC Page 31 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
C3012 Wall Finishes to Interior Walls Interior CMU Walls
Condition Fair - Good
RUL 70
Plan Type Capital Replacement
Quantity 20120
Unit of Measure SF
Unit Cost $11.55
Interior wall Interior wall
Hayat Brown LLC Page 32 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
C3024 Flooring VCT Floor Finishes
Condition Fair - Good
RUL 13
Plan Type Capital Replacement
Quantity 65000
Unit Cost $3.04
Typical floor tile
Hayat Brown LLC Page 33 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
C3025 Carpeting Carpet Floor Covering
Condition Fair - Good
RUL 3
Plan Type Capital Replacement
Quantity 300
Unit Cost $5.98
Typical carpeting
C3025 Replace Carpet Floor Covering Capital
2020 $1,793
Hayat Brown LLC Page 34 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
C3032 Suspended Ceilings Acoustical Ceiling Tiles
Condition Good
RUL 20
Plan Type Capital Replacement
Quantity 65000
Unit Cost $5.19
Typical acoustical ceiling
Hayat Brown LLC Page 35 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D S E R V I C E S S Y S T E M S
D10 CONVEYING SYSTEMS
D1011 Passenger Elevators Passenger Elevator
Condition Fair - Good
RUL 8
Plan Type Capital Replacement
Quantity 1
Unit Cost $115,733.68
Elevator
D1011 Replace Passenger Elevator Capital
2025 $115,734
Hayat Brown LLC Page 36 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D20 PLUMBING
D2010.0 Water_Fixtures Sink, Various Types
Condition Good
RUL 25
Plan Type Capital Replacement
Quantity 66329
Unit Cost $4.96
Single Sink Sinks
Hayat Brown LLC Page 37 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D2014 Sinks Commercial Grade Kitchen Sink, multiple compartments
Condition Good
RUL 35
Plan Type Capital Replacement
Quantity 1
Unit Cost $3,190
Commercial Grade Kitchen Sink, multiple compartments
D2014 Provide indirect waste Plant
Adaptation 2017 $500
Hayat Brown LLC Page 38 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D2021 Cold Water Service Domestic Water Distribution Piping
Condition Fair - Good
RUL 12
Location Throughout
Plan Type Capital Replacement
Quantity 66329
Unit Cost $4.52
Hayat Brown LLC Page 39 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D2022 Hot Water Service Domestic Water Heater, natural gas, 200 MBH
Condition Good
RUL 35
Plan Type Capital Replacement
Quantity 230
Unit of Measure GAL
Unit Cost $64.01
Hayat Brown LLC Page 40 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D2022 Hot Water Service Domestic Hot Water Storage Tank
Condition Good
RUL 35
Plan Type Capital Replacement
Quantity 200
Unit of Measure GAL
Unit Cost $52.50
Domestic Hot Water Storage Tank
Hayat Brown LLC Page 41 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D2031 Waste Piping Waste Piping
Condition Fair - Good
RUL 11
Location Throughout
Plan Type Capital Replacement
Quantity 66329
Unit Cost $6.51
Waste Piping Waste Piping
Hayat Brown LLC Page 42 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D2041 Pipe & Fittings Rainwater Drainage Piping
Condition Good
RUL 22
Location Throughout
Plan Type Capital Replacement
Quantity 66329
Unit of Measure SF
Unit Cost $4.02
Hayat Brown LLC Page 43 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D30 HVAC
D3021 Boilers Cast Iron Boiler, Hot Water/Steam, Gas-fired, 1250 MBH
Condition Good
RUL 20
Plan Type Capital Replacement
Quantity 4
Unit Cost $44,996
Cast Iron Boiler Boiler Tag
Hayat Brown LLC Page 44 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D3041 Air Distribution Systems VRV Terminal Unit
Condition Fair - Good
RUL 10
Plan Type Capital Replacement
Quantity 6
Unit Cost $4,225.85
VRV Terminal Unit
Hayat Brown LLC Page 45 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D3041 Air Distribution Systems Ductwork
Condition Good
RUL 30
Location Throughout
Plan Type Capital Replacement
Quantity 66329
Unit Cost $4.54
Hayat Brown LLC Page 46 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D3042 Exhaust Ventilation Systems Exhaust Fans
Condition Good
RUL 15
Location Roof
Plan Type Capital Replacement
Quantity 10
Unit of Measure EA
Unit Cost $2,121.50
Exhaust Fan
Hayat Brown LLC Page 47 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D3044 Hot Water Distribution Convective hydronic Heater
Condition Good
RUL 25
Plan Type Capital Replacement
Quantity 10
Unit Cost $947.52
Convective hydronic Heater
Hayat Brown LLC Page 48 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D3051 Terminal Self-Contained Units Hydronic Heaters
Condition Fair
RUL 3
Plan Type Capital Replacement
Quantity 10
Unit Cost $713.93
Hydronic Heater
D3051 Replace Hydronic Heaters Capital
2020 $7,139
Hayat Brown LLC Page 49 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D3051 Terminal Self-Contained Units Window A/C Units
Condition Fair - Good
RUL 7
Plan Type Capital Replacement
Quantity 10
Unit Cost $1,569.72
Window AC Units
D3051 Repair defective Window A/C unit.
Deferred
Maintenance 2017 $1,570
D3051 Replace Window A/C Units Capital
2024 $15,697
Hayat Brown LLC Page 50 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D3052 Package Units Rooftop/ Package Unit, 40 Tons
Condition Fair - Good
RUL 10
Location Roof
Plan Type Capital Replacement
Quantity 1
Unit Cost $60,856.39
Rooftop/ Package Unit, 40 Tons
Hayat Brown LLC Page 51 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D3052 Package Units Daikin VRV III Split Outdoor Unit, ~8 Ton each
Condition Good
RUL 15
Location Roof
Plan Type Capital Replacement
Quantity 6
Unit Cost $36,709.62
Daikin VRV III Split Outdoor Unit, ~8 Ton each
Hayat Brown LLC Page 52 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D3052 Package Units Daikin VRV III Split Outdoor Unit, ~6 Ton each
Condition Good
RUL 15
Location Roof
Plan Type Capital Replacement
Quantity 6
Unit Cost $33,038.66
Outdoor Unit, ~6 Ton each
Hayat Brown LLC Page 53 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D3052 Package Units Daikin VRV III Split Outdoor Unit, ~10 Ton each
Condition Good
RUL 15
Location Roof
Plan Type Capital Replacement
Quantity 2
Unit Cost $37,692.50
Outdoor Unit, ~10 Ton each
Hayat Brown LLC Page 54 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D3052 Package Units Mini Split System, Complete, 1 Ton
Condition Fair - Good
RUL 10
Plan Type Capital Replacement
Quantity 1
Unit of Measure EA
Unit Cost $2,870.11
Mini Split System, Complete, 1 Ton
Hayat Brown LLC Page 55 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D3067 Energy Monitoring & Control Meter, Natural Gas
Condition Good
RUL 20
Location Exterior
Plan Type Capital Replacement
Quantity 1
Unit Cost $274.64
Hayat Brown LLC Page 56 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D3068 Building Automation Systems Building Controls (SF), DDC, Average
Condition Fair - Good
RUL 10
Location Throughout
Plan Type Capital Replacement
Quantity 66329
Unit Cost $2.70
Thermostat Thermostat
Hayat Brown LLC Page 57 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D3069 Other Controls & Instrumentation Occupancy Sensors, Indoor Lighting
Condition Good
RUL 16
Plan Type Capital Replacement
Quantity 66329
Unit Cost $0.76
Occupancy Sensors
Hayat Brown LLC Page 58 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D40 F IRE PROTECTION SYSTEMS
D4031 Fire Extinguishers Fire Extinguisher
Condition Good
RUL 19
Location Throughout
Plan Type Capital Replacement
Quantity 66329
Unit Cost $0.37
Hayat Brown LLC Page 59 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D4095 Hood & Duct Fire Protection Kitchen Fire Suppression System
Condition Fair - Good
RUL 19
Location Kitchen
Plan Type Capital Replacement
Quantity 1
Unit of Measure EA
Unit Cost $6,410.56
Kitchen Fire Suppression System Kitchen Fire Suppression System
D4095 Perform inspection and certification of fire suppression system
Predictive Maint Test
Inspec 2017 $250
Hayat Brown LLC Page 60 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D50 ELECTRICAL SYSTEMS
D5012 Low Tension Service & Dist. Panel Board - Newer
Condition Good
RUL 26
Location Electrical Closet
Plan Type Capital Replacement
Quantity 16
Unit of Measure Each
Unit Cost $10,664.25
Electrical Panel
Hayat Brown LLC Page 61 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D5012 Low Tension Service & Dist. Panel Board - Old
Condition Poor - Fair
RUL 3
Location Kitchen, Cafeteria
Plan Type Capital Replacement
Quantity 3
Unit of Measure Each
Unit Cost $10,664.25
The Older electrical panel in the cafeteria which is accessible to students doesn't have a cover lock.
Electrical Panel Older
D5012 Replace Panel Board - Old Capital
2020 $31,993
Hayat Brown LLC Page 62 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D5012 Low Tension Service & Dist. Primary Transformer
Condition Good
RUL 26
Location Main Electrical Room
Plan Type Capital Replacement
Quantity 2
Unit Cost $37,131.05
Transformer Transformer
Hayat Brown LLC Page 63 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D5012 Low Tension Service & Dist. Transfer Switch, Auto
Condition Fair - Good
RUL 14
Location Main Electrical Room
Plan Type Capital Replacement
Quantity 2
Unit Cost $7,152.57
Automatic Transfer Switch
Hayat Brown LLC Page 64 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D5012 Low Tension Service & Dist. Switchboard, 1600 Amp
Condition Good
RUL 26
Location Main Electrical Room
Plan Type Capital Replacement
Quantity 1
Unit of Measure Each
Unit Cost $504,641.20
Switch Gear
Hayat Brown LLC Page 65 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D5012 Low Tension Service & Dist. Switchboard, 400 Amp
Condition Good
RUL 26
Location Main Electrical Room
Plan Type Capital Replacement
Quantity 1
Unit of Measure Each
Unit Cost $194,092.77
Switch Gear
Hayat Brown LLC Page 66 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D5012 Low Tension Service & Dist. Electrical Service and Distribution
Condition Good
RUL 16
Location Main Electrical Room
Plan Type Capital Replacement
Quantity 1
Unit Cost $274,897.38
Main Switch Gear
Hayat Brown LLC Page 67 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D5021 Branch Wiring Devices Branch Wiring Devices
Condition Good
RUL 26
Plan Type Capital Replacement
Quantity 66329
Unit Cost $3.01
Hayat Brown LLC Page 68 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D5022 Lighting Equipment Flood Light, Exterior
Condition Fair
RUL 6
Location Exterior
Plan Type Capital Replacement
Quantity 31
Unit of Measure Each
Unit Cost $844.04
Exterior Lights
D5022 Replace Flood Light, Exterior Capital
2023 $26,165
Hayat Brown LLC Page 69 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D5022 Lighting Equipment Lighting Equipment - fluorescent T5
Condition Good
RUL 16
Plan Type Capital Replacement
Quantity 55725
Unit Cost $3.62
T5 Lights
Hayat Brown LLC Page 70 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D5022 Lighting Equipment Lighting Control Panel
Condition Poor - Fair
RUL 3
Location Auditorium/ Gymnasium
Plan Type Capital Replacement
Quantity 1
Unit Cost $1,272.38
Lighting Control Panel
D5022 Replace Lighting Control Panel Capital
2020 $1,272
Hayat Brown LLC Page 71 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D5022 Lighting Equipment Lighting Equipment - Fluorescent Auditorium/Gymnasium/Cafeteria
Condition Good
RUL 16
Location Auditorium/Gymnasium, Cafeteria
Plan Type Capital Replacement
Quantity 6293
Hayat Brown LLC Page 72 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D5022 Lighting Equipment Lighting Equipment - Fluorescent Kitchen
Condition Good
RUL 16
Location Kitchen
Plan Type Capital Replacement
Quantity 1311
Hayat Brown LLC Page 73 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D5022 Lighting Equipment Lighting Equipment - LED
Condition Good
RUL 16
Location Lobbies
Plan Type Capital Replacement
Quantity 52
Unit Cost $335.84
LED Lights
Hayat Brown LLC Page 74 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D5022 Lighting Equipment Stage Lighting
Condition Poor - Fair
RUL 3
Location Auditorium/ Gymnasium
Plan Type Capital Replacement
Quantity 18
Unit of Measure EA
Unit Cost $268.67
Stage Lights
D5022 Replace Stage Lighting Capital
2020 $4,836
Hayat Brown LLC Page 75 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D5031 Public Address & Music Systems Public Address System
Condition Fair - Good
RUL 11
Location 3rd Floor Data Room
Plan Type Capital Replacement
Quantity 66329
Unit Cost $2.12
PA System
Hayat Brown LLC Page 76 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D5031 Public Address & Music Systems Sound System
Condition Poor
RUL 2
Location Auditorium/ Gymnasium
Plan Type Capital Replacement
Quantity 1
Unit Cost $2,067.61
Sound System
D5031 Replace Sound System Capital
2019 $2,068
Hayat Brown LLC Page 77 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D5037 Fire Alarm Systems Fire Alarm Systems
Condition Good
RUL 16
Location Main Electrical Room
Plan Type Capital Replacement
Quantity 66329
Unit of Measure SF
Unit Cost $4.02
Annunciator Fire Alarm Panel
Hayat Brown LLC Page 78 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D5038 Security and Detection Systems Security and Detection Systems - CCTV
Condition Fair - Good
RUL 11
Location 3rd Floor Data Room
Plan Type Capital Replacement
Quantity 66329
Unit Cost $1.92
Security Camera CCTV Panel
Hayat Brown LLC Page 79 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D5038 Security and Detection Systems Card Reader without Keypad
Condition Fair
RUL 6
Location Exterior, Data Room door
Plan Type Capital Replacement
Quantity 6
Unit Cost $1,149.90
Card Reader without Keypad
D5038 Replace Card Reader without Keypad Capital
2023 $6,899
Hayat Brown LLC Page 80 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D5038 Security and Detection Systems Intrusion Detection Switch, Interior
Condition Fair - Good
RUL 11
Location 3rd Floor Data Room
Plan Type Capital Replacement
Quantity 66328
Unit of Measure SF
Unit Cost $1.48
Security Panel
Hayat Brown LLC Page 81 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D5092 Emergency Light & Power Systems Emergency Light System
Condition Good
RUL 16
Plan Type Capital Replacement
Quantity 66329
Unit Cost $0.97
Emergency Lights
Hayat Brown LLC Page 82 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D5092 Emergency Light & Power Systems Exit Lighting Fixture
Condition Good
RUL 16
Plan Type Capital Replacement
Quantity 66329
Unit Cost $0.61
Exit Lights
Hayat Brown LLC Page 83 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
D5092 Emergency Light & Power Systems Generator, Diesel, 150 kW
Condition Good
RUL 21
Location Exterior
Plan Type Capital Replacement
Quantity 1
Unit Cost $117,290.74
Generator
Hayat Brown LLC Page 84 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
E E Q U I P M E N T & F U R N I S H I N G S Y S T E M S
E10 EQUIPMENT
E1093 Food Service Equipment Refrigerator, residential
Condition Fair - Good
RUL 11
Plan Type Capital Replacement
Quantity 3
Unit Cost $1,404.83
Refrigerator
Hayat Brown LLC Page 85 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
E1093 Food Service Equipment Kitchen Food Service Equipment, various types
Condition Good
RUL 15
Location Kitchen
Plan Type Capital Replacement
Quantity 1000
Unit Cost $104.41
Various Kitchen Equipment Walk-in freezer
Double Deck Ovens Under Kitchen Hood
Hayat Brown LLC Page 86 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
G B U I L D I N G S I T E W O R K S Y S T E M S
G20 S ITE IMPROVEMENTS
G2022 Paving & Surfacing Parking Lot Paving
Condition Fair
RUL 4
Plan Type Capital Replacement
Quantity 13000
Unit Cost $16.43
Rear yard and parking Front parking
Rear parking
Hayat Brown LLC Page 87 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
G2022 Replace Parking Lot Paving Capital
2021 $213,629
Hayat Brown LLC Page 88 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
G2031 Paving & Surfacing Pedestrian Paving, Schoolyard
Condition Poor - Fair
RUL 0
Plan Type Capital Replacement
Quantity 45000
Unit Cost $4.65
School yard
G2031 Replace Pedestrian Paving, Schoolyard Capital
2017 $209,250
Hayat Brown LLC Page 89 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
G2031 Paving & Surfacing Concrete Pedestrian Paving
Condition Fair
RUL 8
Plan Type Capital Replacement
Quantity 5800
Unit of Measure SF
Unit Cost $12.37
Front entrance Driveway
G2031 Replace Concrete Pedestrian Paving Capital
2025 $71,746
Hayat Brown LLC Page 90 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
G2041 Fences & Gates Chain Link Fence, 10'
Condition Fair - Good
RUL 8
Plan Type Capital Replacement
Quantity 120
Unit of Measure LF
Unit Cost $56.32
Gate
G2041 Replace/Repair chain link gate Deferred
2017 $901
Hayat Brown LLC Page 91 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
G2041 Fences & Gates Chain Link Fence 8'
Condition Fair - Good
RUL 8
Plan Type Capital Replacement
Quantity 1750
Unit Cost $43.33
Typical fence
G2041 Remove temporary chain link fence not being used Plant
Adaptation 2017 $250
G2041 Replace/repair chain link fence Deferred
Maintenance 2017 $867
G2041 Install new 8' chain link fence at parking lot for security Plant
Adaptation 2018 $1,300
Hayat Brown LLC Page 92 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
G2041 Fences & Gates Chain Link Fence, 4'
Condition Fair - Good
RUL 6
Plan Type Capital Replacement
Quantity 500
Unit Cost $17.93
Fence Fence
G2041 Replace 4' high chain link fence with gates Deferred
2018 $897
Hayat Brown LLC Page 93 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
G2041 Fences & Gates Chain Link Fence, 6'
Condition Fair - Good
RUL 7
Plan Type Capital Replacement
Quantity 120
Unit Cost $23.98
Missing fence Missing fence
G2041 Replace fence at generator, 6' chain link.
Deferred
2017 $480
Hayat Brown LLC Page 94 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
G2047 Playing Fields Playground Structures
Condition Good
RUL 13
Location Playgrounds
Plan Type Capital Replacement
Quantity 3
Unit of Measure EA
Unit Cost $42,840
Hayat Brown LLC Page 95 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
G2047 Playing Fields Safety Surface
Condition Good
RUL 8
Location Playgrounds
Plan Type Capital Replacement
Quantity 6000
Unit of Measure SF
Unit Cost $4.62
Damaged Safety Surface Safety Surface
G2047 Repair safety Surface Routine
Maint Minor Repairs
2017 $250
G2047 Replace Safety Surface Capital
2025 $27,720
Hayat Brown LLC Page 96 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
Hayat Brown LLC Page 97 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
THIS PAGE INTENTIONALLY LEFT BLANK
Hayat Brown LLC Page 98 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
APPENDICES
Appendix A: Expenditure Forecast
Appendix B: Photographic Record
Appendix C: Survey Information Resulting In Plant Adaptation Recommendations
Hayat Brown LLC Page 99 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
Appendix A:
Expenditure Forecast
Plan Item Report
1/7/2018 5:49:59 PM District of Columbia DGS Page 1 of 2
Hendley Elementary School
GSF (building): 66329
Year Built: 1959 Renew Year :
Replacement Cost: $15,352,510
Materials
Fiscal Year $ CSI Type Name Description Qty Units Cost Assessed Cost
Add. Cost $
2017 $454,367 B2010 Deferred Maintenance Replace window guards 150 SF $99 $14,915 $14,915
B2010 Deferred Maintenance Replace cracked brick 500 SF $53 $26,735 $26,735
B2010 Deferred Maintenance Replace coping stone 10 LF $151 $1,508 $1,508
B2010 Deferred Maintenance Deteriorated sealant at coping, windows and doors 200 LF $70 $14,028 $14,028
B2010 Deferred Maintenance Replace deteriorated louver 7 EACH $250 $1,750 $1,750
B2010 Deferred Maintenance Deteriorated masonry joints 10000 SF $11 $110,400 $110,400
B2010 Deferred Maintenance Repair stucco walls 100 SF $18 $1,820 $1,820
B2010 Deferred Maintenance Repair concrete cracks 100 SF $28 $2,847 $2,847
B2020 Deferred Maintenance Corrosion at window lintels 300 LF $57 $17,163 $17,163
C1020 Deferred Maintenance Replace/repair Deteriorated wood doors 7 Each $1,344 $9,405 $9,405
C1020 Deferred Maintenance Deteriorated metal door at kitchen 1 Each $1,858 $1,858 $1,858
C2010 Routine Maint Minor Repairs
Replace handrails end pieces 10 EA $50 $500 $500
C2010 Routine Maint Minor Repairs
Replace rubber nosing 20 EA $20 $400 $400
C2010 Deferred Maintenance Replace deteriorated rails 50 LF $83 $4,143 $4,143
C2010 Deferred Maintenance Replace/Repair concrete stairs 50 SF $37 $1,874 $1,874
D2010 Plant Adaptation Provide indirect waste 1 LS $500 $500 $500
D3050 Deferred Maintenance Repair defective Window A/C unit. 1 EA $1,570 $1,570 $1,570
D4090 Predictive Maint Test Inspec
Perform inspection and certification of fire suppression system
1 LS $250 $250 $250
G2030 Capital Replacement Replace Pedestrian Paving, Schoolyard 45000 SF $5 $209,250 $209,250
G2040 Routine Maint Minor Repairs
Repair safety Surface 1 LS $250 $250 $250
G2040 Deferred Maintenance Replace/repair chain link fence 20 LF $43 $867 $867
G2040 Plant Adaptation Remove temporary chain link fence not being used 1 LS $250 $250 $250
Note: This plan item list contains all plan item types for the facility. Only Deferred Maintenance, Plant Adaptation and Capital Replacement plan types contribute to the FCI calculations. Plan types Routine Maint Minor Repairs, Energy, Engineering Study, and Predictive Maint Test Inspec do not contribute to the FCI calculation.
Plan Item Report
1/7/2018 5:49:59 PM
District of Columbia DGS
G2040 Deferred Maintenance Replace fence at generator, 6' chain link. 20 LF $24 $480 $480
G2040 Deferred Maintenance Replace/Repair chain link gate 16 LF $56 $901 $901
Z1010 Plant Adaptation Replace Consider: ADA Investments 1 LS $30,705 $30,705 $30,705
2018 $2,196 G2040 Deferred Maintenance Replace 4' high chain link fence with gates 50 LF $18 $897 $897
G2040 Plant Adaptation Install new 8' chain link fence at parking lot for security
30 LF $43 $1,300 $1,300
2019 $2,068 D5030 Capital Replacement Replace Sound System 1 Each $2,068 $2,068 $2,068
2020 $47,034 C3020 Capital Replacement Replace Carpet Floor Covering 300 SF $6 $1,793 $1,793
D3050 Capital Replacement Replace Hydronic Heaters 10 EA $714 $7,139 $7,139
D5010 Capital Replacement Replace Panel Board - Old 3 Each $10,664 $31,993 $31,993
D5020 Capital Replacement Replace Lighting Control Panel 1 EA $1,272 $1,272 $1,272
D5020 Capital Replacement Replace Stage Lighting 18 EA $269 $4,836 $4,836
2021 $213,629 G2020 Capital Replacement Replace Parking Lot Paving 13000 SF $16 $213,629 $213,629
2023 $33,065 D5020 Capital Replacement Replace Flood Light, Exterior 31 Each $844 $26,165 $26,165
D5030 Capital Replacement Replace Card Reader without Keypad 6 Each $1,150 $6,899 $6,899
2024 $15,697 D3050 Capital Replacement Replace Window A/C Units 10 EA $1,570 $15,697 $15,697
2025 $215,200 D1010 Capital Replacement Replace Passenger Elevator 1 EA $115,734 $115,734 $115,734
G2030 Capital Replacement Replace Concrete Pedestrian Paving 5800 SF $12 $71,746 $71,746
G2040 Capital Replacement Replace Safety Surface 6000 SF $5 $27,720 $27,720
2026 $888,809 B10 Capital Replacement Replace SuperStructure 66329 SF $13 $888,809 $888,809
Total: $1,872,064
Hayat Brown LLC Page 101 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
Appendix B:
Photographic Record
Hayat Brown LLC Page 102 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
Exterior Walls :- Annex building
Exterior Walls:- Minor brick crack
Hayat Brown LLC Page 103 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
Exterior Walls :- Site wall
Exterior Walls:- Typical exterior wall
Exterior Walls :- Typical deteriorated sealant
Exterior Walls:- Site wall
Hayat Brown LLC Page 104 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
Exterior Walls :- Areaway wall
Exterior Walls:- Deteriorated louver
Exterior Walls :- Covered louver
Exterior Walls:- Upper roof
Hayat Brown LLC Page 105 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
Exterior Walls :- Exterior wall
Exterior Walls:- Deteriorated brick
Exterior Walls :- Soffit
Exterior Walls:- Exterior wall
Hayat Brown LLC Page 106 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
Exterior Walls :- Cracked concrete
Exterior Walls:- Exterior guards
Exterior Windows :- Typical window
Exterior Windows:- Typical windows
Hayat Brown LLC Page 107 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
Exterior Doors :- Exterior door
Exterior Doors:- Exterior door
Exterior Doors :- Exterior door
Exterior Doors:- Exterior door
Hayat Brown LLC Page 108 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
Single-Ply Modified Bituminous/Thermoplastic Roof :- General roof
Interior Metal Doors:- Interior door
Interior Wood Doors :- Typical deteriorated door
Interior Wood Doors:- Typical deteriorated door
Hayat Brown LLC Page 109 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
Interior Wood Doors :- Interior door
Concrete filled metal pan stairs:- Missing rails
Concrete filled metal pan stairs :- Deteriorated rubber nosing
Concrete filled metal pan stairs:- Deteriorated rubber nosing
Hayat Brown LLC Page 110 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
Exterior concrete stairs :- Concrete at basement stairs
Exterior concrete stairs:- Concrete stairs
Exterior concrete stairs :- Loose rail at stairs to basement
Exterior concrete stairs:- Typical concrete stair
Hayat Brown LLC Page 111 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
Exterior concrete stairs :- Typical exterior stairs
Exterior concrete stairs:- Typical concrete stairs
Exterior concrete stairs :- Deteriorated rail
Exterior concrete stairs:- Cracked stairs and missing rails
Hayat Brown LLC Page 112 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
Gypsum Board Wall Finishes :- Typical wall finishes
Interior CMU Walls:- Interior wall
Interior CMU Walls :- Interior wall
VCT Floor Finishes:- Typical floor tile
Hayat Brown LLC Page 113 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
Carpet Floor Covering :- Typical carpeting
Acoustical Ceiling Tiles:- Typical acoustical ceiling
Passenger Elevator :- Elevator
Sink, Various Types:- Single Sink
Hayat Brown LLC Page 114 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
Sink, Various Types :- Sinks
Commercial Grade Kitchen Sink, multiple compartments:- Commercial Grade Kitchen Sink, multiple compartments
Domestic Hot Water Storage Tank :- Domestic Hot Water Storage Tank
Domestic Water Heater, natural gas, 200 MBH
Hayat Brown LLC Page 115 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
Waste Piping :- Waste Piping
Waste Piping:- Waste Piping
Cast Iron Boiler, Hot Water/Steam, Gas-fired, 1250 MBH :- Cast Iron Boiler
Cast Iron Boiler, Hot Water/Steam, Gas-fired, 1250 MBH:- Boiler Tag
Hayat Brown LLC Page 116 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
VRV Terminal Unit :- VRV Terminal Unit
Exhaust Fans:- Exhaust Fan
Convective hydronic Heater :- Convective hydronic Heater
Hydronic Heaters:- Hydronic Heater
Hayat Brown LLC Page 117 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
Window A/C Units :- Window AC Units
Daikin VRV III Split Outdoor Unit, ~10 Ton each:- Daikin VRV III Split Outdoor Unit, ~10 Ton each
Daikin VRV III Split Outdoor Unit, ~6 Ton each :- Daikin VRV III Split Outdoor Unit, ~6 Ton each
Daikin VRV III Split Outdoor Unit, ~8 Ton each:- Daikin VRV III Split Outdoor Unit, ~8 Ton each
Hayat Brown LLC Page 118 of 142 Powered by iPlan™ © 4tell™ Solutions, LP
Mini Split System, Complete, 1 Ton :- Mini Split System, Complete, 1 Ton
Rooftop/ Package Unit, 40 Tons:- Rooftop/ Package Unit, 40 Tons
Building Controls (SF), DDC, Average :- Thermostat
Bu…