This document is an Operations & Maintenance Manual requirements attachment issued by the District of Columbia Department of General Services (DGS) and District of Columbia Public Schools (DCPS) for the Hendley Elementary School modernization project. The Design-Build Teams must create comprehensive Operations & Maintenance (O&M) manuals that provide school staff with clear, accessible information for all major building systems. The manual deliverables include one professionally printed, tabbed 3-ring binder and one searchable digital PDF, with identical content formatted according to DCPS specifications. The draft manual is due to DGS/DCPS by June 20 of the project delivery year, with the final version due by August 1. The document prescribes detailed content requirements across 13 major sections including sustainability features, doors and access control, PA systems, mechanical systems, lighting and electrical, plumbing, technology and equipment, monument signage, cleaning and specialty care, kitchen equipment, and exterior landscape features.

The manual must be designed for non-technical school staff and emphasize practical, step-by-step instructions using bullet points and simple language while avoiding jargon. All pages must include a standardized footer with the filename format "School Name_OMM_4-digit Year" for version control purposes. Graphics, floor plans, and diagrams should be clean and limited to essential information, with each topic typically fitting on one page unless justified by complexity. The manual must include manufacturer manuals, training materials, signage requirements, and references to DGS-provided examples and the DCPS Purchasing Guide for environmentally preferable products. Content should address common operational scenarios, maintenance dos and don'ts, reporting procedures through Salesforce work orders, and guidance on building systems specific to the approximately 79,575 square-foot Hendley ES facility designed to meet DCPS Educational Specifications including new site amenities, play areas, and a minimum U-8 sized turf field.

View the file

Other files

File Type Posted
Attachment_AA_ODR_Accessibility_Checklist_2026.pdf PDF
Attachment_Z_Tax_Exemption_Certificate_2020.pdf PDF
Attachment_W_Quality_Control_Master_Program.pdf PDF
Attachment_X-DGS_Standard_Specifications_and_Owner’s_Project_Requirements.pdf PDF
Attachment_Y_Contractor_Self-Certification_(V4_09.12.2024).pdf PDF
Attachment_O_Bid_Guarantee_Certification.pdf PDF
Attachment_Q_Release_of_Lien_Forms.pdf PDF
RFP-DCAM26CSRFP0011_Hendley_ES.pdf PDF
Attachment_N-NTP-DCAM26CSRFP0011_Hendley_ES.pdf PDF
Attachment_P_Conflict_of_Interest_Disclosure_Statement.PDF PDF
Attachment_U_Turnover_Protocol_Manual_2024.1.pdf PDF
Attachment_V_National_BIM_Guide.pdf PDF
Attachment_R_EEO_Policy_Statement.pdf PDF
Attachment_S_Certification_to_Furnish_Performance_&_Payment_Bond.pdf PDF
Attachment_T_Payment_and_Performance_Bond.pdf PDF
Attachment_A1_CD_SD_DD_Milestone_Requirements.pdf PDF
Attachment_A2_Hendley_Elementary_School_Educational_Specifications.pdf PDF
Attachment_E_Tax_Affidavit_Certification_Form.pdf PDF
Attachment_M_-_FOC-DCAM26CSRFP0011_Hendley_ES.pdf PDF
Attachment_B1_Existing_Drawings.pdf PDF
Attachment_C_-_FOL-DCAM26CSRFP0011_Hendley_ES.pdf PDF
Attachment_H1_Standard_Contract_Provisions_(Construction).pdf PDF
Attachement_A3_Ed_Spec_Standards_ES_(2021)_–_w_Appendices_A,_B,_&_C_(2025).pdf PDF
Attachment_A4_Waste_Management_Guidelines.pdf PDF
Attachment_B2_Facility_Conditions_Assessment.pdf PDF
Attachment_B6_Hendley_ES_Radon_Report.pdf PDF
Attachment_F1_-_Davis_Bacon_Wage_Determination_Act.pdf PDF
Attachment_G_Bid_Bond_Form.pdf PDF
Attachment_H2_Standard_Contract_Provision_Architectural_&_Engineering.pdf PDF
Attachment_I_SBE_Subcontracting_Plan.pdf PDF
Attachment_J_First_Source_Employment_Agreement_$5M.pdf PDF
Attachment_L_Past_Performance_Evaluation_Form.pdf PDF
Attachment_B3_Asbestos_Management_Plan_and_Asbestos_Inspection_Report.pdf PDF
Attachment_B4_Hendley_ES_Roof_Condition_Assessment_Report.pdf PDF
Attachment_B5_Hendley_ES_Lead_Inspection_Report.pdf PDF
Attachment_D_Bidder_Offeror_Certification_Form.pdf PDF
Attachment_F2_Title_29_CFR_Part_5.5_Davis_Bacon_Provision.PDF PDF
Attachment_K_Living_Wage_Act.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3924 Minnesota Avenue, NE, Washington, DC 20019 | Telephone (202) 727-2800 | Fax (202) 727-9877

DCPS Operations & Maintenance Manual

This document outlines the mandatory requirements that Design-Build Teams must follow when creating, organizing, and delivering the Operations & Maintenance Manual for school staff.

Objective:

Provide school staff with clear, concise, and easy‑to‑use Operations & Maintenance (O&M) information for all major building systems. The manual should be visually intuitive, limited to essential content, and organized so staff can quickly find what they need.

Development Requirements:

1. Content Focus A) What: Identify key systems, components, or procedures staff need to know.

B) How: Provide simple, step‑by‑step instructions for common tasks (for example:

“Report malfunction: Submit a Salesforce ticket.”). Include links where appropriate.

C) Where: Clearly show locations of critical equipment using labeled floor plans or simplified diagrams. This can be a marked-up PDF.

D) Dos & Don'ts: Provide practical guidance for maintaining systems (for example: “Do not use space heaters.” “Do turn off lights when leaving rooms.”)

2. Length

Each topic should fit on one page whenever possible. More complex items may utilize two pages while remaining concise and staff‑friendly.

3. Style and Language A) Use bullet points and short imperative sentences (“Check…”, “Report…”, “Shut off…”).

B) Avoid jargon or technical language unless necessary.

C) Define technical terms immediately when used.

D) All content should be written for non‑technical school staff.

4. Visual Communication A) Use simple diagrams, schematics, and floor plan snippets when they improve clarity.

B) Graphics should be clean, easy to read, and limited to essential information.

5. Organization & Deliverables A) Deliverables:

I) Printed Binder:

(a) One professionally printed, tabbed 3‑ring binder must be provided to

DGS for distribution to the school.

(b) The binder must include labeled, physical tabs that separate each primary section and content area (e.g., “General School Operations”) II) Digital PDF:

(a) One digital PDF, identical to the printed binder, must be provided to DGS for distribution.

(b) The PDF must be fully searchable.

(c) Includes hierarchical bookmarks matching all major sections and subsections.

(d) The file must follow the naming convention: School Name_OMM_4-digit Year.pdf (example: Malcolm X Elementary_OMM_2026 V1.pdf)

(e) Each page must include a footer with the same file‑name string for version control.

III) Timeline:

(a) Draft due to DGS/DCPS by June 20 of the project delivery year.

(b) Final due by August 1 of the project delivery year.

B) Metadata and Version Control:

I) Footnote: Every page of the Manual must include a standardized footnote at the bottom, stating: School Name_OMM_4-digit Year. This serves as a critical version control and context identifier. e.g. Malcom X Elementary_OMM_2026

6. Table of Contents & Outline

A) Cover Letter (reference DGS provided cover letter example) B) Work Orders Include the following standardized language:

I) When maintenance or warranty issues arise, contact your MSL so they can submit a work order through Salesforce.

C) Sustainability Features/Net Zero

Overview

I) Provide a high‑level summary of the school’s net‑zero features.

II) Include practical do’s and don’ts that help the school maintain Net Zero performance. (The design team should determine the most relevant items.)

III) Examples:

(a) Do not bring personal appliances into the school.

(b) Turn off devices and lights at the end of the day.

(c) Provide guidance for operable windows: when to use them, when not to use them, and which rooms are equipped with them.

(d) Reference DGS provided Examples

D) Doors Access and Security

Provide:

I) High‑level overview of entrances and security protocols.

II) Card readers, lockdown systems, and links to training materials.

III) Key schedules and plans with door numbers that match as‑built conditions.

IV) A‑phone instructions for entrances and kitchen.

V) Security system operation guidance, including how to arm/disarm the system.

VI) Clearly labeled floor plans with room and door numbers.

VII) Identification of any spaces that allow public access after-hours.

VIII) Exterior gates, fencing, pedestrian and vehicle gate operation, and any site‑specific conditions.

E) PA system

Provide:

I) Basic operating instructions II) Manufacturer manuals III) Training materials

F) Mechanical Systems

Purpose:

School staff do not perform maintenance or filter changes. These are handled by DGS Facilities. Staff only need to know how to operate the system correctly and when to request service.

Include:

I) Overview of the HVAC system II) Zoning diagrams or descriptions III) Thermostat operation instructions IV) Signage for thermostats V) Do’s and don’ts (e.g., no space heaters, keep windows closed during system operation) VI) “What to do if…” section with common scenarios and required steps

G) Lighting / Electrical

I) How lighting operates in classrooms II) Occupancy sensor behavior III) Specialty lighting (auditorium, stage) IV) Outlets on occupancy sensors (if applicable) V) Printed and digital breaker panel diagrams, mounted at each panel

H) Plumbing (non-kitchen)

I) General do’s and don’ts (example: only flush toilet paper) II) Plans showing locations of shut‑off valves III) Outdoor drinking fountain shut‑off valve locations and winterization guidance IV) Floor drain maintenance instructions (add water monthly if unused)

I) Technology and Equipment

Include Information for:

I) Auditorium, gym, cafeteria equipment, sound systems, projectors

II) Auditorium/stage lighting

III) Manufacturer manuals and training materials IV) Gym equipment (dividers, hoops, nets) including quick-start guide V) Elevator or chair lift operation, do’s/don’ts, and manuals (e.g., do not overload the cab)

J) Monument Sign I) Include operating instructions and manufacturer manuals/training

K) Cleaning and Specialty Care I) Guidance for non‑standard finishes II) Requirements under the Healthy Schools Act III) Reference to the DCPS Purchasing Guide for approved environmentally preferable products IV) Finish plans and schedules

L) Kitchen Equipment I) Provide O&M materials for Food and Nutrition services II) Include all equipment warranties and workmanship warranties

M) Exterior Landscape/Garden

I) Instructions for reporting potential stormwater system issues (e.g., bioretention area staying flooded 48–72 hours may indicate a clog requiring a work order)

END

DCPS Operations & Maintenance Manual
Provide school staff with clear, concise, and easy‑to‑use Operations & Maintenance (O&M) information for all major building systems. The manual should be visually intuitive, limited to essential content, and organized so staff can quickly find what th...
Development Requirements:

File details come from the government source that posted it. Updated .