This Performance Work Statement (PWS) details the haulout maintenance and inspection requirements for the US Geological Survey's Research Vessel KIYI, a 107-foot steel vessel used for Great Lakes fisheries research. The maintenance is scheduled for October 1st, 2025 to May 1st, 2026, and requires a contractor to perform comprehensive services including removing the vessel from water, conducting visual hull inspections, high-pressure washing, tank and void cleaning, ultrasonic hull gauging, propulsion system inspections, and installing specific equipment upgrades like an emergency steering system and electronic fire pump switch.
Key technical requirements mandate the work be performed at a shipyard within the Great Lakes basin, with the contractor responsible for providing all labor, materials, and marine repair resources. The contractor must ensure safe work environments, obtain gas-free certifications, provide fire watch during hot work, handle hazardous material disposal, and coordinate equipment de-energizing. Upon completion, the vessel must be restored to full operational status, with sea trials conducted and inspected by a USGS technical representative. The solicitation is a small business set-aside under NAICS code 336611, with the contract opportunity number 140G0225R0017 issued by the Department of the Interior's US Geological Survey Office of Acquisitions and Grants.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement Research Vessel KIYI Haulout Maintenance and Inspection
1.0 Introduction
There are currently five US. Geological Survey (USGS) research vessels (R/V) within the large vessel program headquartered at the Great Lakes Science Center (GLSC) in Ann Arbor, MI. The GLSC large vessel maintenance plan requires each vessel to undergo haul-out, a thorough maintenance review, and inspection every 5 years. R/V KIYI is scheduled for a haul-out, maintenance, and inspection period starting in 2025. The R/V KIYI is designed to function as an offshore work platform primarily conducting fisheries monitoring and research on the Laurentian Great Lakes. It focuses on fish population assessments, aquatic invasive species, and native fish restoration. It provides crucial scientific data to meet management and conservation goals for the Great Lakes. The R/V KIYI explores biological and ecosystem health by conducting surveys primarily in Lake Superior. Haul-out and associated services are to be performed on R/V KIYI in a period between October 1st, 2025, and May 1st, 2026, to accommodate seasonal fisheries research schedule and return to homeport in Ashland, WI.
Background
The R/V Kiyi is a 107-foot 299 gross ton steel haul ship. The R/V KIYI was built in 1999 for the US. Geological Survey to accomplish freshwater fisheries research work on the Great Lakes. Since then, it has been run every survey season collecting valuable data. It has undergone a haul-out/maintenance period every five years at a shipyard where projects that require outside assistance usually get completed which is part of our large vessel maintenance plan and in accordance with the USGS safety management system (SMS). The last haul-out for R/V Kiyi was completed in 2021. The plant consists of two Cummins QSK 19 diesel main drive engines (1300SHP), twin screw propulsion, and two Cummins 6BT5.9 ship service diesel generators (SSDGs) rated for 99Kw.
2.0 Scope
Contractor will be required to remove the vessel from the water and block in an environmentally controlled drydock location. Perform visual hull inspection and high-pressure wash and touch up paint (if needed). Clean and inspect all tanks and voids. Conduct ultrasonic gauging of hull. Clean and inspect propulsion shafts and propellers in place. Conduct bow thruster inspection and maintenance. Install a helm pump emergency steering system in aft steering. Install an additional electronic fire pump switch on the aft deck. Repaint anchor chain markings, install drip-less shaft seals, and conduct engine coolant flush.
Options include overhauling and remounting both SSDG’s, remounting Starlink antenna, replacing #1 bilge pump with a more powerful pump, and troubleshooting toilet/black water system and fix as necessary to decrease water use on-board.
3.0 Applicable Documents
R/V KIYI Blueprints
4.0 Technical Requirements
The maintenance will be required to be performed at a shipyard within the Great Lakes basin.
The underwater hull is inspected, and maintenance of the underwater machinery and equipment is serviced to operate as designed.
The contractor will be required to provide all labor, materials, and marine repair resources for the work described herein. The Contractor shall be responsible for certifying that a safe atmosphere exists in and about a compartment prior to the commencement of any work. Whenever compartments must be gas free to meet state and federal regulations, the Contractor shall pump down, open, remove sludge, clean, wipe, ventilate and take all other action required to make the compartments safe for the work to be performed. If off-loading of fuel oil is necessary because of insufficient empty tank space, the contractor shall off-load the fuel. Copies of gas free certificates, issued by a Marine Chemist certified by the National Fire Protection Association shall be posted on the ship in two locations designated by the USGS Technical Representative.
Follow-up inspections by the Contractor’s Competent Person shall also be documented at the same two locations. The Contractor shall be responsible for identifying the compartments which require gas free certification.
Hot work is permitted only when fire watch standers are provided by the Contractor. A fire watch stander is required whenever welding, flame cutting, or other hot work is performed where combustible materials are present or when combustible materials are adjacent to the opposite side of metal partitions exposed to hot work and could be ignited by conduction or radiation. In the latter case, a fire watch stander is required on both sides of the partition. The Contractor shall remove all hazardous materials used and shall properly dispose of all hazardous waste produced during the performance of work under the contract. The Contractor is responsible for all Lock-Out/Tag-Out requirements and shall coordinate the de-energizing and re-energizing of equipment and machinery with the USGS Technical Representative and ship’s Master or Engineer. The Contractor shall clean-up and remove from the ship all dirt, debris, scrap, and other materials incident to Contractor’s work at the end of each workday; all oil, or other fluids, shall be cleaned off all surfaces. Prior to starting work on interior spaces, protect the decks and deck coverings of spaces in which contract work is to be performed and spaces through which workers will traverse by covering the decks and deck coverings with a temporarily fitted heavy vinyl, plywood, or particle board. While at the shipyard R/V KIYI will require 480volt, three phase, 100-amp service via 4 wire, located on main aft deck. The contractor shall provide necessary air, potable water, fire main, electricity, sewage disposal, trash, service, oily waste removal, and waste oil removal to the vessel for the duration of the shipyard availability.
Temporary fire main, potable water, and black/gray water connections shall be provided to the vessel’s deck risers, where the vessel is so equipped.
The contractor shall dock the vessel for the underwater hull inspection, sandblasting, painting, and repairs of the underwater hull as well as the installation and/or modification of machinery and piping systems connected to the underwater hull. Contractor shall re-float the vessel in good order upon completion of all specified underwater repairs, cleaning, sandblasting, and painting. The USGS Technical Representative shall be present when undocking/launching vessel.
5.0 Deliverables
Upon completion of all work items the ship and all its equipment shall be placed back in operating order by the contractor within technical design specifications and inspected by a USGS technical representative to ensure proper working order. Sea trials must be conducted by the ship master and engineer and shall be deemed satisfactory by the USGS technical representative before final completion. Any defects found on ship systems/equipment that are deemed a result of contract work shall be fixed by the contractor.