This document is an Amendment (0005) to a federal solicitation for the haulout, inspection, maintenance, and repair of the Research Vessel Kiyi. The amendment modifies the original solicitation (140G0225R0017) by changing the Period of Performance to October 01, 2025, to May 01, 2026, and provides clarifications to technical questions, including confirmation of drydock stability calculations per SFLC Standard Spec 8634 Appendix A. The amendment also indicates that a lines plan is attached (Attachment 18 D105-01-1 Lines and Offsets), and a hecsalv .sh2 geometry file can be provided post-award if needed. The solicitation remains a Small Business set-aside under NAICS Code 336611, with the government reserving the right to select and fund specific work items within 30 days after the vessel's arrival at the shipyard.

View the file

Other files

File Type Posted
Sol_140G0225R0017_Amd_0006.pdf PDF
Attachment_16_20-127-03-R1__KIYI__Stability_Report_126135316_126153827_0005.pdf PDF
Attachment_17_KIYI_Stability_Letter_126152428_0005.pdf PDF
Attachment_18_D105-01-1-_Lines_and_Offsets_0005.pdf PDF
Sol_140G0225R0017_Amd_0004.pdf PDF
Sol_140G0225R0017_Amd_0003.pdf PDF
Attachment_4a_25-102-238-R-_Emergency_Helm_Pump_Installation_0002.pdf PDF
Attachment_6_D589-660-01-1_Bilge-Ballast_System_0002.pdf PDF
Attachment_12_25-102-445-R-_Starlink_Antenna_Mounting_Modification_0002.pdf PDF
Attachment_2_589-D610-01-1-_Shafting_Arrangement___Details_0002.pdf PDF
Attachment_10_25-102-510-R-_Ventilation_Modifications_0002.pdf PDF
Sol_140G0225R0017_Amd_0002.pdf PDF
Attachment_11_589-D645-01-1-_Fresh_Water_System_0002.pdf PDF
Attachment_14_18-139-260_Keel_Cooler_Modifications_0002.pdf PDF
Attachment_13_589-D640-01-1-Engine___Generator_Cooling_0002.pdf PDF
Attachment_3_589-D610-02-1-_Bow_Thruster_Details_0002.pdf PDF
Attachment_15_SFLC-Std-Spec-0740-(2020)_0002.pdf PDF
Attachment_8_589-D410-01-1-_Hull_Outfit_and_Fittings_0002.pdf PDF
Attachment_7_25-102-870-R-_Davit_Modification_0002.pdf PDF
Attachment_4_598-D615-01-1-_Steering_Arrangement_and_Details_0002.pdf PDF
Attachment_1_589-D501-01-1-_Sonar_and_Transducer_Well_Details_0002.pdf PDF
Attachment_5_25-102-225-R-_Shaft_Seal_Modifications_0002.pdf PDF
Attachment_9_589-D670-01-1-_Vents_Sounds_and_Sea_Chest_0002.pdf PDF
B08_Attachment_C_Schedule_of_Work_Items_Rev1_0001.docx DOCX document
Sol_140G0225R0017_Amd_0001.pdf PDF
Attachment_A_KIYI_Haulout_Specification_2025.pdf PDF
Attachment_C_Schedule_of_Work_Items.docx DOCX document
Attachment_B_PWS_KIYI_Shipyard_2025.pdf PDF
Sol_140G0225R0017.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140G0225R0017 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

GDB

DENVER CO 80225-0046

204 DENVER FEDERAL CENTER

PO BOX 25046

USGS OAG DENVER ACQUISITION BRANCH

07/02/20250005

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/06/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment 0005 is being issued to provide answers to questions received and to change the

Period of Performance to October 01, 2025, to May 01, 2026, as originally submitted.

1. We are interpreting the drydock stability section to mean stability calculations in accordance with SFLC Standard Spec 8634 Appendix A. Are there further stability calculations needed? Correct, Only 8634 Appendix A.

2. Does the vessel have a trim & stability booklet that can be shared? Yes, Attachments 16 and 17.

3. Is there a GHS geometry file available? If not, is there a lines plan and tank plan

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Mary Wilson

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140G0225R0017/0005 available? Lines plan is attached (See Attachment

18 D105-01-1 Lines and Offsets). A hecsalv .sh2 geometry can be provided following the award if needed.

Period of Performance: 10/01/2025 to 05/01/2026

Change Item 00010 to read as follows(amount shown is the obligated amount):

00010 Services, non-personal to provide all plant, equipment, labor, supervision, and materials

(unless otherwise provided herein) necessary for

Haulout, inspection, maintenance, and repair of the Research Vessel Kiyi. Perform all work described in the specifications, drawings, and other attachments herein.

Total price for all BASE plus OPTIONAL work from the specification and Attachment C Schedule of

Work Items. At the time of contract award, the government will select which items will be ordered/funded; work items not ordered/funded at the time of contract award may be ordered/funded within 30 days after vessel arrival at the shipyard.