Attachment A - PPQ.pdf

PDF 206 KB Posted

Attached to
IDIQ Structural Concrete Repairs
Solicitation number
AOCACB21R0004
Issued by

View the file

Other files

File Type Posted
2021-2028 IDIQ Structural Concrete Repairs - SOW 03.17.2021.pdf PDF
AOCACB21R0004 (A007).pdf PDF
AOCACB21R0004 - Pre-Bid RFI Responses 03-16-2021.pdf PDF
AOCACB21R0004 (A006).pdf PDF
Revised Section L 03.16.2021.pdf PDF
Revised Section M 03.16.2021.pdf PDF
AOCACB21R0004 A005.pdf PDF
AOCACB21R0004 - Pre-Bid RFI Responses 03102021.pdf PDF
2021-2028 IDIQ Structural Concrete Repairs - Bid Form 03.09.2021.pdf PDF
AOCACB21R0004 A001.pdf PDF
COVID-19 OAP Decision Tool (attachment to AOC Clause AOC52.223-11).pdf PDF
COVID-19 Daily Health Screening Inventory (attachment to AOC Clause AOC52.223-11).pdf PDF
2021 - 2028 IDIQ Tunnel Structural Repairs - Drawings.pdf PDF
Division 26 - Generic Electrical Specifications.pdf PDF
Contracting Officer Statement.docx DOCX document
0003.pdf PDF
2021 - 2028 IDIQ Tunnel Structural Repairs - Specifications.pdf PDF
CPP UDS SOP March 2019.pdf PDF
RFI 1.pdf PDF
0002.pdf PDF
0001.pdf PDF
2021 - 2028 IDIQ Tunnel Repairs - Site Visit Details and Requirements.docx DOCX document
Sample Certificate of Insurance (COI).pdf PDF
2021-2028 IDIQ Structural Concrete Repairs - Bid Form 01.15.pdf PDF
COVID-19 Poster OSHA4000.pdf PDF
Attachment D -Davis-Bacon Wage Determination.pdf PDF
PandemicFlu.pdf PDF
IDIQ - Structural Repairs Tunnel Improvements SOW - 01.15.pdf PDF
SCUS Police Background Check Form.pdf PDF
NDA.pdf PDF
AOCACB21R0004 (final).pdf PDF
USCP Request for Check of Criminal History (Form CP-491 (5-18) Revised.pdf PDF
Attachment B - CEQ.pdf PDF
Attachment C - Bid Form 11.19.2020.pdf PDF
USCP Vehicle Delivery Procedure Reference Guide (5-08).pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Title: Structural Repairs & Tunnel Improvements Location: Capitol Power Plant (CPP) Utility Distribution System (UDS) Tunnels

AOCACB21R0004

Revised 7 December 2011 36

SOURCE SELECTION SENSITIVE INFORMATION

DISCLOSURE LIMITATIONS AS OUTLINED IN FAR 2.101 & 3.104 APPLY

ATTACHMENT A

AOC PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information Firm Name: CAGE Code:

Address: DUNs Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture

Other (Explain) Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name:

Title:

Phone Number:

Email Address:

Title: Structural Repairs & Tunnel Improvements IDIQ Location: Capitol Power Plant (CPP) Utility Distribution System (UDS) Tunnels

AOCACB21R0004

Revised May 2014 37

SOURCE SELECTION SENSITIVE INFORMATION

DISCLOSURE LIMITATIONS AS OUTLINED IN FAR 2.101 & 3.104 APPLY

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: AOC REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND

SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE

COMPLETED QUESTIONNAIRE TO AOC WITH THEIR PROPOSAL, AND MAY

DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON AOC

SOLICITATIONS. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES

DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED

DIRECTLY TO AOC. PLEASE CONTACT THE OFFEROR FOR AOC POC INFORMATION.

THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION

ON THIS FORM.

File details come from the government source that posted it. Updated .