2021 - 2028 IDIQ Tunnel Structural Repairs - Specifications.pdf

PDF 4 MB Posted

Attached to
IDIQ Structural Concrete Repairs
Solicitation number
AOCACB21R0004
Issued by

View the file

Other files

File Type Posted
2021-2028 IDIQ Structural Concrete Repairs - SOW 03.17.2021.pdf PDF
AOCACB21R0004 (A007).pdf PDF
AOCACB21R0004 - Pre-Bid RFI Responses 03-16-2021.pdf PDF
AOCACB21R0004 (A006).pdf PDF
Revised Section L 03.16.2021.pdf PDF
Revised Section M 03.16.2021.pdf PDF
AOCACB21R0004 A005.pdf PDF
AOCACB21R0004 - Pre-Bid RFI Responses 03102021.pdf PDF
2021-2028 IDIQ Structural Concrete Repairs - Bid Form 03.09.2021.pdf PDF
AOCACB21R0004 A001.pdf PDF
COVID-19 OAP Decision Tool (attachment to AOC Clause AOC52.223-11).pdf PDF
COVID-19 Daily Health Screening Inventory (attachment to AOC Clause AOC52.223-11).pdf PDF
2021 - 2028 IDIQ Tunnel Structural Repairs - Drawings.pdf PDF
Division 26 - Generic Electrical Specifications.pdf PDF
Contracting Officer Statement.docx DOCX document
0003.pdf PDF
CPP UDS SOP March 2019.pdf PDF
RFI 1.pdf PDF
0002.pdf PDF
0001.pdf PDF
2021 - 2028 IDIQ Tunnel Repairs - Site Visit Details and Requirements.docx DOCX document
Sample Certificate of Insurance (COI).pdf PDF
2021-2028 IDIQ Structural Concrete Repairs - Bid Form 01.15.pdf PDF
Attachment A - PPQ.pdf PDF
COVID-19 Poster OSHA4000.pdf PDF
Attachment D -Davis-Bacon Wage Determination.pdf PDF
PandemicFlu.pdf PDF
IDIQ - Structural Repairs Tunnel Improvements SOW - 01.15.pdf PDF
SCUS Police Background Check Form.pdf PDF
NDA.pdf PDF
AOCACB21R0004 (final).pdf PDF
USCP Request for Check of Criminal History (Form CP-491 (5-18) Revised.pdf PDF
Attachment B - CEQ.pdf PDF
Attachment C - Bid Form 11.19.2020.pdf PDF
USCP Vehicle Delivery Procedure Reference Guide (5-08).pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AOC P/N PP19001 //CONTROLLED//

Non-Walkable Tunnel Restoration November 18, 2020 000110 TABLE OF CONTENTS For Construction Rev2

A/E P/N 19320 SECTION 000110-1 of 2 Version Date: 2/10/2020

//CONTROLLED//

DOCUMENT 00 01 10 – TABLE OF CONTENTS

DIVISION 0 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 00 10 Cover Sheet 00 01 07 Professional Seals 00 01 10 Table of Contents 00 41 43 Unit Price Bid-Form

DIVISION 1 - GENERAL REQUIREMENTS

01 00 00 General Requirements 01 00 01 Capitol Power Plant Special Provisions 01 10 00 Summary 01 22 00 Unit Prices 01 23 10 Alternates 01 25 00 Substitution Procedures 01 26 00 Contract Modification Procedures 01 29 00 Payment Procedures 01 30 00 Construction Safety and Health 01 30 01 Supplemental Construction Safety and Health 01 31 00 Project Management and Coordination 01 31 26 Project Management and Communication 01 32 00 Construction Progress Documentation 01 32 33 Photographic Documentation 01 33 00 Submittal Procedures 01 35 91 Protection 01 42 00 References 01 43 00 Quality Control Services over 500K 01 50 00 Temporary Facilities & Controls 01 53 00 Landscape Protection and Restoration 01 55 00 Security Requirements 01 60 00 Product Requirements 01 73 00 Execution 01 73 29 Cutting and Patching 01 74 19 Construction Waste Management and Disposal – Small Projects 01 74 20 Management of Hazardous Waste 01 77 00 Closeout Procedures 01 78 30 Bonds and Warranties 01 78 39 Project Record Documents

DIVISION 02 - SITE CONSTRUCTION

02 07 50 Concrete Removal 02 15 00 Shoring 02 82 13 Asbestos Abatement Procedures 02 83 13 Lead Removal 02 84 01 Handling of Lighting Ballast and Lamps Containing PCBs and Mercury 02 84 16 Other Hazardous and Special Wastes Removal and Disposal 02 84 33 Removal and Disposal of PCBs

2021 - 2028 TUNNEL STRUCTURAL

REPAIRS - SPECIFICATIONS

(FOR REFERENCE ONLY)

000110 TABLE OF CONTENTS For Construction Rev2

A/E P/N 19320 SECTION 000110-2 of 2 Version Date: 2/10/2020

DIVISION 03 - CONCRETE

03 31 00 Concrete Restoration 03 37 13 Shotcrete 03 60 00 Chemical Grouting 03 70 00 Embedded Galvanic Anodes

DIVISION 05 – METALS

05 12 00 Structural Steel

DIVISION 09 — FINISHES

09 91 13 Painting

DIVISION 26 - ELECTRICAL

GENERIC SPECIFICATIONS PROVIDED FOR REFERENCE

010000 GENERAL REQUIREMENTS For Construction – Rev2

A/E P/N. 19320 SECTION 010000-1 of 8 Version Date: 2/10/2020

SECTION 010000 – GENERAL REQUIREMENTS

GENERAL

SUMMARY

A. The provisions of the Division 01 specifications apply to the entire work of the Contract.

B. This Section describes the following in general:

1. Definitions and terms.

2. Background information.

3. Summary of the Work.

4. Supervision and construction procedures.

5. Project Schedule.

6. Tax-Exempt work.

7. Examination of existing site conditions

8. Conflicting requirements.

9. Contract documents maintained on project site.

10. Confidentiality and security of documents.

11. Advertising and promotional materials.

12. Specification and Drawing conventions.

13. References.

C. Related Requirements include, but are not limited to the following:

1. Section 011000 “Summary” for project information, general scope of work, site restrictions, work restrictions, and coordination with occupants.

2. Section 010100 “CPP Special Provisions” for additional provisions specific to the

Capitol Power Plant and Utility Tunnels.

3. Section 013100 “Project Management and Coordination” for key staff, meetings, administrative submittals, PMIS, and Requests for Information (RFIs).

4. Section 013200 "Construction Progress Documentation" for construction progress schedule, progress reporting, field reports, and requests for extension of time.

DEFINITIONS AND TERMS

A. The term “Government” means the United States of America and shall be represented by the Architect of the Capitol (AOC), who is the Contracting Officer (AOC52.202-2).

B. The term “Architect” as used in the Contract Documents shall mean the Architect of the Capitol, the Contracting Officer, or the Contracting Officer’s Technical Representative

(AOC52.202-2).

C. The term “Associate Architect” shall mean the design professional(s) retained by the Architect to prepare designated portions of the Contract Documents.

D. The term “Contracting Officer” (CO) as used in the Contract Documents means the Architect of the Capitol or his duly authorized representative (AOC52.202-2).

E. The term “Contracting Officer’s Technical Representative” (COTR) as used in the Contract Documents means the duly authorized representative the Architect of the Capitol.

F. The term “Contract Documents” includes, collectively, the Project Manual, the contract drawings and the addenda and modifications thereto, if any (AOC52.202-2). These documents are not to be used separately for bid or construction as they represent the entirety of the project. The Contractor is responsible for insuring that the documents are used together.

A/E P/N. 19320 SECTION 010000-2 of 8 Version Date: 2/10/2020

G. The term “Work” includes, but is not limited to, materials, labor, and manufacturer and fabrication of components (AOC52.202-2).

H. The term “Specifications” means the portion of the Contract Documents that consist of the written requirements for materials, equipment, construction systems, standards and workmanship for the Work, and performance of related services (AOC52.202-2).

I. The term “Drawings” means the graphic and pictorial portions of the Contract Documents, wherever located and whenever issued, that show the design, location and dimensions of the Work, and generally includes plans, elevations, sections, details, schedules and diagrams (AOC52.202-2).

J. “Informational Documents” include documents that are included for convenience with the Contract Documents but are not Contract Documents. They are indicated “For Information Only” and may include drawings, hazardous material reports, photographs, historic documents, and the Preservation Policy. The Contractor is expected to independently verify all information shown in informational drawings and to provide the Contractor’s own surveys, testing, and verification of conditions shown therein.

K. “Notice of Award” is the Architect’s written confirmation of an award of a contract to the successful bidder, stating the award, award date, and including the COTR letter.

L. “Notice to Proceed” is the formal authorization to the Contractor to begin the Work. Unless specifically authorized in writing, any steps taken in connection with the performance of, or the preparation to perform, the Contract, prior to issuance of the Notice to Proceed, will be the responsibility of and at the risk of the Contractor, and without any cost whatsoever to the Architect (AOC52.211-6).

M. “Substantial Completion” is defined in Section 017700 “Closeout Procedures.”

N. “Beneficial Occupancy” is defined in Section 017700 “Closeout Procedures.”

O. “Conditions for Final Acceptance” are specified in Section 017700 “Closeout Procedures.”

P. The “Project Management Information System” (PMIS) is defined in Section 013100

“Project Management Communications.”

Q. The terms “Must” and “Shall” are used interchangeably and denote the imperative. “May” denotes the permissive. However, the words “no person may…” mean that no person is required, authorized, or permitted to do the act described.

R. Unless noted otherwise, all number of days indicated are in calendar days.

BACKGROUND INFORMATION

A. AOC’s purview: The Architect of the Capitol (AOC) is responsible for the maintenance, operation, development, and preservation of over 17,400,000 square feet of building space and over 530 acres of land within the United States Capitol Complex and outlying sites. AOC facilities are organized by Jurisdictions which include the United States Capitol, the House Office Buildings, and the Senate Office Buildings, the Library of Congress Buildings and Grounds, the United States Supreme Court, the United States Botanic Garden, the United States Capitol Power Plant, the Capitol Grounds, and the Capitol Police Buildings, Grounds and Security. AOC maintains off-site facilities in the District of Columbia and in Virginia and Maryland. Some off-site facilities include climate control book storage facilities, data centers, Security training facilities, child care centers and mail facilities.

B. Higher standard of care: Compared to a typical commercial project, an AOC project requires on the part of the Contractor a higher level of attentiveness and detail, a greater amount of look-ahead and pre-planning, and a rigorous regard for security restrictions.

AOC projects seek to preserve the character and history of the Capitol, other Capitol

A/E P/N. 19320 SECTION 010000-3 of 8 Version Date: 2/10/2020

Complex Buildings, or the United States Capitol Grounds. AOC’s design guidelines emphasize building longevity, security and safety, and historic preservation. The Contractor shall accord with these precepts by anticipating greater attention to detail and tighter coordination with stakeholders.

C. Coordination with Other Work: Contractor should anticipate and plan for concurrent projects with overlapping schedules and work areas. The Contractor shall fully inform himself as to conditions relating to construction and labor under work by others that may affect the Project. The Contractor shall cooperate in every way with other parties doing work and provide, to the extent their work is affected by his work, all information necessary for the proper execution of their work, without delay (AOC52.236-2).

D. Irregularity of Capitol Complex operations: Capitol Complex operations are, at irregular and unanticipated times, interrupted due to events that can occur on the Capitol Complex, e.g. funerals in the Rotunda, closure of Congressional buildings due to unusual activities, etc. These events can impact AOC contractor operations. Any AOC contractor that becomes aware of an event that may affect its operations on the Capitol Complex may go to www.aoc.gov/business/contractors to receive current information of the operational status of the Capitol Complex. Before ceasing or limiting its operations, the Contractor must obtain written approval from the COTR (AOC52.204-6).

SUMMARY OF THE WORK

A. Project/Work Identification

1. General: Project name is Non-Walkable Utility Tunnel Restoration, Us Capitol Power

Plant, Washington, D.C., as shown on Contract Documents prepared by the Architect of the Capitol (AOC). Drawings and specifications are dated August 14, 2020

2. Summary by Reference: Work of the Contract can be summarized by references to the SCHEDULE, GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS, Official Procedure for Making Changes in Contracts, Specification Sections, Drawings, Amendments and Modifications to the contract documents issued subsequent to the initial printing of this Project Manual and including, but not necessarily limited to, printed material referenced by any of these.

3. General scope of work and other project information are described in Section 011000 “Summary.”

SUPERVISION AND CONSTRUCTION PROCEDURES

A. The Contractor shall supervise and direct the Work and be responsible for construction means and methods. Contractor is responsible for coordinating all portions of the Work and for jobsite safety.

B. Comply with governing regulations and the codes and standards imposed upon the work.

These requirements include the obtaining of permits, licenses, inspections, releases and similar documentation, as well as payments, statements and similar requirements associated with regulations, codes and standards.

PROJECT SCHEDULE

A. Construction Duration: Will be 180 calendar days from the date of Notice to Proceed. If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination Clause.

B. Milestones will be set for individual tasks/tunnel sections by the Government. Failure to complete the work within the specified time will result in liquidated damages.

TAX-EXEMPT WORK

A/E P/N. 19320 SECTION 010000-4 of 8 Version Date: 2/10/2020

A. Reference AOC52.229-1.

EXAMINATION OF EXISTING SITE CONDITIONS

A. Execution of the Contract by the Contractor is a representation that the Contractor has visited the Project site, become generally familiar with local conditions, and correlated personal observations with the requirements of the Contract Documents.

B. Contractor shall, before starting each portion of the Work, carefully review the relevant Contract Documents as well as information provided by Architect, shall take any necessary field measurements of existing conditions, and shall observe any conditions at the site affecting the Work.

CONFLICTING REQUIREMENTS

A. Contractor shall promptly inform Architect, in writing, of any discovered errors, omissions, discrepancies, conflicts, or ambiguities in the Contract Documents before proceeding with any work affected by such factors. Failure to do so will be at the risk of the Contractor (AOC52.311-3).

B. Anything mentioned in the specifications and not shown on the drawings, or shown on the drawings and not mentioned in the specifications, shall be of like effect as if shown or mentioned in both. In case of difference between drawings and specifications, promptly submit a Request for Information (RFI) to the Architect, who shall promptly make a determination in writing. Any adjustment by the Contractor without such a determination shall be at the Contractor’s own risk and expense (AOC52.236-10).

Delays necessitated by requests for interpretation shall not form the basis for a Change to the contract. The Architect’s interpretation and decision shall be final.

C. Omissions from the drawings and specifications or the mis description of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or mis described details of the Work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications

(AOC52.236-10).

D. Industry Standards: Where compliance with two (2) or more industry standards or sets of requirements is specified, and overlapping of those different standards or requirements establishes different or conflicting minimums or levels of quality, the most stringent requirement is intended and will be enforced, unless specifically detailed language written into Contract Documents clearly indicates that a less stringent requirement is to be fulfilled. Refer apparently-equal-but-different requirements, and uncertainties as to which level of quality is more stringent, to the Architect for a decision before proceeding.

CONTRACT DOCUMENTS MAINTAINED ON PROJECT SITE

A. Contractor shall keep on the Project site a copy of the full-sized drawings and specifications, approved shop drawings, product data and samples, and shall at all times give the Architect access thereto (AOC52.236-10).

B. As specified in Section 017839 “Project Record Documents,” store record documents and samples in the field office apart from the Contract Documents used for construction.

CONFIDENTIALITY AND SECURITY OF DOCUMENTS

A. Before dissemination to subcontractors or other personnel, all Architect drawings and electronic copies thereof shall be considered at minimum to be Sensitive but Unclassified

(SBU) (AOC52.223-3).

A/E P/N. 19320 SECTION 010000-5 of 8 Version Date: 2/10/2020

1. The following statement shall be imprinted on each page of drawings: “PROPERTY

OF THE UNITED STATES GOVERNMENT. COPYING, DISSEMINATING, OR

DISTRIBUTING THESE DRAWINGS, PLANS OR SPECIFICATIONS TO

UNAUTHORIZED USERS IS PROHIBITED.”

2. Do not remove this notice.

3. Properly destroy documents when no longer needed.

B. Contractor is strictly prohibited from placing or transmitting drawings and specifications on the Internet or modem without express permission from the Architect (AOC52.223- 4).

C. Any information supplied to the Contractor by the Architect shall be considered confidential and/or proprietary. Contractor shall not disclose such information to a third party without prior written consent of Architect (AOC52.203-5).

ADVERTISING AND PROMOTIONAL MATERIALS

A. Contractor shall not refer to the project in commercial advertising in such manner as to state or imply that the product or service provided is endorsed or preferred by Architect or is considered by Architect to be superior to other products and services. Submit to Architect for approval any proposed advertising or promotional copy connected in any manner with this Contract and/or the Capitol, other Capitol Complex Buildings, or the United States Capitol Grounds (AOC52.203-1).

SPECIFICATION AND DRAWING CONVENTIONS

A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows:

1. Imperative mood and streamlined language are generally used in the Specifications.

The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

2. Specification requirements are to be performed by Contractor unless specifically stated otherwise.

B. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products:

1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections

2. Abbreviations: Materials and products are identified by abbreviations [published as part of the U.S. National CAD Standard] [and] [scheduled on Drawings].

3. Keynoting: Materials and products are identified by reference keynotes referencing Specification Section numbers found in this Project Manual.

C. Drawing Symbols: Except as otherwise indicated, graphic symbols used on drawings are those symbols recognized in the construction industry for purposes indicated. Where not otherwise noted, symbols are defined by "Architectural Graphic Standards", published by John Wiley & Sons, Inc., Ninth edition.

1. Mechanical/Electrical Drawings: Graphic symbols used on mechanical and electrical drawings are generally aligned with symbols recommended by ASHRAE. Where appropriate, these symbols are supplemented by more specific symbols as recommended by other recognized technical associations including ASME, ASPE, IEEE and similar organizations. Refer instances of uncertainty to the Architect for clarification before proceeding

A/E P/N. 19320 SECTION 010000-6 of 8 Version Date: 2/10/2020

D. Bolding and Underscoring in the Specifications: Are used strictly to assist reader of specification text in scanning text for key words (for quick recall). No emphasis on or relative importance is intended where bolding and underscoring are used.

E. Abbreviations: Actual word abbreviations of a self-explanatory nature have been included in texts. Singular words will be interpreted as plural and plural words will be interpreted as singular where applicable and where full context of the contract documents so indicates.

F. Minimum Quality/Quantity: In every instance, the quality level or quantity shown or specified is intended as minimum for the work to be performed or provided. Except as otherwise specifically indicated, actual work may either comply exactly with that minimum (within specified tolerances) or may surpass the quality of that minimum within reasonable limits. In complying with requirements, indicated numeric values are either minimum or maximums as noted or as appropriate for context of requirements.

Refer instances of uncertainty to the Architect for decision before proceeding.

G. Definitions: The following definitions are general for the work and may have more specific meanings in other parts of the Contract Documents:

1. Installer: The entity (person or firm) engaged by the Contractor, its subcontractor or sub-subcontractor for performance of a particular unit of work at the project site, including installation, erection, application and similar required operations. Such entities (installers) shall be expert in the operations they are engaged to perform.

2. Testing Laboratory: An independent entity engaged to perform specific inspections or tests of the Work, either at the Project site or elsewhere, and to report, and (if required) interpret results of those inspections or tests.

3. Indicated: The term "indicated" is a cross-reference to graphic representations, notes or schedules on drawings, to other paragraphs or schedules in the specifications, and to similar means of recording requirements in contract documents. Where terms such as "shown," "noted," "scheduled," and "specified" are used in lieu of "indicated," it is for the purpose of helping the reader locate cross-reference, and no limitation is intended except as specifically noted.

4. Furnish: Except as otherwise defined in greater detail, the term "furnish" means to supply and deliver to the Project site, ready for unloading, unpacking, assembly, installation, etc., as applicable in each instance.

5. Install: Except as otherwise defined in greater detail, the term "install" describes operations at the Project site including unloading, unpacking, assembly, erection, placing, anchoring, applying, working to dimension, finishing, curing, protecting, cleaning and similar operations, as applicable in each instance.

6. Provide: Except as otherwise defined in greater detail, the term "provide" means to furnish and install, complete and ready for intended use, as applicable in each instance.

7. Exposed: Describes an item or surface, exterior or interior, which can be seen by a person outside the building or a person inside a usable space within the building during normal activity.

8. Concealed: Describes an item or space not normally seen, occupied or used by building occupants or staff, such as shafts, hoistways, tunnels, ceiling plenums, attics, and crawls spaces.

9. Finished Space: Space normally used by the public, building occupants or staff for primary functions of the building, but does not include mechanical, electrical and elevator equipment rooms, hoistways, tunnels or mechanical penthouses, unless otherwise indicated.

A/E P/N. 19320 SECTION 010000-7 of 8 Version Date: 2/10/2020

10. Specialist: An individual or firm of established reputation (or, if newly organized, whose personnel have previously established a reputation in the same field), which is regularly engaged in, and which maintains a regular force of workers skilled in either (as applicable) manufacturing or fabricating items required by the contract, installing items required by the contract, or otherwise performing work required by the contract.

Where the contract specification requires installation by a specialist, that term shall also be deemed to mean either the manufacturer of the item, an individual or firm licensed by the manufacturer, or an individual or firm who will perform the work under the manufacturer's direct supervision.

REFERENCES

A. Industry Standards

1. General: Except to the extent that more explicit or more stringent requirements are written directly into contract documents, applicable standards of the construction industry have the same force and effect (and are made a part of the contract documents by reference) as if copied directly into the contract documents, or as if published copies were bound herein, subject to the order of precedence previously stated.

2. Publication Dates: Except as otherwise indicated, where compliance with an industry standard is required, conform to the standard in effect on the date of the Invitation for Bids, or, if referred to in any Amendments, at the date of such Amendments.

3. Abbreviations and Names: The following acronyms or abbreviations as referenced in contract documents are defined to mean the associated names. Both names and addresses are subject to change but are believed to be accurate as of the date of contract documents:

AIA - American Institute of Architects (The); www.aia.org; (202) 626-7300.

AISC - American Institute of Steel Construction; www.aisc.org; (800)

644-2400.

ANSI - American National Standards Institute; www.ansi.org; (202)

293-8020.

ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning

Engineers; www.ashrae.org; (800) 527-4723.

ASTM - American Society for Testing and Materials International; www.

astm.org; (610) 832-9585.

AWI - Architectural Woodwork Institute; www.awinet.org; (800) 449-8811.

AWS - American Welding Society; www.aws.org; (800) 443-9353.

CDA - Copper Development Association Inc.; www.copper.org; (800)

232-3282.

FMG - FM Global (formerly FM - Factory Mutual System);

www.fmglobal.com; (401) 275-3000.

IEEE - Institute of Electrical and Electronics Engineers; www.ieee.org; (212)

419-7900.

NAAMM - National Association of Architectural Metal Manufacturers;

www.naamm.org; (301) 657-3110.

NECA - National Electrical Contractors Association; www.necanet.org; (301)

657-3110.

NEMA - National Electrical Manufacturers Association; www.nema.org;

(703) 841-3200.

NFPA - National Fire Protection Association; www.nfpa.org; (800) 344-3555.

A/E P/N. 19320 SECTION 010000-8 of 8 Version Date: 2/10/2020

NRCA - National Roofing Contractors Association; www.nrca.net; (800) 323-9545.

SMACNA - Sheet Metal and Air Conditioning Contractors' National Association; www.sspc.org; (877) 281-7772.

SSPC - The Society for Protective Coatings; www.sspc.org; (877) 281-7772.

UL - Underwriters Laboratories Inc.; www.ul.com; (800) 704-4050.

WWPA - Western Wood Products Association; www.wwpa.org; (503)

224-3930.

B. Federal Government Agencies

1. Abbreviations and names: The following acronyms or abbreviations referenced in the Contract Documents indicate names of Standard- or Specification-producing agencies of the federal government. Names and addresses are subject to change but are believed to be accurate and as of the date of the Contract Documents:

CFR - Code of Federal Regulations; www.access.gpo.gov/nara/cfr; (202) 512-1530.

EPA - Environmental Protection Agency; www.epa.gov; (800) 438-2474.

FS - Federal Specification: Available from the following:

1) Defense Automated Printing Service: www.astimage.daps.dla.mil/online;

(215) 697-6257.

2) General Services Administration: www.fss.gsa.gov/pub/fed-specs.cfm;

(202) 619-8925.

3) National Institute of Building Sciences: www.nibs.org; (202) 289-7800.

OSHA - Occupational Safety and Health Administration; www.osha.gov;

(800) 321-OSHA.

C. District of Columbia Government Agencies

1. Abbreviations and names: The following acronyms or abbreviations referenced in the Contract Documents indicate names of Standard- or Specification-producing agencies of the DC government. Names and addresses are subject to change but are believed to be accurate as of the date of the Contract Documents:

Department of Energy and Environment (DOEE); 1200 First Street. N.E, Washington, DC 20002; doee.dc.gov; (202) 535-2600.

DDOT - District Department of Transportation; 2000 14th Street, NW, 6th Floor, Washington, DC 20009; ddot.dc.gov; (202) 673-6813.

D. DC Water - District of Columbia Water and Sewer Authority; 1385 Canal Street, S.E., Washington DC 20003; www.dcwater.com; (202) 787-2427.

PRODUCTS (NOT USED)

EXECUTION (NOT USED)

END OF 010000 – GENERAL REQUIREMENTS

010001 CAPITOL POWER PLANT SPECIAL PROVISION For Construction – Rev2

A/E P/N. 19320 SECTION 010001-1 of 20 //CONTROLLED//

SECTION 01 00 01 – CAPITOL POWER PLANT SPECIAL PROVISIONS

These Special Provisions contain unique requirements for work performed at the Capitol Power Plant (CPP) and on the Utility Distribution System. These special provisions are considered to be in addition to or take precedence over the requirements stated in other sections of these contract specifications.

PART 1 - EXECUTION

1.1 UTLITY DISTRIBUTION SYSTEM ENTRY:

A. Contractor shall prepare a Confined Space Entry Program in accordance with 29 CFR 1910.146 for all confined spaces except the Utility Distribution Tunnel System. Contractor shall submit the program to the Architect for review and approval for compliance with OSHA. Contractor shall not use the Architect’s Confined Space Entry Program in lieu of developing a Contractor’s Confined Space Entry Program.

B. Contractor shall follow the Architect’s requirements for work in the Utility Distribution Tunnel System. Refer to the Utility Distribution System (UDS) Standard Operating Procedures (SOP) at the end of the Section which also includes traffic control procedures at specific manholes and the Emergency Action and Response Plan (EARP). A copy of the EARP is included in the digital version of this specification.

1.2 COORDINATION WITH OTHER CONTRACTORS:

A. The work associated with this contract will require significant construction coordination with the work of other AOC contractors that will be working in the CPP Tunnels during the performance period of this contract.

B. It is the intent of the contract to coordinate construction activities with the other work in the CPP Tunnels and the Jurisdictions such that the concrete repair work will be continuously executed from the Notice to Proceed (NTP) to the completion dates specified. Failure to complete such work by the dates specified will result in liquidated damages as specified in the Contract Clause.

1.3 PHASING/WORKING PLAN:

A. The Contractor is expected to complete all work sequentially to provide the minimum disruption of parking and normal tunnel and building operations. The Contractor should expect to work overtime and/or off hours to complete some of the required tasks.

B. The Contractor shall develop and submit a detailed work plan that will demonstrate how each phase will be executed. The work plan shall include, but will in no way be limited to, discussions regarding the approach for protection of existing construction, equipment locations, material deliveries, site security, any required temporary structures, access points to perform the work, public space requirements, potential impacts to operation of the Jurisdictions and local

A/E P/N. 19320 SECTION 010001-2 of 20 //CONTROLLED// businesses, debris removal plan, any temporary shoring required to control falling debris during demolition, demolition approach, repair technique and safety considerations.

C. The Contractor shall be required to submit Phasing/Working Plans to the AOC for approval prior to the start of the work.

1.4 USE OF PREMISES

A. General: Contractor shall have limited use of premises for construction operations, including use of Project site, during construction period. Contractor's use of premises is also limited by Government’s responsibility to

1. To protect safety, health, and welfare of occupants, employees, and visitors;

2. To conduct operations required for or incidental to governing;

3. To protect integrity of building, its components and historic treasures;

4. To perform routine or emergency maintenance work; and

5. To perform construction work or retain other contractors to perform work on portions of this project or other projects.

B. Use of Site: Limitations on use of premises are contained on the drawings, specifications, General and Supplementary Conditions; addendums and other contract documents.

1. Work Area Limits: Limit use of premises to work indicated. Do not disturb portions of

Project building or site beyond areas in which Work is indicated. Portions of premises’ not indicated as part of Work shall not be occupied by the Contractor. These areas are not available to the contractor except as approved by the Architect.

2. Government Occupancy: Government will operate premises during conduct of the Work.

Cooperate fully with Architect and Capitol Power Plant personnel during construction operations to minimize conflicts and to facilitate Government usage.

3. The Government holds the daily UDS tunnel Safety briefing at 0630 hours at CPP, and all contractors working for CPP inside the tunnels are required to attend this meeting. All contractors must sign in each morning.

4. Condition of Existing Structure / Tunnel: Maintain portions of existing tunnel affected by construction operations in a weather-tight condition throughout construction period.

Repair damage caused by construction operations.

5. The Contractor will confer with the AOC to determine when the activity should be performed.

6. Confine operations at the site to areas indicated. Do not disturb portions of the site beyond the areas in which Work is indicated.

7. Keep public areas, such as sidewalks, hallways, stairs, lobbies and toilet rooms, free from accumulation of waste material, rubbish, construction debris and construction materials.

Clean work areas daily.

8. Keep existing driveways and entrances serving the premises clear and available to the U.

S. Capitol Police, House Office Buildings (HOB) and Library of Congress (LOC), and employees at all times.

9. Pollution-producing equipment shall not be located adjacent to or near air intakes where airborne smoke or fumes could be drawn into any Capitol Hill buildings or Tunnel System.

10. Unless designated for sole Contractor use, keep existing driveways and entrances serving the premises clear and available to the Government and its employees at all times. Do not permit trucks of any kind to use existing sidewalks without prior authorization of the

AOC.

A/E P/N. 19320 SECTION 010001-3 of 20 //CONTROLLED//

11. Maintain driveways between and around combustible material storage piles at least 15-feet wide and free of accumulation of rubbish, equipment and materials. Maintain access for firefighting equipment.

12. Do not unreasonably encumber the site with materials or equipment. Confine stockpiling of materials and location of storage sheds to the areas indicated. If additional storage is necessary, obtain and pay for such storage off-site.

13. Provide 24hr/7day access to the tunnel, vaults and manholes by emergency vehicles and firefighting equipment.

C. Photographs: Contractor will take detailed photographs or videos of the entire interior and exterior area prior to starting work. Provide digital copies of the photographs and video to the Architect. The photos and/or video will constitute documentation of the existing conditions. The information may be used to evaluate any damage that may occur.

D. Materials, Equipment and Storage: Do not reasonably encumber site with materials or equipment. Confine stockpiling of materials to areas within the Staging Plan. Store equipment and materials in an organized manner as use of site reflects on Capitol Hill and AOC appearance. Use designated staging area wisely and efficiently. Coordinate the delivery of materials and equipment with the availability of space within the staging area. If additional storage space is necessary, Contractor shall obtain and pay for such storage off-site.

E. Project Site Limits of Work: Contractor shall have full use of the project site within “Limits of Work” boundaries for construction operations during the construction period. Contractor's use of Project site is limited only by Government's right to perform work or to retain other contractors on portions of project. These limits are subject to change as determined by the U.S.

Capitol Police and Authority Having Jurisdiction (AHJ).

F. Project Facilities: Contractor shall have limited use of the project facilities for construction operations as indicated on the drawings by contract limits and as indicated by requirements of this Section.

G. Cleaning and Protection: During handling and installation of work at the project site, clean and protect work in progress and adjoining work on the basis of continuous maintenance. Apply protective covering on installed work where it is required to ensure freedom from damage or deterioration at time of completion.

1. Clean and perform maintenance on installed work as frequently as necessary through remainder of the construction period. Adjust and lubricate operable components to ensure operability without damaging effects.

2. Limiting Exposures of Work: To the extent possible through reasonable control and protection methods, supervise performance of the work in such a manner and by such means which will ensure that none of the work, whether completed or in progress, will be subjected to harmful, dangerous, damaging or otherwise deleterious exposure during the construction period.

a. Opening Protection: Protect against possible damage to all pipes, cords, light fixtures, ladders, stanchions, supports, pipe supports, insulation, egress doors, hatches, stairs, frames, doors, thresholds, jambs/heads and sills of permanent openings used as passageways or through which materials are handled.

b. Route Protection: Install protection materials on all surfaces along routes where materials and equipment are transported within the building. This includes floors, walls, and other fixed items. Remove protection immediately after the material and

A/E P/N. 19320 SECTION 010001-4 of 20 //CONTROLLED// equipment transport are completed. Clean all surfaces after removal of protective materials.

3. Load all trucks leaving the site with materials or loose debris in a manner that will prevent dropping of materials on streets. Fasten suitable tarpaulins over the load before they enter surrounding paved streets. Spray trucks with water prior to leaving site to prevent dust from propagated beyond the work area.

4. Cleaning: Clean corridors and rooms in areas where work is performed and in adjacent spaces daily or more often as necessary, of debris, spillage or other waste products related to the construction operations.

5. Final Cleaning: Contractor shall engage a professional cleaning company to thoroughly clean areas where work was performed. This includes but is not limited to wiping down all surfaces of floors, walls, stairs, ceiling; light fixtures, mechanical and electrical equipment, piping and conduit, life safety equipment, etc. for all spaces where work is performed related to this project.

1.5 ACCESS TO SITE

A. General: Contractor shall have limited use of the project site for construction operations as indicated on Drawings and as indicated by requirements of this Section.

B. Use of Site: Limit use of project site to the areas indicated in the drawings. Do not disturb portions of the project site beyond areas in which Work is being performed.

C. Limits: Confine construction operations to the designated space indicated in the drawings.

D. Driveways, Walkways and Entrances: Keep driveways and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times.

Do not use these areas for parking or storage of materials.

1. Schedule deliveries to minimize use of driveways and entrances by construction operations.

2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

3. Condition of Existing Tunnel: Maintain portions of existing tunnel affected by construction operations in a weathertight condition throughout the construction period.

Repair damage caused by construction operations.

1.6 COORDINATION WITH OCCUPANTS

A. Full Government Occupancy: Government and their representatives will occupy the tunnels during the entire construction period. Cooperate with the Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations. Maintain existing entrances and exits.

B. Maintain access to existing entrances, walkways, corridors, and other occupied facilities. Do not close or obstruct entrances, walkways, corridors, or other occupied facilities without written permission from Architect and approval of authorities having jurisdiction.

C. Notify the Architect not less than 30 days in advance of activities that will affect Government's operations.

A/E P/N. 19320 SECTION 010001-5 of 20 //CONTROLLED//

D. Communication within the tunnel will be over the radios. Up to six (6) government owned radios will be issued (daily basis) by the Government to the contractor. All radios must be tracked and maintained by the contractor and shall not be lost and must be turned in daily when used. Contractors and their subs are to adhere to AOC CPP Tunnels Communication Protocol when using the radios.

E. Any queries from Press or Neighbors or public are to be forwarded to Communications Manager of AOC through AOC COTR for this project. No information is to be given out on work related to this project or AOC property etc.

1.7 CONTRACTORS ADVANCE WORK

A. General: Contractor will perform several preparatory actions before beginning any Work on site.

B. Temporary Protection: Contractor shall install temporary protection prior to mobilizing the site for demolition or construction to protect the Work area and prevent damage to the existing surfaces and equipment. Temporary safety barriers around the work area

C. The actions taken shall be performed in reverse sequence when the project has been completed.

Restore the site to its original condition

1.8 WORK RESTRICTIONS

A. Work Restrictions, General: Comply with restrictions on construction operations.

1. Comply with limitations on use of public streets and other requirements of authorities having jurisdiction.

2. Contractor’s On-Site Work Hours:

a. General Working Hours: Work shall generally be performed during the hours of 6:00 a.m. to 4:00 p.m., Monday through Friday, except as otherwise indicated.

b. After Normal Hours Work: Work that may disrupt operations within the Tunnel and or adjacent buildings such as noise from drilling and hammering shall be performed after normal business working hours with the approval of the Architect, Monday through Friday, except as otherwise indicated.

3. Weekend Hours: No work will be performed unless approved in advance by the Architect. Work on weekends may start at 8:00 a.m. on Saturday and must end by 6:00 a.m. on Monday.

4. Utility Shutdowns: Schedule work after normal business working hours. As required and scheduled 30 days in advance.

5. Contractor shall perform operations that can transmit noise to adjacent buildings and residences during the morning and afternoon hours. Monitor noise several times per day.

Record levels and maintain log of information to include time of day, levels experienced and Locations where readings were taken. Maintain levels below District of Columbia requirements.

6. Provide supplementary means of arresting noise levels prior to start of work and if determined will exceed District of Columbia noise requirements.

7. Contractor shall monitor dust generation and distribution outside the structure. Provide supplementary means to prevent distribution of dust to adjacent areas.

A/E P/N. 19320 SECTION 010001-6 of 20 //CONTROLLED//

8. Contractor to provide the Architect with schedule where construction activities may affect occupancy of grounds and adjacent buildings.

9. Notify Architect not less than seventy-two (72) hours in advance of proposed disruptive operations.

10. Obtain Architect's written permission before proceeding with disruptive operations.

B. Stop Work: Due to the Government events it may be necessary to stop work. Stop work directions will be issued by the Architect. Stop work may be for only a few hours or for several days.

C. Utility Service Interruptions

1. Contractor shall submit a utility service interruption plan for the project. Plan shall include dates and times of each scheduled interruption, with estimated period of outage, list of existing equipment that will be affected by the interruption, proposed sequence of equipment shut-down and start-up, and responsible personnel.

2. Schedule interruptions during times when the facility is unoccupied.

3. Outages must be requested at least 30 days in advance.

4. Obtain the Architect’s written permission before proceeding with utility interruptions.

5. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by

Government or others unless permitted under following conditions and then only after arranging to provide temporary utility services according to the operational requirements indicated:

a. Notify Architect not less than 30 days in advance of proposed utility interruptions.

b. Contractor to provide Architect with schedule where construction activities may affect occupancy of grounds, Tunnel and adjacent buildings.

c. Provide temporary utility services to replace the interrupted utility services during

Governments hours of operation. Provide Architect with plan which includes equipment, in/out of service times, equipment Locations and areas affected by outage, etc.

d. Notify Architect not less than 30 days in advance of proposed utility interruptions.

Do not proceed with utility interruptions without Architect’s written permission.

e. Notify Architect immediately of any damage to Government utilities and services.

f. Notify Architect and Local utility company of any damage to street utilities.

D. Heat Generation: Open flames are not permitted within the tunnel enclosure or on the premises.

Obtain permits for welding from Architect (Hot Work Permit).

E. Open Flames: Open flames are not permitted within or adjacent to the tunnels unless approved by the Architect (Hot Work Permit). Obtain a permit from the Architect (Hot Work Permit) to operate an open flame or welding in presence of a fire watch. Combustible Products or Materials: Do not store or maintain combustible materials or products within the tunnel. Adhere to CPP regulations for storage of combustible materials. The contractor shall keep and maintain a 20 lb fire extinguisher on site at all times.

F. Equipment Use: The Contractor may use excavation equipment, where appropriate. Extreme caution must be exercised when using excavation equipment as there are unknown utilities and unforeseen condition prevalent throughout the site. Use hand tools associated with excavation when encountering irrigation systems, electrical distributions, and other obstacles.

G. Consuming of Tobacco Products: Tobacco products, to include but not limited to smoking, chewing or snuff, shall not be consumed within the tunnel or the job site or within 25 feet (8 m)

A/E P/N. 19320 SECTION 010001-7 of 20 //CONTROLLED// of entrances, operable windows, or outdoor air intakes. Dispose of tobacco products in containers at the exterior of the tunnel and project site locations.

H. Controlled Substances: The use or possession of controlled substances within the tunnel or CPP or project site is prohibited.

I. Conversation and Language: The Contractor’s personnel shall use discretion in their choice of language, topics and words while working in the area since they will be among Government employees, the public and children.

J. Food Availability: There are no vending machines available for use by workers. Due to pedestrian and vehicular traffic as well as availability of parking spaces, portable vending vehicles prohibited. Workers should bring sufficient food and drink for breaks and meals to be consumed outside of the tunnels. Contractor shall collect all waste from food consumption at the end of each day and disposed of offsite.

K. Off-Site Storage: There may be limited area for storage of materials, equipment and products on site (as indicated on the drawings – lay down area). Therefore, the contractor is expected to store excess materials, equipment and products at an offsite Location. The cost of the off-site storage is the responsibility of the contractor.

L. Construction Parking: Parking spaces for the personal vehicles are not available on site.

Construction workers will need to park elsewhere or find alternate means of travel to the site.

Parking spaces for delivery vehicles is not available on the site except for temporary loading and unloading. Metro services the area from two Local stops at Capitol South SE (Orange and Blue lines) and Union Station, NE (Red line). A Pay for Parking lot is Located in the vicinity of South Capitol Street under the Freeway, at Union Station and elsewhere adjacent to Capitol Hill. Individuals are responsible for paying for parking.

M. Road Protection: Protect asphalt and concrete surfaces from damage or staining by installing an impervious temporary cover over the surfaces. Provide temporary protected surface over area where vehicles may access site.

N. Ammunition, Explosives, Weapons and similar Tools:

1. Ammunition: Use of any kind or type of ammunition or similar device generating an explosion or projectile is prohibited.

2. Explosives: Use of any kind or type of explosive or device generating an explosion in performance of work is prohibited.

3. Weapons: Weapons of any type or size are not permitted on the premises of the Capitol

Power Plant and Capitol Complex. Any tool or instrument that can be deemed to be a weapon by the USCP will be banned.

4. Use of Powder or Gas Actuated Tools: Construction tools actuated by or employing powder or gas actuated charges may be permitted provided tool(s) are of the kind and design ordinarily used for construction and the Architect has authorized its use after determining that its use will not endanger human life or safety.

5. Notify and obtain approval from the Architect (US Capitol Police) at least 72 hours prior to using any tool that may sound like a weapon being fired, such as a powder actuated tool (RAMSET), so Local authorities can be informed of the potential noise and avert unnecessary initiation of emergency actions and responses to potential incidents.

O. Security Requirements

A/E P/N. 19320 SECTION 010001-8 of 20 //CONTROLLED//

1. General: During the construction period, access to the project site will be controlled by the US Capitol Police conducting a screening process of all persons, materials, equipment and other items.

2. Personnel Screening: All workers are expected to comply with the process when entering and leaving the work…