AOCACB21R0004 - Pre-Bid RFI Responses 03-16-2021.pdf

PDF 132 KB Posted

Attached to
IDIQ Structural Concrete Repairs
Solicitation number
AOCACB21R0004
Issued by

View the file

Other files

File Type Posted
2021-2028 IDIQ Structural Concrete Repairs - SOW 03.17.2021.pdf PDF
AOCACB21R0004 (A007).pdf PDF
AOCACB21R0004 (A006).pdf PDF
Revised Section L 03.16.2021.pdf PDF
Revised Section M 03.16.2021.pdf PDF
AOCACB21R0004 A005.pdf PDF
AOCACB21R0004 - Pre-Bid RFI Responses 03102021.pdf PDF
2021-2028 IDIQ Structural Concrete Repairs - Bid Form 03.09.2021.pdf PDF
AOCACB21R0004 A001.pdf PDF
COVID-19 OAP Decision Tool (attachment to AOC Clause AOC52.223-11).pdf PDF
COVID-19 Daily Health Screening Inventory (attachment to AOC Clause AOC52.223-11).pdf PDF
2021 - 2028 IDIQ Tunnel Structural Repairs - Drawings.pdf PDF
Division 26 - Generic Electrical Specifications.pdf PDF
Contracting Officer Statement.docx DOCX document
0003.pdf PDF
2021 - 2028 IDIQ Tunnel Structural Repairs - Specifications.pdf PDF
CPP UDS SOP March 2019.pdf PDF
RFI 1.pdf PDF
0002.pdf PDF
0001.pdf PDF
2021 - 2028 IDIQ Tunnel Repairs - Site Visit Details and Requirements.docx DOCX document
Sample Certificate of Insurance (COI).pdf PDF
2021-2028 IDIQ Structural Concrete Repairs - Bid Form 01.15.pdf PDF
Attachment A - PPQ.pdf PDF
COVID-19 Poster OSHA4000.pdf PDF
Attachment D -Davis-Bacon Wage Determination.pdf PDF
PandemicFlu.pdf PDF
IDIQ - Structural Repairs Tunnel Improvements SOW - 01.15.pdf PDF
SCUS Police Background Check Form.pdf PDF
NDA.pdf PDF
AOCACB21R0004 (final).pdf PDF
USCP Request for Check of Criminal History (Form CP-491 (5-18) Revised.pdf PDF
Attachment B - CEQ.pdf PDF
Attachment C - Bid Form 11.19.2020.pdf PDF
USCP Vehicle Delivery Procedure Reference Guide (5-08).pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI No. Request for Information (RFI) Document Reference Government Response(s) Dated 03.11.2021

I have read that Key Personnel cannot be substituted during the first 90 days, can you please clarify if laborers on the job can be added and/or switched out within the first 90 days? Solicitation

Per Section AOC52.211 - 1, the key personnel are Project Manager, Superintendent, Quality Control Manager, and Safety officer. Requirements for evaluation of key personnel are provided in Section L, L.1.5. Laborers are not considered Key personnel per section L1..5

Prior to job starting, will there be a Task Order Schedule? Or will the Task Orders only be determined at the weekly meetings? Solicitation

Task Orders will be issued post award of the IDIQ Contract in acordance with 52.216-

18. No specific task order schedule will be provided. Weekly meetings to take place during task order performance / execution period.

It states in the specs, that the contract is “Firm-Fixed Pricing”, however the solicitation reads as a Negotiated price, please clarify. Solicitation

The task order contract(s) issued against IDIQ contract will be Firm-Fixed Price based on IDIQ rate schedules.This IDIQ solictation will be Negotiated Price.

Please clarify section 52.216-19: Order Limitations.

Solicitation Form - SF1442 Per Section 10, Note C, of the SF1442 ( page 1 of 62), the "guaranteed contract minimum is $1,000.00. The total aggregate maximum amount expendable under the entire IDIQ is $15,000,000.00."

Section 01 45 00, cannot be located in the specs, can you please send it as an attachment? Solicitation - Section L.1.5.d

Please replace Section 01 45 00 with Section 01 43 00 "Quality Control Services over 500K" for requirements of the Quality Control Manager.

Can we form and pour all locations in leu of shotcrete?

Specification Section 03 37 13 - Shotcrete

Only vertical wall or floor repairs may be formed and poured. Overhead repairs will typically not have access to the upper surface and therefore full depth concrete placement is typically not possible. Government prefers the shotcrete method vs a form and pump method. Only in rare instances where both sides of the ceiling concrete would be accessible would a form and pour method be acceptable. The form and pump method for ceiling repairs may be permitted with EOR approval. Contractor shall ensure air pockets will not be formed / trapped by providing work plan for Government approval. Therefore, shotcrete is preferred.

Are HEPA filters required for all dust mitigation? Specification Section 01 50 00 - Temporary

Facilities and Controls Filters are required for dust mitigation. Contractor shall conform to Specification Section section 01 50 00 - 2.05.G. under "equipment"

Is there a specific zinc content you want for your anode, we normally run 105. Specification Section 03 70 00 - Embedded

Galvanic Anodes Per specification section 03 70 00 - Embedded Galvanic Anodes, 100 gram zinc mass Vector Galvanic XP2 Anodes or equal are acceptable to use.

Do the spalling concrete repairs need to be approved by the engineers prior to applying the concrete.

Specification Section 03 31 00 - Concrete Restoration

The concrete repairs will be outlined in the contract drawings to be issued with the task order(s). It is not required for the Engineer of Record to inspect the concrete repairs prior to forming/pouring concrete, however if honeycombing and/or signs of inadequate consolidation are discovered by Engineer / AOC inspections, the contractor shall remove the work and replace at no additional cost.

The contractor will be responsible for quality of work and testing/inspection, including sounding of concrete at least 28 days after placement.

Can we bid an add alternate for a different product for the curtain wall grouting?

Specification Section 03 60 00 - Chemical Grouting

No. No alternate or different product is to be considered when submitting pricing proposals for this Solicitation.

Throughout the course of this anticipated IDIQ Contract period of seven (7) years, it is concieveable that new product(s), alternative product(s), or emerging technology may be considered or introduced by the EOR on a task order basis.

Can you please specify what product you want used for the curtain wall grouting? Specification Section 03 60 00 - Chemical

Grouting Reference Specifications Section 03 60 00 for curtain grouting materials

For full curtain wall grouting can we drill 18” off the face of the wall to create a complete envelope? This is our typical process. Specification Section 03 60 00 - Chemical

Grouting & A502 Repair Grouting Details

Curtain grouting shall be installed per Manufacturer's recommendations.

Pre-Bid Questions & Clarifications (#1 to #25): Solicitation Number AOCACB21R0004 - Responses updated 03/16/2021 Pre-Bid RFI / Questions Received from Potential Offerors (Due Date March 05, 2021)

For steel base support details, is it acceptable to bolt connections in lieu of welding where possible? Drawing A504 - Typical Steel Support

Restoration Details

Drawing A504 - Typical Steel Support Restoration Details. This is acceptable as long as there is enough clearance for pipes and other equipment to be supported. Alternate connection details must be prepared and submitted to the Engineer for review and approval.

Are line items 00013 through 00023 stand-alone pay items whenever used, or are these persons such as the Project Manager, Site Super, Safety Officer and Quality Manager to be all inclusive of the unit price items 00001 through 00012? Unit Price Bid Form (Page 2 of 9)

Items 00013 through 0023 (and their respective line items for the Option Years) are to be inclusive of items #00001 through 00012 and respective corresponding option period items.. Please use updated Bid Form dated 03.09.2021when submitting pricing proposals for this Solicitation.

Will line item 00018 Electrician and line item 00017 Certified Shotcrete Nozzleman be paid per the hourly rate when employed as needed independent of the unit prices?

Unit Price Bid Form (Page 2 of 9)

Yes, the unit price for repairs mentioned in the Bid Sheet are all inclusive which may or may not include the services of an Electrical Journeyman, Electrical Apprentice, and Certified Shotcrete Nozzleman.

It is foreseeable that an Electrical Journeyman, Electrical Apprentice, or other personnel may be required within the scope of this IDIQ contract independant of repair items #00001 through #00010 and respective corresponding option period items.

Pay item 00001 Mobilization/General Conditions is paid as a lump sum. How is the bidder to determine how many times per year they may be required to mobilize to determine the most competitive pricing? Would the AOC consider changing this to a per “Each” unit?

Unit Price Bid Form (Page 2 of 9)

For this solicitation, the Offeror shall provide price item #00001 and respective corresponding option period items on a per month cost basis for each task order mobilization. Please use updated Bid Form dated 03.09.2021when submitting pricing proposals for this Solicitation.

The duration of each task order is expected to vary between three (3) months upto a period of sixteen (16) months. Item #0001 Mobilization / General Conditions costs (LumpSum) shall be one time cost to be applied for each task order issued / awarded.

Pay item 00002 Protection and Dust Containment is also paid as a lump sum.

Again, how is the bidder to determine a reasonable price not knowing how many areas, or how many times they may be required to work? Would the AOC consider changing this to a per “Each” unit?

Unit Price Bid Form (Page 2 of 9)

For this solicitation, the Offeror shall provide price item #00002 and respective corresponding option period items for "each unit". Each unit shall be defined as up to 300 consecutive Lineal Feet of tunnel or a utility vault. Please use updated Bid Form dated 03.09.2021when submitting pricing proposals for this Solicitation.

Item #00002 Protection and Dust Containment costs (LumpSum) shall be one time cost to be applied for each task order issued / awarded.

Please better define the payment item per “square foot” for line item 00008 Curtain Grouting. This is typically measured by the linear foot and does not easily related to “square foot.”

Unit Price Bid Form (Page 2 of 9)

For this solicitation, the Offeror shall provide price item #00008 and respective corresponding option period items per Square Feet (SF).This is due to large variances in tunnel configurations and tunnel perimter dimensions.

For Task Order contracts, Pricing may be calculated per linear foot of tunnel based on SF unit price.For local / partial/ Individual curtain groutings, SF calculation is based on port spacings.

Could you please confirm that a bid bond is not required with our bid submission?

Solicitation Form - SF1442

Per Section 12a of the SF1442 form (page 1 of 62), a bid bond will not be required for bid submission of this IDIQ award. Task Orders will require Bid Bond and Insurance and other relevant documentation for award of Task Order contracts.

Is it the intent of the AOC to have a single or multiple awardees for this contract?

Solicitation Form - SF1442 Per Section 10, Note B, of the SF1442 form (page 1 of 62), the intent is for the AOC to award one (1) contractor for this Indefinite-Delivery Indefinite-Quantity (IDIQ).

On page 18 of 62 (section 52.236-1 Performance of Work by the Contractor) it states that “The Contractor shall perform on the site, and with its own organization, work equivalent to at least 100% of the total amount of work to be performed under the contract”. Does this mean the use of subcontractors to help with the work is not allowed? According to page 54 of 62 (section L.1.6 Subcontractor Experience) we are to submit information of relevant experience for any subcontractors that will be used.

We would like to confirm if the use of subcontractors will be allowed for this work.

Solicitation & Section L

The use of subcontractors is acceptable provided their experience is pertinent to the Scope of Work and as required per Section L / Section L.1.6 Subcontractor Experience.

RFI No. Request for Information (RFI) Document Reference Below additional Government Response(s) Dated 03.16.2021

Regarding the corporate experience writeup, it states “The Offeror shall demonstrate completing the underground concrete restoration and new construction projects”. With this being a repair IDIQ, do the project references need to be new construction or can they all be concrete restoration projects?

Solicitation & Section L

Refer to section L.1.2.b and subsection L1.2.b.1. providing information on number of projects and which projects to provide as part of "Corporate Experience and Expertise".

Regarding the technical proposal, the evaluation factors are the following:

Corporate experience and expertise, past performance, project management plan with technical approach, key personnel and subcontractor Experience (per pg 47 of 62 of solicitation). However, section L.1/e.1 states: Technical Proposals shall be organized into five subsections: Project Management Plan with Technical Approach, Proposed Contract Duration and Summary Schedule, Key Personnel, and Sub-Contractor Experience.

Please confirm that the evaluation factors are Corporate experience and expertise, t f j t t l ith t h i l h k

Solicitation & Section L

Contractors to provide technical proposals in the format indicate on Page 47 of 62:

Corporate Experience and Expertise; Past Performance; Project Management Plan with Technical Approach; Key Personnel; and Subcontractor Experience.

See updated Sections L & M via Attachment 006.

Please confirm that it is still anticipated that all awarded task orders will only involve the walkable tunnels.

Solicitation & SOW

Refer to SOW dated 01/15/2021 indicating that this IDIQ is for Structural Repairs & Tunnel Improvements for all CPP Utility Distribution System tunnels. This applies to both walkable and non-walkable tunnels.The intent of this IDIQ is to include all property considered part of the CPP Jurisdiction though typical TO are anticipated to be within the walkable portions of the UDS tunnels

Electrical work items are not included in unit pricing, only electrician hourly rate.

Would pricing for electrical work be addressed with each individual Task Order?

Would that work be on a time and material basis?

Unit Price Bid Form (Page 2 of 9) Refer to RFI Question & Answer #15.