2021-2028 IDIQ Structural Concrete Repairs - Bid Form 03.09.2021.pdf

PDF 626 KB Posted

Attached to
IDIQ Structural Concrete Repairs
Solicitation number
AOCACB21R0004
Issued by

View the file

Other files

File Type Posted
2021-2028 IDIQ Structural Concrete Repairs - SOW 03.17.2021.pdf PDF
AOCACB21R0004 (A007).pdf PDF
AOCACB21R0004 - Pre-Bid RFI Responses 03-16-2021.pdf PDF
AOCACB21R0004 (A006).pdf PDF
Revised Section L 03.16.2021.pdf PDF
Revised Section M 03.16.2021.pdf PDF
AOCACB21R0004 A005.pdf PDF
AOCACB21R0004 - Pre-Bid RFI Responses 03102021.pdf PDF
AOCACB21R0004 A001.pdf PDF
COVID-19 OAP Decision Tool (attachment to AOC Clause AOC52.223-11).pdf PDF
COVID-19 Daily Health Screening Inventory (attachment to AOC Clause AOC52.223-11).pdf PDF
2021 - 2028 IDIQ Tunnel Structural Repairs - Drawings.pdf PDF
Division 26 - Generic Electrical Specifications.pdf PDF
Contracting Officer Statement.docx DOCX document
0003.pdf PDF
2021 - 2028 IDIQ Tunnel Structural Repairs - Specifications.pdf PDF
CPP UDS SOP March 2019.pdf PDF
RFI 1.pdf PDF
0002.pdf PDF
0001.pdf PDF
2021 - 2028 IDIQ Tunnel Repairs - Site Visit Details and Requirements.docx DOCX document
Sample Certificate of Insurance (COI).pdf PDF
2021-2028 IDIQ Structural Concrete Repairs - Bid Form 01.15.pdf PDF
Attachment A - PPQ.pdf PDF
COVID-19 Poster OSHA4000.pdf PDF
Attachment D -Davis-Bacon Wage Determination.pdf PDF
PandemicFlu.pdf PDF
IDIQ - Structural Repairs Tunnel Improvements SOW - 01.15.pdf PDF
SCUS Police Background Check Form.pdf PDF
NDA.pdf PDF
AOCACB21R0004 (final).pdf PDF
USCP Request for Check of Criminal History (Form CP-491 (5-18) Revised.pdf PDF
Attachment B - CEQ.pdf PDF
Attachment C - Bid Form 11.19.2020.pdf PDF
USCP Vehicle Delivery Procedure Reference Guide (5-08).pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Structural Repairs & Tunnel Improvements – IDIQ Contract Bid Form – Solicitation Number: AOCACB21R0004

Unit Price Bid Form

Project Name: Capitol Power Plant: UDS Tunnels IDIQ Contract Structural Repairs & Tunnel Improvements (2021-2028) Solicitation Number: AOCACB21R0004 Base Bid for restoration items to be performed in the Structural Repairs & Tunnel Improvements – IDIQ Contract Date Updated: March 09, 2021

Bid Form – Table of Contents

YEAR 1 - SCHEDULE OF UNIT / HOURLY RATES

YEAR 2 - SCHEDULE OF UNIT / HOURLY RATES

YEAR 3 – SCHEDULE OF UNIT / HOURLY RATES

YEAR 4 – SCHEDULE OF UNIT / HOURLY RATES

YEAR 5 – SCHEDULE OF UNIT / HOURLY RATES

YEAR 6 – SCHEDULE OF UNIT / HOURLY RATES

YEAR 7 – SCHEDULE OF UNIT / HOURLY RATES

DEFINITIONS OF UNIT RATES

YEAR 1 - SCHEDULE OF UNIT / HOURLY RATES

ITEM DESCRIPTION UNIT RATE

00001 Mobilization/General Conditions $_________/Mo 00002 Protection and Dust Containment (Set-Up & Maintenance) $_________300 LF 00003 Concrete Restoration – Vertical (Wall Surfaces) $_________SF 00004 Concrete Restoration – Overhead Surfaces $_________SF 00005 Concrete Restoration – Floor Repairs $_________SF 00006 Curtain Grouting $_________SF 00007 Pipe Support/Steel Cleaning & Repainting $_________EA 00008 Pipe Support/Steel Cleaning & Repair $_________EA 00009 Pipe Support/Steel Replacement $_________EA 00010 Expansion Joint Restoration $_________LF 00011 Not Used 00012 Not Used

ITEM DESCRIPTION HOURLY RATE

00013 Project Manager $_________ 00014 Site Superintendent $_________ 00015 Safety Officer $_________ 00016 Quality Manager $_________ 00017 Certified Shotcrete Nozzleman $_________ 00018 Skilled Laborer $_________ 00019 General Laborer $_________ 00020 00020A

Electrical Journeyman Electrical Apprentice

00021 Administrative Support $_________ 00022 Corporate G&A % Rate $_________ 00023 Profit % Rate $_________

YEAR 1: ADDITIONAL QUANTITIES - SCHEDULE OF UNIT / HOURLY RATES

(FOR QUANTITIES THAT EXCEED TASK ORDER BASE SCOPE)

00024 Additional Concrete Restoration $_________SF 00025 Vertical (Wall Surfaces) $_________SF 00026 Overhead Surfaces $_________SF 00027 Floor Repairs $_________SF 00028 Additional Curtain Grouting $_________SF 00029 Additional Pipe Support/Steel Cleaning & Repainting $_________EA 00030 Additional Pipe Support/Steel Replacement $_________EA 00031 Additional Expansion Joint Restoration $_________LF

YEAR 2 - SCHEDULE OF UNIT / HOURLY RATES

ITEM DESCRIPTION HOURLY RATE

00032 Mobilization/General Conditions $_________/Mo 00033 Protection and Dust Containment (Set-Up & Maintenance) $_________ 300 LF 00034 Concrete Restoration – Vertical (Wall Surfaces) $_________SF 00035 Concrete Restoration – Overhead Surfaces $_________SF 00036 Concrete Restoration – Floor Repairs $_________SF 00037 Curtain Grouting $_________SF 00038 Pipe Support/Steel Cleaning & Repainting $_________EA 00039 Pipe Support/Steel Cleaning & Repair $_________EA 00040 Pipe Support/Steel Replacement $_________EA 00041 Expansion Joint Restoration $_________LF

ITEM DESCRIPTION HOURLY RATE

00042 Project Manager $_________ 00043 Site Superintendent $_________ 00044 Safety Officer $_________ 00045 Quality Manager $_________ 00046 Certified Shotcrete Nozzleman $_________ 00047 Skilled Laborer $_________ 00048 General Laborer $_________ 00049 00049A

Electrical Journeyman Electrical Apprentice

00050 Administrative Support $_________ 00051 Corporate G&A % Rate $_________ 00052 Profit % Rate $_________

YEAR 2 - ADDITIONAL QUANTITIES - SCHEDULE OF UNIT / HOURLY RATES

00053 Additional Concrete Restoration $_________SF 00054 Vertical (Wall Surfaces) $_________SF 00055 Overhead Surfaces $_________SF 00056 Floor Repairs $_________SF 00057 Additional Curtain Grouting $_________SF 00058 Additional Pipe Support/Steel Cleaning & Repainting $_________EA 00059 Additional Pipe Support/Steel Replacement $_________EA 00060 Additional Expansion Joint Restoration $_________LF

YEAR 3 – SCHEDULE OF UNIT / HOURLY RATES

00061 Mobilization/General Conditions $_________ MO 00062 Protection and Dust Containment (Set-Up & Maintenance) $_________ 300 LF 00063 Concrete Restoration – Vertical (Wall Surfaces) $_________SF 00064 Concrete Restoration – Overhead Surfaces $_________SF 00065 Concrete Restoration – Floor Repairs $_________SF

00066 Curtain Grouting $_________SF 00067 Pipe Support/Steel Cleaning & Repainting $_________EA 00068 Pipe Support/Steel Cleaning & Repair $_________EA 00069 Pipe Support/Steel Replacement $_________EA 00070 Expansion Joint Restoration $_________LF

ITEM DESCRIPTION HOURLY RATE

00071 Project Manager $_________ 00072 Site Superintendent $_________ 00073 Safety Officer $_________ 00074 Quality Manager $_________ 00075 Certified Shotcrete Nozzleman $_________ 00076 Skilled Laborer $_________ 00077 General Laborer $_________ 00078 00078A

Electrical Journeyman Electrical Apprentice

00079 Administrative Support $_________ 00080 Corporate G&A % Rate $_________ 00081 Profit % Rate $_________

YEAR 3 – ADDITIONAL QUANTITIES - SCHEDULE OF UNIT / HOURLY RATES

00082 Additional Concrete Restoration $_________SF 00083 Vertical (Wall Surfaces) $_________SF 00084 Overhead Surfaces $_________SF 00085 Floor Repairs $_________SF 00086 Additional Curtain Grouting $_________SF 00087 Additional Pipe Support/Steel Cleaning & Repainting $_________EA 00088 Additional Pipe Support/Steel Replacement $_________EA 00089 Additional Expansion Joint Restoration $_________LF

YEAR 4 – SCHEDULE OF UNIT / HOURLY RATES

00090 Mobilization/General Conditions $_________Mo 00091 Protection and Dust Containment (Set-Up & Maintenance) $_________ 300 LF 00092 Concrete Restoration – Vertical (Wall Surfaces) $_________SF 00093 Concrete Restoration – Overhead Surfaces $_________SF 00094 Concrete Restoration – Floor Repairs $_________SF 00095 Curtain Grouting $_________SF 00096 Pipe Support/Steel Cleaning & Repainting $_________EA 00097 Pipe Support/Steel Cleaning & Repair $_________EA 00098 Pipe Support/Steel Replacement $_________EA 00099 Expansion Joint Restoration $_________LF

00100 Project Manager $_________ 00101 Site Superintendent $_________ 00102 Safety Officer $_________ 00103 Quality Manager $_________ 00104 Certified Shotcrete Nozzleman $_________ 00105 Skilled Laborer $_________ 00106 General Laborer $_________ 00107 00107A

Electrical Journeyman Electrical Apprentice

00108 Administrative Support $_________ 00109 Corporate G&A % Rate $_________ 00110 Profit % Rate $_________

YEAR 4 – ADDITIONAL QUANTITIES - SCHEDULE OF UNIT / HOURLY RATES

00111 Additional Concrete Restoration $_________SF 00112 Vertical (Wall Surfaces) $_________SF 00113 Overhead Surfaces $_________SF 00114 Floor Repairs $_________SF 00115 Additional Curtain Grouting $_________SF 00116 Additional Pipe Support/Steel Cleaning & Repainting $_________EA 00117 Additional Pipe Support/Steel Replacement $_________EA 00118 Additional Expansion Joint Restoration $_________LF

YEAR 5 – SCHEDULE OF UNIT / HOURLY RATES

00119 Mobilization/General Conditions $_________Mo 00120 Protection and Dust Containment (Set-Up & Maintenance) $_________ 300 LF 00121 Concrete Restoration – Vertical (Wall Surfaces) $_________SF 00122 Concrete Restoration – Overhead Surfaces $_________SF 00123 Concrete Restoration – Floor Repairs $_________SF 00124 Curtain Grouting $_________SF 00125 Pipe Support/Steel Cleaning & Repainting $_________EA 00126 Pipe Support/Steel Cleaning & Repair $_________EA 00127 Pipe Support/Steel Replacement $_________EA 00128 Expansion Joint Restoration $_________LF

ITEM DESCRIPTION HOURLY RATE

00129 Project Manager $_________ 00130 Site Superintendent $_________ 00131 Safety Officer $_________ 00132 Quality Manager $_________ 00133 Certified Shotcrete Nozzleman $_________ 00134 Skilled Laborer $_________

00135 General Laborer $_________ 00136 00136A

Electrical Journeyman Electrical Apprentice

00137 Administrative Support $_________ 00138 Corporate G&A % Rate $_________ 00139 Profit % Rate $_________

YEAR 5 – ADDITIONAL QUANTITIES - SCHEDULE OF UNIT / HOURLY RATES

00140 Additional Concrete Restoration $_________SF 00141 Vertical (Wall Surfaces) $_________SF 00142 Overhead Surfaces $_________SF 00143 Floor Repairs $_________SF 00144 Additional Curtain Grouting $_________SF 00145 Additional Pipe Support/Steel Cleaning & Repainting $_________EA 00146 Additional Pipe Support/Steel Replacement $_________EA 00147 Additional Expansion Joint Restoration $_________LF

YEAR 6 – SCHEDULE OF UNIT / HOURLY RATES

00148 Mobilization/General Conditions $_________Mo 00149 Protection and Dust Containment (Set-Up & Maintenance) $_________ 300 LF 00150 Concrete Restoration – Vertical (Wall Surfaces) $_________SF 00151 Concrete Restoration – Overhead Surfaces $_________SF 00152 Concrete Restoration – Floor Repairs $_________SF 00153 Curtain Grouting $_________SF 00154 Pipe Support/Steel Cleaning & Repainting $_________EA 00155 Pipe Support/Steel Cleaning & Repair $_________EA 00156 Pipe Support/Steel Replacement $_________EA 00157 Expansion Joint Restoration $_________LF

ITEM DESCRIPTION HOURLY RATE

00158 Project Manager $_________ 00159 Site Superintendent $_________ 00160 Safety Officer $_________ 00161 Quality Manager $_________ 00162 Certified Shotcrete Nozzleman $_________ 00163 Skilled Laborer $_________ 00164 General Laborer $_________ 00165 00165A

Electrical Journeyman Electrical Apprentice

00166 Administrative Support $_________ 00167 Corporate G&A % Rate $_________ 00168 Profit % Rate $_________

YEAR 6 – ADDITIONAL QUANTITIES - SCHEDULE OF UNIT / HOURLY RATES

00169 Additional Concrete Restoration $_________SF 00170 Vertical (Wall Surfaces) $_________SF 00171 Overhead Surfaces $_________SF 00172 Floor Repairs $_________SF 00173 Additional Curtain Grouting $_________SF 00174 Additional Pipe Support/Steel Cleaning & Repainting $_________EA 00175 Additional Pipe Support/Steel Replacement $_________EA 00176 Additional Expansion Joint Restoration $_________LF

YEAR 7 – SCHEDULE OF UNIT / HOURLY RATES

00177 Mobilization/General Conditions $_________ Mo 00178 Protection and Dust Containment (Set-Up & Maintenance) $_________ 300 LF 00179 Concrete Restoration – Vertical (Wall Surfaces) $_________SF 00180 Concrete Restoration – Overhead Surfaces $_________SF 00181 Concrete Restoration – Floor Repairs $_________SF 00182 Curtain Grouting $_________SF 00183 Pipe Support/Steel Cleaning & Repainting $_________EA 00184 Pipe Support/Steel Cleaning & Repair $_________EA 00185 Pipe Support/Steel Replacement $_________EA 00186 Expansion Joint Restoration $_________LF

ITEM DESCRIPTION HOURLY RATE

00187 Project Manager $_________ 00188 Site Superintendent $_________ 00189 Safety Officer $_________ 00190 Quality Manager $_________ 00191 Certified Shotcrete Nozzleman $_________ 00192 Skilled Laborer $_________ 00193 General Laborer $_________ 00194 00194A

Electrical Journeyman Electrical Apprentice

00195 Administrative Support $_________ 00196 Corporate G&A % Rate $_________ 00197 Profit % Rate $_________

YEAR 7 – ADDITIONAL QUANTITIES - SCHEDULE OF UNIT / HOURLY RATES

00198 Additional Concrete Restoration $_________SF 00199 Vertical (Wall Surfaces) $_________SF 00200 Overhead Surfaces $_________SF

00201 Floor Repairs $_________SF 00202 Additional Curtain Grouting $_________SF 00203 Additional Pipe Support/Steel Cleaning & Repainting $_________EA 00204 Additional Pipe Support/Steel Replacement $_________EA 00205 Additional Expansion Joint Restoration $_________LF

DEFINITIONS OF UNIT RATES

Number Commodity Name Quantity Unit of

Issue

Unit Price

Total Cost ($, Inc.

disc)

1 Mobilization/General Conditions 1 Mo $ $

Description: Mobilization/General Conditions – Scope of work includes all mobilization of equipment, materials, and construction of temporary enclosures at the locations identified in the Project Documents.

Pricing shall be all-inclusive and include overhead, profit, and general conditions costs spread over the duration of each task order. Offeror is expected to price this on a per month cost basis and shall be a one-time cost to be applied for each task order issued / awarded. The duration of each task order is expected to vary between three

(3) months up to a period of sixteen (16) months.

2 Protection and Dust Containment 300 LF $ $

Description: Protection and Dust Containment – Scope of work includes installation, maintenance, and takedown of all protection required for existing utilities and dust control barriers and filters; air monitoring;

sampling; testing; protecting intake, exhaust fans within the tunnels; installing dust partitions at regular intervals and in areas of work; prevention of dust and debris run-off into sump pits; and ensuring prevention of dust into exhaust/intake grates. Pricing shall be all-inclusive and include overhead, profit, and incidental costs spread over the duration of each task order. Each unit shall be defined as up to 300 consecutive Lineal Feet of tunnel or a utility vault. For this solicitation, the Offeror shall provide price for this item and respective corresponding option period items for "each unit". Protection and Dust Containment costs (Lump Sum) shall be one time cost to be applied for each task order issued / awarded.

3 Concrete Restoration – Vertical (Wall) Surfaces

1 SF $ $

Description: Concrete Restoration – Vertical - Scope of work includes all labor, material, and equipment to perform concrete restoration at all overhead surfaces as indicated on the contract drawings. Pricing shall be all-inclusive and include overhead, profit, and incidental costs.

Note: Repair of approved additional quantities identified during the course of the work shall be performed and paid at the same unit rates above. Actual quantities are to be recorded to the nearest half square foot and adjusted up or down accordingly via change order. Quantities listed on the Drawings are as-measured quantities. Quantities in this Bid Form include anticipated growth. Full-depth repairs are not generally anticipated but may occur.

4 Concrete Restoration – Overhead Surfaces 1 SF $ $

Description: Concrete Restoration – Overhead – Scope of work includes all labor, material, and equipment to perform quantities of concrete restoration at overhead surfaces as indicated on the contract drawings.

Pricing shall be all-inclusive and include overhead, profit, and incidental costs.

Note: Repair of approved additional quantities identified during the course of the work shall be performed and paid at the same unit rates above. Actual quantities are to be recorded to the nearest half square foot and adjusted up or down accordingly via change order. Quantities listed on the Drawings are as-measured quantities. Quantities in this Bid Form include anticipated growth. Full-depth repairs are not generally anticipated but may occur.

5 Concrete Restoration – Floor Repairs 1 SF $ $

Description: Concrete Restoration – Floor – Scope of work includes all labor, material, and equipment to perform quantities of concrete restoration at horizontal surfaces. Pricing shall be all-inclusive and include overhead, profit, and incidental costs.

Note: Repair of approved additional quantities identified during the course of the work shall be performed and paid at the same unit rates above. Actual quantities are to be recorded to the nearest half square foot and adjusted up or down accordingly via change order. Horizontal repairs are not generally anticipated but may occur.

6 Curtain Grouting 1 SF $ $

Description: Curtain Grouting (by Square Feet as measured by the inside face of tunnel) – Scope of work includes all labor, material, and equipment to perform curtain grouting at the locations indicated on the contract drawings. Pricing shall be per square foot of tunnel and shall include all steps in the process including, but not limited to; installation of injection ports, addressing large cracks and spalls, removal of ports, and all associated cleaning. Pricing shall be all-inclusive and include overhead, profit, and incidental costs. Curtain grouting at cracks and control joints will be considered one-unit width. For Task Order contracts, pricing may be calculated per linear foot of tunnel based on SF unit price. For local / partial/ individual curtain grouting, SF calculation is based on port spacing.

Note: Repair of approved additional quantities identified during the course of the work shall be performed and paid at the same unit rates above. Actual quantities are to be recorded to the nearest half square foot and adjusted up or down accordingly via change order.

7 Pipe Support/Steel Cleaning and Repainting 1 EA $ $

Description: Pipe Support Cleaning and Repainting – Scope of work includes all labor, material, and equipment to remove corrosion from steel, prime with zinc oxide primer, and paint to match the existing paint.

Each item will be assumed to include 3 square feet of work. Pricing shall be all-inclusive and include overhead, profit, and incidental costs.

8 Pipe Support/Steel Cleaning and Repair 1 EA $ $

Description: Pipe Support/Steel Cleaning and Repair – Scope of work includes all labor, material, and equipment to remove corrosion from steel, and add supplementary steel as indicated in the contract drawings.

This includes priming the existing and new steel with a zinc oxide primer, and paint to match existing. Each item will assume to include one angle to supplement heavily corroded steel, and 3 square feet cleaning, priming, and painting. Pricing shall be all-inclusive and include overhead, profit, and incidental costs.

9 Pipe Support/Steel Replacement 1 EA $ $

Description: Pipe Support/Steel Replacement – Scope of work includes all labor, material, and equipment to replace existing pipe support/steel in kind. This includes priming the new steel with a zinc oxide primer and painting the steel to match existing.

10 Expansion Joint Restoration 1 LF $ $

Description: Expansion Joint Restoration – Scope of work includes all labor, material, and equipment to perform Expansion joint work at the locations indicated on the contract drawings. Quantities to be indicated on the contract drawings. Pricing shall be all-inclusive and include overhead, profit, and incidental costs.

Total Price for Base Contract

End of Document