GENERAL NOTES
1. THE FY2020 CONDITION ASSESSMENT OF THE CPP TUNNELS WAS CONDUCTED BETWEEN OCTOBER 2020 AND DECEMBER 2020 BY WDP &
ASSOCIATES AND AFFILIATED ENGINEERS, INC.
2. RESTORATION EFFORTS WERE IN PROGRESS BY THE IDIQ CONTRACTOR IN VARIOUS LOCATIONS OF THE Y TUNNEL DURING THE SURVEY.
3. DETERIORATIONS NOTED DURING THE FY2020 CONDITION ASSESSMENT WERE MARKED IN RED AND GENERALLY WERE MARKED 20 IN A CORNER.
4. IN ACCORDANCE WITH THE AOC DESIGN GUIDE, THE SHEET NUMBERING IS AS FOLLOWS
a. SEQUENCE CONVENTION IS “DDTFFNN” WHERE:
- DD = DISIPLINE ( G-GENERAL, C-CIVIL, A-ARCHITECTURAL)
- T = DRAWING TYPE (SINGLE NUMBER DESIGNATION)
- FF = TUNNELS(Tx) - (R-RED, B-BLACK, G-GREEN, O-ORANGE, Y-YELLOW, V-VIOLET, C-CVC,BG=BG MANHOLES, CM-CHM VAULTS)
- NN = SHEET NUMBER
ABBREVIATIONS
AOC ARCHITECT OF THE CAPITOL
DELM. DELAMINATION/DELAMINATED
DIA. DIAMETER
EJ EXPANSION JOINT
EXP. EXPANSION
GALV. GALVANIZED
HL HAIRLINE
LF LINEAR FEET
MIN MINIMUM
MAX MAXIMUM
O.C. ON CENTER
SDS SAFETY DATA SHEET
TBD TO BE DETERMINED
TYP TYPICAL
LEGEND
EXISTING DELAMINATION/SPALL
NEW DELAMINATION/SPALL
EXISTING PATCH/REPAIR
NEW PATCH/REPAIR
COMPLETED CURTAIN GROUTING AREA
CRACK/HAIRLINE CRACK
EXISTING EXPANSION JOINT
SUPPORT NUMBER
STATION NUMBER
PAINT COLORS (TUNNEL MARKINGS)
FY2012 - ORANGE
FY2014 - BLUE
FY2016 - PINK
FY2017/18 - GREEN
FY2019/20 - RED
S1
0+00
C1 B1-1
FHWA COLORS
RATING 3
RATING 4
RATING 5
RATING 6
RATING 7
RATING 8
GENERAL NOTES
G002
PROPERTY OF THE UNITED STATES
GOVERNMENT
CONTROLLED UNCLASSIFIED INFORMATION //
LAW ENFORCEMENT SENSITIVE
U.S. Capitol Utility Tunnels
Drawings are based on visual surveys.
Field verify where measurements are critical.
Affiliated Engineers
FY2020 STRUCTURAL ASSESSMENT OF
CPP TUNNELS - SURVEY DRAWINGS
As Noted DAW JMG
& Associates
REVISIONS
NO DESCRIPTION DATE
NOTE
LEGEND
ARCHITECTS & ENGINEERS
Affiliated Engineers, Inc.
200 International Circle, Suite 5888 Hunt Valley, MD 21031 Tel (410) 229-0090 www.aeieng.com
WDP & Associates Consulting Engineers, Inc.
10621 Gateway Blvd., Suite 200 Manassas, VA 20110 Tel (703) 257-9280 Fax: 703) 257-7589 www.wdpa.com
RECOMMENDED FOR APPROVAL
DIRECTOR OF DESIGN SERVICES
DIRECTOR OF PLANNING
& PROJECT MANAGEMENT
J. BRETT BLANTON
// CONTROLLED //// CONTROLLED //
// CONTROLLED //// CONTROLLED //
ARCHITECT OF THE CAPITOL
BUILDING NAME
PROJECT TITLE
DRAWING TITLE
SCALE DRAWN BY CHECKED BY
LOGO
AOC CONTRACT NO. IFB NO.
CAD FILE NO.
DRAWING NO.
SHEET DATE
01/15/2021
AOC19C3010-T018_G002.dwg
AOC19C3010-T018
OF 103
EXISTING DELAMINATION
20+00
S1 C1
NEW DELAMINATION
EXISTING PATCH
NEW PATCH
CRACK
EXPANSION JOINT
SUPPORT/BUTTRESS NUMBER
STATION NUMBER
PAINT COLOR LEGEND
FY2012 - ORANGE
FY2014 - BLUE
FY2016 - PINK
FY2017/18 - GREEN
FY2019/20 - RED
FHWA LEGEND
RATING 3
RATING 4
RATING 5
RATING 6
RATING 7
RATING 8
COMPLETED CURTAIN GROUTING AREA
Sheet List Table
Sheet Number Sheet Title
General
G001 TITLE SHEET
G002 GENERAL NOTES
Site Plans
C1TB-01 SITE PLAN - B TUNNEL
C1TC-02 SITE PLAN - CVC TUNNEL
C1TG-03 SITE PLAN - G TUNNEL
C1TR-04 SITE PLAN - R TUNNEL
C1TV-05 SITE PLAN - V TUNNEL
C1TY-06 SITE PLAN - Y TUNNEL
C1TBG07 SITE PLAN - BGM TUNNEL
C1TCM08 SITE PLAN - CHM TUNNEL
C1TO-09 SITE PLAN - O TUNNEL
B Tunnel
C1TB-01 B TUNNEL - STATION 0+00 TO 2+00
C1TB-02 B TUNNEL - STATION 2+00 TO 4+00 & BG-2
C1TB-03 B TUNNEL - STATION 4+00 TO 6+00 & BM-3
C1TB-04 B TUNNEL - STATION 6+00 TO 8+00 & BM-4
C1TB-05 B TUNNEL - STATION 8+00 TO 10+00 & BM-5
C1TB-06 B TUNNEL - STATION 10+00 TO 12+00 & BM-6
C1TB-07 B TUNNEL - STATION 12+00 TO 14+00 & BM-7
C1TB-08 B TUNNEL - STATION 14+00 TO 16+00 & BG-8
C1TB-09 B TUNNEL - STATION 16+00 TO 17+35 & BM-9
C1TB-10 B TUNNEL - MADISON AND CANNON BRANCHES
C1TB-11 B TUNNEL - BG-10 BRANCH
CVC Tunnel
C1TC-12 CVC TUNNEL - STATION 2+00 TO 0+00
C1TC-13 CVC TUNNEL - STATION 4+00 TO 2+00
C1TC-14 CVC TUNNEL - STATION 6+00 TO 4+00
C1TC-15 CVC TUNNEL - STATION R TUNNEL TO 6+00
G Tunnel
C1TG-16 G TUNNEL - STATION 0+00 TO 2+00
C1TG-17 G TUNNEL - STATION 2+00 TO 4+00
C1TG-18 G TUNNEL - STATION 4+00 TO 6+00
C1TG-19 G TUNNEL - STATION 6+00 TO 8+00
R Tunnel
C1TR-20 R TUNNEL - STATION 0+00 TO 1+50
C1TR-21 R TUNNEL - STATION 1+50 TO 3+00 RG-1
C1TR-22 R TUNNEL - STATION 3+00 TO 5+00
C1TR-23 R TUNNEL - STATION 5+00 TO 7+00
C1TR-24 R TUNNEL - STATION 7+00 TO 9+00 & RG-2
C1TR-25 R TUNNEL - STATION 9+00 TO 11+00
C1TR-26 R TUNNEL - STATION 11+00 TO 13+00
C1TR-27 R TUNNEL - STATION 13+00 TO 14+50 & RG-4
C1TR-28 R TUNNEL - STATION 14+50 TO 16+50
C1TR-29 R TUNNEL - STATION 16+50 TO 18+50
C1TR-30 R TUNNEL - STATION 18+50 TO 19+50 & RD-5
C1TR-31 R TUNNEL - STATION 19+50 TO 21+50 & RG-6
C1TR-32 R TUNNEL - STATION 21+50 TO 23+50
C1TR-33 R TUNNEL - STATION 23+50 TO 25+50
C1TR-34 R TUNNEL - STATION 25+50 TO 26+50 & RD-7 RD-8
C1TR-35 R TUNNEL - RD-9 BRANCH
C1TR-36 R TUNNEL - STATION 26+50 TO 27+50
C1TR-37 R TUNNEL - STATION 27+50 TO 29+00 & ADAMS
VAULT
C1TR-38 R TUNNEL - STATION 29+00 TO 30+50 & RG-11
C1TR-39 R TUNNEL - STATION 30+50 TO 32+50
C1TR-40 R TUNNEL - STATION 32+50 TO 34+50 & RG-12
C1TR-41 R TUNNEL - STATION 34+50 TO 36+00 & RTD-13
C1TR-42 R TUNNEL - STATION 36+00 TO 38+00
C1TR-43 R TUNNEL - STATION 38+00 TO 40+00
C1TR-44 R TUNNEL - STATION 40+00 TO 42+00
C1TR-45 R TUNNEL - 42+00 TO 43+00 & RG-16
C1TR-46 R TUNNEL - 43+00 TO 44+50 & RG-16A
C1TR-47 R TUNNEL - STATION 44+50 TO 46+85
C1TR-48 R TUNNEL - RD-17 BRANCH
C1TR-49 R TUNNEL - STATION 46+85 TO 48+50
C1TR-50 R TUNNEL - STATION 48+50 TO 49+76 & RD-18
RD-18A
C1TR-51 R TUNNEL - STATION 49+76 TO 52+00
C1TR-52 R TUNNEL - STATION 52+00 TO 54+04
V Tunnel
C1TV-53 V TUNNEL - STATION 0+00 TO 2+00
C1TV-54 V TUNNEL - STATION 2+00 TO 4+00
C1TV-55 V TUNNEL - STATION 4+00 TO 6+00
C1TV-56 V TUNNEL - STATION 6+00 TO 8+00
C1TV-57 V TUNNEL - STATION 8+00 TO 10+00
C1TV-58 V TUNNEL - STATION 10+00 TO 12+00
C1TV-59 V TUNNEL - STATION 12+00 TO 14+00
C1TV-60 V TUNNEL - STATION 14+00 TO 16+00
C1TV-61 V TUNNEL - STATION 16+00 TO VD-7
Y Tunnel
C1TY-62 Y TUNNEL - STATION 0+00 TO 1+50 YG-2
C1TY-63 Y TUNNEL - STATION 1+50 TO 3+00 & YG-3 YG-4
C1TY-64 Y TUNNEL - STATION 3+00 TO 5+00 & YG-4A
C1TY-65 Y TUNNEL - STATION 5+00 TO 7+00
C1TY-66 Y TUNNEL - STATION 7+00 TO 8+50 & YG-5B
C1TY-67 Y TUNNEL - STATION 8+50 TO 10+50
C1TY-68 Y TUNNEL - STATION 10+50 TO 12+50
C1TY-69 Y TUNNEL - STATION 12+50 TO 14+50
C1TY-70 Y TUNNEL - STATION 14+50 TO 16+50
C1TY-71 Y TUNNEL - STATION 16+50 TO 18+50
C1TY-72 Y TUNNEL - STATION 18+50 TO 20+50 & YG-6A
C1TY-73 Y TUNNEL - STATION 20+50 TO 22+50 & YM-7A
C1TY-74 Y TUNNEL - STATION 22+50 TO 24+50
C1TY-75 Y TUNNEL - STATION 24+50 TO 26+00
C1TY-76 Y TUNNEL - STATION 26+00 TO 28+00
C1TY-77 Y TUNNEL - STATION 28+00 TO 29+76
BGM Tunnel
C1TBG78 BGM TUNNEL - BGM-1
C1TBG79 BGM TUNNEL - BGM-2A & BGM-2B
C1TBG80 BGM TUNNEL - BGM-3
C1TBG81 BGM TUNNEL - BGM-4
C1TBG82 BGM TUNNEL - BGM-5 & BGM-6
C1TBG83 BGM TUNNEL - BGM-7
CHM Tunnel
C1TCM84 CHM TUNNEL - CHM-1 & CHM-2
O Tunnel
C1TO-85 O TUNNEL - OM-4 & OM-5
C1TO-86 O TUNNEL - OM-7 & OM-8
C1TO-87 O TUNNEL - OM-12, OM-13 & OM-18
C1TO-88 O TUNNEL - OM-21, OM-22, OM-23 & OM-24
C1TO-89 O TUNNEL - OM-24A, OM-25 & OM-26
C1TO-90 O TUNNEL - OM-26A, OM-30 & OM-31
C1TO-91 O TUNNEL - OM-35
C1TO-92 O TUNNEL - OM-37 & OM-38
2021 - 2028
TUNNEL
STRUCTURAL
REPAIRS -
DRAWINGS
(FOR REFERENCE
ONLY)
2. RESTORATION EFFORTS WERE IN PROGRESS BY THE IDIQ CONTRACTOR IN VARIOUS LOCATIONS OF THE Y TUNNEL DURING THE SURVEY.
3. DETERIORATIONS NOTED DURING THE FY2020 CONDITION ASSESSMENT WERE MARKED IN RED AND GENERALLY WERE MARKED 20 IN A CORNER.
4. IN ACCORDANCE WITH THE AOC DESIGN GUIDE, THE SHEET NUMBERING IS AS FOLLOWS
a. SEQUENCE CONVENTION IS “DDTFFNN” WHERE:
- DD = DISIPLINE ( G-GENERAL, C-CIVIL, A-ARCHITECTURAL)
- T = DRAWING TYPE (SINGLE NUMBER DESIGNATION)
- FF = TUNNELS(Tx) - (R-RED, B-BLACK, G-GREEN, O-ORANGE, Y-YELLOW, V-VIOLET, C-CVC,BG=BG MANHOLES, CM-CHM VAULTS)
- NN = SHEET NUMBER
NOT
INCLUDED
IN THIS SET
SHEETS ALSO INCLUDED IN THIS SET:
A501 - TYPICAL REPAIR DETAILS
A502A - TYPICAL CURTAIN GROUTING DETAILS -
NON-WALKABLE TUNNELS / UTILITY VAULTS (BGM,CHM,O)
A502B - TYPICAL CURTAIN GROUTING DETAILS - B & R
A502C - TYPICAL CURTAIN GROUTING DETAILS - Y
A502D- TYPICAL CURTAIN GROUTING DETAILS - V
A503 - TYPICAL TUNNEL SECTION DETAILS - B & R
A504 - TYPICAL STEEL SUPPORT RESTORATION DETAILS
A505 - TYPICAL BARRIER FENCE DETAILS
C502 - EROSION AND SEDIMENT CONTROL
(FOR REFERENCE ONLY)
ACTIVE
LEAKS
S4
S4
S4
S4
S4
S4
S4
S4
S5
S5
+0
+5
+0
+5
+0
BM-5EXPOSED
REBAR
S4
S4
S4
S4
S4
S4
S4
S4
S5
S5
8+
8+
9+
9+
+0
EXPOSED
REBAR
EXPOSED
REBAR
S4
S4
S4
S4
S4
S4
S4
S4
S5
S5
+0
+5
+0
+5
+0
BM-5
MODERATE CORROSION
AT EGRESS
8+
8+
9+
9+
+0
S4
S4
S4
S4
S4
S4
S4
S4
S5
S5
BM-5
BM-5
BM-5
5 BM-5 NORTH
1/8" = 1'-0"
6 BM-5 SOUTH
1/8" = 1'-0"
PLAN
NORTH
M
AT
C H
L
IN
E
SE
E
1/ A1
TB
-0
M
AT
C
H L
IN
E
SE
E 4/
A1
TB
-0
M
AT
C H
L
IN
E
SE
E
2/ A1
TB
-0
M
AT
C
H L
IN
E
SE
E 3/
A1
TB
-0
M
ATC
H
LIN
E 5
SEE 1/A1TB-04
M
ATC
H
LIN
E 5
SEE 2/A1TB-04
M
ATC
H
LIN
E 5
SEE 3/A1TB-04
M
ATC
H
LIN
E 5
SEE 4/A1TB-04
A1TB-05
1 CEILING PLAN
1/8" = 1'-0"
3 WEST WALL
1/8" = 1'-0"
4 EAST WALL
1/8" = 1'-0" MIRROR IMAGE
2 FLOOR PLAN
1/8" = 1'-0"
8" = 1'-0"
4' 8' 16'0'
A1TB-05
A1TB-05
A1TB-05
A1TB-05
B TUNNEL - STATION 8+00 TO 10+00 & BM-5
PROPERTY OF THE UNITED STATES
GOVERNMENT
CONTROLLED UNCLASSIFIED INFORMATION //
LAW ENFORCEMENT SENSITIVE
U.S. Capitol Utility Tunnels
Drawings are based on visual surveys.
Field verify where measurements are critical.
Affiliated Engineers
FY2020 STRUCTURAL ASSESSMENT OF
CPP TUNNELS - SURVEY DRAWINGS
As Noted DAW JMG
& Associates
REVISIONS
NO DESCRIPTION DATE
NOTE
LEGEND
ARCHITECTS & ENGINEERS
Affiliated Engineers, Inc.
200 International Circle, Suite 5888 Hunt Valley, MD 21031 Tel (410) 229-0090 www.aeieng.com
WDP & Associates Consulting Engineers, Inc.
10621 Gateway Blvd., Suite 200 Manassas, VA 20110 Tel (703) 257-9280 Fax: 703) 257-7589 www.wdpa.com
RECOMMENDED FOR APPROVAL
DIRECTOR OF DESIGN SERVICES
DIRECTOR OF PLANNING
& PROJECT MANAGEMENT
J. BRETT BLANTON
// CONTROLLED //// CONTROLLED //
// CONTROLLED //// CONTROLLED //
ARCHITECT OF THE CAPITOL
BUILDING NAME
PROJECT TITLE
DRAWING TITLE
SCALE DRAWN BY CHECKED BY
LOGO
AOC CONTRACT NO. IFB NO.
CAD FILE NO.
DRAWING NO.
SHEET DATE
01/15/2021
AOC19C3010-T018_A1TB-05.dwg
AOC19C3010-T018
OF 103
EXISTING DELAMINATION
20+00
S1 C1
NEW DELAMINATION
EXISTING PATCH
NEW PATCH
CRACK
EXPANSION JOINT
SUPPORT/BUTTRESS NUMBER
STATION NUMBER
PAINT COLOR LEGEND
FY2012 - ORANGE
FY2014 - BLUE
FY2016 - PINK
FY2017/18 - GREEN
FY2019/20 - RED
FHWA LEGEND
RATING 3
RATING 4
RATING 5
RATING 6
RATING 7
RATING 8
COMPLETED CURTAIN GROUTING AREA
HOLE WITH
ACTIVE LEAK
ACTIVE
LEAK
S5
S5
S5
S5
S5
S5
S5
S5
S6
+0
+5
+0
+5
+0
BM-6
WATER AND MUD
WASHING IN FROM BM-6
WATER AND MUD
WASHING IN FROM BM-6
S5
S5
S5
S5
S5
S5
S5
S5
S6
+0
+5
+0
+5
+0
SURFACE SCALING/EXPOSED
AGGREGATE THROUGHOUT TUNNEL
EXPOSED
REBAR
EXPOSED REBAR
S5
S5
S5
S5
S5
S5
S5
S5
S6
+0
+5
+0
+5
+0
BM-6
MODERATE CORROSION
AT EGRESSEFFLORESENCE ACTIVE LEAKSEALANT
FAILING
END SEVERE CORROSION
ON CONDUIT TRAY
+0
+5
+0
+5
+0
S5
S5
S5
S5
S5
S5
S5
S5
S6
BM-6
BM-6
BM-6
5 BM-6 NORTH
1/8" = 1'-0"
6 BM-6 SOUTH
1/8" = 1'-0"
M
AT
C H
L
IN
E
SE
E
1/ A1
TB
-0
M
AT
C
H L
IN
E
SE
E 2/
A1
TB
-0
M
AT
C H
L
IN
E
SE
E
3/ A1
TB
-0
M
AT
C
H L
IN
E
SE
E 4/
A1
TB
-0
M
ATC
H
LIN
E 6
SEE 1/A1TB-05
M
ATC
H
LIN
E 6
SEE 2/A1TB-05
M
ATC
H
LIN
E 6
SEE 3/A1TB-05
M
ATC
H
LIN
E 6
SEE 4/A1TB-05
A1TB-06
PLAN
N
O R
TH
1 CEILING PLAN
1/8" = 1'-0"
3 WEST WALL
1/8" = 1'-0"
4 EAST WALL
1/8" = 1'-0" MIRROR IMAGE
2 FLOOR PLAN
1/8" = 1'-0"
8" = 1'-0"
4' 8' 16'0'
A1TB-06
A1TB-06
A1TB-06
A1TB-06
B TUNNEL - STATION 10+00 TO 12+00 & BM-6
PROPERTY OF THE UNITED STATES
GOVERNMENT
CONTROLLED UNCLASSIFIED INFORMATION //
LAW ENFORCEMENT SENSITIVE
U.S. Capitol Utility Tunnels
Drawings are based on visual surveys.
Field verify where measurements are critical.
Affiliated Engineers
FY2020 STRUCTURAL ASSESSMENT OF
CPP TUNNELS - SURVEY DRAWINGS
As Noted DAW JMG
& Associates
REVISIONS
NO DESCRIPTION DATE
NOTE
LEGEND
ARCHITECTS & ENGINEERS
Affiliated Engineers, Inc.
200 International Circle, Suite 5888 Hunt Valley, MD 21031 Tel (410) 229-0090 www.aeieng.com
WDP & Associates Consulting Engineers, Inc.
10621 Gateway Blvd., Suite 200 Manassas, VA 20110 Tel (703) 257-9280 Fax: 703) 257-7589 www.wdpa.com
RECOMMENDED FOR APPROVAL
DIRECTOR OF DESIGN SERVICES
DIRECTOR OF PLANNING
& PROJECT MANAGEMENT
J. BRETT BLANTON
// CONTROLLED //// CONTROLLED //
// CONTROLLED //// CONTROLLED //
ARCHITECT OF THE CAPITOL
BUILDING NAME
PROJECT TITLE
DRAWING TITLE
SCALE DRAWN BY CHECKED BY
LOGO
AOC CONTRACT NO. IFB NO.
CAD FILE NO.
DRAWING NO.
SHEET DATE
01/15/2021
AOC19C3010-T018_A1TB-06.dwg
AOC19C3010-T018
OF 103
EXISTING DELAMINATION
20+00
S1 C1
NEW DELAMINATION
EXISTING PATCH
NEW PATCH
CRACK
EXPANSION JOINT
SUPPORT/BUTTRESS NUMBER
STATION NUMBER
PAINT COLOR LEGEND
FY2012 - ORANGE
FY2014 - BLUE
FY2016 - PINK
FY2017/18 - GREEN
FY2019/20 - RED
FHWA LEGEND
RATING 3
RATING 4
RATING 5
RATING 6
RATING 7
RATING 8
EXPOSED
REBAR
EXPOSED REBAREXPOSED
REBAR
EXPOSED REBAR EXPOSED REBARCRACK ACTIVE LEAK EXPOSED REBAR MOISTURE ON WALL
S6
S6
S6
S6
S6
S6
S6
S6
S6
S7
+0
+5
+0
+5
+0
BM-7
MOISTURE ON WALL
START OF SEVERELY
CORRODED CONDUIT TRAY
S6
S6
S6
S6
S6
S6
S6
S6
S6
S7
+0
+5
+0
+5
+0
EXPOSED REBARPREVIOUS
TESTING AREA
CORROSION ON LADDER PREVIOUS TESTING AREA
S6
S6
S6
S6
S6
S6
S6
S6
S6
S7
+0
+5
+0
+5
+0
BM-7
EXPOSED
REBAR
MODERATE CORROSION
AT EGRESS STAINS AND CORROSION
AROUND JOINT
+0
+5
+0
+5
+0
S6
S6
S6
S6
S6
S6
S6
S6
S6
S7
BM-7
BM-7
BM-7
5 BM-7 NORTH
1/8" = 1'-0"
6 BM-7 SOUTH
1/8" = 1'-0"
M
AT
C H
L
IN
E
SE
E
4/ A1
TB
-0
M
AT
C
H L
IN
E
SE
E 3/
A1
TB
-0
M
AT
C H
L
IN
E
SE
E
2/ A1
TB
-0
M
AT
C
H L
IN
E
SE
E 1/
A1
TB
-0 8M
ATC
H
LIN
E 7
SEE 1/A1TB-06
M
ATC
H
LIN
E 7
SEE 2/A1TB-06
M
ATC
H
LIN
E 7
SEE 3/A1TB-06
M
ATC
H
LIN
E 7
SEE 4/A1TB-06
A1TB-07
PLAN
N
O R
TH
1 CEILING PLAN
1/8" = 1'-0"
3 WEST WALL
1/8" = 1'-0"
4 EAST WALL
1/8" = 1'-0" MIRROR IMAGE
2 FLOOR PLAN
1/8" = 1'-0"
8" = 1'-0"
4' 8' 16'0'
A1TB-07
A1TB-07
B TUNNEL - STATION 12+00 TO 14+00 & BM-7
PROPERTY OF THE UNITED STATES
GOVERNMENT
CONTROLLED UNCLASSIFIED INFORMATION //
LAW ENFORCEMENT SENSITIVE
U.S. Capitol Utility Tunnels
Drawings are based on visual surveys.
Field verify where measurements are critical.
Affiliated Engineers
FY2020 STRUCTURAL ASSESSMENT OF
CPP TUNNELS - SURVEY DRAWINGS
As Noted DAW JMG
& Associates
REVISIONS
NO DESCRIPTION DATE
NOTE
LEGEND
ARCHITECTS & ENGINEERS
Affiliated Engineers, Inc.
200 International Circle, Suite 5888 Hunt Valley, MD 21031 Tel (410) 229-0090 www.aeieng.com
WDP & Associates Consulting Engineers, Inc.
10621 Gateway Blvd., Suite 200 Manassas, VA 20110 Tel (703) 257-9280 Fax: 703) 257-7589 www.wdpa.com
RECOMMENDED FOR APPROVAL
DIRECTOR OF DESIGN SERVICES
DIRECTOR OF PLANNING
& PROJECT MANAGEMENT
J. BRETT BLANTON
// CONTROLLED //// CONTROLLED //
// CONTROLLED //// CONTROLLED //
ARCHITECT OF THE CAPITOL
BUILDING NAME
PROJECT TITLE
DRAWING TITLE
SCALE DRAWN BY CHECKED BY
LOGO
AOC CONTRACT NO. IFB NO.
CAD FILE NO.
DRAWING NO.
SHEET DATE
01/15/2021
AOC19C3010-T018_A1TB-07.dwg
AOC19C3010-T018
OF 103
EXISTING DELAMINATION
20+00
S1 C1
NEW DELAMINATION
EXISTING PATCH
NEW PATCH
CRACK
EXPANSION JOINT
SUPPORT/BUTTRESS NUMBER
STATION NUMBER
PAINT COLOR LEGEND
FY2012 - ORANGE
FY2014 - BLUE
FY2016 - PINK
FY2017/18 - GREEN
FY2019/20 - RED
FHWA LEGEND
RATING 3
RATING 4
RATING 5
RATING 6
RATING 7
RATING 8
S1 S2 S3 S4 GS5 S6 GS7 S8 GS9 S10 GS11 GS12 GS13 S14
0+50 1+00 1+50 2+000+00
S1 S2 S3 S4 GS5 S6 GS7 S8 GS9 S10 GS11 GS12 GS13 S14
0+50 1+00 1+50 2+000+00
GD-11
GD-12
S3S2S1 S4 GS5 S6 GS7 S8 GS9 S10 GS11 GS12 GS13 S14
0+50 1+00 1+500+00 2+00
GD-12
S3S2S1 S4 GS5 S6 GS7 S8 GS9 S10 GS11 GS12 GS13 S14
0+50 1+00 1+500+00 2+00
OBSTRUCTED BY PIPES
FHWA
RATING
5 WALL
1/8" = 1'-0"
6 WALL
1/8" = 1'-0"
7 WALL
1/8" = 1'-0"
8 WALL
1/8" = 1'-0"
9 WALL
1/8" = 1'-0"
6 A1TG-16 5
A1TG-16 9
M
AT
C H
L
IN
E
SE
E
1/ A1
TG
-1
M
AT
C
H L
IN
E
SE
E 2/
A1
TG
-1
M
AT
C H
L
IN
E
SE
E
4/ A1
TG
-1
8" = 1'-0"
4' 8' 16'0'
3 SOUTH WALL
1/8" = 1'-0"
4 NORTH WALL
1/8" = 1'-0" MIRROR IMAGE
1 CEILING PLAN
1/8" = 1'-0"
2 FLOOR PLAN
1/8" = 1'-0"
PLAN
NORTH
M
AT
C H
L
IN
E
SE
E
3/ A1
TG
-1
M
ATC
H
LIN
E 19
SEE 1/A1TR
-40 M
ATC
H
LIN
E 19
SEE 2/A1TR
-40
A1TG-16
G TUNNEL - STATION 0+00 TO 2+00
PROPERTY OF THE UNITED STATES
GOVERNMENT
CONTROLLED UNCLASSIFIED INFORMATION //
LAW ENFORCEMENT SENSITIVE
U.S. Capitol Utility Tunnels
Drawings are based on visual surveys.
Field verify where measurements are critical.
Affiliated Engineers
FY2020 STRUCTURAL ASSESSMENT OF
CPP TUNNELS - SURVEY DRAWINGS
As Noted DAW JMG
& Associates
REVISIONS
NO DESCRIPTION DATE
NOTE
LEGEND
ARCHITECTS & ENGINEERS
Affiliated Engineers, Inc.
200 International Circle, Suite 5888 Hunt Valley, MD 21031 Tel (410) 229-0090 www.aeieng.com
WDP & Associates Consulting Engineers, Inc.
10621 Gateway Blvd., Suite 200 Manassas, VA 20110 Tel (703) 257-9280 Fax: 703) 257-7589 www.wdpa.com
RECOMMENDED FOR APPROVAL
DIRECTOR OF DESIGN SERVICES
DIRECTOR OF PLANNING
& PROJECT MANAGEMENT
J. BRETT BLANTON
// CONTROLLED //// CONTROLLED //
// CONTROLLED //// CONTROLLED //
ARCHITECT OF THE CAPITOL
BUILDING NAME
PROJECT TITLE
DRAWING TITLE
SCALE DRAWN BY CHECKED BY
LOGO
AOC CONTRACT NO. IFB NO.
CAD FILE NO.
DRAWING NO.
SHEET DATE
01/15/2021
AOC19C3010-T018_A1TG-16.dwg
AOC19C3010-T018
OF 103
EXISTING DELAMINATION
20+00
S1 C1
NEW DELAMINATION
EXISTING PATCH
NEW PATCH
CRACK
EXPANSION JOINT
SUPPORT/BUTTRESS NUMBER
STATION NUMBER
PAINT COLOR LEGEND
FY2012 - ORANGE
FY2014 - BLUE
FY2016 - PINK
FY2017/18 - GREEN
FY2019/20 - RED
FHWA LEGEND
RATING 3
RATING 4
RATING 5
RATING 6
RATING 7
RATING 8
GS15 S16 GS17 S18 GS19 S20 S21
S2
2+00 2+50 3+00
GS15 S16 GS17 S18 GS19 S20 S21
2+00 2+50 3+00 S2
WATER ON FLOOR
GS15 S16 GS17 S18 GS19 S20 S21
2+50 3+002+00
GS15 S16 GS17 S18 GS19 S20 S21
2+50 3+002+00
5 WALL
1/8" = 1'-0"
6 WALL
1/8" = 1'-0"
5 A1TG-17 6
M
ATC
H
LIN
E 20
SEE 1/A1TG
-16
M
AT
C H
L
IN
E
SE
E
5/ A1
TG
-1
M
AT
C
H L
IN
E
SE
E 6/
A1
TG
-1
M
ATC
H
LIN
E 20
SEE 2/A1TG
-16 M
ATC
H
LIN
E 20
SEE 4/A1TG
-16
8" = 1'-0"
4' 8' 16'0'
3 SOUTH WALL
1/8" = 1'-0"
4 NORTH WALL
1/8" = 1'-0" MIRROR IMAGE
1 CEILING PLAN
1/8" = 1'-0"
2 FLOOR PLAN
1/8" = 1'-0"
PLAN
NORTH
M
ATC
H
LIN
E 20
SEE 4/A1TG
-16
A1TG-17
G TUNNEL - STATION 2+00 TO 4+00
PROPERTY OF THE UNITED STATES
GOVERNMENT
CONTROLLED UNCLASSIFIED INFORMATION //
LAW ENFORCEMENT SENSITIVE
U.S. Capitol Utility Tunnels
Drawings are based on visual surveys.
Field verify where measurements are critical.
Affiliated Engineers
FY2020 STRUCTURAL ASSESSMENT OF
CPP TUNNELS - SURVEY DRAWINGS
As Noted DAW JMG
& Associates
REVISIONS
NO DESCRIPTION DATE
NOTE
LEGEND
ARCHITECTS & ENGINEERS
Affiliated Engineers, Inc.
200 International Circle, Suite 5888 Hunt Valley, MD 21031 Tel (410) 229-0090 www.aeieng.com
WDP & Associates Consulting Engineers, Inc.
10621 Gateway Blvd., Suite 200 Manassas, VA 20110 Tel (703) 257-9280 Fax: 703) 257-7589 www.wdpa.com
RECOMMENDED FOR APPROVAL
DIRECTOR OF DESIGN SERVICES
DIRECTOR OF PLANNING
& PROJECT MANAGEMENT
J. BRETT BLANTON
// CONTROLLED //// CONTROLLED //
// CONTROLLED //// CONTROLLED //
ARCHITECT OF THE CAPITOL
BUILDING NAME
PROJECT TITLE
DRAWING TITLE
SCALE DRAWN BY CHECKED BY
LOGO
AOC CONTRACT NO. IFB NO.
CAD FILE NO.
DRAWING NO.
SHEET DATE
01/15/2021
AOC19C3010-T018_A1TG-17.dwg
AOC19C3010-T018
OF 103
EXISTING DELAMINATION
20+00
S1 C1
NEW DELAMINATION
EXISTING PATCH
NEW PATCH
CRACK
EXPANSION JOINT
SUPPORT/BUTTRESS NUMBER
STATION NUMBER
PAINT COLOR LEGEND
FY2012 - ORANGE
FY2014 - BLUE
FY2016 - PINK
FY2017/18 - GREEN
FY2019/20 - RED
FHWA LEGEND
RATING 3
RATING 4
RATING 5
RATING 6
RATING 7
RATING 8
+5
+0
+5
+0
+5
S128 S129 GS130 S131 S132 S133 GS134 S135 GS136 S137 GS138 S139 S140 GS141 S142
G S1
S1
S1
G S1
S1
S1
S1
G S1
S1
G S1
S1
G S1
S1
S1
G S1
S1
+5
+5
+0
+5
+0
+5
+5
C31 C32
C33
+5
+0
+5
+0
+5
S128 S129 GS130 S131 S132 S133
GS134 S135
GS136 S137 GS138 S139 S140 GS141 S142
19+50 19+50
20+00
20+50
21+00
21+50
S128 S129 GS130 S131 S132 S133 GS134 S135 GS136 S137 GS138 S139 S140 GS141 S142
C31 C32
C33
3 WEST WALL
1/8" = 1'-0"
2 FLOOR PLAN
1/8" = 1'-0"
7 RG-6 WALL
1/8" = 1'-0"
5 RG-6 WALL
1/8" = 1'-0"
6 RG-6 WALL
1/8" = 1'-0"
N O
R
TH
8 RG-6 WALL
1/8" = 1'-0" MIRROR IMAGE4 EAST WALL
1/8" = 1'-0" MIRROR IMAGE
A1TG-31
8 A1TG-31 7
RG-6
M
AT
C H
L
IN
E
SE
E
1/ A1
TR
-3
M
AT
C
H L
IN
E
SE
E 2/
A1
TR
-3
M
AT
C H
L
IN
E
SE
E
3/ A1
TR
-3
M
AT
C
H L
IN
E
SE
E 4/
A1
TR
-3
M
ATC
H
LIN
E 28
SEE 1/A1TR
-30 M
ATC
H
LIN
E 28
SEE 2/A1TR
-30
M
ATC
H
LIN
E 28
SEE 3/A1TR
-30 M
ATC
H
LIN
E 28
SEE 4/A1TR
-30
A1TR-31
1 CEILING PLAN
1/8" = 1'-0"
8" = 1'-0"
4' 8' 16'0'
R TUNNEL - STATION 19+50 TO 21+50 & RG-6
PROPERTY OF THE UNITED STATES
GOVERNMENT
CONTROLLED UNCLASSIFIED INFORMATION //
LAW ENFORCEMENT SENSITIVE
U.S. Capitol Utility Tunnels
Drawings are based on visual surveys.
Field verify where measurements are critical.
Affiliated Engineers
FY2020 STRUCTURAL ASSESSMENT OF
CPP TUNNELS - SURVEY DRAWINGS
As Noted DAW JMG
& Associates
REVISIONS
NO DESCRIPTION DATE
NOTE
LEGEND
ARCHITECTS & ENGINEERS
Affiliated Engineers, Inc.
200 International Circle, Suite 5888 Hunt Valley, MD 21031 Tel (410) 229-0090 www.aeieng.com
WDP & Associates Consulting Engineers, Inc.
10621 Gateway Blvd., Suite 200 Manassas, VA 20110 Tel (703) 257-9280 Fax: 703) 257-7589 www.wdpa.com
RECOMMENDED FOR APPROVAL
DIRECTOR OF DESIGN SERVICES
DIRECTOR OF PLANNING
& PROJECT MANAGEMENT
J. BRETT BLANTON
// CONTROLLED //// CONTROLLED //
// CONTROLLED //// CONTROLLED //
ARCHITECT OF THE CAPITOL
BUILDING NAME
PROJECT TITLE
DRAWING TITLE
SCALE DRAWN BY CHECKED BY
LOGO
AOC CONTRACT NO. IFB NO.
CAD FILE NO.
DRAWING NO.
SHEET DATE
01/15/2021
AOC19C3010-T018_A1TR-31.dwg
AOC19C3010-T018
OF 103
EXISTING DELAMINATION
20+00
S1 C1
NEW DELAMINATION
EXISTING PATCH
NEW PATCH
CRACK
EXPANSION JOINT
SUPPORT/BUTTRESS NUMBER
STATION NUMBER
PAINT COLOR LEGEND
FY2012 - ORANGE
FY2014 - BLUE
FY2016 - PINK
FY2017/18 - GREEN
FY2019/20 - RED
FHWA LEGEND
RATING 3
RATING 4
RATING 5
RATING 6
RATING 7
RATING 8
+0
+5
+0
+5
GS143 S144 GS145 S146 GS147 S148 S149 GS150 S151 GS152 S153 GS154 S155
G S1
S1
G S1
S1
G S1
S1
S1
G S1
S1
G S1
S1
G S1
S1
+5
+5
+0
+5
+0
+5
+5
C34 C35
C36 C37
21+50 21+50
22+00
22+50
23+00
23+50
GS143 S144 GS145 S146 GS147 S148 S149 GS150 S151 GS152 S153 GS154 S155
C34 C35
C36 C37
+5
+0
+5
+0
+5
GS143 S144 GS145 S146 GS147 S148 S149 GS150 S151 GS152 S153 GS154 S155
1 CEILING PLAN
1/8" = 1'-0"
3 WEST WALL
1/8" = 1'-0"
2 FLOOR PLAN
1/8" = 1'-0"
N O
R
TH
4 EAST WALL
1/8" = 1'-0" MIRROR IMAGE
M
AT
C H
L
IN
E
SE
E
1/ A1
TR
-3
M
AT
C
H L
IN
E
SE
E 2/
A1
TR
-3
M
AT
C H
L
IN
E
SE
E
3/ A1
TR
-3
M
AT
C
H L
IN
E
SE
E 4/
A1
TR
-3
M
ATC
H
LIN
E 29
SEE 1/A1TR
-31 M
ATC
H
LIN
E 29
SEE 2/A1TR
-31
M
ATC
H
LIN
E 29
SEE 3/A1TR
-31 M
ATC
H
LIN
E 29
SEE 4/A1TR
-31
A1TR-32
8" = 1'-0"
4' 8' 16'0'
R TUNNEL - STATION 21+50 TO 23+50
PROPERTY OF THE UNITED STATES
GOVERNMENT
CONTROLLED UNCLASSIFIED INFORMATION //
LAW ENFORCEMENT SENSITIVE
U.S. Capitol Utility Tunnels
Drawings are based on visual surveys.
Field verify where measurements are critical.
Affiliated Engineers
FY2020 STRUCTURAL ASSESSMENT OF
CPP TUNNELS - SURVEY DRAWINGS
As Noted DAW JMG
& Associates
REVISIONS
NO DESCRIPTION DATE
NOTE
LEGEND
ARCHITECTS & ENGINEERS
Affiliated Engineers, Inc.
200 International Circle, Suite 5888 Hunt Valley, MD 21031 Tel (410) 229-0090 www.aeieng.com
WDP & Associates Consulting Engineers, Inc.
10621 Gateway Blvd., Suite 200 Manassas, VA 20110 Tel (703) 257-9280 Fax: 703) 257-7589 www.wdpa.com
RECOMMENDED FOR APPROVAL
DIRECTOR OF DESIGN SERVICES
DIRECTOR OF PLANNING
& PROJECT MANAGEMENT
J. BRETT BLANTON
// CONTROLLED //// CONTROLLED //
// CONTROLLED //// CONTROLLED //
ARCHITECT OF THE CAPITOL
BUILDING NAME
PROJECT TITLE
DRAWING TITLE
SCALE DRAWN BY CHECKED BY
LOGO
AOC CONTRACT NO. IFB NO.
CAD FILE NO.
DRAWING NO.
SHEET DATE
01/15/2021
AOC19C3010-T018_A1TR-32.dwg
AOC19C3010-T018
OF 103
EXISTING DELAMINATION
20+00
S1 C1
NEW DELAMINATION
EXISTING PATCH
NEW PATCH
CRACK
EXPANSION JOINT
SUPPORT/BUTTRESS NUMBER
STATION NUMBER
PAINT COLOR LEGEND
FY2012 - ORANGE
FY2014 - BLUE
FY2016 - PINK
FY2017/18 - GREEN
FY2019/20 - RED
FHWA LEGEND
RATING 3
RATING 4
RATING 5
RATING 6
RATING 7
RATING 8
+0
+5
+0
+5
GS156 S157 S158 GS159 S160 S161 S162 GS163 S164 GS165 S166 GS167 S168 S169 GS170
G S1
S1
S1
G S1
S1
S1
S1
G S1
S1
G S1
S1
G S1
S1
S1
G S1
+5
+5
+0
+5
+0
+5
+5 0C38 C39 C40 C41
+5
+0
+5
+0
+5
GS156 S157 S158 GS159 S160 S161 S162 GS163 S164 GS165 S166 GS167 S168 S169 GS170
23+50 23+50
24+00
24+50
25+00
25+50
GS156 S157 S158 GS159 S160 S161 S162 GS163 S164 GS165 S166 GS167 S168 S169 GS170
C38 C39 C40 C41
1 CEILING PLAN
1/8" = 1'-0"
3 WEST WALL
1/8" = 1'-0"
2 FLOOR PLAN
1/8" = 1'-0"
N O
R
TH
4 EAST WALL
1/8" = 1'-0" MIRROR IMAGE
M
AT
C H
L
IN
E
SE
E
1/ A1
TR
-3
M
AT
C
H L
IN
E
SE
E 2/
A1
TR
-3
M
AT
C H
L
IN
E
SE
E
3/ A1
TR
-3
M
AT
C
H L
IN
E
SE
E 4/
A1
TR
-3
M
ATC
H
LIN
E 30
SEE 1/A1TR
-32 M
ATC
H
LIN
E 30
SEE 2/A1TR
-32
M
ATC
H
LIN
E 30
SEE 3/A1TR
-32 M
ATC
H
LIN
E 30
SEE 4/A1TR
-32
A1TR-33
8" = 1'-0"
4' 8' 16'0'
R TUNNEL - STATION 23+50 TO 25+50
PROPERTY OF THE UNITED STATES
GOVERNMENT
CONTROLLED UNCLASSIFIED INFORMATION //
LAW ENFORCEMENT SENSITIVE
U.S. Capitol Utility Tunnels
Drawings are based on visual surveys.
Field verify where measurements are critical.
Affiliated Engineers
FY2020 STRUCTURAL ASSESSMENT OF
CPP TUNNELS - SURVEY DRAWINGS
As Noted DAW JMG
& Associates
REVISIONS
NO DESCRIPTION DATE
NOTE
LEGEND
ARCHITECTS & ENGINEERS
Affiliated Engineers, Inc.
200 International Circle, Suite 5888 Hunt Valley, MD 21031 Tel (410) 229-0090 www.aeieng.com
WDP & Associates Consulting Engineers, Inc.
10621 Gateway Blvd., Suite 200 Manassas, VA 20110 Tel (703) 257-9280 Fax: 703) 257-7589 www.wdpa.com
RECOMMENDED FOR APPROVAL
DIRECTOR OF DESIGN SERVICES
DIRECTOR OF PLANNING
& PROJECT MANAGEMENT
J. BRETT BLANTON
// CONTROLLED //// CONTROLLED //
// CONTROLLED //// CONTROLLED //
ARCHITECT OF THE CAPITOL
BUILDING NAME
PROJECT TITLE
DRAWING TITLE
SCALE DRAWN BY CHECKED BY
LOGO
AOC CONTRACT NO. IFB NO.
CAD FILE NO.
DRAWING NO.
SHEET DATE
01/15/2021
AOC19C3010-T018_A1TR-33.dwg
AOC19C3010-T018
OF 103
EXISTING DELAMINATION
20+00
S1 C1
NEW DELAMINATION
EXISTING PATCH
NEW PATCH
CRACK
EXPANSION JOINT
SUPPORT/BUTTRESS NUMBER
STATION NUMBER
PAINT COLOR LEGEND
FY2012 - ORANGE
FY2014 - BLUE
FY2016 - PINK
FY2017/18 - GREEN
FY2019/20 - RED
FHWA LEGEND
RATING 3
RATING 4
RATING 5
RATING 6
RATING 7
RATING 8
+0
+5
S171 GS172 S173 S174 S176
S175
S1
G S1
S1
S1
S1
S1
+5
+5
+0
+5
+5
C42 C43
RD-8
+5
+0
+5
S171 GS172 S173 S174
S175
S176
25+50 25+50
26+00
26+50
S171 GS172 S173 S174 S175 S176
C42 C43
S171 G
S172 S171
G S172
1 CEILING PLAN
1/8" = 1'-0"
2 FLOOR PLAN
1/8" = 1'-0"
11 RD-8 CEILING
1/8" = 1'-0"
12 RD-8 FLOOR
1/8" = 1'-0"
9 RD-7 WALL
1/8" = 1'-0"
7 RD-7 WALL
1/8" = 1'-0"
13 RD-8 WALL
1/8" = 1'-0"
3 WEST WALL
1/8" = 1'-0"
N O
R
TH
8 RD-7 WALL
1/8" = 1'-0" MIRROR IMAGE4 EAST WALL
1/8" = 1'-0" MIRROR IMAGE 14 RD-8 WALL
1/8" = 1'-0" MIRROR IMAGE
5 RD-7 CEILING PLAN
1/8" = 1'-0"
6 RD-7 FLOOR PLAN
1/8" = 1'-0"
10 RD-7 WALL
1/8" = 1'-0"
A1TR-34 9
A1TR-34
M
ATC
H
LIN
E 33
SEE 1/A1TR
-34
M
ATC
H
LIN
E 32
SEE 1/A1TR
-34 M
ATC
H
LIN
E 32
SEE 2/A1TR
-34
M
AT
C H
L
IN
E
SE
E
4/ A1
TR
-3
M
AT
C
H L
IN
E
SE
E 3/
A1
TR
-3
M
AT
C H
L
IN
E
SE
E
2/ A1
TR
-3
M
AT
C
H L
IN
E
SE
E 1/
A1
TR
-3 6M
ATC
H
LIN
E 31
SEE 1/A1TR
-33
MATCH LINE 32
SEE 5/A1TR-34
MATCH LINE 33
SEE 11/A1TR-34
MATCH LINE 34
SEE 1/A1TR-35
MATCH LINE 34
SEE 2/A1TR-35
MATCH LINE 33
SEE 12/A1TR-34
MATCH LINE 32
SEE 6/A1TR-34
M
ATC
H
LIN
E 31
SEE 2/A1TR
-33 M
ATC
H
LIN
E 31
SEE 3/A1TR
-33
M
ATC
H
LIN
E 31
SEE 4/A1TR
-33
NORTH
NORTH
M
ATC
H
LIN
E 33
SEE 2/A1TR
-34
A1TR-34
8" = 1'-0"
4' 8' 16'0'
R TUNNEL - STATION 25+50 TO 26+50 & RD-7
RD-8
PROPERTY OF THE UNITED STATES
GOVERNMENT
CONTROLLED UNCLASSIFIED INFORMATION //
LAW ENFORCEMENT SENSITIVE
U.S. Capitol Utility Tunnels
Drawings are based on visual surveys.
Field verify where measurements are critical.
Affiliated Engineers
FY2020 STRUCTURAL ASSESSMENT OF
CPP TUNNELS - SURVEY DRAWINGS
As Noted DAW JMG
& Associates
REVISIONS
NO DESCRIPTION DATE
NOTE
LEGEND
ARCHITECTS & ENGINEERS
Affiliated Engineers, Inc.
200 International Circle, Suite 5888 Hunt Valley, MD 21031 Tel (410) 229-0090 www.aeieng.com
WDP & Associates Consulting Engineers, Inc.
10621 Gateway Blvd., Suite 200 Manassas, VA 20110 Tel (703) 257-9280 Fax: 703) 257-7589 www.wdpa.com
RECOMMENDED FOR APPROVAL
DIRECTOR OF DESIGN SERVICES
DIRECTOR OF PLANNING
& PROJECT MANAGEMENT
J. BRETT BLANTON
// CONTROLLED //// CONTROLLED //
// CONTROLLED //// CONTROLLED //
ARCHITECT OF THE CAPITOL
BUILDING NAME
PROJECT TITLE
DRAWING TITLE
SCALE DRAWN BY CHECKED BY
LOGO
AOC CONTRACT NO. IFB NO.
CAD FILE NO.
DRAWING NO.
SHEET DATE
01/15/2021
AOC19C3010-T018_A1TR-34.dwg
AOC19C3010-T018
OF 103
EXISTING DELAMINATION
20+00
S1 C1
NEW DELAMINATION
EXISTING PATCH
NEW PATCH
CRACK
EXPANSION JOINT
SUPPORT/BUTTRESS NUMBER
STATION NUMBER
PAINT COLOR LEGEND
FY2012 - ORANGE
FY2014 - BLUE
FY2016 - PINK
FY2017/18 - GREEN
FY2019/20 - RED
FHWA LEGEND
RATING 3
RATING 4
RATING 5
RATING 6
RATING 7
RATING 8
CORROSION ON CONDUIT
Section loss on backside
ACTIVE LEAKS
8+
8+
8+
8+
9+
9+
9+
9+
+0
+0
C 80 C
81 C 82 C 83 C 84 C 85 C
86 C 87 C 88 C
89 C 90 C 91 C 92 C 93 C not active in
2020 ACTIVE
LEAKS
HEAVY CORROSION AT SUPPORT BASES
BUT HAS SUPPLEMENTAL SUPPORTSSUPPORT CLEANED AND PAINTED
BUT NEEDS SUPPLEMENTAL REPAIR
8'-0" x 2'-0" PROPOSED ADDITIONALCURTAIN GROUT AREA AT FLOOR
SMALL HOLE
shallow anode, conduit corrosionACTIVE LEAK
Delam not repaired
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
8+
8+
8+
8+
9+
9+
9+
9+
+0
+0
SURFACE
CORROSION
ACTIVE LEAK ACTIVE LEAK
not active in
ACTIVE LEAK
8+
8+
8+
8+
9+
9+
9+
9+
+0
+0
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
CORROSION ON
CONDUIT2'-0" PROPOSED ADDITIONAL
CURTAIN GROUTING AREA
ACTIVE LEAK
8+
8+
8+
8+
9+
9+
9+
9+
+0
+0
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
PREVIOUS LEAK
8'-0" x 2'-0" PROPOSED ADDITIONAL CURTAIN GROUT AREA AT FLOOR
PREVIOUS LEAK
CORROSION ON CONDUIT
3 NORTH WALL
1/8" = 1'-0"
4 SOUTH WALL
1/8" = 1'-0" MIRROR IMAGE
1 CEILING PLAN
1/8" = 1'-0"
2 FLOOR PLAN
1/8" = 1'-0"
PLAN
NORTH
8" = 1'-0"
4' 8' 16'0'
M
ATC
H
LIN
E 64
SEE 1/A1TV-56
M
ATC
H
LIN
E 64
SEE 2/A1TV-56
M
ATC
H
LIN
E 64
SEE 3/A1TV-56
M
ATC
H
LIN
E 64
SEE 4/A1TV-56
M
AT
C H
L
IN
E
SE
E
1/ A1
TV
-5
M
AT
C
H L
IN
E
SE
E 2/
A1
TV
-5
M
AT
C H
L
IN
E
SE
E
3/ A1
TV
-5
M
AT
C
H L
IN
E
SE
E 4/
A1
TV
-5
A1TV-57
V TUNNEL - STATION 8+00 TO 10+00
PROPERTY OF THE UNITED STATES
GOVERNMENT
CONTROLLED UNCLASSIFIED INFORMATION //
LAW ENFORCEMENT SENSITIVE
U.S. Capitol Utility Tunnels
Drawings are based on visual surveys.
Field verify where measurements are critical.
Affiliated Engineers
FY2020 STRUCTURAL ASSESSMENT OF
CPP TUNNELS - SURVEY DRAWINGS
As Noted DAW JMG
& Associates
REVISIONS
NO DESCRIPTION DATE
NOTE
LEGEND
ARCHITECTS & ENGINEERS
Affiliated Engineers, Inc.
200 International Circle, Suite 5888 Hunt Valley, MD 21031 Tel (410) 229-0090 www.aeieng.com
WDP & Associates Consulting Engineers, Inc.
10621 Gateway Blvd., Suite 200 Manassas, VA 20110 Tel (703) 257-9280 Fax: 703) 257-7589 www.wdpa.com
RECOMMENDED FOR APPROVAL
DIRECTOR OF DESIGN SERVICES
DIRECTOR OF PLANNING
& PROJECT MANAGEMENT
J. BRETT BLANTON
// CONTROLLED //// CONTROLLED //
// CONTROLLED //// CONTROLLED //
ARCHITECT OF THE CAPITOL
BUILDING NAME
PROJECT TITLE
DRAWING TITLE
SCALE DRAWN BY CHECKED BY
LOGO
AOC CONTRACT NO. IFB NO.
CAD FILE NO.
DRAWING NO.
SHEET DATE
01/15/2021
AOC19C3010-T018_A1TV-57.dwg
AOC19C3010-T018
OF 103
EXISTING DELAMINATION
20+00
S1 C1
NEW DELAMINATION
EXISTING PATCH
NEW PATCH
CRACK
EXPANSION JOINT
SUPPORT/BUTTRESS NUMBER
STATION NUMBER
PAINT COLOR LEGEND
FY2012 - ORANGE
FY2014 - BLUE
FY2016 - PINK
FY2017/18 - GREEN
FY2019/20 - RED
FHWA LEGEND
RATING 3
RATING 4
RATING 5
RATING 6
RATING 7
RATING 8
FENCE
+0
+0
+0
+0
+5
+5
+0
+0
+5
+5 0C 95 C
96 C 97 C
98 C
C
C
C
C
C
C
C
C
C
C
PREVIOUS LEAK
PREVIOUS LEAK
PREVIOUS LEAK
5'-0" x 2'-0" PROPOSED
ADDITIONAL CURTAIN
GROUTING AREA AT FLOOR
Exposed rebar at new egress opening
X
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
TO O
G
-2
VH-4A
+0
+0
+5
+5
+0
+0
+5
+5
+0
+0
ACTIVE LEAKING
ACTIVE LEAKING
not active in 2020
±5'-6" LIMITED CURTAIN
GROUT AREA
+0
+0
+5
+5
+0
+0
+5
+5
+0
+0
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
TO O
G
-2
4" CRACK
ACTIVE LEAK
ACTIVE LEAKS
AT BASE OF
WALL
9'-5" PROPOSED ADDITIONAL
CURTAIN GROUTING AREA - FLOOR
PLUS 2'-0" UP EACH WALL
ACTIVE LEAK
ACTIVE LEAK
ACTIVE LEAK
VH-4ATO
OG-22
+0
+0
+0
+0
+5
+5
+0
+0
+5
+5
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
PREVIOUS LEAK±21'-0" LIMITED CURTAIN GROUT AREA
LARGE CRACK
5'-0" x 2'-0" PROPOSED
ADDITIONAL CURTAIN
GROUTING AREA AT FLOOR
PREVIOUS LEAK
3 NORTH WALL
1/8" = 1'-0"
4 SOUTH WALL
1/8" = 1'-0" MIRROR IMAGE
1 CEILING PLAN
1/8" = 1'-0"
2 FLOOR PLAN
1/8" = 1'-0"
PLAN
NORTH
8" = 1'-0"
4' 8' 16'0'
M
ATC
H
LIN
E 65
SEE 1/A1TV-57
M
ATC
H
LIN
E 65
SEE 2/A1TV-57
M
ATC
H
LIN
E 65
SEE 3/A1TV-57
M
ATC
H
LIN
E 65
SEE 4/A1TV-57
M
AT
C H
L
IN
E
SE
E
1/ A1
TV
-5
M
AT
C
H L
IN
E
SE
E 2/
A1
TV
-5
M
AT
C H
L
IN
E
SE
E
3/ A1
TV
-5
M
AT
C
H L
IN
E
SE
E 4/
A1
TV
-5
A1TV-58
V TUNNEL - STATION 10+00 TO 12+00
PROPERTY OF THE UNITED STATES
GOVERNMENT
CONTROLLED UNCLASSIFIED INFORMATION //
LAW ENFORCEMENT SENSITIVE
U.S. Capitol Utility Tunnels
Drawings are based on visual surveys.
Field verify where measurements are critical.
Affiliated Engineers
FY2020 STRUCTURAL ASSESSMENT OF
CPP TUNNELS - SURVEY DRAWINGS
As Noted DAW JMG
& Associates
REVISIONS
NO DESCRIPTION DATE
NOTE
LEGEND
ARCHITECTS & ENGINEERS
Affiliated Engineers, Inc.
200 International Circle, Suite 5888 Hunt Valley, MD 21031 Tel (410) 229-0090 www.aeieng.com
WDP & Associates Consulting Engineers, Inc.
10621 Gateway Blvd., Suite 200 Manassas, VA 20110 Tel (703) 257-9280 Fax: 703) 257-7589 www.wdpa.com
RECOMMENDED FOR APPROVAL
DIRECTOR OF DESIGN SERVICES
DIRECTOR OF PLANNING
& PROJECT MANAGEMENT
J. BRETT BLANTON
// CONTROLLED //// CONTROLLED //
// CONTROLLED //// CONTROLLED //
ARCHITECT OF THE CAPITOL
BUILDING NAME
PROJECT TITLE
DRAWING TITLE
SCALE DRAWN BY CHECKED BY
LOGO
AOC CONTRACT NO. IFB NO.
CAD FILE NO.
DRAWING NO.
SHEET DATE
01/15/2021
AOC19C3010-T018_A1TV-58.dwg
AOC19C3010-T018
OF 103
EXISTING DELAMINATION
20+00
S1 C1
NEW DELAMINATION
EXISTING PATCH
NEW PATCH
CRACK
EXPANSION JOINT
SUPPORT/BUTTRESS NUMBER
STATION NUMBER
PAINT COLOR LEGEND
FY2012 - ORANGE
FY2014 - BLUE
FY2016 - PINK
FY2017/18 - GREEN
FY2019/20 - RED
FHWA LEGEND
RATING 3
RATING 4
RATING 5
RATING 6
RATING 7
RATING 8
VD-6
+0
+0 0 14
+5
+5
0 15 +0
+0 0 15
+5
+5
0 16 +0
+0
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
PREVIOUS LEAK
Honeycombing
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
+0
+0
+5
+5
+0
+0
+5
+5
+0
+0
LEAK JOINT NOT SEALED±30'-0" LIMITED CURTAIN GROUT AREA
VD-6
+0
+0
+5
+5
+0
+0
+5
+5
+0
+0
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
ELEVATION
DIFFERENCE AT FLOOR
WATER ON FLOORCORROSION
ON PIPE
Active leak
+0
+0
+5
+5
+0
+0
+5
+5
+0
+0
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
SEALANT SEPARATIONS
HOLE
1 CEILING PLAN
1/8" = 1'-0"
2 FLOOR PLAN
1/8" = 1'-0"
3 WEST WALL
1/8" = 1'-0"
4 EAST WALL
1/8" = 1'-0" MIRROR IMAGE
M
ATC
H
LIN
E 67
SEE 1/A1TV-59
8" = 1'-0"
4' 8' 16'0'
PLAN
N
O R
TH
M
ATC
H
LIN
E 67
SEE 3/A1TV-59
M
ATC
H
LIN
E 67
SEE 4/A1TV-59
M
ATC
H
LIN
E 67
SEE 2/A1TV-59
M
AT
C H
L
IN
E
SE
E
1/ A1
TV
-6
M
AT
C H
L
IN
E
SE
E
3/ A1
TV
-6
M
AT
C
H L
IN
E
SE
E 2/
A1
TV
-6
M
AT
C H
L
IN
E
SE
E
4/ A1
TV
-6
A1TV-60
V TUNNEL - STATION 14+00 TO 16+00
PROPERTY OF THE UNITED STATES
GOVERNMENT
CONTROLLED UNCLASSIFIED INFORMATION //
LAW ENFORCEMENT SENSITIVE
U.S. Capitol Utility Tunnels
Drawings are based on visual surveys.
Field verify where measurements are critical.
Affiliated Engineers
FY2020 STRUCTURAL ASSESSMENT OF
CPP TUNNELS - SURVEY DRAWINGS
As Noted DAW JMG
& Associates
REVISIONS
NO DESCRIPTION DATE
NOTE
LEGEND
ARCHITECTS & ENGINEERS
Affiliated Engineers, Inc.
200 International Circle, Suite 5888 Hunt Valley, MD 21031 Tel (410) 229-0090 www.aeieng.com
WDP & Associates Consulting Engineers, Inc.
10621 Gateway Blvd., Suite 200 Manassas, VA 20110 Tel (703) 257-9280 Fax: 703) 257-7589 www.wdpa.com
RECOMMENDED FOR APPROVAL
DIRECTOR OF DESIGN SERVICES
DIRECTOR OF PLANNING
& PROJECT MANAGEMENT
J. BRETT BLANTON
// CONTROLLED //// CONTROLLED //
// CONTROLLED //// CONTROLLED //
ARCHITECT OF THE CAPITOL
BUILDING NAME
PROJECT TITLE
DRAWING TITLE
SCALE DRAWN BY CHECKED BY
LOGO
AOC CONTRACT NO. IFB NO.
CAD FILE NO.
DRAWING NO.
SHEET DATE
01/15/2021
AOC19C3010-T018_A1TV-60.dwg
AOC19C3010-T018
OF 103
EXISTING DELAMINATION
20+00
S1 C1
NEW DELAMINATION
EXISTING PATCH
NEW PATCH
CRACK
EXPANSION JOINT
SUPPORT/BUTTRESS NUMBER
STATION NUMBER
PAINT COLOR LEGEND
FY2012 - ORANGE
FY2014 - BLUE
FY2016 - PINK
FY2017/18 - GREEN
FY2019/20 - RED
FHWA LEGEND
RATING 3
RATING 4
RATING 5
RATING 6
RATING 7
RATING 8
ACTIVE
LEAK
+5
+5
2+
2+
3+00 3+00
S1
S1
S1
S1
PS H
AN
G
ER
PS H
AN
G
ER
PS S1
S1
S1
S1
S1
S1
K
BR
AC
E
S12
K BRACE
Y2 -S
Y2 -S
YE
-S
YE
-S
HEAVY EFFLORESCENCE
IN THIS AREA CURTAIN GROUTING
YG-3 YG-4 EFFLORESCENCE ON
CEILING HERE TO S123
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
2+
3+
3+
+5
+5
2+
YE
-S
YE
-S
Y2 -S
Y2 -S
AREA
OBSTRUCTED
CURTAIN GROUTING
ALLIGATOR CRACKS
BAR
EXPOSED
YG-4YG-4
SPALLING SPALLING
S1
S1
S1
PS H
AN
G
ER
PS H
AN
G
ER
PS S1
S1
S1
S1
S1
S1
K
BR
AC
E
S12
K BRACE
+5
+5
2+
2+
3+00 3+00
Y2 -S
Y2 -S
YE
-S
YE
-S
S1
CORROSION ON
HANGER RODS AND
CONDUIT SUPPORTS
HOLE IN
FLOOR
YG-3 YG-4
CORROSION
ON LADDER
SUPPORT
LIGHT CORROSION ON
LPC SUPPORTS
CORROSION ON
HANGER RODS AND
CONDUIT SUPPORTS
12x34 18" off ground
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
1+
1+
2+
3+
3+
2+
YE
-S
YE
-S
Y2 -S
Y2 -S
CURTAIN GROUTING
HEAVY EFFLORESCENCE AND
CRACKING THROUGHOUT AREA
YG-3 YG-4
YG-4YG-3
YG-4
8 YG-4 SOUTH WALL
1/8" = 1'-0"
5 YG-3 NORTH WALL
1/8" = 1'-0"
7 YG-4 NORTH WALL
1/8" = 1'-0"
6 YG-3 SOUTH WALL
1/8" = 1'-0"
1 CEILING PLAN
1/8" = 1'-0"
3 WEST WALL
1/8" = 1'-0"
4 EAST WALL
1/8" = 1'-0" MIRROR IMAGE
2 FLOOR PLAN
1/8" = 1'-0"
PLAN
N
O R
TH
M
ATC
H
LIN
E 70
SEE 1/A1TY-62
M
ATC
H
LIN
E 70
SEE 2/A1TY-62
M
ATC
H
LIN
E 70
SEE 3/A1TY-62
M
ATC
H
LIN
E 70
SEE 4/A1TY-62
MATCH LINE 71
SEE 2/A1TY-64
M
AT
C H
L
IN
E
SE
E
4/ A1
TY
-6
M
AT
C
H L
IN
E
SE
E 3/
A1
TY
-6
MATCH LINE 71
SEE 1/A1TY-64
A1TY-63
A1TY-63
A1TY-63
A1TY-63
A1TY-63
A1TY-63
8" = 1'-0"
4' 8' 16'0'
A1TY-63
Y TUNNEL - STATION 1+50 TO 3+00 & YG-3
YG-4
PROPERTY OF THE UNITED STATES
GOVERNMENT
CONTROLLED UNCLASSIFIED INFORMATION //
LAW ENFORCEMENT SENSITIVE
U.S. Capitol Utility Tunnels
Drawings are based on visual surveys.
Field verify where measurements are critical.
Affiliated Engineers
FY2020 STRUCTURAL ASSESSMENT OF
CPP TUNNELS - SURVEY DRAWINGS
As Noted DAW JMG
& Associates
REVISIONS
NO DESCRIPTION DATE
NOTE
LEGEND
ARCHITECTS & ENGINEERS
Affiliated Engineers, Inc.
200 International Circle, Suite 5888 Hunt Valley, MD 21031 Tel (410) 229-0090 www.aeieng.com
WDP & Associates Consulting Engineers, Inc.
10621 Gateway Blvd., Suite 200 Manassas, VA 20110 Tel (703) 257-9280 Fax: 703) 257-7589 www.wdpa.com
RECOMMENDED FOR APPROVAL
DIRECTOR OF DESIGN SERVICES
DIRECTOR OF PLANNING
& PROJECT MANAGEMENT
J. BRETT BLANTON
// CONTROLLED //// CONTROLLED //
// CONTROLLED //// CONTROLLED //
ARCHITECT OF THE CAPITOL
BUILDING NAME
PROJECT TITLE
DRAWING TITLE
SCALE DRAWN BY CHECKED BY
LOGO
AOC CONTRACT NO. IFB NO.
CAD FILE NO.
DRAWING NO.
SHEET DATE
01/15/2021
AOC19C3010-T018_A1TY-63.dwg
AOC19C3010-T018
OF 103
EXISTING DELAMINATION
20+00
S1 C1
NEW DELAMINATION
EXISTING PATCH
NEW PATCH
CRACK
EXPANSION JOINT
SUPPORT/BUTTRESS NUMBER
STATION NUMBER
PAINT COLOR LEGEND
FY2012 - ORANGE
FY2014 - BLUE
FY2016 - PINK
FY2017/18 - GREEN
FY2019/20 - RED
FHWA LEGEND
RATING 3
RATING 4
RATING 5
RATING 6
RATING 7
RATING 8
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
3+
3+
4+
5+
5+
3+
4+
Y2 -S
CURTAIN GROUTING
ON
RETURN
WALLHOLE
3+
3+
3+
4+
4+
5+
5+
K BRACE
S1
K
BR
AC
E
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
Y2 -S
CURTAIN
GROUTING
YG-4A
S126 DOES
NOT EXIST
CHAIN NOT
CONNECTED
HEAVY CORROSION ON
CEILING HERE TO S124
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
3+
3+
4+
5+
5+
3+
4+
Y2 -S
CURTAIN GROUTING
TO YG-4A
SURFACE
CORROSION
ON PIPE
STAINING
K BRACE
S1
K
BR
AC
E
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
3+
3+
3+
4+
4+
5+
5+
Y2 -S
HEAVY CORROSION ON CONDUIT,
DOOR FRAME, AND HANGER RODS
MODERATE CORROSION ON CONDUIT AND HANGER RODS
YG-4A
8 YG-4A SOUTH WALL
1/8" = 1'-0"
5 YG-4A NORTH WALL
1/8" = 1'-0"
7 YG-4A WEST WALL
1/8" = 1'-0"
6 YG-4A EAST WALL
1/8" = 1'-0"
1 CEILING PLAN
1/8" = 1'-0"
3 SOUTH WALL
1/8" = 1'-0"
4 NORTH WALL
1/8" = 1'-0" MIRROR IMAGE
2 FLOOR PLAN
1/8" = 1'-0"
PLAN
NORTH
M
ATCH LINE 71
SEE 1/A1TY-63
M
ATCH LINE 71
SEE 2/A1TY-63
M
ATC
H
LIN
E 71
SEE 3/A1TY-63
M
ATC
H
LIN
E 71
SEE 4/A1TY-63
M
AT
C H
L
IN
E
SE
E
4/ A1
TY
-6
M
AT
C
H L
IN
E
SE
E 3/
A1
TY
-6
M
AT
C H
L
IN
E
SE
E
2/ A1
TY
-6
M
AT
C
H L
IN
E
SE
E 1/
A1
TY
-6
A1TY-64
A1TY-64
A1TY-64
A1TY-64
A1TY-64
A1TY-64
8" = 1'-0"
4' 8' 16'0'
A1TY-64
Y TUNNEL - STATION 3+00 TO 5+00 & YG-4A
PROPERTY OF THE UNITED STATES
GOVERNMENT
CONTROLLED UNCLASSIFIED INFORMATION //
LAW ENFORCEMENT SENSITIVE
U.S. Capitol Utility Tunnels
Drawings are based on visual surveys.
Field verify where measurements are critical.
Affiliated Engineers
FY2020 STRUCTURAL ASSESSMENT OF
CPP TUNNELS - SURVEY DRAWINGS
As Noted DAW JMG
& Associates
REVISIONS
NO DESCRIPTION DATE
NOTE
LEGEND
ARCHITECTS & ENGINEERS
Affiliated Engineers, Inc.
200 International Circle, Suite 5888 Hunt Valley, MD 21031 Tel (410) 229-0090 www.aeieng.com
WDP & Associates Consulting Engineers, Inc.
10621 Gateway Blvd., Suite 200 Manassas, VA 20110 Tel (703) 257-9280 Fax: 703) 257-7589 www.wdpa.com
RECOMMENDED FOR APPROVAL
DIRECTOR OF DESIGN SERVICES
DIRECTOR OF PLANNING
& PROJECT MANAGEMENT
J. BRETT BLANTON
// CONTROLLED //// CONTROLLED //
// CONTROLLED //// CONTROLLED //
ARCHITECT OF THE CAPITOL
BUILDING NAME
PROJECT TITLE
DRAWING TITLE
SCALE DRAWN BY CHECKED BY
LOGO
AOC CONTRACT NO. IFB NO.
CAD FILE NO.
DRAWING NO.
SHEET DATE
01/15/2021
AOC19C3010-T018_A1TY-64.dwg
AOC19C3010-T018
OF 103
EXISTING DELAMINATION
20+00
S1 C1
NEW DELAMINATION
EXISTING PATCH
NEW PATCH
CRACK
EXPANSION JOINT
SUPPORT/BUTTRESS NUMBER
STATION NUMBER
PAINT COLOR LEGEND
FY2012 - ORANGE
FY2014 - BLUE
FY2016 - PINK
FY2017/18 - GREEN
FY2019/20 - RED
FHWA LEGEND
RATING 3
RATING 4
RATING 5
RATING 6
RATING 7
RATING 8
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
+0
+0
+0
+0
+0
+5
+5
YID-10
+0
+0
+5
+0
+5
+0
+0
S2
S2 74 S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
YID-10
CONCRETE BLOCK PARTITION
AT ABANDONED BOOK TUNNEL ACTIVE LEAK
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
+0
+0
+0
+0
+0
+5
+5
YID-10
ABANDONED TUNNEL
BLOCK WALL
S2
S2 74 S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
+0
+0
+5
+0
+5
+0
+0
CONCRETE BLOCK PARTITION
AT ABANDONED BOOK TUNNEL
YID-10
AREA OBSTRUCTED
BY NEW FAN
PLAN
N
O R
TH
1 CEILING PLAN
1/8" = 1'-0"
3 WEST WALL
1/8" = 1'-0"
4 EAST WALL
1/8" = 1'-0" MIRROR IMAGE
2 FLOOR PLAN
1/8" = 1'-0"
M
ATCH LINE 85
SEE 5/A1TY-75
M
ATCH LINE 85
SEE 6/A1TY-75
M
ATC
H
LIN
E 85
SEE 3/A1TY-75
M
ATC
H
LIN
E 85
SEE 4/A1TY-75
M
AT
C H
L
IN
E
SE
E
4/ A1
TY
-7
M
AT
C
H L
IN
E
SE
E 3/
A1
TY
-7
M
AT
C H
L
IN
E
SE
E
1/ A1
TY
-7
M
AT
C
H L
IN
E
SE
E 2/
A1
TY
-7 7 3
A1TY-76
A1TY-76
8" = 1'-0"
4' 8' 16'0'
A1TY-76
Y TUNNEL - STATION 26+00 TO 28+00
PROPERTY OF THE UNITED STATES
GOVERNMENT
CONTROLLED UNCLASSIFIED INFORMATION //
LAW ENFORCEMENT SENSITIVE
U.S. Capitol Utility Tunnels
Drawings are based on visual surveys.
Field verify where measurements are critical.
Affiliated Engineers
FY2020 STRUCTURAL ASSESSMENT OF
CPP TUNNELS - SURVEY DRAWINGS
As Noted DAW JMG
& Associates
REVISIONS
NO DESCRIPTION DATE
NOTE
LEGEND
ARCHITECTS & ENGINEERS
Affiliated Engineers, Inc.
200 International Circle, Suite 5888 Hunt Valley, MD 21031 Tel (410) 229-0090 www.aeieng.com
WDP & Associates Consulting Engineers, Inc.
10621 Gateway Blvd., Suite 200 Manassas, VA 20110 Tel (703) 257-9280 Fax: 703) 257-7589 www.wdpa.com
RECOMMENDED FOR APPROVAL
DIRECTOR OF DESIGN SERVICES
DIRECTOR OF PLANNING
& PROJECT MANAGEMENT
J. BRETT BLANTON
// CONTROLLED //// CONTROLLED //
// CONTROLLED //// CONTROLLED //
ARCHITECT OF THE CAPITOL
BUILDING NAME
PROJECT TITLE
DRAWING TITLE
SCALE DRAWN BY CHECKED BY
LOGO
AOC CONTRACT NO. IFB NO.
CAD FILE NO.
DRAWING NO.
SHEET DATE
01/15/2021
AOC19C3010-T018_A1TY-76.dwg
AOC19C3010-T018
OF 103
EXISTING DELAMINATION
20+00
S1 C1
NEW DELAMINATION
EXISTING PATCH
NEW PATCH
CRACK
EXPANSION JOINT
SUPPORT/BUTTRESS NUMBER
STATION NUMBER
PAINT COLOR LEGEND
FY2012 - ORANGE
FY2014 - BLUE
FY2016 - PINK
FY2017/18 - GREEN
FY2019/20 - RED
FHWA LEGEND
RATING 3
RATING 4
RATING 5
RATING 6
RATING 7
RATING 8
WATER DRIPPING FROM
CRACK IN CEILING
PIPE AND HANGER
SUPPORT CORROSION
SUMP PIT - FULL OF WATER
CHANNEL SUPPORT CORROSION
CORROSION AT
BASE OF SUPPORTS
CRACK WITH MINOR LEAK
HEAVY CORROSION
ON CONDUIT
HEAVY
STAINING
ACTIVE LEAK AND EXPOSED
CORRODED STEEL
EXPOSED ABANDONED CONDUIT
EXPOSED STEEL ENDS WITH
SURFACE CORROSION
1 BGM-2A & 2B CEILING PLAN
1/4" = 1'-0" 2 BGM-2A & 2B FLOOR PLAN
1/4" = 1'-0"
4 BGM-2A & 2B EAST WALL
1/4" = 1'-0"
5 BGM 2B NORTH WALL
1/4" = 1'-0" 6 BGM 2A NORTH WALL
1/4" = 1'-0"
9 BGM-2B WEST WALL
1/4" = 1'-0"
7 BGM 2B SOUTH WALL
1/4" = 1'-0" 8 BGM 2A SOUTH WALL
1/4" = 1'-0"
4" = 1'-0"
0' 2' 4' 8'
A1TBG79
A1TBG79
A1TBG79
A1TBG79
A1TBG79
A1TBG79 A1TBG79
A1TBG79
10 BGM 2A WEST WALL
1/4" = 1'-0"
KEY PLAN
NO
RT
H
A1TBG79
12 BGM 2B EAST EGRESS WALL
1/4" = 1'-0"
3 BGM-2A & 2B WEST WALL
1/4" = 1'-0"
11 BGM 2A EAST EGRESS WALL
1/4" = 1'-0"
A1TBG79
A1TBG79
BGM TUNNEL - BGM-2A & BGM-2B
PROPERTY OF THE UNITED STATES
GOVERNMENT
CONTROLLED UNCLASSIFIED INFORMATION //
LAW ENFORCEMENT SENSITIVE
U.S. Capitol Utility Tunnels
Drawings are based on visual surveys.
Field verify where measurements are critical.
Affiliated Engineers
FY2020 STRUCTURAL ASSESSMENT OF
CPP TUNNELS - SURVEY DRAWINGS
As Noted DAW JMG
& Associates
REVISIONS
NO DESCRIPTION DATE
NOTE
LEGEND
ARCHITECTS & ENGINEERS
Affiliated Engineers, Inc.
200 International Circle, Suite 5888 Hunt Valley, MD 21031 Tel (410) 229-0090 www.aeieng.com
WDP & Associates Consulting Engineers, Inc.
10621 Gateway Blvd., Suite 200 Manassas, VA 20110 Tel (703) 257-9280 Fax: 703) 257-7589 www.wdpa.com
RECOMMENDED FOR APPROVAL
DIRECTOR OF DESIGN SERVICES
DIRECTOR OF PLANNING
& PROJECT MANAGEMENT
J. BRETT BLANTON
// CONTROLLED //// CONTROLLED //
// CONTROLLED //// CONTROLLED //
ARCHITECT OF THE CAPITOL
BUILDING NAME
PROJECT TITLE
DRAWING TITLE
SCALE DRAWN BY CHECKED BY
LOGO
AOC CONTRACT NO. IFB NO.
CAD FILE NO.
DRAWING NO.
SHEET DATE
01/15/2021
AOC19C3010-T018_A1TBG79.dwg
AOC19C3010-T018
OF 103
EXISTING DELAMINATION
20+00
S1 C1
NEW DELAMINATION
EXISTING PATCH
NEW PATCH
CRACK
EXPANSION JOINT
SUPPORT/BUTTRESS NUMBER
STATION NUMBER
PAINT COLOR LEGEND
FY2012 - ORANGE
FY2014 - BLUE
FY2016 - PINK
FY2017/18 - GREEN
FY2019/20 - RED
FHWA LEGEND
RATING 3
RATING 4
RATING 5
RATING 6
RATING 7
RATING 8
CORROSION ON
CONDUIT SUPPORTS
SURFACE CORROSION
ON ROD SUPPORT
HEAVY CORROSION ON
WALL PIPE SUPPORTS
HEAVY CORROSION
ON SUPPORT BUT
MAY BE ABANDONED
1 BGM-3 CEILING PLAN
1/4" = 1'-0" 2 BGM-3 FLOOR PLAN
1/4" = 1'-0"
3 BGM-3 NORTH WALL
1/4" = 1'-0" 4 BGM-3 EAST WALL
1/4" = 1'-0"
5 BGM-3 SOUTH WALL
1/4" = 1'-0" 6 BGM-3 WEST WALL
1/4" = 1'-0"
4" = 1'-0"
0' 2' 4' 8'
A1TBG80
A1TBG80
A1TBG80 6
A1TBG80
A1TBG80KEY PLAN
NO
RT
H
BGM TUNNEL - BGM-3
PROPERTY OF THE UNITED STATES
GOVERNMENT
CONTROLLED UNCLASSIFIED INFORMATION //
LAW ENFORCEMENT SENSITIVE
U.S. Capitol Utility Tunnels
Drawings are based on visual surveys.
Field verify where measurements are critical.
Affiliated Engineers
FY2020 STRUCTURAL ASSESSMENT OF
CPP TUNNELS - SURVEY DRAWINGS
As Noted DAW JMG
& Associates
REVISIONS
NO DESCRIPTION DATE
NOTE
LEGEND
ARCHITECTS & ENGINEERS
Affiliated Engineers, Inc.
200 International Circle, Suite 5888 Hunt Valley, MD 21031 Tel (410) 229-0090 www.aeieng.com
WDP & Associates Consulting Engineers, Inc.
10621 Gateway Blvd., Suite 200 Manassas, VA 20110 Tel (703) 257-9280 Fax: 703) 257-7589 www.wdpa.com
RECOMMENDED FOR APPROVAL
DIRECTOR OF DESIGN SERVICES
DIRECTOR OF PLANNING
& PROJECT MANAGEMENT
J. BRETT BLANTON
// CONTROLLED //// CONTROLLED //
// CONTROLLED //// CONTROLLED //
ARCHITECT OF THE CAPITOL
BUILDING NAME
PROJECT TITLE
DRAWING TITLE
SCALE DRAWN BY CHECKED BY
LOGO
AOC CONTRACT NO. IFB NO.
CAD FILE NO.
DRAWING NO.
SHEET DATE
01/15/2021
AOC19C3010-T018_A1TBG80.dwg
AOC19C3010-T018
OF 103
EXISTING DELAMINATION
20+00
S1 C1
NEW DELAMINATION
EXISTING PATCH
NEW PATCH
CRACK
EXPANSION JOINT
SUPPORT/BUTTRESS NUMBER
STATION NUMBER
PAINT COLOR LEGEND
FY2012 - ORANGE
FY2014 - BLUE
FY2016 - PINK
FY2017/18 - GREEN
FY2019/20 - RED
FHWA LEGEND
RATING 3
RATING 4
RATING 5
RATING 6
RATING 7
RATING 8
SUMP PIT
CONDUIT CORROSION
HANGER SUPPORT
CORROSION
MUD ON FLOOR
CORROSION ON COLLAR
OLD STEEL
CORRODED
"NEW" SUPPORT ANCHORED
INTO DELAMINATED CONCRETE
LARGE GAP BETWEEN
VAULT CEILING AND
TUNNEL ROOF
STAINING AROUND
BASE OF EGRESS
OPENING
1 BGM-7 CEILING PLAN
1/4" = 1'-0" 2 BGM-7 FLOOR PLAN
1/4" = 1'-0"
10 BGM-7A WEST WALL
1/4" = 1'-0"
4" = 1'-0"
0' 2' 4' 8'
A1TBG83
A1TBG83
A1TBG83
A1TBG83
A1TBG83
A1TBG83
A1TBG83
A1TBG83
A1TBG83
A1TBG83
A1TBG83
11 BGM-7 WEST WALL
1/4" = 1'-0" 12 BGM-7B WEST WALL
1/4" = 1'-0"
7 BGM-7A EAST WALL
1/4" = 1'-0"6 BGM-7 EAST WALL
1/4" = 1'-0"5 BGM-7B EAST WALL
1/4" = 1'-0"
8 BGM-7A SOUTH WALL
1/4" = 1'-0" 9 BGM-7B SOUTH WALL
1/4" = 1'-0"
3 BGM-7 NORTH WALL
1/4" = 1'-0" 4 BGM-7A NORTH WALL
1/4" = 1'-0"
KEY PLAN
NO
RT
H
BGM TUNNEL - BGM-7
PROPERTY OF THE UNITED STATES
GOVERNMENT
CONTROLLED UNCLASSIFIED INFORMATION //
LAW ENFORCEMENT SENSITIVE
U.S. Capitol Utility Tunnels
Drawings are based on visual surveys.
Field verify where measurements are critical.
Affiliated Engineers
FY2020 STRUCTURAL ASSESSMENT OF
CPP TUNNELS - SURVEY DRAWINGS
As Noted DAW JMG
& Associates
REVISIONS
NO DESCRIPTION DATE
NOTE
LEGEND
ARCHITECTS & ENGINEERS
Affiliated Engineers, Inc.
200 International Circle, Suite 5888 Hunt Valley, MD 21031 Tel (410) 229-0090 www.aeieng.com
WDP & Associates Consulting Engineers, Inc.
10621 Gateway Blvd., Suite 200 Manassas, VA 20110 Tel (703) 257-9280 Fax: 703) 257-7589 www.wdpa.com
RECOMMENDED FOR APPROVAL
DIRECTOR OF DESIGN SERVICES
DIRECTOR OF PLANNING
& PROJECT MANAGEMENT
J. BRETT BLANTON
// CONTROLLED //// CONTROLLED //
// CONTROLLED //// CONTROLLED //
ARCHITECT OF THE CAPITOL
BUILDING NAME
PROJECT TITLE
DRAWING TITLE
SCALE DRAWN BY CHECKED BY
LOGO
AOC CONTRACT NO. IFB NO.
CAD FILE NO.
DRAWING NO.
SHEET DATE
01/15/2021
AOC19C3010-T018_A1TBG83.dwg
AOC19C3010-T018
OF 103
EXISTING DELAMINATION
20+00
S1 C1
NEW DELAMINATION
EXISTING PATCH
NEW PATCH
CRACK
EXPANSION JOINT
SUPPORT/BUTTRESS NUMBER
STATION NUMBER
PAINT COLOR LEGEND
FY2012 - ORANGE
FY2014 - BLUE
FY2016 - PINK
FY2017/18 - GREEN
FY2019/20 - RED
FHWA LEGEND
RATING 3
RATING 4
RATING 5
RATING 6
RATING 7
RATING 8
CHM-1 PATCHED EDGES AT
CEILING AROUND RISER
STANDING WATER
SURFACE CORROSION
ON BEAM AND PLATE
CHM-1CHM-1
LEAK AT COLD JOINT
12" NEW CONCRETE,
ALL SIDES
MINOR STAINING,
ALL SIDES
CHM-2
PATCHED EDGES AT
CEILING AROUND RISER
NOW SPALLING
6" OF STANDING WATER
SURFACE CORROSION
ON BEAM AND PLATE
ALL SUPPORTS HAVE
LIGHT TO MODERATE
CORROSION. HEAVY
SURFACE CORROSION
ON PIPES.
CHM-2
CHM-1CHM-1
CHM-2CHM-2 CHM-2
1 CHM-1 CEILING PLAN
1/4" = 1'-0" 2 CHM-1 FLOOR PLAN
1/4" = 1'-0"
3 CHM-1 WEST WALL
1/4" = 1'-0"4 CHM-1 NORTH WALL
1/4" = 1'-0"
10 CHM-2 SOUTH WALL
1/4" = 1'-0"
8 CHM-2 FLOOR PLAN
1/4" = 1'-0"7 CHM-2 CEILING PLAN
1/4" = 1'-0"
5 CHM-1 EAST WALL
1/4" = 1'-0" 6 CHM-1 SOUTH WALL
1/4" = 1'-0"
9 CHM-2 EAST WALL
1/4" = 1'-0" 11 CHM-2 WEST WALL
1/4" = 1'-0" 12 CHM-2 NORTH WALL
1/4" = 1'-0"
4" = 1'-0"
0' 2' 4' 8'
NO
RT
H
A1TCM84
A1TCM84
A1TCM84
A1TCM84
A1TCM84
A1TCM84
A1TCM84
A1TCM84
A1TCM84
NO
RT
H
CHM TUNNEL - CHM-1 & CHM-2
PROPERTY OF THE UNITED STATES
GOVERNMENT
CONTROLLED UNCLASSIFIED INFORMATION //
LAW ENFORCEMENT SENSITIVE
U.S. Capitol Utility Tunnels
Drawings are based on visual surveys.
Field verify where measurements are critical.
Affiliated Engineers
FY2020 STRUCTURAL ASSESSMENT OF
CPP TUNNELS - SURVEY DRAWINGS
As Noted DAW JMG
& Associates
REVISIONS
NO DESCRIPTION DATE
NOTE
LEGEND
ARCHITECTS & ENGINEERS
Affiliated Engineers, Inc.
200 International Circle, Suite 5888 Hunt Valley, MD 21031 Tel (410) 229-0090 www.aeieng.com
WDP & Associates Consulting Engineers, Inc.
10621 Gateway Blvd., Suite 200 Manassas, VA 20110 Tel (703) 257-9280 Fax: 703) 257-7589 www.wdpa.com
RECOMMENDED FOR APPROVAL
DIRECTOR OF DESIGN SERVICES
DIRECTOR OF PLANNING
& PROJECT MANAGEMENT
J. BRETT BLANTON
// CONTROLLED //// CONTROLLED //
// CONTROLLED //// CONTROLLED //
ARCHITECT OF THE CAPITOL
BUILDING NAME
PROJECT TITLE
DRAWING TITLE
SCALE DRAWN BY CHECKED BY
LOGO
AOC CONTRACT NO. IFB NO.
CAD FILE NO.
DRAWING NO.
SHEET DATE
01/15/2021
AOC19C3010-T018_A1TCM84.dwg
AOC19C3010-T018
OF 103
EXISTING DELAMINATION
20+00
S1 C1
NEW DELAMINATION
EXISTING PATCH
NEW PATCH
CRACK
EXPANSION JOINT
SUPPORT/BUTTRESS NUMBER
STATION NUMBER
PAINT COLOR LEGEND
FY2012 - ORANGE
FY2014 - BLUE
FY2016 - PINK
FY2017/18 - GREEN
FY2019/20 - RED
FHWA LEGEND
RATING 3
RATING 4
RATING 5
RATING 6
RATING 7
RATING 8
COMPLETED CURTAIN GROUTING AREA
8 CHM-2 FLOOR PLAN
1/4" = 1'-0"
A1TCM07
A1TCM07
A1TCM07
A1TCM07
GS1 S4
S3
S2
2+50 3+00
OM-5OM-4
HIGH PRIORITY REPAIR
EXPOSED REBAR AND
ACTIVE LEAKING
ACTIVE LEAK
GS1 S4
S3
S2
2+50 3+00
SURFACE CORROSION
AT BASE OF STAIRS
HEAVY CORROSION AT
BOTTOM OF COLUMN
ROUGH FLOOR
BEGINS HERE
EFF. ON SUPPORT
AND PIPE
S3 S4
3+00 2+50
OM-5OM-4
S3 S4 GS5
S1
3+00
2+50 ACTIVE LEAKING
NORTH
3 OM-5 SOUTH WALL PROFILE VIEW
1/8" = 1'-0"
4 OM-5 NORTH WALL PROFILE VIEW
1/8" = 1'-0" MIRROR IMAGE
1 OM-4 & 5 CEILING PLAN
1/8" = 1'-0"
2 OM-4 & 5 FLOOR PLAN
1/8" = 1'-0"
5 OM-4 & 5 EAST WALL
1/8" = 1'-0"
M
AT
C H
L
IN
E
SE
E
3/ A1
TO
-8
8" = 1'-0"
0' 4' 8' 16'
M
AT
CH
L
IN
E
SE
E
1/ A1
TO
-8
M
AT
C
H L
IN
E
SE
E 3/
A1
TO
-8
A1TO-85
M
AT
CH
L
IN
E
SE
E
2/ A1
TO
-8
A1TO-85
A1TO-85
A1TO-85
O TUNNEL - OM-4 & OM-5
PROPERTY OF THE UNITED STATES
GOVERNMENT
CONTROLLED UNCLASSIFIED INFORMATION //
LAW ENFORCEMENT SENSITIVE
U.S. Capitol Utility Tunnels
Drawings are based on visual surveys.
Field verify where measurements are critical.
Affiliated Engineers
FY2020 STRUCTURAL ASSESSMENT OF
CPP TUNNELS - SURVEY DRAWINGS
As Noted DAW JMG
& Associates
REVISIONS
NO DESCRIPTION DATE
NOTE
LEGEND
ARCHITECTS & ENGINEERS
Affiliated Engineers, Inc.
200 International Circle, Suite 5888 Hunt Valley, MD 21031 Tel (410) 229-0090 www.aeieng.com
WDP & Associates Consulting Engineers, Inc.
10621…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .