AOCACB21R0004 A005.pdf

PDF 123 KB Posted

Attached to
IDIQ Structural Concrete Repairs
Solicitation number
AOCACB21R0004
Issued by

View the file

Other files

File Type Posted
2021-2028 IDIQ Structural Concrete Repairs - SOW 03.17.2021.pdf PDF
AOCACB21R0004 (A007).pdf PDF
AOCACB21R0004 - Pre-Bid RFI Responses 03-16-2021.pdf PDF
AOCACB21R0004 (A006).pdf PDF
Revised Section L 03.16.2021.pdf PDF
Revised Section M 03.16.2021.pdf PDF
AOCACB21R0004 - Pre-Bid RFI Responses 03102021.pdf PDF
2021-2028 IDIQ Structural Concrete Repairs - Bid Form 03.09.2021.pdf PDF
AOCACB21R0004 A001.pdf PDF
COVID-19 OAP Decision Tool (attachment to AOC Clause AOC52.223-11).pdf PDF
COVID-19 Daily Health Screening Inventory (attachment to AOC Clause AOC52.223-11).pdf PDF
2021 - 2028 IDIQ Tunnel Structural Repairs - Drawings.pdf PDF
Division 26 - Generic Electrical Specifications.pdf PDF
Contracting Officer Statement.docx DOCX document
0003.pdf PDF
2021 - 2028 IDIQ Tunnel Structural Repairs - Specifications.pdf PDF
CPP UDS SOP March 2019.pdf PDF
RFI 1.pdf PDF
0002.pdf PDF
0001.pdf PDF
2021 - 2028 IDIQ Tunnel Repairs - Site Visit Details and Requirements.docx DOCX document
Sample Certificate of Insurance (COI).pdf PDF
2021-2028 IDIQ Structural Concrete Repairs - Bid Form 01.15.pdf PDF
Attachment A - PPQ.pdf PDF
COVID-19 Poster OSHA4000.pdf PDF
Attachment D -Davis-Bacon Wage Determination.pdf PDF
PandemicFlu.pdf PDF
IDIQ - Structural Repairs Tunnel Improvements SOW - 01.15.pdf PDF
SCUS Police Background Check Form.pdf PDF
NDA.pdf PDF
AOCACB21R0004 (final).pdf PDF
USCP Request for Check of Criminal History (Form CP-491 (5-18) Revised.pdf PDF
Attachment B - CEQ.pdf PDF
Attachment C - Bid Form 11.19.2020.pdf PDF
USCP Vehicle Delivery Procedure Reference Guide (5-08).pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

03/12/2021

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

PPA2100

9901CODE

Architect of the Capitol Acquisition and Material Management Division Ford House Building Room H2-263 2nd and D Streets SW Washington, DC 20515

6. ISSUED BY CODE7. ADMINISTERED BY (If other than Item 6)

9A. AMENDMENT OF SOLICITATION NO.

AOCACB21R0004

CODE FACILITY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, country, state and ZIP Code) (X)

X 9B. DATED (SEE ITEM 11)

03/12/2021

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X XThe above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended, Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning __1__copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to correct the amendment numbering. Amendment 01 posted March 12, 2021 is Amendment 04.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) Darwin Thomas Jr.

(Signature of person authorized to sign)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED

By (Signature of Contracting Officer)

16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

Document Number: AOCACB21R0004 Page 1 of 1

File details come from the government source that posted it. Updated .