Attachment A - Itemized Schedule of Values Cost Breakdown.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
Z2DZ--Build out Community Living Center Building 72 Project No: 565-21-103
Solicitation number
36C24623B0045
Issued by

About this file

This document contains an itemized schedule of values cost breakdown template and related federal contract opportunity solicitation for a build out of Community Living Center Building 72 project located at the Fayetteville VA Medical Center in Fayetteville, North Carolina. The cost breakdown template includes line items for labor and material costs by construction division to be completed by offerors for both the base offer and alternative option. The related solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6 and has solicitation number 36C24623B0045 for project number 565-21-103 for a build out of the community living center. Offerors are to provide pricing using the itemized cost breakdown template.

View the file

Other files

File Type Posted
36C24623B0045 0008.pdf PDF
Questions and Answers Rev 2.docx DOCX document
09 67 23.60 RESINOUS (EPOXY BASE) WITH VINYL CHIP BROADCAST (RES-2) - IFC.pdf PDF
00 01 10 TABLE OF CONTENTS.pdf PDF
00 01 15 List of Drawing Sheets.pdf PDF
36C24623B0045 0007.docx DOCX document
36C24623B0045 0006.docx DOCX document
36C24623B0045 0005.docx DOCX document
Questions and Answers Rev. 1.docx DOCX document
36C24623B0045 0004.docx DOCX document
Site Visit Attendance.pdf PDF
Drawing ID 701 - Finish Plan 1st Floor - Rev. 1 - 11-09-2023.pdf PDF
36C24623B0045 0003.docx DOCX document
Drawing ID 602 - Room Finishes Legend - Rev. 1 - 11-09-2023.pdf PDF
Specification Section 09 67 23.20 - Dated 11-15-23.pdf PDF
Specification Section 09 91 00 - Dated 11-15-23.pdf PDF
Specification Section 12 36 00 - Dated 11-15-23.pdf PDF
Specification Section 09 65 13 - Dated 11-15-23.pdf PDF
Specification Section 10 21 16 - Dated 11-15-23.pdf PDF
Specification Section 10 26 00 - Dated 11-15-23.pdf PDF
Specification Section 09 65 19 - Dated 11-15-23.pdf PDF
Specification Section 09 72 16 - Dated 11-15-23.pdf PDF
Specification Section 12 34 00 - Dated 11-15-23.pdf PDF
Specification Section 10 13 00 - Dated 11-15-23.pdf PDF
Drawing ID 601 - Room Finishes Schedule - Rev. 1 - 11-09-2023.pdf PDF
Specification Section 09 06 00 - Dated 11-15-23.pdf PDF
Specification Section 09 51 00 - Dated 11-15-23.pdf PDF
36C24623B0045 0002.docx DOCX document
36C24623B0045 0001.docx DOCX document
Attachment I - 06 Plumbing Drawing Sheets Bldg 72.pdf PDF
Attachment B - Wage Determination.pdf PDF
Attachment C - Specifications 565-21-103 Build out Bldg 72.pdf PDF
Attachment G - 04 Fire Protection Drawing Sheets Bldg 72.pdf PDF
36C24623B0045_1.docx DOCX document
Attachment E - 02 Architecture Drawing Sheets Bldg 72.pdf PDF
Attachment D - 01 General Drawing Sheets Bldg 72.pdf PDF
Attachment J - 07 Electrical Drawing Sheets Bldg 72.pdf PDF
Attachment H - 05 Mechanical Drawing Sheets Bldg 72.pdf PDF
Attachment K - 08 Low Voltage Drawing Sheets Bldg 72.pdf PDF
Attachment F - 03 Interior Design Drawing Sheets Bldg 72.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer

Base Offer Cost Breakdown

Project Number: 565-21-103 Edward L Roy: VA assigned project #

Date:
Project TitleBuild Out Community Living Center Bldg. 72

Edward L Roy: VA assigned Project Title

Project LocationBuilding 72 Fayetteville VA Medical Center, Fayetteville, NC
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Alternative 1

Alternative 1 Offer Cost Breakdown

Project Number: 565-21-103 Edward L Roy: VA assigned project #

Date:
Project TitleBuild Out Community Living Center Bldg. 72

Edward L Roy: VA assigned Project Title

Project LocationBuilding 72 Fayetteville VA Medical Center, Fayetteville, NC
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Alt. 1 Offer Cost $ - 0 $ - 0 $ - 0