Specification Section 09 65 13 - Dated 11-15-23.pdf

PDF 83 KB Posted

Attached to
Z2DZ--Build out Community Living Center Building 72 Project No: 565-21-103
Solicitation number
36C24623B0045
Issued by

About this file

This document is a specification section outlining resilient base and flooring requirements for the Z2DZ--Build out Community Living Center Building 72 Project No: 565-21-103 solicitation issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. The specification requires resilient base adhered to interior walls and partitions, resilient stair treads adhered to interior stair treads, and sheet rubber flooring adhered to interior stair landings. Acceptable products include rubber or vinyl base, rubber stair treads with skid-resistant abrasive strip nosing, and rubber sheet flooring. Materials must meet standards for recycled content, low volatile organic compounds, and sustainable construction requirements. Installation requirements specify substrate preparation, layout, adhesion, sealing, protection, and cleaning of installed products.

View the file

Other files

File Type Posted
36C24623B0045 0008.pdf PDF
Questions and Answers Rev 2.docx DOCX document
09 67 23.60 RESINOUS (EPOXY BASE) WITH VINYL CHIP BROADCAST (RES-2) - IFC.pdf PDF
00 01 10 TABLE OF CONTENTS.pdf PDF
00 01 15 List of Drawing Sheets.pdf PDF
36C24623B0045 0007.docx DOCX document
36C24623B0045 0006.docx DOCX document
36C24623B0045 0005.docx DOCX document
Questions and Answers Rev. 1.docx DOCX document
36C24623B0045 0004.docx DOCX document
Site Visit Attendance.pdf PDF
Drawing ID 701 - Finish Plan 1st Floor - Rev. 1 - 11-09-2023.pdf PDF
36C24623B0045 0003.docx DOCX document
Drawing ID 602 - Room Finishes Legend - Rev. 1 - 11-09-2023.pdf PDF
Specification Section 09 67 23.20 - Dated 11-15-23.pdf PDF
Specification Section 09 91 00 - Dated 11-15-23.pdf PDF
Specification Section 12 36 00 - Dated 11-15-23.pdf PDF
Specification Section 10 21 16 - Dated 11-15-23.pdf PDF
Specification Section 10 26 00 - Dated 11-15-23.pdf PDF
Specification Section 09 65 19 - Dated 11-15-23.pdf PDF
Specification Section 09 72 16 - Dated 11-15-23.pdf PDF
Specification Section 12 34 00 - Dated 11-15-23.pdf PDF
Specification Section 10 13 00 - Dated 11-15-23.pdf PDF
Drawing ID 601 - Room Finishes Schedule - Rev. 1 - 11-09-2023.pdf PDF
Specification Section 09 06 00 - Dated 11-15-23.pdf PDF
Specification Section 09 51 00 - Dated 11-15-23.pdf PDF
36C24623B0045 0002.docx DOCX document
36C24623B0045 0001.docx DOCX document
Attachment I - 06 Plumbing Drawing Sheets Bldg 72.pdf PDF
Attachment B - Wage Determination.pdf PDF
Attachment C - Specifications 565-21-103 Build out Bldg 72.pdf PDF
Attachment G - 04 Fire Protection Drawing Sheets Bldg 72.pdf PDF
36C24623B0045_1.docx DOCX document
Attachment E - 02 Architecture Drawing Sheets Bldg 72.pdf PDF
Attachment D - 01 General Drawing Sheets Bldg 72.pdf PDF
Attachment J - 07 Electrical Drawing Sheets Bldg 72.pdf PDF
Attachment A - Itemized Schedule of Values Cost Breakdown.xlsx XLSX spreadsheet
Attachment H - 05 Mechanical Drawing Sheets Bldg 72.pdf PDF
Attachment K - 08 Low Voltage Drawing Sheets Bldg 72.pdf PDF
Attachment F - 03 Interior Design Drawing Sheets Bldg 72.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

565-21-103

B72 COMMUNITY LIVING CENTER

95% CONSTRUCTION DOCUMENTS 11-15-23

09 65 13 - 1

SECTION 09 65 13

RESILIENT BASE AND ACCESSORIES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Resilient base (RB) adhered to interior walls and partitions.

2. Resilient stair treads (RST) adhered to interior stair treads.

3. Sheet rubber flooring (SRF) adhered to interior stair landings.

1.2 RELATED REQUIREMENTS

A. Sheet Flooring Integral Base: Section 09 65 16, RESILIENT SHEET

FLOORING.

B. Rubber Tile Flooring at Landings: Section 09 65 19, RESILIENT TILE

FLOORING.

1.3 APPLICABLE PUBLICATIONS

A. Comply with references to extent specified in this section.

B. ASTM International (ASTM):

F1344-15................Rubber Floor Tile.

F1859-14e1..............Rubber Sheet Floor Covering without Backing.

F1860-14e1..............Rubber Sheet Floor Covering with Backing.

F1861-16................Resilient Wall Base.

D4259-18................Preparation of Concrete by Abrasion Prior to

Coating Application.

C. Federal Specifications (Fed. Spec.):

RR-T-650E (1994)........Treads, Metallic and Non-Metallic, Skid-Resistant.

D. International Concrete Repair Institute (ICRI):

310.2R-2013.............Selecting and Specifying Concrete Surface

Preparation for Sealers, Coatings, Polymer

Overlays, and Concrete Repair.

1.4 SUBMITTALS

A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

B. Manufacturer's Literature and Data:

1. Description of each product.

2. Adhesives and primers indicating manufacturer's recommendation for each application.

3. Installation instructions.

565-21-103

B72 COMMUNITY LIVING CENTER

95% CONSTRUCTION DOCUMENTS

565-21-103

B72 COMMUNITY LIVING CENTER

95% CONSTRUCTION DOCUMENTS

565-21-103

ISSUED FOR CONSTRUCTION

95% CONSTRUCTION DOCUMENTS 11-15-23

09 65 13 - 2

C. Samples:

1. Resilient Base: 150 mm (6 inches) long, each type and color.

2. Resilient Stair Treads: 150 mm (6 inches) long, each type and color.

3. Sheet Rubber Flooring: 300 mm (12 inches) square, each type and color.

D. Sustainable Construction Submittals:

1. Recycled Content: Identify post-consumer and pre-consumer recycled content percentage by weight.

2. Low Pollutant-Emitting Materials:

a. Stair Treads and Sheet Rubber Flooring: Submit Floor Score label.

b. Show volatile organic compound types and quantities.

E. Operation and Maintenance Data:

1. Care instructions for each exposed finish product.

1.5 DELIVERY

A. Deliver products in manufacturer's original sealed packaging.

B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, color, production run number, and manufacture date.

C. Before installation, return or dispose of products within distorted, damaged, or opened packaging.

1.6 STORAGE AND HANDLING

A. Store products indoors in dry, weathertight facility.

B. Protect products from damage when handling and during construction operations.

1.7 FIELD CONDITIONS

A. Environment:

1. Product Temperature: Minimum 21 degrees C (70 degrees F) for minimum

48 hours before installation.

2. Work Area Ambient Temperature Range: 21 to 27 degrees C (70 to

80 degrees F) continuously, beginning 48 hours before installation.

3. Install products when building is permanently enclosed and when wet construction is completed, dried, and cured.

1.8 WARRANTY

A. Construction Warranty: FAR clause 52.246-21, "Warranty of

Construction."

565-21-103

B72 COMMUNITY LIVING CENTER

95% CONSTRUCTION DOCUMENTS

565-21-103

B72 COMMUNITY LIVING CENTER

95% CONSTRUCTION DOCUMENTS

565-21-103

95% CONSTRUCTION DOCUMENTS 11-15-23

09 65 13 - 3

PART 2 - PRODUCTS

2.1 PRODUCTS

A. Basis of Design: Section 09 06 00, SCHEDULE FOR FINISHES.

B. Provide each product from one manufacturer and from one production run.

C. Provide resilient stair treads and sheet rubber flooring from same manufacturer.

D. Sustainable Construction Requirements:

1. Sheet Rubber Flooring Recycled Content: 90 percent total recycled content, minimum.

2. Low Pollutant-Emitting Materials: Comply with VOC limits specified in Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS for the following products:

a. Flooring Adhesives and Sealants.

2.2 RESILIENT BASE

A. Resilient Base: 3 mm (1/8 inch) thick, 100 mm (4 inches) high.

1. Type: Rubber or vinyl; use one type throughout.

2. ASTM F1861, Type TP thermoplastic rubber or Type TV thermoplastic vinyl, Group 2 - layered.

B. Applications:

1. Carpet Flooring Locations: Style A - Straight.

2. Other Locations: Style B - Cove.

2.3 RESILIENT STAIR TREADS

A. Resilient Stair Treads: Rubber, skid-resistant abrasive strip nosing, 5 mm (3/16 inch) thick nosing wear surface tapered to 3 mm (1/8 inch) thick at riser.

1. Fed. Spec. RR-T-650, Composition A, Type 2.

2. Abrasive Strips: Design for access by visually impaired.

3. Nosing: Flexible, accommodating angle between tread and riser; shape suiting sub-tread.

4. Size: Single piece full stair tread width and depth.

565-21-103

B72 COMMUNITY LIVING CENTER

95% CONSTRUCTION DOCUMENTS

565-21-103

B72 COMMUNITY LIVING CENTER

95% CONSTRUCTION DOCUMENTS

565-21-103

95% CONSTRUCTION DOCUMENTS 11-15-23

09 65 13 - 4

2.4 SHEET RUBBER FLOORING

A. Sheet Rubber Flooring (SRF): ASTM F1859 or ASTM F1860; Rubber, 900 mm

(36 inches) wide, 3 mm (1/8 inch) thick, smooth face; color and pattern matching resilient stair treads.

2.5 PRIMER (FOR CONCRETE FLOORS)

A. Primer: Type recommended by adhesive manufacturer.

2.6 LEVELING COMPOUND (FOR CONCRETE FLOORS)

A. Leveling Compound: Provide products mixed with latex or polyvinyl acetate resins.

2.7 ADHESIVES

A. Adhesives: Low pollutant-emitting, water based type recommended by adhered product manufacturer for each application.

PART 3 - EXECUTION

3.1 PREPARATION

A. Examine and verify substrate suitability for product installation.

B. Protect existing construction and completed work from damage.

C. Prepare for new installation.

1. Dispose of removed materials.

D. Correct substrate deficiencies.

1. Fill cracks, pits, and depressions with leveling compound.

2. Remove protrusions; grind high spots.

3. Apply leveling compound to achieve 3 mm (1/8 inch) in 3 m (10 feet) maximum surface variation.

E. Clean substrates. Remove contaminants capable of affecting subsequently installed product's performance.

1. Mechanically clean concrete floor substrate according to ASTM D4259.

2. Surface Profile: ICRI Guideline No. 310.2R.

F. Allow substrate to dry and cure.

G. Perform flooring manufacturer’s recommended bond, substrate moisture content, and pH tests.

3.2 INSTALLATION GENERAL

A. Install products according to manufacturer's instructions.

1. When instructions deviate from specifications, submit proposed resolution for Contracting Officer consideration.

3.3 RESILIENT BASE INSTALLATION

A. Applications:

1. Install resilient base in rooms scheduled on Drawings.

565-21-103

B72 COMMUNITY LIVING CENTER

95% CONSTRUCTION DOCUMENTS

565-21-103

B72 COMMUNITY LIVING CENTER

95% CONSTRUCTION DOCUMENTS

565-21-103

95% CONSTRUCTION DOCUMENTS 11-15-23

09 65 13 - 5

2. Install resilient base on casework and locker toe spaces, and other curb supported fixed equipment.

3. Extend resilient base into closets, alcoves, and cabinet knee spaces, and around columns within scheduled room.

B. Lay out resilient base with minimum number of joints.

1. Length: 600 mm (24 inches) minimum, each piece.

2. Locate joints 150 mm (6 inches) minimum from corners and intersection of adjacent materials.

C. Installation:

1. Apply adhesive uniformly for full contact between resilient base and substrate.

2. Set resilient base with hairline butted joints aligned along top edge.

D. Field form corners and end stops.

1. V-groove back of outside corner.

2. V-groove face of inside corner and notch cove for miter joint.

E. Roll resilient base ensuring complete adhesion.

3.4 RESILIENT STAIR TREAD INSTALLATION

A. Not Used.

3.5 SHEET RUBBER FLOORING INSTALLATION

A. Applications:

1. Install sheet rubber flooring on intermediate and floor landings where resilient stair treads are installed.

B. Lay out sheet rubber flooring symmetrically, with minimum number of joints.

1. Locate floor landing joints centered under doors.

C. Installation:

1. Apply adhesive uniformly for full contact between sheet rubber flooring and substrate.

2. Install sheet rubber flooring with 1 mm (0.04 inch) maximum width seams, perimeter joints, and joints with adjacent flooring.

a. Scribe sheet rubber flooring tight to interrupting surfaces.

3. Roll sheet rubber flooring ensuring complete adhesion.

3.6 CLEANING

A. Remove excess adhesive before adhesive sets.

B. Clean exposed resilient base, resilient stair treads, and sheet rubber flooring surfaces. Remove contaminants and stains.

565-21-103

B72 COMMUNITY LIVING CENTER

95% CONSTRUCTION DOCUMENTS

565-21-103

B72 COMMUNITY LIVING CENTER

95% CONSTRUCTION DOCUMENTS

565-21-103

95% CONSTRUCTION DOCUMENTS 11-15-23

09 65 13 - 6

1. Clean with mild detergent. Leave surfaces free of detergent residue.

C. Polish exposed resilient base to gloss sheen.

3.7 PROTECTION

A. Prohibit traffic on sheet rubber flooring 72 hours, minimum, after installation.

B. Protect products from construction traffic and operations.

1. Cover resilient sheet rubber flooring with reinforced kraft paper, and plywood or hardboard.

2. Maintain protection until directed by Contracting Officer's

Representative.

C. Replace damaged products and re-clean.

1. Damaged Products include cut, gouged, scraped, torn, and unbonded products.

- - E N D - -

565-21-103

B72 COMMUNITY LIVING CENTER

95% CONSTRUCTION DOCUMENTS

565-21-103

B72 COMMUNITY LIVING CENTER

95% CONSTRUCTION DOCUMENTS

565-21-103

File details come from the government source that posted it. Updated .