Drawing ID 601 - Room Finishes Schedule - Rev. 1 - 11-09-2023.pdf

PDF 551 KB Posted

Attached to
Z2DZ--Build out Community Living Center Building 72 Project No: 565-21-103
Solicitation number
36C24623B0045
Issued by

About this file

This drawing package details specifications for interior finishes and materials for the build out of Community Living Center Building 72, a project of the Department of Veterans Affairs. Key details include finish schedules for 145 rooms indicating flooring, base, wall, ceiling, and door materials. The project location is in Fayetteville, North Carolina and the architectural firm is Cornerstone Architecture & Interior Design. The related federal contract opportunity is solicitation number 36C24623B0045 for the Z2DZ--Build out Community Living Center Building 72 project numbered 565-21-103 to be awarded by the Department of Veterans Affairs Veterans Health Administration VISN 6.

View the file

Other files

File Type Posted
36C24623B0045 0008.pdf PDF
Questions and Answers Rev 2.docx DOCX document
09 67 23.60 RESINOUS (EPOXY BASE) WITH VINYL CHIP BROADCAST (RES-2) - IFC.pdf PDF
00 01 10 TABLE OF CONTENTS.pdf PDF
00 01 15 List of Drawing Sheets.pdf PDF
36C24623B0045 0007.docx DOCX document
36C24623B0045 0006.docx DOCX document
36C24623B0045 0005.docx DOCX document
Questions and Answers Rev. 1.docx DOCX document
36C24623B0045 0004.docx DOCX document
Site Visit Attendance.pdf PDF
Drawing ID 701 - Finish Plan 1st Floor - Rev. 1 - 11-09-2023.pdf PDF
36C24623B0045 0003.docx DOCX document
Drawing ID 602 - Room Finishes Legend - Rev. 1 - 11-09-2023.pdf PDF
Specification Section 09 67 23.20 - Dated 11-15-23.pdf PDF
Specification Section 09 91 00 - Dated 11-15-23.pdf PDF
Specification Section 12 36 00 - Dated 11-15-23.pdf PDF
Specification Section 09 65 13 - Dated 11-15-23.pdf PDF
Specification Section 10 21 16 - Dated 11-15-23.pdf PDF
Specification Section 10 26 00 - Dated 11-15-23.pdf PDF
Specification Section 09 65 19 - Dated 11-15-23.pdf PDF
Specification Section 09 72 16 - Dated 11-15-23.pdf PDF
Specification Section 12 34 00 - Dated 11-15-23.pdf PDF
Specification Section 10 13 00 - Dated 11-15-23.pdf PDF
Specification Section 09 06 00 - Dated 11-15-23.pdf PDF
Specification Section 09 51 00 - Dated 11-15-23.pdf PDF
36C24623B0045 0002.docx DOCX document
36C24623B0045 0001.docx DOCX document
Attachment I - 06 Plumbing Drawing Sheets Bldg 72.pdf PDF
Attachment B - Wage Determination.pdf PDF
Attachment C - Specifications 565-21-103 Build out Bldg 72.pdf PDF
Attachment G - 04 Fire Protection Drawing Sheets Bldg 72.pdf PDF
36C24623B0045_1.docx DOCX document
Attachment E - 02 Architecture Drawing Sheets Bldg 72.pdf PDF
Attachment D - 01 General Drawing Sheets Bldg 72.pdf PDF
Attachment J - 07 Electrical Drawing Sheets Bldg 72.pdf PDF
Attachment A - Itemized Schedule of Values Cost Breakdown.xlsx XLSX spreadsheet
Attachment H - 05 Mechanical Drawing Sheets Bldg 72.pdf PDF
Attachment K - 08 Low Voltage Drawing Sheets Bldg 72.pdf PDF
Attachment F - 03 Interior Design Drawing Sheets Bldg 72.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Alliance WSP JV 1695 Prince Street Alexandria, VA 22314 277 Bendix Road, Suite 300

Virginia Beach, VA 23452

Interior Design:

Cornerstone Architecture & Interior Design 211B W. 7th Street Richmond, VA, 23224

BUILD OUT BUILDING 72

COMMUNITY LIVING CENTER

FAYETTEVILLE, NC

565-21-103

B72 Project Director

OCTOBER 28, 2022 JHS KHWRevisions: Date:

B

C

D

E

1/

/2

:0 2:

A

M Z:

\2

AW

SP

J

V N

C \2

5.

C

O M

M U

N

IT

Y

LI

VI

N

G C

EN

TE

R B

\D

ES

IG

N \T

EM

PL

AT

ES

\5

-2 1-

3-

BR

D

R .D

W G

DWG. ____ OF 91

ISSUED FOR

CONSTRUCTION

Rev 0 10/28/2022 Rev 1 11/09/2023

ID601

ROOM FINISHES

SCHEDULE

FINISH SCHEDULE

ROOM NO

ROOM NAME

ENTRY FOYER

VESTIBULE

ADMIN

BREAK ROOM

STAFF TLT

LIVING ROOM

DINING

KITCHEN

PANTRY

STOR

CORRIDOR

BEDROOM

TLT

BEDROOM

TLT

BARIATRIC

TLT

BEDROOM

TLT

BEDROOM

TLT

BEDROOM

TLT

SUPPLIES

LINEN CLOS

MED GAS

SOILED

IT CLOSET

MED SUPPLIES

COMM

CORRIDOR

BEDROOM

TLT

BEDROOM

TLT

BEDROOM

TLT

BEDROOM

TLT

SOILED

LINENS

LAUNDRY

HVAC

MECH

LADDER

ELEC

ELEC CLOS

FLOOR

MATL

LVT1/LVT2

LVT1/LVT2

LVT2

LVT2

FT1

LVT1/LVT2

LVT1/LVT2

LVT1

LVT1

LVT1

LVT1/LVT2

LVT1/LVT2

FT1

LVT1/LVT2

FT1

LVT1/LVT2

FT1

LVT1/LVT2

FT1

LVT1/LVT2

FT1

LVT1/LVT2

FT1

LVT1

LVT1

SV1

SV1

SDT1

SV1

SDT1

LVT1/LVT2

LVT1/LVT2

FT1

LVT1/LVT2

FT1

LVT1/LVT2

FT1

LVT1/LVT2

FT1

SV1

LVT2

LVT2

EPY1

EPY1

EPY1

EPY1

EPY1

BASE

WB1

WB1

WB1

WB1

CB1

WB1

WB1

WB1

WB1

WB1

WB1

WB1

CB1

WB1

CB1

WB1

CB1

WB1

CB1

WB1

CB1

WB1

CB1

WB1

WB1

WB1

WB1

WB1

WB1

WB1

WB1

WB1

CB1

WB1

CB1

WB1

CB1

WB1

CB1

WB1

WB1

WB1

WB1

WB1

WB1

WB1

WB1

DOOR TRIM

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

WALLS

N

WC4

WC1

PT-1

PT-1

WC1

WC2

WC2

WT1

PT-2

PT-2

WC2

PT-1/2

WT2/PT-1

PT-1

WT2/PT-1

PT-1

WT2/PT-1

PT-1

WT2/PT-1

PT-1

WT2/PT-1

PT-1

WT2/PT-1

PT-1

PT-2

PT-1

PT-1

PT-2

PT-1

PT-2

WC2

PT-1/2

WT2/PT-1

PT-1

WT2/PT-1

PT-1/2

WT2/PT-1

PT-1

WT2/PT-1

PT-1

PT-2

PT-1/2

PT-1/2

PT-2

PT-

PT-2

PT-2

E

WC4

WC1

PT-1

PT-1

WC1

WC2

WC2

WT1

PT-2

PT-2

WC2

PT-1

WT2/PT-1

PT-1

WT2/PT-1

PT-2

WT2/PT-1

PT-1

WT2/PT-1

PT-2

WT2/PT-1

PT-1

WT2/PT-1

PT-1

PT-2

PT-1

PT-1/2

PT-2

PT-1

PT-2

WC2

PT-1

WT2/PT-1

PT-1

WT2/PT-1

PT-1

WT2/PT-1

PT-1

WT2/PT-1

PT-1/2

PT-2

PT-1/2

PT-1/2

PT-2

PT-2

PT-2

PT-2

S

WC4

WC1

PT-2/WC2

WC2

WC1

WC2

WC2

PT-1

PT-2

PT-2

WC2

PT-1

WT2/PT-1

PT-2

WT2/PT-1

PT-2

WT2/PT-1

PT-2

WT2/PT-1

PT-2

WT2/PT-1

PT-2

WT2/PT-1

PT-1

PT-2

PT-1

PT-12

PT-

PT-1

PT-2

WC2

PT-1

WT2/PT-1

PT-1/2

WT2/PT-1

PT-1/2

WT2/PT-1

PT-1/2

WT2/PT-1

PT-1/2

PT-2

PT-1

PT-1

PT-2

PT-2

PT-2

PT-2

W

WC4

WC1

PT-1

PT-1

WC1

WC2

WC2

PT-2

PT-2

WC2

PT-1/2

WT2/PT-1

PT-2

WT2/PT-1

PT-1

CT1/CT2

PT-2

WT2/PT-1

PT-1

WT2/PT-1

PT-2

WT2/PT-1

PT-1

PT-2

PT-1

PT-1

PT-2

PT-1

PT-2

WC2

PT-1/2

WT2/PT-1

PT-1/2

WT2/PT-1

PT-1

WT2/PT-1

PT-1/2

WT2/PT-1

PT-1

PT-2

PT-1

PT-1

PT-2

PT-2

PT-

PT-2

CEILING

MATL

GWB1

GWB1

AT1

AT1

GWB1

GWB1/AT1

GWB1/AT1

GWB1/AT1

AT1

AT1

AT1

AT1

GWB1

AT1

GWB1

AT1

GWB1

AT1

GWB1

AT1

GWB1

AT1

GWB1

GWB1

AT1

GWB1

GWB1

GWB1

AT1

AT1

AT1

AT1

GWB1

AT1

GWB1

AT1

GWB1

AT1

GWB1

GWB1

AT1

GWB1

GWB1

GWB1

AT1

HEIGHT

NOTES

SEE ARCH.

DRAWINGS

CA PROJECT NAME - 2022.04.13
ID601 ROOM FINISHES SCHEDULE
ID602 ROOM FINISHES LEGEND
ID701 FINISH PLAN

File details come from the government source that posted it. Updated .