This document is a specification section outlining requirements for shower and dressing compartments to be installed as part of the Build out Community Living Center Building 72 Project No: 565-21-103, solicited by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. Key requirements include prefabricated single plastic shower cabinets in white with a minimum 65% post-consumer recycled content, dressing booth partitions constructed per CID A-A-60003 Type I Style C, powder-coated steel finishes, and installation in accordance with manufacturer's instructions and applicable accessibility standards.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
565-21-103
B72 COMMUNITY LIVING CENTER
95% CONSTRUCTION DOCUMENTS 11-15-23
10 21 16 - 1
SECCTION 10 21 16
SHOWER AND DRESSING COMPARTMENTS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Prefabricated shower cabinet .
1.2 RELATED WORK
A. Section 06 20 00, FINISH CARPENTRY: Wood seats and seat supports.
B. Section 09 06 00, SCHEDULE FOR FINISHES: Color of baked enamel finish and color of shower cabinet.
1.3 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this section.
B. ASTM International (ASTM):
A653/A653M-20...........Steel Sheet, Zinc-Coated (Galvanized) or
Zinc-Iron Alloy-Coated (Galvannealed) by the
Hot-Dip Process.
D1187/D1187M-97(2018)...Asphalt-Base Emulsions for Use as Protective
Coatings for Metal.
E84-20..................Surface Burning Characteristics of Building
Materials
C. American Society of Mechanical Engineers (ASME):
A112.18.1-2018..........Plumbing Supply Fittings.
D. Commercial Item Descriptions (CID):
A-A-60003(8-22-1997)....Partitions, Toilet, Complete.
E. Code of Federal Regulations (CFR):
40 CFR 247(2020)........Comprehensive Procurement Guidelines for
Products Containing Recovered Materials.
1.4 SUBMITTALS
A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Submittal Drawings:
1. Show size, configuration, and fabrication and installation details.
C. Manufacturer's Literature and Data:
1. Description of each product.
2. Installation instructions.
3. Warranty.
565-21-103
B72 COMMUNITY LIVING CENTER
95% CONSTRUCTION DOCUMENTS
565-21-103
B72 COMMUNITY LIVING CENTER
95% CONSTRUCTION DOCUMENTS
565-21-103
ISSUED FOR CONSTRUCTION
10 21 16 - 2
4. Samples: Paint: 300 mm (6 inch) square, each type and color .
a. Submit quantity required to show full color and texturerange.
D. Sustainable Construction Submittals:
1. Recycled Content: Identify post-consumer and pre-consumer recycled content percentage by weight.
E. Certificates: Certify products comply with specifications.
1. Shower cabinets.
2. Dressing booth partitions.
3. Zinc-Coating: Certificate, attesting that zinc-coatings conform to specified requirements.
4. Flame spread rating is Class C for plastic shower units.
F. Qualifications: Substantiate qualifications comply with specifications.
1. Manufacturer with project experience list .
G. Operation and Maintenance Data:
1. Care instructions for each exposed finish product.
1.5 QUALITY ASSURANCE
A. Manufacturer Qualifications:
1. Regularly manufactures specified products.
2. Manufactured specified products with satisfactory service on five similar installations for minimum five years.
a. Project Experience List: Provide contact names and addresses for completed projects.
B. Comply with ADA accessibility requirements.
1.6 DELIVERY
A. Deliver products in manufacturer's original sealed packaging.
B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, color, production run number, and manufacture date.
C. Before installation, return or dispose of products within distorted, damaged, or opened packaging.
1.7 STORAGE AND HANDLING
A. Store products indoors in dry, weathertight conditioned facility.
B. Protect products from damage during handling and construction operations.
1.8 FIELD CONDITIONS
A. Environment:
565-21-103
B72 COMMUNITY LIVING CENTER
95% CONSTRUCTION DOCUMENTS
565-21-103
B72 COMMUNITY LIVING CENTER
95% CONSTRUCTION DOCUMENTS
565-21-103
10 21 16 - 3
1. Product Temperature: Minimum 21 degrees C (70 degrees F) for minimum
48 hours before installation.
2. Work Area Ambient Conditions: HVAC systems are complete, operational, and maintaining facility design operating conditions continuously, beginning 48 hours before installation until
Government occupancy.
3. Install products when building is permanently enclosed and when wet construction is completed, dried, and cured.
B. Field Measurements: Verify field conditions affecting compartments fabrication and installation. Show field measurements on Submittal
Drawings.
1. Coordinate field measurement and fabrication schedule to avoid delay.
1.9 WARRANTY
A. Construction Warranty: FAR clause 52.246-21, "Warranty of
Construction."
PART 2 - PRODUCTS
2.1 MATERIALS
A. Plastic Sheet: Solid, high-density polyethylene (HDPE).
2.2 PRODUCTS - GENERAL
A. Basis of Design: Section 09 06 00, SCHEDULE FOR FINISHES.
B. Provide system components from one manufacturer.
C. Sustainable Construction Requirements:
1. Plastic Shower Compartments: 65 percent post-consumer recycled content, minimum.
2. Low Pollutant-Emitting Materials: Comply with VOC limits specified in Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS for the following products:
a. Non-flooring adhesives and sealants.
b. Aerosol adhesives.
c. Paints and coatings.
565-21-103
B72 COMMUNITY LIVING CENTER
95% CONSTRUCTION DOCUMENTS
565-21-103
B72 COMMUNITY LIVING CENTER
95% CONSTRUCTION DOCUMENTS
565-21-103
10 21 16 - 4
2.3 SHOWER CABINETS
A. Materials: Single plastic unit complete.
1. Maximum Surface Burning Characteristics: ASTM E84.
a. Flame Spread Index: 25 .
b. Smoke Developed Index: 450.
2. Size: 940 mm (37 inches) square.
3. Accessories: Chromium plated or corrosion-resisting steel.
a. Curtain rod.
b. Soap dish.
4. Plastic shower units shall have a Class A flame spread rating.
5. Color and Patterns: As selected by Architect (WHITE).
2.4 DRESSING BOOTH PARTITIONS
A. Materials and Construction: CID A-A-60003, Type I, Style C (overhead braced).
1. Accessories:
a. Coat Hooks (2): Double hook, chromium plated, one located 75 mm
(3 inches) from top edge at middle of each partition.
b. Curtain Rod and Hooks: Chromium plated or corrosion-resisting steel curtain rod and roller type chromium plated curtain hooks.
c. Curtains will be furnished by Government.
B. Drill partitions for through-bolting of wood seat supports. Reinforce partitions to receive wood seats. Fasten coat hooks to partitions by machine screws.
2.5 FINISHES
A. Steel Paint Finish:
1. Powder-Coat Finish: Manufacturer's standard two-coat finish system consisting of the following:
a. One coat primer.
b. One coat thermosetting topcoat.
c. Dry-film Thickness: 0.05 mm (2 mils) minimum.
d. Color: Refer to Section 09 06 00, SCHEDULE FOR FINISHES.
B. Finish exposed surfaces after fabrication.
2.6 ACCESSORIES
A. Fasteners: Stainless steel.
B. Touch-Up Paint: Match shop finish.
565-21-103
B72 COMMUNITY LIVING CENTER
95% CONSTRUCTION DOCUMENTS
565-21-103
B72 COMMUNITY LIVING CENTER
95% CONSTRUCTION DOCUMENTS
565-21-103
10 21 16 - 5
PART 3 - EXECUTION
3.1 INSTALLATION - GENERAL
A. Install products according to manufacturer's instructions and approved submittal drawings .
1. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.
B. Install dressing booth partitions and shower cabinets in rigid, substantial manner, straight, plumb and with horizontal lines level.
Provide hex-bolts for through-bolt fastening. Conceal evidence of drilling, cutting, and fitting in finish work. Clean finished surfaces and leave free of imperfections.
C. Support each panel and pilaster abutting building walls near top and bottom by stirrup supports secured to partitions with sex bolts. Secure stirrup supports to building construction with two anchoring devices for each stirrup. Clamp headrails or set into top of each pilaster and secured to building walls. Secure clamps to pilasters with two through-bolts to each clamp. When set into pilasters, through-bolt headrails to pilasters. Support headrails on wall flange fittings secured to building walls with minimum of two anchor bolts to each flange fitting.
D. Shower Cabinets: Make connections to water supplies and drains watertight. When mounted in wall recesses, caulk joint between cabinet and adjacent wall construction.
3.2 CLEANING
A. Clean exposed compartment surfaces. Remove contaminants and stains.
3.3 PROTECTION
A. Remove protective materials immediately before acceptance.
B. Repair damage.
- - - E N D - - -
565-21-103
B72 COMMUNITY LIVING CENTER
95% CONSTRUCTION DOCUMENTS
565-21-103
B72 COMMUNITY LIVING CENTER
95% CONSTRUCTION DOCUMENTS
565-21-103