Specification Section 09 65 19 - Dated 11-15-23.pdf

PDF 71 KB Posted

Attached to
Z2DZ--Build out Community Living Center Building 72 Project No: 565-21-103
Solicitation number
36C24623B0045
Issued by

About this file

This specification section outlines the requirements for resilient tile flooring for the Build out Community Living Center Building 72 project. Luxury vinyl tile that is 20 mil thick, sized at 9x48, and containing no less than 30% recycled content will be installed. Adhesives must have a VOC content less than 50 grams/L. The tile must meet standards for critical radiant flux, smoke density, and slip resistance. Installation will be in accordance with the manufacturer's instructions and industry standards. The project is solicited under solicitation number 36C24623B0045 for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6.

View the file

Other files

File Type Posted
36C24623B0045 0008.pdf PDF
Questions and Answers Rev 2.docx DOCX document
09 67 23.60 RESINOUS (EPOXY BASE) WITH VINYL CHIP BROADCAST (RES-2) - IFC.pdf PDF
00 01 10 TABLE OF CONTENTS.pdf PDF
00 01 15 List of Drawing Sheets.pdf PDF
36C24623B0045 0007.docx DOCX document
36C24623B0045 0006.docx DOCX document
36C24623B0045 0005.docx DOCX document
Questions and Answers Rev. 1.docx DOCX document
36C24623B0045 0004.docx DOCX document
Site Visit Attendance.pdf PDF
Drawing ID 701 - Finish Plan 1st Floor - Rev. 1 - 11-09-2023.pdf PDF
36C24623B0045 0003.docx DOCX document
Drawing ID 602 - Room Finishes Legend - Rev. 1 - 11-09-2023.pdf PDF
Specification Section 09 67 23.20 - Dated 11-15-23.pdf PDF
Specification Section 09 91 00 - Dated 11-15-23.pdf PDF
Specification Section 12 36 00 - Dated 11-15-23.pdf PDF
Specification Section 09 65 13 - Dated 11-15-23.pdf PDF
Specification Section 10 21 16 - Dated 11-15-23.pdf PDF
Specification Section 10 26 00 - Dated 11-15-23.pdf PDF
Specification Section 09 72 16 - Dated 11-15-23.pdf PDF
Specification Section 12 34 00 - Dated 11-15-23.pdf PDF
Specification Section 10 13 00 - Dated 11-15-23.pdf PDF
Drawing ID 601 - Room Finishes Schedule - Rev. 1 - 11-09-2023.pdf PDF
Specification Section 09 06 00 - Dated 11-15-23.pdf PDF
Specification Section 09 51 00 - Dated 11-15-23.pdf PDF
36C24623B0045 0002.docx DOCX document
36C24623B0045 0001.docx DOCX document
Attachment I - 06 Plumbing Drawing Sheets Bldg 72.pdf PDF
Attachment B - Wage Determination.pdf PDF
Attachment C - Specifications 565-21-103 Build out Bldg 72.pdf PDF
Attachment G - 04 Fire Protection Drawing Sheets Bldg 72.pdf PDF
36C24623B0045_1.docx DOCX document
Attachment E - 02 Architecture Drawing Sheets Bldg 72.pdf PDF
Attachment D - 01 General Drawing Sheets Bldg 72.pdf PDF
Attachment J - 07 Electrical Drawing Sheets Bldg 72.pdf PDF
Attachment A - Itemized Schedule of Values Cost Breakdown.xlsx XLSX spreadsheet
Attachment H - 05 Mechanical Drawing Sheets Bldg 72.pdf PDF
Attachment K - 08 Low Voltage Drawing Sheets Bldg 72.pdf PDF
Attachment F - 03 Interior Design Drawing Sheets Bldg 72.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

565-21-103

B72 COMMUNITY LIVING CENTER

95% CONSTRUCTION DOCUMENTS 11-15-23

09 65 19 - 1

SECTION 09 65 19

RESILIENT TILE FLOORING

PART 1 - GENERAL

1.1 DESCRIPTION:

A. This section specifies the installation of luxury vinyl tile and accessories required for a complete installation.

1.2 RELATED WORK:

A. Sustainable Design Requirements: Section 01 81 13, SUSTAINABLE

CONSTRUCTION REQUIREMENTS.

B. Resilient Base: Section 09 65 13, RESILIENT BASE AND ACCESSORIES.

C. Subfloor Testing and Preparation: Section 09 05 16, SUBSURFACE

PREPARATION FOR FLOOR FINISHES.

D. Removal of Existing Construction Containing Asbestos:

Section 02 82 13.19, ASBESTOS FLOOR TILE AND MASTIC ABATEMENT.

E. Color, Pattern and Texture for Resilient Tile Flooring and Accessories:

Section 09 06 00, SCHEDULE FOR FINISHES.

1.3 SUBMITTALS:

A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT

DATA, AND SAMPLES.

B. Sustainable Design Submittals as described below:

1. Volatile organic compounds per volume as described in

PART 2 PRODUCTS.

2. Postconsumer and preconsumer recycled content as described in

PART 2 PRODUCTS.

C. Manufacturer's Literature and Data:

1. Description of each product.

2. Resilient material manufacturer’s recommendations for adhesives, underlayment, primers, and polish.

3. Application, installation and maintenance instructions.

D. Samples:

1. Tile: Each type, color, thickness and finish.

2. Edge Strips: Each type, color, thickness and finish.

3. Feature Strips: Each type, color, thickness and finish.

E. Shop Drawings:

1. Layout of patterns as shown on the construction documents.

2. Edge strip locations showing types and detail cross sections.

F. Test Reports:

565-21-103

B72 COMMUNITY LIVING CENTER

95% CONSTRUCTION DOCUMENTS

565-21-103

B72 COMMUNITY LIVING CENTER

95% CONSTRUCTION DOCUMENTS

565-21-103

ISSUED FOR CONSTRUCTION

95% CONSTRUCTION DOCUMENTS 11-15-23

09 65 19 - 2

1. Abrasion resistance: Depth of wear for each tile type and color and volume loss of tile, certified by independent laboratory. Tested per

ASTM F510/F510M.

2. Moisture and pH test results as per Section 09 05 16, SUBSURFACE

PREPARATION FOR FLOOR FINISHES.

1.4 DELIVERY:

A. Deliver materials to the site in original sealed packages or containers, clearly marked with the manufacturer's name or brand, type and color, production run number and date of manufacture.

B. Materials from containers which have been distorted, damaged or opened prior to installation are not acceptable.

1.5 STORAGE:

A. Store materials in a clean, dry, enclosed space off the ground, protected from harmful weather conditions and at temperature and humidity conditions recommended by the manufacturer. Protect adhesives from freezing. Store flooring, adhesives, and accessories in the spaces where they will be installed for at least 48 hours before beginning installation.

1.6 QUALITY ASSURANCE:

A. Installer Qualifications: A company specializing in installation with minimum three (3) years’ experience and employs experienced flooring installers who have retained, and currently hold, an INSTALL

Certification, or a certification from a comparable certification program.

1. Installers to be certified by INSTALL or a comparable certification program with the following minimum criteria:

a. US Department of Labor approved four (4) year apprenticeship program, 160 hours a year.

b. Career long training.

c. Manufacturer endorsed training.

d. Fundamental journeyman skills certification.

B. Mockup: Build floor tile mockup to verify selections made under sample submittals and to demonstrate aesthetic effects and set quality standards for materials and execution.

1. Size: 9.3 sq. m (100 sq. ft.) for each type, color, and pattern.

Locations as indicated on construction documents.

565-21-103

B72 COMMUNITY LIVING CENTER

95% CONSTRUCTION DOCUMENTS

565-21-103

B72 COMMUNITY LIVING CENTER

95% CONSTRUCTION DOCUMENTS

565-21-103

95% CONSTRUCTION DOCUMENTS 11-15-23

09 65 19 - 3

2. Contracting Officer Representative (COR) approved mockup may become part of the completed Project if undisturbed at time of Substantial

Completion.

C. Furnish product type materials from the same production run.

1.7 WARRANTY:

A. Construction Warranty: Comply with FAR clause 52.246-21, “Warranty of

Construction”.

1.8 APPLICABLE PUBLICATIONS:

A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.

B. ASTM International (ASTM):

D2047-11................Test Method for Static Coefficient of Friction of Polish-Coated Flooring Surfaces as Measured by the James Machine

D2240-05(R2010).........Test Method for Rubber Property—Durometer

Hardness

D4078-02(R2008).........Water Emulsion Floor Finish

E648-14c................Critical Radiant Flux of Floor Covering Systems

Using a Radiant Energy Source

E662-14.................Specific Optical Density of Smoke Generated by

Solid Materials

E1155/E1155M-14.........Determining Floor Flatness and Floor Levelness

Numbers

F510/F510M-14...........Resistance to Abrasion of Resilient Floor

Coverings Using an Abrader with a Grit Feed

Method

F710-11.................Preparing Concrete Floors to Receive Resilient

Flooring

F925-13.................Test Method for Resistance to Chemicals of

Resilient Flooring

F1344-12(R2013).........Rubber Floor Tile

F1700-13a...............Solid Vinyl Floor Tile

F1869-11................Test Method for Measuring Moisture Vapor

Emission Rate of Concrete Subfloor Using

Anhydrous Calcium Chloride

565-21-103

B72 COMMUNITY LIVING CENTER

95% CONSTRUCTION DOCUMENTS

565-21-103

B72 COMMUNITY LIVING CENTER

95% CONSTRUCTION DOCUMENTS

565-21-103

95% CONSTRUCTION DOCUMENTS 11-15-23

09 65 19 - 4

F2170-11................Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in Situ Probes

F2195-13................Linoleum Floor Tile

C. Code of Federal Regulation (CFR):

40 CFR 59...............Determination of Volatile Matter Content, Water

Content, Density Volume Solids, and Weight

Solids of Surface Coating

D. International Standards and Training Alliance (INSTALL):

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS:

A. Provide adhesives, underlayment, primers, and polish recommended by resilient floor material manufacturer.

B. Critical Radiant Flux: 0.45 watts per sq. cm or more, Class I, per

ASTM E648.

C. Smoke Density: Less than 450 per ASTM E662.

D. Slip Resistance – Not less than 0.5 when tested with ASTM D2047.

2.2 RUBBER TILE:

A. Not used.

2.3 LINOLEUM TILE:

A. Not used.

2.4 SOLID VINYL-TILE:

A. Not used.

2.5 LUXURY VINYL TILE:

A. ASTM F1700, Class III, Printed Film Vinyl Tile, Type A.

B. Thickness: 20 mil (5mm).

C. Size: 9x48.

D. Provide products with recycled content with not less than 30 percent.

E. Chemical Resistance: ASTM F925; pass.

2.6 ADHESIVES:

A. Provide water resistant type adhesive for flooring, base and accessories as recommended by the manufacturer to suit substrate conditions. VOC content to be less than the 50 grams/L when calculated according to 40 CFR 59 (EPA Method 24). Submit manufacturer’s descriptive data, documentation stating physical characteristics, and mildew and germicidal characteristics.

565-21-103

B72 COMMUNITY LIVING CENTER

95% CONSTRUCTION DOCUMENTS

565-21-103

B72 COMMUNITY LIVING CENTER

95% CONSTRUCTION DOCUMENTS

565-21-103

95% CONSTRUCTION DOCUMENTS 11-15-23

09 65 19 - 5

2.7 PRIMER FOR CONCRETE SUBFLOORS:

A. Provide in accordance with Section 09 05 16, SUBSURFACE PREPARATION FOR

FLOOR FINISHES.

2.8 LEVELING COMPOUND FOR CONCRETE FLOORS:

A. Provide cementitious products with latex or polyvinyl acetate resins in the mix in accordance with Section 09 05 16, SUBSURFACE PREPARATION FOR

FLOOR FINISHES.

2.9 POLISH AND CLEANERS:

A. Cleaners: As recommended in writing by floor tile manufacturer.

B. Polish: Not used.

2.10 MOULDING:

A. Not used.

PART 3 - EXECUTION

3.1 ENVIRONMENTAL REQUIREMENTS:

A. Maintain flooring materials and areas to receive resilient flooring at a temperature above 20 degrees C (68 degrees F) for three (3) days before application, during application and two (2) days after application, unless otherwise directly by the flooring manufacturer for the flooring being installed. Maintain a minimum temperature of 13 degrees C (55 degrees F) thereafter. Provide adequate ventilation to remove moisture from area and to comply with regulations limiting concentrations of hazardous vapors.

B. Do not install flooring until building is permanently enclosed and wet construction in or near areas to receive tile materials is complete, dry and cured.

3.2 SUBFLOOR TESTING AND PREPARATION:

A. Prepare and test surfaces to receive resilient tile and adhesive as per

Section 09 05 16, SUBSURFACE PREPARATION FOR FLOOR FINISHES.

B. Prepare concrete substrates in accordance with ASTM F710.

3.3 INSTALLATION:

A. Install in accordance with manufacturer's instructions for application and installation unless specified otherwise.

B. Mix tile from at least two containers. An apparent line either of shades or pattern variance is not acceptable.

565-21-103

B72 COMMUNITY LIVING CENTER

95% CONSTRUCTION DOCUMENTS

565-21-103

B72 COMMUNITY LIVING CENTER

95% CONSTRUCTION DOCUMENTS

565-21-103

95% CONSTRUCTION DOCUMENTS 11-15-23

09 65 19 - 6

C. Tile Layout:

1. If layout is not shown on construction documents, lay tile symmetrically about center of room or space with joints aligned.

2. Vary edge width as necessary to maintain full size tiles in the field, no edge tile to be less than 1/2 the field tile size, except where irregular shaped rooms make it impossible.

3. Place tile pattern in the same direction; do not alternate tiles unless specifically indicated in the construction documents to the contrary. Match tile installation to approved mockup.

D. Application:

1. Adhere floor tile to flooring substrates using a full spread of adhesive applied to substrate to produce a completed installation without open cracks, voids, raising and puckering at joints, telegraphing of adhesive spreader marks, and other surface imperfections.

2. Scribe, cut, and fit floor tiles to butt neatly and tightly to vertical surfaces and permanent fixtures including built-in furniture, cabinets, pipes, outlets, and door frames.

3. Extend floor tiles into toe spaces, door reveals, closets, and similar openings. Extend floor tiles to center of door openings.

4. Roll tile floor with a minimum 45 kg (100 pound) roller.

E. Seal joints at pipes with sealants in accordance with Section 07 92 00, JOINT SEALANTS.

F. Installation of Edge Strips:

1. Locate edge strips under center line of doors unless otherwise shown on construction documents.

2. Set resilient edge strips in adhesive. Anchor metal edge strips with anchors and screws.

3. Where tile edge is exposed, butt edge strip to touch along tile edge.

4. Where thin set ceramic tile abuts resilient tile, set edge strip against floor file and against the ceramic tile edge.

3.4 CLEANING AND PROTECTION:

A. Clean adhesive marks on exposed surfaces during the application of resilient materials before the adhesive sets. Exposed adhesive is not acceptable.

565-21-103

B72 COMMUNITY LIVING CENTER

95% CONSTRUCTION DOCUMENTS

565-21-103

B72 COMMUNITY LIVING CENTER

95% CONSTRUCTION DOCUMENTS

565-21-103

95% CONSTRUCTION DOCUMENTS 11-15-23

09 65 19 - 7

B. Keep traffic off resilient material for a minimum 72 hours after installation.

C. Clean flooring as recommended in accordance with manufacturer’s printed maintenance instructions and within the recommended time frame. As required by the manufacturer, apply the recommended number of coats and type of polish and/or finish in accordance with manufacturer’s written instructions.

D. When construction traffic occurs over tile, cover resilient materials with reinforced kraft paper properly secured and maintained until removal is directed by COR. At entrances and where wheeled vehicles or carts are used, cover tile with plywood, hardboard, or particle board over paper, secured and maintained until removal is directed by COR.

E. When protective materials are removed and immediately prior to acceptance, replace damaged tile and mouldings, re-clean resilient materials.

3.5 LOCATION:

A. Unless otherwise indicated in construction documents, install tile flooring, under areas where casework, laboratory and pharmacy furniture and other equipment occur.

B. Extend tile flooring for room into adjacent closets and alcoves.

- - - E N D - - -

565-21-103

B72 COMMUNITY LIVING CENTER

95% CONSTRUCTION DOCUMENTS

565-21-103

B72 COMMUNITY LIVING CENTER

95% CONSTRUCTION DOCUMENTS

565-21-103