Drawing ID 701 - Finish Plan 1st Floor - Rev. 1 - 11-09-2023.pdf

PDF 1 MB Posted

Attached to
Z2DZ--Build out Community Living Center Building 72 Project No: 565-21-103
Solicitation number
36C24623B0045
Issued by

About this file

This document contains drawings and specifications for a build out project of a Community Living Center at a Department of Veterans Affairs medical facility. The project includes finish plans and schedules for the 1st floor detailing flooring types for each room including luxury vinyl tile, ceramic tile, epoxy flooring, static dissipative tile, and transition strips. General notes provide instructions for flooring installation, wall preparation, lighting requirements, sample approvals, and repairing existing flooring. The related federal contract opportunity is a solicitation to build out Community Living Center Building 72 with a solicitation number of 36C24623B0045 issued by the Department of Veterans Affairs Veterans Health Administration VISN 6.

View the file

Other files

File Type Posted
36C24623B0045 0008.pdf PDF
Questions and Answers Rev 2.docx DOCX document
09 67 23.60 RESINOUS (EPOXY BASE) WITH VINYL CHIP BROADCAST (RES-2) - IFC.pdf PDF
00 01 10 TABLE OF CONTENTS.pdf PDF
00 01 15 List of Drawing Sheets.pdf PDF
36C24623B0045 0007.docx DOCX document
36C24623B0045 0006.docx DOCX document
36C24623B0045 0005.docx DOCX document
Questions and Answers Rev. 1.docx DOCX document
36C24623B0045 0004.docx DOCX document
Site Visit Attendance.pdf PDF
36C24623B0045 0003.docx DOCX document
Drawing ID 602 - Room Finishes Legend - Rev. 1 - 11-09-2023.pdf PDF
Specification Section 09 67 23.20 - Dated 11-15-23.pdf PDF
Specification Section 09 91 00 - Dated 11-15-23.pdf PDF
Specification Section 12 36 00 - Dated 11-15-23.pdf PDF
Specification Section 09 65 13 - Dated 11-15-23.pdf PDF
Specification Section 10 21 16 - Dated 11-15-23.pdf PDF
Specification Section 10 26 00 - Dated 11-15-23.pdf PDF
Specification Section 09 65 19 - Dated 11-15-23.pdf PDF
Specification Section 09 72 16 - Dated 11-15-23.pdf PDF
Specification Section 12 34 00 - Dated 11-15-23.pdf PDF
Specification Section 10 13 00 - Dated 11-15-23.pdf PDF
Drawing ID 601 - Room Finishes Schedule - Rev. 1 - 11-09-2023.pdf PDF
Specification Section 09 06 00 - Dated 11-15-23.pdf PDF
Specification Section 09 51 00 - Dated 11-15-23.pdf PDF
36C24623B0045 0002.docx DOCX document
36C24623B0045 0001.docx DOCX document
Attachment I - 06 Plumbing Drawing Sheets Bldg 72.pdf PDF
Attachment B - Wage Determination.pdf PDF
Attachment C - Specifications 565-21-103 Build out Bldg 72.pdf PDF
Attachment G - 04 Fire Protection Drawing Sheets Bldg 72.pdf PDF
36C24623B0045_1.docx DOCX document
Attachment E - 02 Architecture Drawing Sheets Bldg 72.pdf PDF
Attachment D - 01 General Drawing Sheets Bldg 72.pdf PDF
Attachment J - 07 Electrical Drawing Sheets Bldg 72.pdf PDF
Attachment A - Itemized Schedule of Values Cost Breakdown.xlsx XLSX spreadsheet
Attachment H - 05 Mechanical Drawing Sheets Bldg 72.pdf PDF
Attachment K - 08 Low Voltage Drawing Sheets Bldg 72.pdf PDF
Attachment F - 03 Interior Design Drawing Sheets Bldg 72.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Alliance WSP JV 1695 Prince Street Alexandria, VA 22314 277 Bendix Road, Suite 300

Virginia Beach, VA 23452

Interior Design:

Cornerstone Architecture & Interior Design 211B W. 7th Street Richmond, VA, 23224

BUILD OUT BUILDING 72

COMMUNITY LIVING CENTER

FAYETTEVILLE, NC

565-21-103

B72 Project Director

OCTOBER 28, 2022 JHS KHWRevisions: Date:

B

C

D

E

1/

/2

:0 2:

A

M Z:

\2

AW

SP

J

V N

C \2

5.

C

O M

M U

N

IT

Y

LI

VI

N

G C

EN

TE

R B

\D

ES

IG

N \T

EM

PL

AT

ES

\5

-2 1-

3-

BR

D

R .D

W G

DWG. ____ OF 91

ISSUED FOR

CONSTRUCTION

Rev 0 10/28/2022 Rev 1 11/09/2023

ID701

FINISH PLAN

FDFD FD FD

FD

FD

FD

FD

FD

FD

FD

COVERED

PORCH

PORCH

PORCH

CO

CO

CO

PL

AN

N O

R

TH

1'-0"

1' -0

" 1' -5

"1' -2

'-3

1'-0"

1'-0" 2'-2" 1'-0" 6'-0"

1'-0" 2'-2" 1'-0" 5'-6"

1'-5" 8'-6" 1'-0" 3'-10" 9'-4" 3'-10" 1'-0" 8'-6" 1'-1"

1' -0

5'

-1 1"

1' -0

2'

-7

'-1

0" 1'

-0

1'-5" 5'-11" 1'-0"

2'-1" 17'-11"

2'-1" 1'-0"

5'-11" 5'-5"

2'-1" 1'-6" 5'-7" 4"

3'-2"

1' -5

1'

-6

'-2

4"

3' -2

7'-11" 1'-0"

1' -0

5'

-8

1' -0

'-7

1' -0

6'

-0

1' -0

1' -0

5'

-9

1' -0

'-7

1' -0

6'

-0

1' -0

'-1 1"

1' -0

6'

-0

1' -0

1'-0" 6'-9" 1'-0" 23'-4" 1'-0" 6'-1" 1'-0" 1'-0" 3'-10" 1'-0"

1' -0

"2' -1

0" 1'

-0

1' -6

6' -6

2'

-1

2' -2

F1

TS

TS

TS

TS

TS

TS

TS

TS1TS1TS1TS1

(TYP.)

(TYP.)(TYP.)

BEDROOM

BEDROOM

ELEC

146 SOILED

HVAC

LAUNDRY

MECH

IT

CLOSET

MED

SUPPLIES

129 LIVING

ROOM

DINING

KITCHEN

SUPPLIES

MED

GAS

LINEN

CLOS

ELEC

CLOS

TLT

TLT

123 BEDROOM

BEDROOM

BEDROOM

BARIATRIC

CORRIDOR

BEDROOM

BEDROOM

112ADMIN

VESTIBULE

101BREAK

ROOM

BEDROOM

132BEDROOM

COMM

LINENS

CORRIDOR

ENTRY

FOYER

SOILED

127PANTRY

STOR

TLT

TLT

113STAFF

TLT

TLT

TLT

TLT

TLT

LADDER

TLT

TLT

F1. MECHANICAL MEZZANINE STAIR TO BE PAINTED TO PT-5 PER FINISH

LEGEND

1. PLAN NORTH IS TO DETERMINE THE LOCATION OF FINISHES ON THE

INDICATED WALLS.

2. A PRE-FLOORING INSTALLATION MEETING MUST BE HELD PRIOR TO LAYING

ANY FLOORING. ALL FLOORING COMPONENTS RELATED TO INSTALLATION

SHALL BE PRESENT FOR INSPECTION BY ARCHITECT/DESIGNER.

3. ALL INTERIOR PARTITIONS SHALL BE PREPARED TO A LEVEL 4 FINISH PRIOR TO

RECEIVING ANY WALLCOVERING.

4. ALL TRANSITIONS OF FLOORING MATERIAL SHALL OCCUR UNDER THRESHOLD

OF DOOR, U.N.O.

5. ADEQUATE LIGHTING TO BE INSTALLED AND REMAIN LIT BEFORE, DURING AND

AFTER THE INSTALLATION OF ANY VINYL WALLCOVERING.

6. ALL SUBSTITUTES MUST BE APPROVED BY INTERIOR DESIGNER AND BE OF

EQUAL QUALITY.

8. LIGHT SWITCH AND RECEPTACLES AND COVER PLATES TO MATCH EXISTING.

HEIGHTS SHALL BE INDICATED FROM FLOOR TO CENTER LINE OF DEVICE PER

MEP DRAWINGS U.N.O..

9. TRIM RING COLOR ON RECESSED CAN LIGHT FIXTURES TO MATCH ADJACENT

CEILING.

10. ALWAYS FOLLOW MANUFACTURER'S RECOMMENDATIONS FOR APPLICATION

OR INSTALLATION OF MATERIAL OR FINISH.

11. ALL HOLES OR MISSING PIECES OCCURRING IN FLOOR MUST BE FILLED

AND/OR REPAIRED PRIOR TO INSTALLING NEW FLOORING MATERIALS.

12. ALL PLASTIC LAMINATE COUNTERTOPS TO HAVE PVC VINYL EDGE - COLOR

TO MATCH COUNTERTOP. CONTRACTOR TO SUBMIT SAMPLES FOR

APPROVAL.

13. ALL NEW WINDOW SILLS TO BE SS1 PER FINISH LEGEND (TYP.)

FINISH PLAN KEY NOTES

FINISH PATTERN KEY

FINISH PLAN GENERAL NOTES

F0

TS1

- LUXURY VINYL TILE (LVT2); SEE FINISH

SCHEDULE

- CERAMIC TILE (FT1) PER FINISH LEGEND

- EPOXY FLOORING (EPY1) PER FINISH

LEGEND

- LUXURY VINYL TILE (LVT1); SEE FINISH

SCHEDULE

- STATIC DISSIPATIVE TILE FLOORING (SDT1)

PER FINISH LEGEND

-TRANSITION STRIP (TS1) PER FINISH

LEGEND

SCALE: 1/8" = 1'-0"

1 FINISH PLAN - 1ST FLOOR

ID701

CA PROJECT NAME - 2022.04.13
ID601 ROOM FINISHES SCHEDULE
ID602 ROOM FINISHES LEGEND
ID701 FINISH PLAN

File details come from the government source that posted it. Updated .