Attachment 9 - Utility Status Report.pdf
PDF 106 KB Posted
- Attached to
- South Region Construction Multiple Award Task Order Contract (MATOC) Federal contract opportunity
- Solicitation number
- 693C73-25-R-000082
About this file
The Utility Status Report for Project AR FW BLD 11(1) details the utility infrastructure for Granary South Road as of April 9, 2025. The report identifies two existing utilities within the project limits: an Entergy Arkansas overhead power line and an Enable Midstream Partners underground gas line. Both utilities are to remain in place and be protected during construction, with no proposed relocations. The document is marked as a Final/Certification (100%) review interval and confirms that utility locating requirements are included in specific sections of the project specifications.
The report provides specific details for each utility, including their location (right of centerline), type (power pole and gas line), and a general note that mapping shows utilities on site. The review is prepared by Brian Fletcher, with Jatinder Bains as the Project Manager and Canisha Lyon as the HDM, indicating a comprehensive internal review of the utility status for this infrastructure project.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Utility Status Report
EFL-FM-UTL-01(07)Page 1 of 2
Project : AR FW BLD 11(1) Date: Apr 9, 2025
Preparer : Brian Fletcher - Project Support PM : Jatinder Bains HDM : Canisha Lyons
Review Interval:
Preliminary (30%)
Plan In Hand (70%)
Internal (90%)
External (95%)
Final / Certification (100%)
Other :
Utilities EXIST within project limits NO utilities exist within project limits Presence of existing utilities UNKNOWN
Existing utilities [ are are not ] identified on the Plans
Utility locating requirements are included in the SCR Sections 107 and/or 645✖
NO utilities are proposed to be relocated✖
Utility relocation plans are described in detail below
# Location and Utility Information Design Information
Roadway Name:
Granary South Road
Station / Station Range:
Left of CL Right of CL● Both
Type and/or Size Facility (** See Legend)
Type: P Size/Pole No.
Utility Company Name:
Entergy Arkansas
Primary Contact - Name & Number:
Detailed listing of Utilities on Project Plans
Additional Contact Information
Utility to participate in PreCon Meeting
Design Responsibility:
Payment Responsibility:
Responsible Party:
Work Completed:
Cost Estimate:
Date of Contract or Agreement: N/A
Remarks / Description of Relocation:
Overhead Power lines are present along Granary South Road and runs south parallel to it. Due to proposed work this is to not be disturbed.
Roadway Name:
Granary South Road
Station / Station Range:
170+00 - 171+00
Left of CL Right of CL Both●
Type and/or Size Facility (** See Legend)
Type: G Size/Pole No.
Utility Company Name:
Enable Midstream Partners
Primary Contact - Name & Number:
Detailed listing of Utilities on Project Plans
Additional Contact Information
Utility to participate in PreCon Meeting
Design Responsibility:
Payment Responsibility:
Responsible Party:
Work Completed:
Cost Estimate:
Date of Contract or Agreement: N/A
Remarks / Description of Relocation:
Underground gas line cross the road around MP 1.2. This is line is to remain in place and protect during construction.
General Information :
Mapping shows utilities on site. Due to nature of work, existing utilities at site are to remain in place and protected during construction.
Utility Status Report
EFL-FM-UTL-01(07)Page 2 of 2
**P=Pole, T=buried Tel. Cable, TC=Tel Conduit, PD=Pedestal, G=Gas, W=Water, S=Sewer, SS=Storm Sewer, SFM=Sewer Force Main, MH=Manhole, TV=Buried Cable TV, FO=Fiber Optic, UE=Underground Electric, Other=See Remarks