Attachment 5 - J-Pages - SCRs for Seed Project.pdf

PDF 319 KB Posted

Attached to
South Region Construction Multiple Award Task Order Contract (MATOC) Federal contract opportunity
Solicitation number
693C73-25-R-000082
Issued by
Department of Transportation Federal Highway Administration

About this file

This document contains Special Contract Requirements for a Federal Highway Administration (FHWA) Eastern Federal Lands Highway Division project at the Bald Knob National Wildlife Refuge, designated as Project AR FW BLD 11(1). The contract specifications cover various construction requirements, including strict operational limitations: construction activities can only occur between June 1 and November 14, 2026, with no work permitted on weekends, holidays, during hunting periods, from November 15 to May 31, or during farm harvesting periods. Additional notable requirements include preparing a Flood Contingency Plan, conducting turbidity monitoring, maintaining specific load restrictions on Wildlife Refuge roads, and adhering to environmental protection protocols.

The document provides detailed technical specifications for construction activities, including requirements for aggregate materials (specifically crushed limestone), geosynthetic materials, traffic control, utility location, and temporary stream diversions. The contract includes provisions for fuel price adjustments, quality control testing, and specific guidelines for government field office facilities and equipment. Contractors must follow strict environmental and operational guidelines, such as limitations on tree cutting, special care around existing utilities, and comprehensive turbidity and sediment monitoring to protect the wildlife refuge ecosystem during construction activities.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J-1

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

SPECIAL CONTRACT REQUIREMENTS

Project AR FW BLD 11(1)

BALD KNOB NATIONAL WILDLIFE REFUGE

The following Special Contract Requirements amend and supplement the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-24), U. S. Department of Transportation, Federal Highway Administration.

J-2

Section 101. — TERMS, FORMAT, AND DEFINITIONS

101.04. Delete the definition of (c) "Supplemental agreement" under "Contract Modification".

101.04. Add the following:

Weekend — A period of time defined as beginning at 7:00 p.m. Friday and ending at 7:00 a.m.

Monday.

Section 104. — CONTROL OF WORK

104.06(c). Add the following to the first paragraph:

Provide one full-size (22- by 34-inch) paper copy of the plans from the Government-furnished electronic plans and use this set of plans exclusively for as-built drawings.

104.08. Add the following to the second paragraph:

When hauling on Fish and Wildlife Refuge roads, do not exceed the load restrictions shown in Table 104-1.

Table 104-1 Load Restrictions

Single Units Gross Vehicle Weight, pounds

2 axles 40,000 3 axles 48,000 4 or more axles 52,000

Combination Units Gross Vehicle Weight, pounds

3 axles 57,000 4 axles 62,000 5 or more axles 66,000

Where the ground is saturated with water or during periods of freezing and thawing, the CO may impose further load restrictions or suspend hauling.

104.08. Add the following:

Hauling will only be permitted from the nearest point of public access to the work site.

Minimize hauling over completed pavement.

J-3

Operate loaded vehicles hauling material at speeds not exceeding 40 miles per hour or the posted speed limit, whichever is lower, and spaced at 500-foot minimum intervals. When hauling on bridges, do not exceed 25 miles per hour or the posted speed limit, whichever is lower, or operate more than 1 loaded hauling vehicle at a time.

104.11. Add the following:

Coincident with this contract, other contracts for construction projects may be underway or may commence during the construction of this project. Coordinate with the CO and other contractors to minimize disruption to this project and to other construction projects in the area.

Section 106. — ACCEPTANCE OF WORK

106.05. Add the following to the second paragraph:

The QL-Pay program, along with instructions, can be found at https://highways.dot.gov/federal-lands/materials/ql-pay.

Section 107. — LEGAL RELATIONS

AND RESPONSIBILITY TO THE PUBLIC

107.08. Add the following:

Prepare a Flood Contingency Plan that includes the following:

(a) Procedures for protecting Bald Knob National Wildlife Refuge resources from impacts due to spills, runoff, and equipment during a flood event;

(b) Methods for contacting the Contractor in cases of emergency including Contractor’s on-site personnel, any subcontractors, and any other off-site person’s emergency contact information;

(c) Methods for determining when a threat of flooding exists;

(d) Procedures for notifying the CO, on-site personnel, any subcontractors, Bald Knob National Wildlife Refuge personnel, and any other off-site persons that require notification and emergency contact information for those individuals;

(e) Procedures to remove from flood prone areas and protect from flood damage all construction materials which are not anchored, restrained, or otherwise secured to the greatest extent possible;

(f) Procedures to implement additional measures necessary to prevent the migration of sediment from unstable areas of the project site;

https://highways.dot.gov/federal-lands/materials/ql-pay https://highways.dot.gov/federal-lands/materials/ql-pay

J-4

(g) Procedures to address the site after a flood event and identify and mitigate any damage sustained; and

(h) Continuously observe and measure turbidity at not more than 25 feet upstream and 25 feet downstream of the work area to ensure that there is no generation of sediment plumes and no sediment plumes escape the work area. Monitor turbidity at different depths, depending on the depth of the water in the stream, for example, near the bottom, ¼ depth from the bottom, ¾ depth from the bottom, and near the surface; or at a representative depth if there is a shallow water depth.

Section 108. — PROSECUTION AND PROGRESS

108.01. Add the following:

Construction activities at the project site cannot begin any earlier than June 1, 2026. However, the Contractor may perform any preconstruction activities (such as submitting shop drawings and material mix designs) to prepare for the start of construction once the contract is awarded and the NTP has been issued. Contract time will start as determined by the CO either at time of contract award or as specified in the NTP.

Complete all construction activities no later than November 14, 2026. If the project is close to completion and can be completed before December 1, request approval to extend the completion date.

Construction operations are limited as follows:

(a) No work will be permitted on Saturdays, Sundays, or National legal holidays.

(b) No work will be permitted during the following periods:

• The dedicated hunting period during the second weekend of November.

• November 15 to May 31.

• The farm harvesting period, typically a 1-month period from mid-September to mid- October, as defined by the Bald Knob National Wildlife Refuge.

(c) No cutting of trees will be permitted between March 16 and November 14.

(d) No work will be permitted on days with special events occurring in the vicinity, as determined by the CO.

If the Contractor finds it necessary to work on one of these restricted days, request approval from the CO at least 7 days before the planned work.

J-5

108.04(c). Delete the last paragraph and substitute the following:

For delays due to weather, demonstrate that the weather was unusually severe (as defined under Section 155) based on the most recent 10 years of historical data according to FAR Clause 52.249-10 Default (FixedPrice Construction). If a time extension is requested for unusually severe weather, submit a time impact analysis according to Subsection 108.04(b) and include supporting historical weather data according to Subsections 155.04A and 155.04B. The following criteria will be used for determining a time extension for unusually severe weather:

(1) Time adjustment for rain delays. If the net number of actual workdays lost to rain is less than the total lost days for the month in question, then no time adjustment will be made. If the net number of actual workdays lost to rain is more than the total lost days for the month in question, then a time extension may be granted.

(2) Time adjustment for other weather delays. If a time extension is requested for other unusually severe weather conditions (such as snow, extreme cold or heat, or high winds), follow the same calculation, submittal, and criteria procedures as outlined for rain delays.

Section 109. — MEASUREMENT AND PAYMENT

109.01. Delete the sixth paragraph.

109.02(d)(1)(a). Delete the Subsection and substitute the following:

(a) Average end area method. Take cross-sections of the original ground. Use design or staked templates to determine end areas. Compute the quantity using the average end areas multiplied by the horizontal distance along a centerline or reference line between the end areas.

Add the following after Subsection 109.06:

109.06A Fuel Price Adjustment Provision. This provision provides for a price adjustment in the form of payment to the Contractor or a rebate to the Government for fluctuations in the cost of diesel fuel consumed in the performance of applicable construction work.

This price adjustment provision is intended to reduce but not eliminate the cost effects of price uncertainty to the Contractor and the Government for diesel fuel consumed in the construction of this contract. It provides for sharing by the Government in a portion of the Contractor’s risk, which could result from unusual price fluctuations. The provision is not intended to compensate the Contractor for normal day-to-day fluctuations and seasonal changes or to serve as a guarantee of full compensation for diesel fuel price fluctuations.

J-6

This price adjustment provision is applicable only to contract items listed as eligible pay items in Table 109-2. This price adjustment provision is also applicable to eligible pay items when the Government adds extra work to the contract.

The Fuel Price Adjustment Provision will remain in effect throughout the duration of the contract. Enactment of this provision will only be considered when the increase or decrease in the price of diesel fuel as defined herein exceeds 10 percent.

No price adjustments will be made for work performed beyond the contract completion date.

(a) Price indexes. The Government will determine price indexes for diesel fuel using price data obtained from the Oil Price Information Service (OPIS), which publishes a weekly newsletter on the distillate wholesale rack prices for major cities throughout the United States. The OPIS 5-day newsletter average rack price of Gross Ultra Low Sulfur, No. 2 Diesel Fuel reported for Little Rock, AR will be averaged and used to establish a base price index (BPI) and a monthly performance price index (MPPI). These diesel fuel indexes are defined as follows:

• Base price index (BPI). The BPI is the price index determined by arithmetic average as specified above, shown in the four weekly publications immediately preceding the contract award. It is as follows:

BASE PRICE INDEX (BPI) FOR GROSS ULTRA LOW SULFUR, NO. 2 DIESEL

FUEL

PER GALLON = $ See Note (1) .

Note (1): BPI is calculated by the Government and inserted here immediately before contract award.

• Monthly performance price index (MPPI). The MPPI is the monthly price index at the time of performance of applicable work as determined by arithmetic average as specified above, shown in the four weekly publications issued before the last Wednesday of the month in which the work was performed.

The diesel fuel BPI and MPPI will be posted at https://highways.dot.gov/federal-lands/business/escalation-factors.

(b) Price adjustments. Price adjustments calculated by the Government are not intended to reflect the Contractor’s actual purchase price. The ratio of the monthly performance price index and the base price index (MPPI/BPI) is calculated and used to determine price adjustments for eligible pay items as follows:

• No price adjustment. When the MPPI/BPI ratio falls within the range of 0.90 to 1.10, no price adjustment will be made for any diesel fuel consumed in construction work performed during the relevant month.

https://highways.dot.gov/federal-lands/business/escalation-factors

J-7

• Government rebate. When the MPPI/BPI ratio is calculated to be less than 0.90, the Government is due a rebate determined in accordance with the following formula:

Government rebate = [0.90 – (MPPI/BPI)] (BPI) (Q) (FUF)

• Contractor payment. When the MPPI/BPI ratio is calculated to be greater than 1.10, the Contractor is due additional payment determined in accordance with the following formula:

Contractor payment = [(MPPI/BPI) – 1.10] (BPI) (Q) (FUF)

The following definitions are applicable to both the Government rebate and the Contractor payment formulas:

MPPI = Monthly Performance Price Index for the month during which diesel fuel is consumed in the performance of applicable construction work.

BPI = Base Price Index that is established immediately preceding the contract award.

Q = Quantity of work on the project during the progress payment period for eligible pay items shown in Table 109-2.

FUF = Fuel Usage Factor shown in Table 109-2 applicable to No. 2 diesel fuel.

Table 109-2

Eligible Pay Items for Price Adjustments and Associated Fuel Usage Factors Eligible Pay Items Fuel Usage Factor

Earthwork Section 204 – Excavation and Embankment 20420 Embankment Construction

0.30 gallons per cubic yard

Aggregate and Base Courses Section 301 – Untreated Aggregate Courses 30101 Aggregate Base (Limestone) 30110 Aggregate Surface Course (Limestone)

0.70 gallons per ton

(c) Price adjustment compensation. Monthly adjustments will be accrued. The final price adjustment will be paid, or rebated, after completion of all work for each eligible pay item.

The Contractor may request a partial price adjustment payment once every 12 months, or when the unpaid accrued increase exceeds $10,000. The Government will take a rebate when the deductive accrual exceeds $10,000.

The maximum allowable monthly and final price adjustment to the Contractor or rebate to the Government for fluctuations in the cost of diesel fuel is limited to a MPPI/BPI ratio of 1.6 and 0.4, respectively.

J-8

109.08(a). Add the following:

Submit invoices electronically to EFLConstructionInvoices@dot.gov with email copy to the CO and the project engineer.

109.08(b)(3). Add the following:

Include an electronic or wet signature on the certification; facsimiles will not be accepted.

109.08(d). Add the following after the first sentence of the second paragraph:

Invoices received after 3:00 p.m. Eastern Time will be marked as received the following business day.

109.08(h)(1). Add the following:

The CO may withhold full or partial progress payment until the SWPPP is brought into compliance according to Section 157.

Section 152. — CONSTRUCTION SURVEY AND STAKING

152.03(b). Add the following:

Include procedures for how control will be established and maintained.

152.05(a). Add the following:

Set benchmarks a maximum spacing of 1,000 feet along the length of the roadway.

Section 154. — CONTRACTOR SAMPLING AND TESTING

154.02. Add the following:

Submit formal requests for using alternate AASHTO or state department of transportation approved test methods for review. Alternate methods may be allowed based on documented equivalence to the method specified and if approved by the CO.

154.03. Add the following:

Provide the Government’s portion of the sample or split sample in an acceptable container suitable for shipment with clear identification of the sample on the container to the CO. The CO will insert a completed FHWA Form 1600E, Government Lab Test Request inside the container.

The CO will seal the container with specialty chain-of-custody security tape and will sign the security tape.

mailto:EFLConstructionInvoices@dot.gov

J-9

The CO will furnish a copy of the completed FHWA Form 1600E. Attach the FHWA Form 1600E copy to the outside of the container so the sample identification is clearly and completely visible.

Ship the security-sealed sample by overnight or next day shipping to the EFLHD Central Laboratory at the following address within 24 hours of receiving the sample from the CO:

Federal Highway Administration Eastern Federal Lands Highway Division 1827 Jack Delozier Drive Sevierville, Tennessee 37876

ATTN: MATERIALS LABORATORY

Provide the sample’s shipping information, including tracking number, sample identification, and expected date of delivery, within 24 hours.

For the split sample of asphalt concrete pavement material, provide boxes that are coated with silicone-coated paper throughout the interior.

154.05. Add the following:

For items accepted under Subsection 106.05, use the QL-Pay software program to determine pay factors and report pay factors determined by QL-Pay. Submit a copy of all current test results and pay factor calculations based on those tests on a weekly basis. When large quantities are produced, calculate pay factors as soon as possible. Use this information to make any necessary adjustments to operations to achieve acceptable pay factors. See Subsection 106.01 for conditions upon which the Government may use the Contractor’s test results.

Section 155. — SCHEDULES FOR CONSTRUCTION CONTRACTS

155.02. Add the following:

(f) Drying day. A workday immediately following a rainfall equal to or greater than 1.00 inch which is potentially lost because of wet ground conditions.

(g) Rain day. A potentially lost workday on which rainfall is equal to or greater than 0.10 inches.

(h) Reasonably predictable weather. The number of workdays that can expect to be lost in any month due to rainfall based on 10-year historical weather data.

(i) Unusually severe weather. When the number of actual workdays lost is greater than the reasonably predictable weather for a specific month.

J-10

(j) Workday. A day not excluded from work by Section 108.

155.03. Add the following:

Prepare and submit a Bar Chart Method (BCM) construction schedule.

155.04(i). Add the following:

If a subcontract has not yet been awarded for a certain portion of the work, include the schedule for that work.

155.04. Add the following:

(l) A completed Table 155-1 prepared according to Subsection 155.04A.

Add the following after Subsection 155.04:

155.04A Reasonably Predictable Weather. Determine reasonably predictable weather for this contract by completing Table 155-1. Calculate data for Table 155-1 by computing the average number of workdays lost (rain days plus drying days) for each month and the standard deviation from the average, using the last 10 years of historical weather data from the nearest National Oceanic and Atmospheric Administration (NOAA) weather data collection station. Add the average number of workdays lost to the standard deviation. The total number of lost days (average workdays lost plus 1 standard deviation, rounded to whole days) will be considered normal for each month.

At the option of the Contractor, provide the necessary instrumentation to support weather-related impacts to the project if using the nearest weather station is impractical. If onsite weather instrumentation is not provided, use the nearest weather station.

Provide a weekly summary of the weather data gathered to the CO.

155.04B Unusually Severe Weather. If requesting a time extension due to unusually severe weather, calculate the number of actual workdays lost by totaling the actual rain days plus the actual drying days occurring in the month in question. From this total, deduct any workdays meeting any one of the following conditions:

(a) The rain day or drying day occurred on a non-work weekday such as a holiday.

(b) The rainfall occurred at a time when no weather dependent work was in progress or occurred during planned or unplanned shutdowns due to other circumstances such as equipment failure, strikes, material supplies, delays, etc.

(c) The Contractor was still working or able to work on weather dependent activities to the extent that less than 50 percent of the workday was lost due to weather.

J-11

If the net number of actual workdays lost is greater than the total lost days, then unusually severe weather occurred during the month in question.

Table 155-1 Reasonably Predictable Weather

Project Number:

Project Location:

NOAA Station Location:

Data Years (10-year history):

Month Average

Workdays Lost

Standard Deviation

Total Lost Days

January February March April May June July August September October November December

155.05(b)(1)(c). Add the following:

Include unreflected items, or components of work within a pay item, as separate activities as directed by the CO.

155.05(b)(3). Add the following:

As a minimum, include the following:

• Contractor quality control plan;

• Asphalt mix designs;

• Concrete mix designs;

• Bridge falsework and formwork designs;

• Manufactured items;

• Test panels; and

• Contract specialty items.

J-12

Section 156. — PUBLIC TRAFFIC

156.03. Add the following to the first paragraph:

Submit a temporary traffic control plan conforming to the following:

(a) Ensures the safe and efficient movement of pedestrian, bicycle, and vehicular traffic, including emergency vehicles, at all times during construction;

(b) Includes the scheduling and performance of work to minimize disruption to public traffic;

and

(c) Accommodates the construction operations as approved under Section 155.

Revise the temporary traffic control plan as necessary to accommodate approved changes in the construction schedule. Submit the revised temporary traffic control plan at least 14 days before implementation unless otherwise approved.

156.03. Add the following:

Roadway closures are only allowed on Granary South Road and Bottom 300 Road from June 1 to November 14 as approved.

Close Granary South Road and Bottom 300 Road to traffic during construction as approved.

Open roadway within 24 hours after completion of work or as directed.

156.06(e). Add the following:

The Contractor may use the gravel parking area shown in plans as a staging area. Obtain approval from the CO before using this location for staging.

Document the preconstruction condition of proposed staging areas using a combination of photographs and survey measurements as directed. Take a sufficient number of high-resolution color digital photographs to adequately record the preconstruction condition.

Clearly label the photographs with notes, GPS, or other referencing necessary to adequately establish each photograph’s location. Provide electronic copies of the photographs to the CO. These photographs will be used to establish the extent of restoration required when the staging area is no longer needed. Do not begin staging area work until the documentation of the preconstruction conditions has been approved.

Restore staging areas to their preconstruction condition or better as directed and at no additional cost to the Government.

156.07. Delete the second and third paragraphs, and substitute the following:

Nighttime operations are not permitted.

J-13

156.08. Delete the second paragraph and substitute the following:

The superintendent may serve as the TCS provided the requirements of Subsection 156.02 are met and as approved by the CO.

Section 157. — SOIL EROSION AND SEDIMENT CONTROL

157.04. Add the following:

This project is covered under the (NPDES permit # under which the SWPPP is prepared).

157.04. Add the following to the second paragraph:

Update the Government-furnished draft SWPPP in accordance with the EPA and state requirements using the information provided in the plans, specifications, and permits obtained for the project. At least 7 days before the preconstruction conference, submit an electronic copy of the SWPPP according to Subsection 104.06.

Once the SWPPP is approved, submit a Notice of Intent (NOI) to the Arkansas Division of Environmental Quality as a co-applicant of the FHWA. Provide a copy of the NOI and evidence of its submission.

Update the SWPPP constantly throughout the project as work is performed and when changes are made to the project. Maintain a copy of the current SWPPP on-site at all times.

Post a notice of the project and SWPPP near the main entrance of the construction site.

Upon completion of construction, submit a Notice of Termination (NOT) to the Arkansas Division of Environmental Quality. Provide a copy of the NOT and evidence of its submission.

157.16. Add the following:

The SWPPP will be evaluated under Subsection 106.02. The SWPPP will be jointly reviewed for accuracy and completeness by the CO and the Contractor before the submission of each monthly invoice. If the review finds that the SWPPP is not in compliance, payment of the Contractor’s invoice will be withheld until the SWPPP is brought up to date as outlined in Subsection 109.08(h)(1).

157.18. Add the following:

Progress payments for updating and maintaining a SWPPP will be paid as follows:

• 25 percent of the pay item amount will be paid upon acceptance of the SWPPP and upon submittal of the NOI copy and evidence of its submission to the CO.

J-14

• An additional 50 percent of the pay item amount will be prorated based on total work complete.

• The remaining portion of the pay item amount will be paid upon submittal of the NOT copy and evidence of its submission to the CO.

Section 204. — EXCAVATION AND EMBANKMENT

204.16(c)(1)(a). Delete the Subsection and substitute the following:

(a) Roadway prism embankments. Use the design volume. The design volume is defined as the bid schedule quantity less any allowance, as shown in the plans. This volume is subject to adjustments resulting from changes to slope stakes according to Subsection 152.05(d);

204.17. Add the following:

A price adjustment will be made for fluctuations in the cost of diesel fuel used in the performance of applicable construction work according to Subsection 109.06A.

Section 207. — EARTHWORK GEOSYNTHETICS

207.09. Add the following:

Do not measure geotextile required for riprap for payment.

Section 301. — UNTREATED AGGREGATE COURSES

301.03. Add the following to the second paragraph:

Submit the representative 300-pound sample to the EFLHD Central Laboratory in Sevierville, Tennessee at the address shown in Subsection 154.03.

301.03. Add the following:

An alternate state department of transportation aggregate gradation that is produced according to Subsection 703.05 may be submitted for approval. Provide target values within the allowable target value range of the state department of transportation aggregate gradation. When target values are not provided, the preproduction target values will be the midpoint of the allowable target value range of the state department of transportation aggregate gradation. The allowable deviation (±) from the target values will be according to Table 703-2A.

The maximum allowable pay factor under Subsection 301.10 for a state department of transportation aggregate gradation will be 1.00.

J-15

Do not stockpile aggregate.

301.10. Add the following:

A price adjustment will be made for fluctuations in the cost of diesel fuel used in the performance of applicable construction work according to Subsection 109.06A.

Section 602. — CULVERTS AND DRAINS

602.03. Add the following:

For steel pipes, use a minimum pipe wall thickness of 14-gage.

At least 30 days before starting the pipe culvert replacement work, submit drawings showing the proposed installation methods and construction details for smooth steel pipe.

Section 628. — TEMPORARY STREAM DIVERSIONS

628.01. Add the following:

This work also includes temporary stream turbidity monitoring.

Add the following after Subsection 628.04:

628.04A Water Quality Testing (Turbidity Monitoring). Establish background turbidity and measure turbidity by using EPA approved methods in accordance with 40 CFR Part 136 procedures and manufacturer’s specifications. Establish background turbidity before starting any work in the water.

Submit a turbidity monitoring plan for approval. Include methods to be employed for the turbidity monitoring. Do not begin land disturbing activities until the turbidity monitoring plan is approved.

Observe, measure, and monitor turbidity according to Subsection 107.08.

Perform turbidity monitoring until all land disturbing activities are complete and permanent stabilization is achieved.

628.05(d). Delete the third sentence and substitute the following:

Place a mesh screen over the intake with a maximum mesh size of 3/32 inch.

J-16

628.07. Add the following:

Temporary stream turbidity monitoring will be evaluated under Subsection 106.02.

628.09. Add the following:

Progress payments for temporary stream turbidity monitoring by the lump sum will be prorated based on the price breakdown and total work completed under this Section.

Section 632. — LOCATING UTILITIES

632.02. Add the following to the second paragraph:

Contact Arkansas 811 at 1-800-482-8998, or online at https://www.ar811.org, at least 48 hours before any excavation to have the utilities marked in the field. If Arkansas 811 does not perform this service at the project site, contact and ensure that a commercial utility location service marks underground utilities in the field before any excavation begins. Notify the CO 48 hours before any excavation.

Exercise special care and extreme caution in order to protect and avoid damage to any utility company facilities. Existing utilities have been generally located and shown in the plans as they are believed to exist. The Government assumes no responsibility for the accuracy of locations shown in the plans. Locate and ensure the safety of all existing utilities. Coordinate the repair of damage caused by construction with the utility owners. Pay costs associated with these repairs.

See Subsection 107.02(d) for additional requirements.

632.03. Add the following to the second paragraph:

Backfill using the excavated material or an approved equal. Thoroughly compact backfill material using appropriate compaction methods as approved. Replace aggregate courses and asphalt concrete pavement using approved materials and thicknesses, and appropriate compaction methods. For concrete pavements, use a fast setting concrete.

632.04. Delete the Subsection and substitute the following:

632.04 Reporting. Submit a report of the utility location findings within 48 hours. In the report, describe the utility found (size, material, and function), the locating methods utilized, and plan and profile mapping of the utility. Determine the elevation and coordinates of the top of utility and prepare a field sketch of the pit with photographs. Indicate the date, station, and offset of the utility. Indicate potential conflicts with proposed construction activities and recommendations for mitigation or relocation.

https://www.ar811.org/

J-17

632.08. Delete the second paragraph and substitute the following:

Progress payments for locating utilities by the lump sum will be paid as follows:

(a) 50 percent of the pay item amount will be paid after initial marking.

(b) An additional 25 percent of the pay item amount will be paid after completion of 50 percent of the original contract amount.

(c) The remaining portion of the pay item amount will be paid after the maintenance of the utility markings is no longer needed as determined by the CO.

Section 633. — PERMANENT TRAFFIC CONTROL

633.03. Add the following:

Provide corrosion resistant steel sign posts. Submit sign posts for approval prior to purchasing or installing signs.

Section 635. — TEMPORARY TRAFFIC CONTROL

635.04(e). Add the following:

If marginal or unacceptable devices are not corrected in the timeframe specified, the CO will provide written notification of those devices not in compliance with the contract. If the Contractor fails to bring the specified devices into compliance within a 24-hour period, the CO may assess a daily reduction in payment to the Contractor of $1,950 per day. The CO may continue to assess the daily reduction in payment for each additional 24-hour period until the devices are corrected. This reduction in payment will be subtracted from the Contractor’s progress payments and will be unrecoverable. Use of this reduction in payment does not waive the CO’s right to suspend the work in whole or in part according to Subsection 108.06.

635.04(g). Add the following:

Submit a certification indicating that the devices are crashworthy as defined in Subsection 101.04.

635.04. Add the following:

(h) As a minimum, provide and install the following temporary traffic control devices:

(1) Construction signing;

J-18

(2) Type 3 barricades; and

(3) Other miscellaneous temporary traffic control devices that may be required by the

CO.

635.07. Delete the second paragraph and substitute the following:

Remove or completely cover unnecessary signs, or signs that conflict with the construction signing or the approved temporary traffic control plan. Cover signs that are not removed so that no part of the covered sign is visible to traffic. Use sign covers meeting the following requirements:

(a) Large enough to completely cover the sign;

(b) Easy to attach to and remove from the sign without damaging the sign face. Do not use adhesives, glues, tapes, or mechanical fasteners that mar face of the sign;

(c) Black, non-reflective, and opaque;

(d) Made of plywood (at least ⅜ inches thick), aluminum (at least 0.040 inches thick), or other acceptable materials that will not be lifted, bent, or damaged by wind as approved by the CO; and

(e) Durable enough to resist deterioration due to weathering and atmospheric conditions for the duration of the project.

Section 637. — FACILITIES AND SERVICES

637.02. Add the following:

Locate the Government field office within 15 miles of the project site and where highspeed internet service, as described in Subsection 637.04(k), is available. In remote locations where highspeed internet service is not available, the field office distance range may be extended or waived by the CO.

Clean the Government field office weekly to the approval of the CO.

637.03(a). Add the following:

Provide a storage facility conforming to Subsection 637.03(c).

Provide office equipment conforming to Subsection 637.03(e). Include an adequate supply of surge protectors for the office equipment.

J-19

637.03(c). Add the following after the first sentence:

Ensure the storage facility has a minimum 6-foot inside (floor to ceiling) dimension and can accommodate one or a combination of the following:

• A minimum of 60 asphalt concrete samples and at least 3000 pounds.

• A minimum of 5 aggregate samples and at least 3000 pounds.

• A minimum of forty 6- by 12-inch concrete test cylinders.

Provide enough space for each sample. Samples may be stacked three units high using the sample containers required in Subsection 154.03.

Maintain a temperature ranging from 40 to 80 ºF within the storage facility.

637.03(c). Add the following:

(3) Storage room. Provide a fifth divided and separate storage area within the Government field office.

Table 637-1. Amend the Field Office requirements as follows:

• Add "Closet, 45-cubic foot, 1 each".

• Add "with paper towels supply" to the "Sink with faucets for both hot and cold water" row.

637.03. Add the following:

(e) Office equipment. Provide the following office equipment in the Government field office:

(1) Laser copy machine. One self-feeding plain paper photocopying machine with the following minimum capabilities:

(a) Reproducing black and white, and color copies for each size paper;

(b) Equipped with 3 separate paper trays so that copying can be performed with 8½-by 11-inch (letter size), 8½- by 14-inch (legal size), and 11- by 17-inch paper without switching paper or paper trays;

(c) Automatic document feeder capable of making at least 20 copies per minute for each size paper;

(d) Reducing or enlarging originals, including duplex (double-sided) copying, for each size paper;

J-20

(e) Copying to Universal Serial Bus (USB) flash drive in Adobe Acrobat (*.pdf) file format; and

(f) Built-in wireless technology (Wi-Fi capable).

Provide all necessary supplies for the laser copy machine, including paper.

(2) Laser printer. One plain paper printing machine with the following minimum capabilities:

(a) Producing black and white, and color prints for each size paper;

(b) Equipped with 3 separate paper trays so that printing can be performed with 8½-by 11-inch (letter size), 8½- by 14-inch (legal size), and 11- by 17-inch paper without switching paper or paper trays;

(c) Automatic paper feeder capable of making at least 20 prints per minute for each size paper;

(d) Producing duplex (double-sided) prints for each size paper;

(e) Printing from direct personal computer (PC) and local area network (LAN) connections;

(f) Scanning to Adobe Acrobat (*.pdf) file format; and

(g) Built-in wireless technology (Wi-Fi capable).

The laser printer may be one machine in combination with the laser copy machine.

Provide all necessary supplies for the laser printer, including paper.

(3) Laser facsimile (FAX) machine. One FAX machine with the following minimum

(a) Automatic document feeder with a minimum capacity of 20 pages;

(b) Sending standard size documents up to and including 11- by 17-inch paper;

(c) Printing on plain paper; and

(d) Automatic dial/redial.

The laser FAX machine may be one machine in combination with the laser copy machine. Provide all necessary supplies for the laser FAX machine, including paper.

J-21

(4) High definition computer monitor. One high definition LCD or LED computer monitor with the following minimum capabilities:

(a) 27-inch flat viewing screen;

(b) Video Graphics Array (VGA) and High Definition Multimedia Interface (HDMI) ports; and

(c) Supports an optimal resolution of 1920 x 1080 at 60Hz.

(5) Computer keyboard. One computer keyboard with the following minimum

(a) Standard 104-key Windows U.S. English QWERTY with keys for alphabet, functions, arrows, and numeric keypad; and

(b) Connects to a windows-based computer by either a USB cord or wirelessly.

(6) Computer mouse. One ergonomic computer mouse with the following minimum

(a) Standard 2-button with a wheel for scrolling; and

(b) Connects to a windows-based computer by either a USB cord or wirelessly.

637.04(k). Add the following:

Submit firewall configuration for approval. Do not change the firewall configuration after it is approved. Do not connect any equipment to the system other than U.S. Department of Transportation equipment.

637.04. Add the following:

(n) Wireless air card. Provide one high speed, wireless air card for use with a Government laptop computer capable of providing access to the FHWA’s virtual private network (VPN).

Section 703. — AGGREGATE

703.02. Add the following:

Do not use gravel.

J-22

703.05(a). Delete the first sentence and substitute the following:

Provide hard, durable particles or fragments of crushed limestone conforming to the following:

703.05(a). Delete the text of Subsections (3) and (4); they are not required.

703.05(a). Add the following:

(7) California bearing ratio as determined by 80 percent minimum AASHTO T 193 at 95 percent of maximum dry density in accordance with AASHTO T 180 (Method D).

703.05(b)(1). Add the following:

The gradation only of the aggregate base may conform to the requirements of the current edition of the Arkansas Department of Transportation Standard Specification for Highway Construction, Section 303, Table 303-1, for aggregate Class 7, found at https://ardot.gov/divisions/construction/standard-specifications/, subject to the approval of the CO. Conform to the requirements of Subsections 703.05(a) and 703.05(b) for all other properties. Submit the request according to Subsection 301.03.

703.05(c)(1). Add the following:

The gradation only of the aggregate surface course may conform to the requirements of the current edition of the Arkansas Department of Transportation Standard Specification for Highway Construction, Section 303, Table 303-1, for aggregate Class 8, found at https://ardot.gov/divisions/construction/standard-specifications/, subject to the approval of the CO. Conform to the requirements of Subsections 703.05(a) and 703.05(c) for all other properties. Submit the request according to Subsection 301.03.

703.05. Add the following:

Table 703-2A State Department of Transportation Gradation

Allowable Deviation Based on Target Value Percent by Mass Passing Allowable

Deviation Minimum Maximum

90.1 100.0 6

80.1 90.0 8

30.1 80.0 8

20.1 30.0 8

10.1 20.0 6

0 10.0 4 https://ardot.gov/divisions/construction/standard-specifications/ https://ardot.gov/divisions/construction/standard-specifications/

J-23

703.05(c)(3). Delete the Subsection and substitute the following:

(3) Plasticity index, AASHTO T 90 12 maximum

Section 714. — GEOSYNTHETIC MATERIAL

714.01(c). Delete the Subsection and substitute the following:

(c) Geotextile filter. Provide geotextile filter for the following installations:

(1) Riprap, special rock embankment, rock buttress, and other high survivability applications. Conform to AASHTO M 288 Table 1, Class 1 (either <50 percent elongation or ≥50 percent elongation) and the following:

(a) Minimum permittivity, ASTM D4491 0.1 sec-1

(b) Maximum apparent opening size, ASTM D4751 0.22 mm maximum average roll value

(c) Minimum ultraviolet stability, ASTM D4355 50 percent strength retained after 500 hours of exposure

(2) Underdrains and other subsurface drainage applications. Conform to AASHTO M 288 Table 1, Class 2 (either <50 percent elongation or ≥50 percent elongation) and the following:

(a) Minimum permittivity, ASTM D4491 0.1 sec-1

(b) Maximum apparent opening size, ASTM D4751 0.22 mm maximum average roll value

(c) Minimum ultraviolet stability, ASTM D4355 50 percent strength retained after 500 hours of exposure

Section 718. — TRAFFIC SIGNING AND MARKING MATERIAL

718.01. Add the following:

For a list of acceptable manufacturers and products, refer to the FHWA, Traffic Sign Retroreflective Sheeting Identification Guide found at https://highways.dot.gov/safety/other/visibility/2014-traffic-sign-retroreflective-sheeting-identification-guide.

https://highways.dot.gov/safety/other/visibility/2014-traffic-sign-retroreflective-sheeting-identification-guide https://highways.dot.gov/safety/other/visibility/2014-traffic-sign-retroreflective-sheeting-identification-guide

Section 101. — TERMS, FORMAT, AND DEFINITIONS
Section 104. — CONTROL OF WORK
Section 106. — ACCEPTANCE OF WORK
Section 107. — LEGAL RELATIONS
Section 108. — PROSECUTION AND PROGRESS
Section 109. — MEASUREMENT AND PAYMENT
Section 152. — CONSTRUCTION SURVEY AND STAKING
Section 154. — CONTRACTOR SAMPLING AND TESTING
Section 155. — SCHEDULES FOR CONSTRUCTION CONTRACTS
Section 156. — PUBLIC TRAFFIC
Section 157. — SOIL EROSION AND SEDIMENT CONTROL
Section 204. — EXCAVATION AND EMBANKMENT
Section 207. — EARTHWORK GEOSYNTHETICS
Section 301. — UNTREATED AGGREGATE COURSES
Section 602. — CULVERTS AND DRAINS
Section 628. — TEMPORARY STREAM DIVERSIONS
Section 632. — LOCATING UTILITIES
Section 633. — PERMANENT TRAFFIC CONTROL
Section 635. — TEMPORARY TRAFFIC CONTROL
Section 637. — FACILITIES AND SERVICES
Section 703. — AGGREGATE
Section 714. — GEOSYNTHETIC MATERIAL
Section 718. — TRAFFIC SIGNING AND MARKING MATERIAL