This document is an Amendment (No. 0003) to a Request for Proposal (RFP) for the Bald Knob National Wildlife Refuge project, issued by the Federal Highway Administration's Eastern Federal Lands Highway Division. The amendment, dated October 23, 2025, serves two primary purposes: 1) revising Section 602 of Attachment 5 to clarify pipe wall thickness specifications for the seed project, replacing previous contract requirement changes, and 2) providing a summary of responses to potential bidders' questions. The proposal due date remains unchanged at Tuesday, November 4, 2025, at 2:00 p.m. EST.
The amendment includes clarifications on three key questions from potential bidders: 1) Section 404 permitting will be provided to the contractor, 2) a Stormwater Pollution Prevention Plan (SWPPP) will be provided, with the contractor required to complete specific information, and 3) a Short-Term Activity Authorization will be provided to the contractor for in-stream culvert replacement. The solicitation is for the South Region Construction Multiple Award Task Order Contract (MATOC) and specifically relates to the AR FW BLD 11(1) project at the Bald Knob National Wildlife Refuge, with the solicitation number 693C73-25-R-000082.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7325R000082 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ASHBURN VA 20147
ATTN: Acquisitions
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
See Block 1410/23/20250003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
10/01/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
South Region Construction MATOC:
The purpose of this Amendment is to:
1) Revise Section 602 of Attachment 5 - J-Pages - SCRs for Seed Project to clarify the pipe wall thickness for the seed project.
a. This replaces the Special Contract Requirement changes from Amendment 0002.
2) Provide a summary of responses to questions/clarifications asked by potential bidders.
The proposal due date of Tuesday, November 4, 2025, at 2:00 pm EST remains unchanged.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment No. 0003
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
AR FW BLD 11(1)
Bald Knob National Wildlife Refuge
Request for Proposal No: 693C73-25-R-000082
The purpose of this Amendment is to:
1) Revise Section 602 of Attachment 5 - J-Pages - SCRs for Seed Project to clarify the pipe wall thickness for the seed project.
a. This replaces the Special Contract Requirement changes from Amendment 0002.
2) Provide a summary of responses to questions/clarifications asked by potential bidders.
The proposal due date of Tuesday, November 4, 2025, at 2:00 p.m. EST remains unchanged.
Special Contract Requirement changes
Delete the last paragraph of Subsection 602.03 of the Special Contract Requirements, page J-15, and substitute the following:
At least 30 days before their intended use, submit documents and drawings for approval showing the proposed installation methods and construction details for a smooth steel pipe according to
Subsection 104.06.
Questions / Clarifications
The following questions and issues were submitted via email. The Government response or clarification is provided.
1. The NEPA exclusion document (Attachment 8, Appendix A, pdf page 4) notes Section 404 permitting will be required, but I did not see that in the bid line. Will this permitting be provided by the contractor?
Response: The permits will be provided to the contractor.
2. A few sections down it says a SWPPP is not required, but the bid requires it. Can you clarify?
Response: A SWPPP will be provided, but the contractor selected will need to fill in the specific information pertaining to them.
3. If an in-stream culvert is to be replaced, a Short-Term Activity Authorization would be required, but I see no mention of that anywhere in the bid package. Is this to be provided by the contractor?
Response: A Short-Term Activity Authorization will be provided to the contractor.